Tunnel face peripheral eye small angle drilling mechanism and construction method thereof
By designing a small-angle drilling mechanism for the perimeter holes of the tunnel face, and utilizing the transmission mechanism and the radial spacing of the extended drill rod, the problem of large borehole deviation angle under the constraint of the steel arch frame was solved, enabling small-angle drilling construction and reducing over-excavation and construction costs.
Patent Information
- Application Number
- CN202311856860.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-12-29
AI Technical Summary
During tunnel construction, the close proximity of the steel arch frame to the tunnel face prevents the drill bit from drilling peripheral holes at the designed external angle along the designed excavation outline. This results in excessive borehole deviation, leading to severe over-excavation and increasing construction costs and risks.
Design a small-angle drilling mechanism for the perimeter holes of a tunnel face, including a rock drilling machine, a transmission rod, a transmission mechanism, and an extension drill rod. The extension drill rod is driven to rotate by the transmission mechanism. By using the inclined placement of the propulsion beam and the radial spacing of the transmission mechanism, the drilling inclination angle is reduced, thus realizing small-angle drilling construction.
It effectively reduces borehole deviation angle and over-excavation height, reduces excessive consumption of shotcrete for support, improves the economy of mechanized tunnel construction, and saves construction costs.
Smart Images

Figure CN117759158B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underground engineering technology, and in particular to a small-angle drilling mechanism for the perimeter of a tunnel face and its construction method. Background Technology
[0002] Over-excavation after blasting in mining tunnels has always been an unavoidable problem during tunnel construction. It not only damages the surrounding rock and increases construction risks, but also leads to excessive consumption of shotcrete for support, increasing construction costs. In Class III-IV surrounding rock, after the excavated tunnel is supported, the steel arch frame is close to the tunnel face, greatly limiting the drilling equipment's ability to drill holes around the face. This prevents the drill bit from drilling around the face at the designed outward angle along the designed excavation outline, forcing the holes to be offset inwards from the designed excavation outline, resulting in a larger borehole deviation angle and more severe over-excavation after blasting.
[0003] Currently, the common practice is to use a "long and short eye" hole layout or appropriately increase the distance between the steel arch and the tunnel face to reduce the limiting effect of the steel arch. However, due to factors such as construction efficiency and safety requirements, the effect is limited. In order to address this problem, especially with the increasing prevalence of mechanized tunnel construction, it is urgent to study a method to solve the problem of small-angle drilling construction of the tunnel perimeter under the limiting conditions of the steel arch, so as to reduce tunnel over-excavation, reduce construction costs, and improve construction safety. Summary of the Invention
[0004] The purpose of this invention is to address the problem that after the support structure of the tunnel is constructed, the steel arch frame is too close to the tunnel face, making it impossible for the drill bit to drill the peripheral holes at the designed external angle along the designed excavation outline. This invention provides a small-angle drilling mechanism for the peripheral holes of the tunnel face and its construction method.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solution:
[0006] A small-angle drilling mechanism for the perimeter of a tunnel face includes a rock drilling machine, a transmission rod, a transmission mechanism, and an extension drill rod. The rock drilling machine can drive the transmission rod to rotate. The transmission mechanism is connected to both the transmission rod and the extension drill rod. The transmission rod can drive the extension drill rod to rotate through the transmission mechanism. The extension drill rod is radially spaced relative to the transmission rod.
[0007] The small-angle drilling mechanism for the peripheral holes of the tunnel face described in this invention includes a rock drilling rig, a transmission rod, a transmission mechanism, and an extension drill rod. The rock drilling rig can drive the transmission rod to rotate. The transmission mechanism is connected to both the transmission rod and the extension drill rod, and the transmission rod can drive the extension drill rod to rotate through the transmission mechanism. Thus, the rock drilling rig drives the extension drill rod to rotate via the transmission rod and transmission mechanism for drilling the peripheral holes of the tunnel face. Furthermore, the extension drill rod is radially spaced relative to the transmission rod, meaning there is a gap between the extension drill rod and the transmission rod, so that the extension drill rod and the transmission rod are not on the same straight line. This allows for drilling of the peripheral holes of the tunnel face using the drilling mechanism of this invention. During operation, the rock drilling rig, transmission rod, transmission mechanism, and extension drill rod are mounted on the propulsion beam. In actual operation, the propulsion beam is placed at an angle close to the tunnel face, and the transmission mechanism is placed between the steel arch and the tunnel face. Since there is a radial gap between the extension drill rod and the transmission rod, meaning that the extension drill rod and the transmission rod are not on the same straight line, the extension drill rod is generally placed outside the transmission rod, making the extension drill rod closer to the tunnel sidewall. This reduces the drilling inclination angle of the extension drill rod in the peripheral holes of the tunnel face, thereby reducing the over-excavation height, better controlling the tunnel blasting effect, reducing the over-consumption of shotcrete for support, and enabling small-angle drilling construction in the peripheral holes of the tunnel face under the constraints of the steel arch.
[0008] Preferably, the transmission mechanism includes an input shaft and an output shaft, there is a height difference between the output shaft and the input shaft, and the output shaft is located above the input shaft. The transmission rod is driven to the input shaft, and the output shaft is driven to the extension drill rod.
[0009] The transmission mechanism includes an input shaft and an output shaft. There is a vertical height difference between the output shaft and the input shaft, and the output shaft is located above the input shaft. The transmission rod is driven to the input shaft, and the output shaft is driven to the extension drill rod, thereby creating a radial gap between the transmission rod and the extension drill rod, which in turn creates a height difference between the transmission rod and the extension drill rod.
[0010] Preferably, the system further includes a propulsion beam, a first slide block, and a second slide block. Both the first and second slide blocks are movable relative to the propulsion beam along the length of the extended drill rod. The rock drilling rig is mounted on the first slide block, and the transmission mechanism is mounted on the second slide block.
[0011] The rock drilling rig and the transmission mechanism are moved relative to the propulsion beam by setting the rock drilling rig on the first slide and the transmission mechanism on the second slide.
[0012] Preferably, the push beam is provided with a slide rail, the bottom of the first slide block is provided with a first slide rail groove, the first slide rail groove cooperates with the slide rail, and the bottom of the second slide block is provided with a second slide rail groove, the second slide rail groove cooperates with the slide rail.
[0013] The first slide block moves relative to the push beam by engaging with the slide rail through the first slide rail slot, and the second slide block moves relative to the push beam by engaging with the slide rail through the second slide rail slot.
[0014] Preferably, the transmission mechanism further includes an input gear and an output gear. The input gear is sleeved on the input shaft, and multiple output gears with gradually increasing diameters are sequentially sleeved on the output shaft. The input gear can cooperate with the output gears, and the input gear cooperates with the output gears of different diameters to adjust the height difference between the input shaft and the output shaft.
[0015] The second slide can be raised and lowered relative to the propulsion beam.
[0016] By mounting the input gear on the input shaft, the torque and speed of the rock drilling rig are transmitted to the input gear. Multiple output gears with progressively increasing diameters are sequentially mounted on the output shaft, allowing the input gear to mesh with these gears. This allows the torque and speed of the rock drilling rig to be transmitted to the output gears via the meshing of the input and output gears, and then to the output shaft. When it is necessary to increase the height difference between the input and output shafts, the input gear is adjusted to mesh with a larger diameter output gear to increase the height difference. The second pad of the second slide is also appropriately heightened, increasing the vertical height of the second slide and thus the overall height of the gearbox. This ensures that the input shaft and the transmission rod are at the same height, allowing adjustment of the height difference between the input and output shafts without changing the height of the rock drilling rig. This enables the extended drill rod to perform small-angle drilling operations around the face of the drilling rig under the constraints of a thick steel arch frame.
[0017] Preferably, the transmission mechanism further includes a housing, the input gear and the input shaft are located inside the housing, and the side of the housing near the rock drilling machine is provided with a vertical strip hole, and the input shaft can move vertically along the length direction of the vertical strip hole.
[0018] Since the rock drilling rig is connected to the input shaft via a transmission rod, a vertical strip hole is provided on the side of the housing near the transmission rod. The input shaft passes through the vertical strip hole into the housing. By providing the vertical strip hole, the input shaft can move vertically along the length of the vertical strip hole, which facilitates the adjustment of the height of the input gear on the input shaft. This, in turn, facilitates the matching of the input gear with output gears of different diameters, thereby achieving the purpose of adjusting the height difference between the input shaft and the output shaft.
[0019] Preferably, the second slide includes a second fixing plate, a second pad, and a second slide rail groove arranged sequentially from top to bottom. The second pad is fixed between the second fixing plate and the second slide rail groove by a second bolt, and the gear transmission box is disposed on the second fixing plate.
[0020] The height difference between the second slide block and the push beam is adjusted by increasing or decreasing the height of the second pad, so that the second slide block can rise and fall relative to the push beam.
[0021] Preferably, it further includes a lifting mechanism, which is disposed on the top of the first slide block, and the lifting mechanism is used to adjust the vertical height of the rock drilling rig relative to the propulsion beam.
[0022] After the drilling position of the extended drill rod is determined, the vertical height of the rock drilling rig relative to the propulsion beam is adjusted by the lifting mechanism, thereby adjusting the vertical height of the transmission rod and the input shaft. This allows the input gear to mesh with output gears of different diameters, thus adjusting the speed and torque of the output shaft. This enables the transmission of different gear combinations in the transmission mechanism, allowing for the adjustment of the extended drill rod's speed and torque under different surrounding rock conditions, improving drilling efficiency and reducing mechanical fuel power waste.
[0023] Preferably, the lifting mechanism includes a fixed frame and a grooved component. The grooved component is connected to the top of the first slide block. The rock drilling machine is installed inside the fixed frame. A rack is provided on the side of the grooved component near the fixed frame. A lifting gear is provided on the outer side of the fixed frame near the rack. The lifting gear cooperates with the rack.
[0024] The grooved component has a vertically arranged inner groove, and the fixing frame has an outer protrusion at one end near the grooved component. The outer protrusion is placed in the inner groove, and the outer protrusion and the inner groove can slide relative to each other.
[0025] Preferably, the radial distance L1 between the transmission rod and the extension drill rod is 15cm to 25cm.
[0026] Preferably, the extended drill pipe includes a first section and several intermediate sections.
[0027] Preferably, it also includes a vehicle body and a hydraulic arm, one end of which is hinged to the vehicle body, and the other end of which is provided with a first connecting seat. A slewing mechanism is installed on the first connecting seat, and the slewing mechanism is used to adjust the direction of the push beam.
[0028] The rotary mechanism is provided with a second connecting seat on the side near the propulsion beam. A support seat is provided on the second connecting seat. A bracket is provided at the bottom of the propulsion beam. The support seat is hinged to the bracket. An tilting cylinder is also provided on the second connecting seat. The tilting cylinder is used to push or pull back the propulsion beam.
[0029] This application also discloses a construction method for a drilling mechanism. Using the small-angle drilling mechanism for the perimeter of the tunnel face described in this application, the method further includes the following steps:
[0030] S1: Adjust the vertical height of the second slide block and the height difference between the output shaft and the input shaft according to the thickness of the steel arch frame, and install a drill rod chuck hole at the same height as the output shaft on the push beam, and position the transmission mechanism between the rock drilling machine and the drill rod chuck hole, with the drill rod chuck hole located at the drill end of the push beam;
[0031] S2: Connect the rock drilling machine to the input shaft, then select an appropriate number of intermediate rods according to the distance between the steel arch frame and the working face in actual construction, then connect the intermediate rods to the first section rod to form the extension drill rod, then connect the extension drill rod to the output shaft, and the extension drill rod passes through the drill rod chuck hole;
[0032] S3: Operate the drilling mechanism, control the position of the drilling mechanism and control the inclination angle of the propulsion beam, so that the transmission mechanism and the extended drill rod are located between the steel arch and the tunnel face, and align the first section of the rod with the borehole on the design outline to start the small-angle drilling construction of the tunnel perimeter eye;
[0033] S4: After the first section of the drill rod is drilled into the surrounding rock, a section of the first section of the drill rod is left in place. Then the transmission mechanism is moved backward, the propulsion beam is lowered, the extension drill rod is separated from the output shaft, a new intermediate rod is installed on the extension drill rod, the extension drill rod is connected to the output shaft, and then the propulsion beam is raised to continue drilling.
[0034] The construction method of the drilling mechanism described in this invention enables small-angle drilling of the peripheral holes of the tunnel face under the constraint of the steel arch frame. This effectively reduces the borehole deviation angle and over-excavation height, better controls the tunnel blasting excavation effect, reduces excessive consumption of shotcrete, and overall improves the economy of mechanized tunnel construction and saves tunnel construction costs.
[0035] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0036] 1. The small-angle drilling mechanism for the peripheral holes of the tunnel face according to the present invention includes a rock drilling machine, a transmission rod, a transmission mechanism, and an extension drill rod. The rock drilling machine can drive the transmission rod to rotate. The transmission mechanism is connected to both the transmission rod and the extension drill rod, and the transmission rod can drive the extension drill rod to rotate through the transmission mechanism. Thus, the rock drilling machine drives the extension drill rod to rotate through the transmission rod and the transmission mechanism to perform drilling for the peripheral holes of the tunnel face. Furthermore, the extension drill rod is radially spaced relative to the transmission rod, i.e., there is a gap between the extension drill rod and the transmission rod, so that the extension drill rod and the transmission rod are not on the same straight line. This drilling mechanism of the present invention is used for drilling the peripheral holes of the tunnel face. During construction, the rock drilling rig, transmission rod, transmission mechanism, and extension drill rod are mounted on the advance beam. In actual operation, the advance beam is placed at an angle close to the tunnel face, and the transmission mechanism is placed between the steel arch and the tunnel face. Since there is a radial gap between the extension drill rod and the transmission rod, meaning that the extension drill rod and the transmission rod are not on the same straight line, the extension drill rod is generally placed outside the transmission rod, making the extension drill rod closer to the tunnel sidewall. This reduces the drilling inclination angle of the extension drill rod in the peripheral holes of the tunnel face, thereby reducing the over-excavation height, better controlling the tunnel blasting effect, reducing the over-consumption of shotcrete for support, and enabling small-angle drilling construction in the peripheral holes of the tunnel face under the constraints of the steel arch.
[0037] 2. The construction method of the drilling mechanism described in this invention uses the drilling mechanism of this invention to realize small-angle drilling construction of the peripheral holes of the tunnel face under the constraint of steel arch frame. It can effectively reduce the drilling deviation angle and over-excavation height, better control the tunnel blasting excavation effect, reduce the excessive consumption of shotcrete, and overall improve the economy of mechanized tunnel construction and save tunnel construction costs. Attached image description:
[0038] Figure 1 This is a schematic diagram of the propulsion beam part of the present invention.
[0039] Figure 2 This is a schematic diagram of the overall structure of the present invention.
[0040] Figure 3 This is a schematic diagram of the transmission mechanism.
[0041] Figure 4 yes Figure 3 Sectional view at point AA.
[0042] Figure 5 yes Figure 3 The left-side view.
[0043] Figure 6 This is a schematic diagram showing the coordination between the rock drilling rig, the first sliding block, and the lifting mechanism.
[0044] Figure 7 yes Figure 6Top view.
[0045] Figure 8 yes Figure 6 The left-side view.
[0046] Figure 9 This is a schematic diagram of the extended drill pipe structure.
[0047] Figure 10 This is a schematic diagram of the structure between the hydraulic arm and the propulsion beam.
[0048] Figure 11 This is a schematic diagram of the operation of existing drilling equipment.
[0049] Figure 12 This is a schematic diagram of the drilling mechanism in this application.
[0050] Figure 13 yes Figure 12 A schematic diagram of the propulsion beam.
[0051] In the diagram, the markings are: 1-propulsion beam, 11-slide rail, 2-first slide block, 21-first fixing plate, 22-first pad, 23-first slide rail slot, 24-first bolt, 3-rock drilling rig, 4-lifting mechanism, 41-fixed frame, 411-outer boss, 42-lifting gear, 43-rack, 44-groove part, 441-inner groove, 5-transmission mechanism, 51-box body, 511-vertical strip hole, 52-input shaft, 53-input gear, 54-output shaft, 55-output gear, 551-first gear, 552-second gear, 553-third gear, 56-transmission rod slot, 57-gear retaining ring, 58-connector. 6-Second slide block, 61-Second fixing plate, 62-Second pad, 63-Second slide rail slot, 64-Second bolt, 7-Drill rod chuck hole, 8-Transmission rod, 9-Extension drill rod, 91-First section rod, 92-Intermediate rod, 93-Drill bit, 94-Connecting groove, 95-Connecting boss, 10-Hydraulic arm, 20-First connecting seat, 30-Rotating mechanism, 40-Second connecting seat, 50-Support seat, 60-Bracket, 70-Inclination cylinder, 80-Vehicle body, 90-Existing drilling equipment, 100-Tunnel, 110-Working face, 120-Steel arch frame, 130-Designed excavation outline, a1-First borehole inclination angle, h 1- First over-excavation height, a2 - Second borehole inclination angle, h 2- Second over-excavation height. Detailed Implementation
[0052] The present invention will be further described in detail below with reference to embodiments and specific implementation methods. However, this should not be construed as limiting the scope of the above-described subject matter of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.
[0053] Example 1
[0054] like Figure 11 As shown, in conventional construction, after the support is installed in the tunnel 100, the steel arch 120 is relatively close to the working face 110. This prevents the drilling equipment's propulsion beam from fully entering between the steel arch 120 and the working face 110, severely limiting the drilling equipment's ability to drill holes around the working face 110. Consequently, the drill bit cannot drill around the working face at the designed outward angle along the designed excavation outline 130, resulting in the holes being offset towards the designed excavation outline 130, creating a larger drilling angle. Figure 11 The first borehole inclination angle a1 is too large, resulting in a large first over-excavation height h1, which leads to a large over-excavation area after the explosive charge is blasted. The range of the first borehole inclination angle a1 is 12° to 20°, and the range of the first over-excavation height h1 is 66cm to 110cm.
[0055] like Figures 1-2 As shown, the small-angle drilling mechanism for the perimeter of a tunnel face described in this embodiment includes a rock drilling machine 3, a transmission rod 8, a transmission mechanism 5, and an extension drill rod 9. The rock drilling machine 3 can drive the transmission rod 8 to rotate. The transmission mechanism 5 is connected to the transmission rod 8 and the extension drill rod 9 respectively. The transmission rod 8 can drive the extension drill rod 9 to rotate through the transmission mechanism 5. The extension drill rod 9 is arranged radially at intervals relative to the transmission rod 8.
[0056] The small-angle drilling mechanism for the peripheral holes of the tunnel face described in this embodiment includes a rock drilling machine 3, a transmission rod 8, a transmission mechanism 5, and an extension drill rod 9. The rock drilling machine 3 can drive the transmission rod 8 to rotate. The transmission mechanism 5 is connected to both the transmission rod 8 and the extension drill rod 9, and the transmission rod 8 can drive the extension drill rod 9 to rotate through the transmission mechanism 5. Thus, the rock drilling machine 3 drives the extension drill rod 9 to rotate through the transmission rod 8 and the transmission mechanism 5 to perform drilling construction for the peripheral holes of the tunnel face. Furthermore, the extension drill rod 9 is radially spaced relative to the transmission rod 8, that is, there is a gap between the extension drill rod 9 and the transmission rod 8, so that the extension drill rod 9 and the transmission rod 8 are not on the same straight line. When the drilling mechanism of this embodiment performs drilling construction for the peripheral holes of the tunnel face 110, the rock drilling machine 3, the transmission rod 8, the transmission mechanism 5, and the extension drill rod 9 are generally arranged on the propulsion beam 1. Figures 12-13As shown, in actual operation, the propulsion beam 1 is placed at an angle close to the tunnel face 110, and the transmission mechanism 5 is placed between the steel arch frame 120 and the tunnel face 110. Since there is a radial gap between the extension drill rod 9 and the transmission rod 8, that is, the extension drill rod 9 and the transmission rod 8 are not on the same straight line, the extension drill rod 9 is generally set outside the transmission rod 8, so that the extension drill rod 9 is closer to the side wall of the tunnel 100, thereby reducing the drilling inclination angle of the extension drill rod 9 in the peripheral holes of the tunnel face 110, thereby reducing the over-excavation height, better controlling the tunnel blasting effect, reducing the over-consumption of support shotcrete, and realizing small-angle drilling construction of the peripheral holes of the tunnel face 110 under the constraint of the steel arch frame 120.
[0057] like Figures 12-13 As shown, using the drilling mechanism described in this embodiment, in actual operation, the propulsion beam 1 is placed at an angle close to the tunnel face 110, and the transmission mechanism 5 is placed between the steel arch frame 120 and the tunnel face 110. Since there is a gap between the extended drill rod 9 and the transmission rod 8, i.e., the extended drill rod 9 and the transmission rod 8 are not on the same straight line, the extended drill rod 9 is generally placed outside the transmission rod 8, making the extended drill rod 9 closer to the sidewall of the tunnel 100. Figure 13 As shown, a smaller inclination angle a2 is formed in the second borehole, which in turn forms a smaller second over-excavation height h2. This results in a smaller over-excavation zone after the explosive blast, thereby reducing the over-excavation height, better controlling the blasting effect of tunnel 100, reducing the excessive consumption of shotcrete for support, and enabling small-angle drilling construction of the perimeter holes of the face 110 under the constraint of the steel arch frame 120. The range of the second borehole inclination angle a2 is 2° to 4°, and the range of the second over-excavation height h2 is 10cm to 20cm.
[0058] A preferred method, such as Figures 3-4 As shown, the transmission mechanism 5 includes an input shaft 52 and an output shaft 54. There is a height difference between the output shaft 54 and the input shaft 52, and the output shaft 54 is located above the input shaft 52. The transmission rod 8 is driven to the input shaft 52, and the output shaft 54 is driven to the extension drill rod 9.
[0059] The transmission mechanism 5 includes an input shaft 52 and an output shaft 54. There is a vertical height difference between the output shaft 54 and the input shaft 52, and the output shaft 54 is located above the input shaft 52. The transmission rod 8 is driven to the input shaft 52, and the output shaft 54 is driven to the extension drill rod 9, so that there is a radial gap between the transmission rod 8 and the extension drill rod 9, and there is a height difference between the transmission rod and the extension drill rod.
[0060] like Figure 3As shown, the transmission rod 8 is connected from the lower part of the transmission mechanism 5, and the extension drill rod 9 is connected from the upper part of the transmission mechanism 5. In actual operation, the propulsion beam 1 is placed at an angle close to the tunnel face 110, so that the transmission mechanism 5 is placed between the steel arch frame 120 and the tunnel face 110. Utilizing the height difference between the extension drill rod 9 and the transmission rod 8, the extension drill rod 9 is brought closer to the designed excavation outline 130 of the tunnel 100, as shown. Figure 13 This reduces the borehole inclination angle around the 110 face of the tunnel, thereby decreasing the over-excavation height.
[0061] In a preferred embodiment, the transmission mechanism 5 is preferably an assembled gearbox having an input shaft 52 and an output shaft 54, with a height difference between the output shaft 54 and the input shaft 52, and the output shaft 54 being located above the input shaft 52.
[0062] A preferred method, such as Figure 1 As shown, it also includes a propulsion beam 1, a first slide block 2 and a second slide block 6. Both the first slide block 2 and the second slide block 6 can move relative to the propulsion beam 1 along the length direction of the extended drill rod 9. The rock drilling rig 3 is mounted on the first slide block 2, and the transmission mechanism 5 is mounted on the second slide block 6.
[0063] By mounting the rock drilling rig 32 on the first slide 2 and mounting the transmission mechanism 5 on the second slide 6, the rock drilling rig 3 and the transmission mechanism 5 can move relative to the propulsion beam 1. The movement includes sliding and rolling via wheels, such as the first slide 2 and the second slide 6 sliding on the propulsion beam 1 or rolling via wheels.
[0064] A preferred method, such as Figure 1 , Figure 4 , Figure 8 As shown, a slide rail 11 is provided on the propulsion beam 1, a first slide rail groove 23 is provided at the bottom of the first slide block 2, the first slide rail groove 23 cooperates with the slide rail 11, and a second slide rail groove 63 is provided at the bottom of the second slide block 6, the second slide rail groove 63 cooperates with the slide rail 11.
[0065] The first slide block 2 slides relative to the push beam 1 by cooperating with the slide rail 11 through the first slide rail slot 23, and the second slide block 6 slides relative to the push beam 1 by cooperating with the slide rail 11 through the second slide rail slot 63.
[0066] A preferred method, such as Figures 3-4 As shown, the transmission mechanism 5 also includes an input gear 53 and an output gear 55. The input gear 53 is sleeved on the input shaft 52, and multiple output gears 55 with gradually increasing diameters are sequentially sleeved on the output shaft 54. The input gear 53 can cooperate with the output gears 55, and the input gear 53 cooperates with the output gears 55 of different diameters to adjust the height difference between the input shaft 52 and the output shaft 54.
[0067] The second slide block 6 can be raised and lowered relative to the push beam 1.
[0068] By mounting the input gear 53 on the input shaft 52, the torque and speed of the rock drilling rig 3 are transmitted to the input gear 53. By sequentially mounting multiple output gears 55 with progressively increasing diameters on the output shaft 54, and ensuring that the input gear 53 can mesh with these gears, the torque and speed of the rock drilling rig 3 are transmitted to the output gears 55 through the meshing of the input gear 53 and output gears 55, and then to the output shaft 54 via the output gears 55. When it is necessary to increase the height difference between the input shaft 52 and the output shaft 54, the torque and speed of the rock drilling rig 3 are transmitted by adjusting the input gear 53 with the gears of progressively increasing diameters. The large output gear 55 is engaged to increase the height difference between the input shaft 52 and the output shaft 54, and to adaptively increase the height of the second pad 62 of the second slide 6, thereby increasing the vertical height of the second slide 6, that is, increasing the height of the second slide 6 relative to the push beam 1, thus increasing the overall height of the transmission mechanism 5, so as to ensure that the input shaft 52 and the transmission rod 8 are at the same height, so as to adjust the height difference between the input shaft 52 and the output shaft 54 without changing the height position of the rock drilling rig 3, so that the extended drill rod 9 can carry out small-angle drilling construction of the periphery of the face 110 under the constraint of the thick steel arch frame 120.
[0069] like Figure 4 As shown, the second slide block 6 includes a second fixed plate 61, a second pad 62, and a second slide rail groove 63 arranged sequentially from top to bottom. The second pad 62 is fixed between the second fixed plate 61 and the second slide rail groove 63 by a second bolt 64. The transmission mechanism 5 is set on the second fixed plate 61. The vertical height of the second slide block 6 on the push beam 1 is adjusted by increasing or decreasing the height of the second pad, so as to realize the lifting and lowering of the second slide block 6 relative to the push beam 1. For example, a thicker second pad 62 can be replaced or multiple second pads 62 can be added.
[0070] A preferred method, such as Figures 3-4 As shown, the transmission mechanism 5 also includes a housing 51, an input gear 53 and an input gear 53 located inside the housing 51. The housing 51 has a vertical strip hole 511 on its side near the transmission rod 8, and the input shaft 52 can move vertically along the length of the vertical strip hole 511.
[0071] Since the rock drilling rig 3 is connected to the input shaft 52 via the transmission rod 8, the side of the housing 51 near the transmission rod 8 is provided with a vertical strip hole 511. The input shaft 52 passes through the vertical strip hole 511 and enters the interior of the housing 51. By providing the vertical strip hole 511, the input shaft 52 can move vertically along the length of the vertical strip hole 511, which facilitates the adjustment of the height of the input gear 53 on the input shaft 52. This facilitates the adjustment of the input gear 53 to match the output gear 55 with different diameters, so as to achieve the purpose of adjusting the height difference between the input shaft 52 and the output shaft 54.
[0072] A preferred method, such as Figure 3 As shown, after the input gear 53 is sleeved on the input shaft 52, the input gear 53 is fixed by setting gear retaining rings 57 on both sides of the input gear 53. The input gear 53 and the input shaft 52 can be connected by a key.
[0073] A preferred method, such as Figure 3 As shown, after multiple output gears 55 are sleeved on the output shaft 54, the output gears 55 are fixed by setting gear retaining rings 57 on the outermost sides of the multiple output gears 55. The output gears 55 and the input shaft 52 can be connected by key engagement.
[0074] In a preferred embodiment, compared with gear transmission, transmission mechanism 5 can also adopt belt pulley transmission. That is, the input shaft 52 and output shaft 54 of transmission mechanism 5 adopt belt pulley transmission. A first belt pulley is installed on the input shaft 52, and multiple second belt pulleys with gradually increasing diameters are installed on the output shaft 54. The first belt pulley and the second belt pulley are driven by belts.
[0075] In a preferred embodiment, a lifting mechanism 4 is also included, which is disposed on top of the first slide block 2 and is used to adjust the vertical height of the rock drilling rig 3 relative to the propulsion beam 1.
[0076] After the drilling position of the extended drill rod 9 is determined, the vertical height of the rock drilling rig 3 relative to the propulsion beam 1 is adjusted by the lifting mechanism 4, thereby adjusting the vertical height of the transmission rod 8 and the input shaft 52, and adjusting the engagement of the input gear 53 with the output gears 55 of different diameters, thereby adjusting the speed and torque of the output shaft 54, realizing the transmission of different gear combinations in the transmission mechanism 5, and then adjusting the speed and torque of the extended drill rod 9 under different surrounding rock conditions, improving drilling efficiency and reducing mechanical fuel power waste.
[0077] like Figure 6 , Figure 7As shown, the lifting mechanism 4 includes a fixed frame 41 and a grooved component 44. The grooved component 44 is connected to the top of the first slide block 2. The rock drilling machine 3 is installed inside the fixed frame 41. A rack 43 is provided on the side of the grooved component 44 near the fixed frame 41. A lifting gear 42 is provided on the outer side of the fixed frame 41 near the rack 43. The lifting gear 42 cooperates with the rack 43.
[0078] like Figure 7 As shown, the groove 44 has a vertically arranged inner groove 441, and the fixed frame 41 has an outer boss 411 at one end near the groove 44. The outer boss 411 is placed in the inner groove 441, and the outer boss 411 and the inner groove 441 can slide relative to each other.
[0079] A preferred method, such as Figure 6 , Figure 8 As shown, the first slide block 2 includes a first fixed plate 21, a first pad 22, and a first slide rail groove 23 arranged sequentially from top to bottom. The first pad 22 is fixed between the first fixed plate 21 and the first slide rail groove 23 by the first bolt 24. The rock drilling rig 3 is set on the first fixed plate 21. The vertical height of the first slide block 2 relative to the push beam 1 is adjusted by increasing or decreasing the height of the first pad 22, thereby realizing the lifting and lowering of the first slide block 2 relative to the push beam 1. If a thicker first pad 22 is replaced or multiple first pads 22 are added, the vertical height of the rock drilling rig 3 relative to the push beam 1 can be adjusted by lifting and lowering the first slide block 2 in the event of damage to the lifting mechanism 4. This adjusts the vertical height of the transmission rod 8 and the input shaft 52, thereby adjusting the engagement of the input gear 53 with output gears 55 of different diameters, and thus adjusting the speed and torque of the output shaft 54. This enables the transmission of different gear combinations in the transmission mechanism 5, and allows for the adjustment of the speed and torque of the extended drill rod 9 under different surrounding rock conditions, improving drilling efficiency and reducing mechanical fuel power waste.
[0080] like Figures 1-2 , Figure 8 As shown, it also includes a vehicle body 80 and a hydraulic arm 10. One end of the hydraulic arm 10 is hinged to the vehicle body 80, and the other end of the hydraulic arm 10 is provided with a first connecting seat 20. A slewing mechanism 30 is installed on the first connecting seat 20. The slewing mechanism 30 is used to adjust the steering of the push beam 1. By hinged to the vehicle body 80, the hydraulic arm 10 can rotate around the hinge. By providing a first connecting seat 20 at the other end of the hydraulic arm 10 and installing a slewing mechanism 30 on the first connecting seat 20, the slewing mechanism 30 is used to adjust the steering of the push beam 1, so that the push beam 1 has a larger working range.
[0081] like Figure 8As shown, a second connecting seat 40 is provided on the side of the rotary mechanism 30 near the propulsion beam 1. A support seat 50 is provided on the second connecting seat 40. A bracket 60 is provided at the bottom of the propulsion beam 1. The support seat 50 and the bracket 60 are hinged together. An tilting cylinder 70 is also provided on the second connecting seat 40. The tilting cylinder 70 is used to push or pull back the propulsion beam 1. By pushing the propulsion beam 1 through the tilting cylinder 70, the propulsion beam 1 can tilt around the hinge point of the bracket 60 and the support seat 50. Figure 13 As shown, the tilting cylinder 70 pushes the push beam 1, causing the push beam 1 to tilt upward at a certain angle.
[0082] A preferred method, such as Figure 9 As shown, the extension drill rod 9 includes a first section 91 and several intermediate sections 92. The first section 91 has a drill bit 93 at one end for drilling, and a connecting groove 94 at the other end. Each intermediate section 92 has a connecting boss 95 at one end and a connecting groove 94 at the other end. During assembly, the connecting boss 95 of the intermediate section 92 is inserted into the connecting groove 94 of the first section 91, and then the connecting boss 95 is fixed in the connecting groove 94 using a pin. The connection between the intermediate rod 92 and the first rod 91 is achieved by inserting the connecting boss 95 of one intermediate rod 92 into the connecting groove 94 of another intermediate rod 92 during the connection between the intermediate rods 92. By continuously adding new intermediate rods 92, the length of the extension drill rod 9 is increased. In actual construction, when the extension drill rod 9 enters the soil for drilling, the length of the extension drill rod 9 is increased during the drilling process by continuously adding new intermediate rods 92 outside the soil body, thereby ensuring that deeper holes can be constructed to meet design requirements and improve blasting effect.
[0083] A preferred method, such as Figure 3 As shown, the transmission rod 8 is connected to the input shaft 52 via the connecting sleeve 58, and the extension drill rod 9 is connected to the output shaft 54 via the connecting sleeve 58.
[0084] In a preferred embodiment, the input gear 53 is adjusted to engage with the output gear 55, which has a larger diameter, so that the height difference between the input shaft 52 and the output shaft 54 is greater than the thickness of the steel arch frame supporting the tunnel. The height difference between the input shaft 52 and the output shaft 54 varies within the range of 15 to 25 cm, that is, the radial distance L1 between the transmission rod 8 and the extension drill rod 9 is 15 cm to 25 cm.
[0085] In a preferred embodiment, the drill rod chuck 7 consists of a telescopic rod and a sleeve. The lower part of the support rod is connected to a second slide block 6. During construction, the drill bit end of the extended drill rod 9 passes through the sleeve of the drill rod chuck 7. The sleeve supports the drill bit end of the extended drill rod 9, and the telescopic rod controls the height of the drill bit end of the extended drill rod 9, thereby enabling the drill rod chuck 7 to maintain the stability of the drilling direction of the extended drill rod 9.
[0086] In a preferred embodiment, the transmission rod 8 is a drill rod. By setting the transmission rod 8 as a drill rod, drilling can be performed directly by adjusting the transmission rod 8 without the need for a transmission mechanism 5.
[0087] Example 2
[0088] like Figures 12-13 As shown, based on Embodiment 1, the construction method of the drilling mechanism described in this embodiment, using the small-angle drilling mechanism for the perimeter of the tunnel face as described in Embodiment 1, further includes the following steps:
[0089] S1: Based on the thickness of the steel arch frame 120, adjust the vertical height of the second slide block 6 and the height difference between the output shaft 54 and the input shaft 52, and install a drill rod clasp hole 7 at the same height as the output shaft 54 on the push beam 1, and position the transmission mechanism 5 between the rock drilling machine 3 and the drill rod clasp hole 7, with the drill rod clasp hole 7 located at the drilling end of the push beam 1;
[0090] S2: Connect the rock drilling rig 3 to the input shaft 52, and select an appropriate number of intermediate rods 92 according to the distance between the steel arch frame 120 and the working face 110 in actual construction. Then connect the intermediate rods 92 to the first section rod 91 to form an extension drill rod 9. Then connect the extension drill rod 9 to the output shaft 54, and the extension drill rod 9 passes through the drill rod chuck hole 7. The first section rod 91 is located at the front end of the extension drill rod 9, that is, the drilling end. When the extension drill rod 9 drills, it drills through the drill bit 93 of the first section rod 91.
[0091] S3: Operate the small-angle drilling mechanism for the periphery of the tunnel face, control the position of the small-angle drilling mechanism for the periphery of the tunnel face and control the inclination angle of the propulsion beam 1, so that the transmission mechanism 5 and the extension drill rod 9 are located between the steel arch frame 120 and the tunnel face 110, and align the first section rod 91 with the drill hole on the design outline to start the small-angle drilling construction of the periphery of the tunnel.
[0092] S4: After the first section of the drill rod 91 is drilled into the surrounding rock, a section of the first section of the drill rod 91 is left in place. Then the transmission mechanism 5 is moved backward, the propulsion beam 1 is lowered, the extension drill rod 9 is separated from the output shaft 54, a new intermediate rod 92 is installed on the extension drill rod 9, the extension drill rod 9 is connected to the output shaft 54, and then the propulsion beam 1 is raised to continue drilling.
[0093] In this application, the "small angle" in the small-angle drilling method refers to the small inclination angle of the peripheral holes. As described in Example 1, in current conventional construction, because the steel arch 120 is close to the working face 110, the propulsion beam of the drilling equipment cannot fully enter between the steel arch 120 and the working face 110, which greatly restricts the drilling equipment's drilling of the peripheral holes of the working face 110. This prevents the drill bit from drilling the peripheral holes at the designed outward angle on the designed excavation outline 130, resulting in the peripheral hole opening position being offset inward towards the designed excavation outline 130, forming a larger drilling inclination angle, such as... Figure 11 The first borehole inclination angle a1 in the process, wherein the range of the first borehole inclination angle a1 is 12° to 20°;
[0094] In this application, due to the influence of the steel arch frame 120, the propulsion beam 1 is placed at an angle and close to the tunnel face 110. The transmission mechanism 5 is placed between the steel arch frame 120 and the tunnel face 110. Since there is a gap between the extension drill rod 9 and the transmission rod 8, that is, the extension drill rod 9 and the transmission rod 8 are not on the same straight line, the extension drill rod 9 is generally placed outside the transmission rod 8, so that the extension drill rod 9 is closer to the side wall of the tunnel 100. Figure 13 As shown, a second borehole inclination angle a2 with a smaller inclination angle is formed, wherein the range of the second borehole inclination angle a2 is 1° to 3°, and the second borehole inclination angle a2 is compared with the first borehole inclination angle a1. , The range of the second borehole inclination angle a2 is smaller, that is, the peripheral hole drilling angle formed by the method of this application is smaller than that of the current conventional construction method.
[0095] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A small-angle drilling mechanism for the perimeter of a tunnel face, characterized in that, The system includes a rock drilling machine (3), a transmission rod (8), a transmission mechanism (5), and an extension drill rod (9). The rock drilling machine (3) can drive the transmission rod (8) to rotate. The transmission mechanism (5) is connected to the transmission rod (8) and the extension drill rod (9) respectively. The transmission rod (8) can drive the extension drill rod (9) to rotate through the transmission mechanism (5). The extension drill rod (9) is radially spaced relative to the transmission rod (8). The transmission mechanism (5) includes an input shaft (52) and an output shaft (54). There is a height difference between the output shaft (54) and the input shaft (52), and the output shaft (54) is located above the input shaft (52). The transmission rod (8) is driven to the input shaft (52), and the output shaft (54) is driven to the extension drill rod (9). It also includes a propulsion beam (1), a first slide (2) and a second slide (6), both of which can move relative to the propulsion beam (1) along the length of the extended drill rod (9). The rock drilling machine (3) is mounted on the first slide (2) and the transmission mechanism (5) is mounted on the second slide (6). The transmission mechanism (5) further includes an input gear (53) and an output gear (55). The input gear (53) is sleeved on the input shaft (52), and multiple output gears (55) with gradually increasing diameters are sequentially sleeved on the output shaft (54). The input gear (53) can cooperate with the output gears (55). The input gear (53) cooperates with the output gears (55) of different diameters to adjust the height difference between the input shaft (52) and the output shaft (54). The second slide (6) can be raised and lowered relative to the push beam (1); The transmission mechanism (5) also includes a housing (51), the input gear (53) and the input gear (53) are located inside the housing (51), the housing (51) has a vertical strip hole (511) on the side near the transmission rod (8), and the input shaft (52) can move vertically along the length direction of the vertical strip hole (511); It also includes a lifting mechanism (4), which is located on top of the first slide (2) and is used to adjust the vertical height of the rock drilling rig (3) relative to the propulsion beam (1); It also includes a drill rod chuck (7) installed on the push beam (1), the drill rod chuck (7) being at the same height as the output shaft (54), the drill rod chuck (7) being located at the drill end of the push beam (1), and the extension drill rod (9) passing through the drill rod chuck (7).
2. The small-angle drilling mechanism for the perimeter of the tunnel face according to claim 1, characterized in that, The lifting mechanism (4) includes a fixed frame (41) and a grooved component (44). The grooved component (44) is connected to the top of the first slide block (2). The rock drilling machine (3) is installed inside the fixed frame (41). A rack (43) is provided on the side of the grooved component (44) near the fixed frame (41). A lifting gear (42) is provided on the outer side of the fixed frame (41) near the rack (43). The lifting gear (42) cooperates with the rack (43). The groove (44) is vertically provided with an inner groove (441), and the fixed frame (41) is provided with an outer boss (411) at one end near the groove (44). The outer boss (411) is placed in the inner groove (441), and the outer boss (411) and the inner groove (441) can slide relative to each other.
3. The small-angle drilling mechanism for the perimeter eye of the tunnel face according to any one of claims 1-2, characterized in that, The radial distance L1 between the transmission rod (8) and the extension drill rod (9) is 15cm to 25cm.
4. The small-angle drilling mechanism for the perimeter eye of the tunnel face according to any one of claims 1-2, characterized in that, The extended drill pipe (9) includes a first section (91) and several intermediate sections (92).
5. A construction method for a drilling mechanism, characterized in that, The small-angle drilling mechanism for the perimeter eye of the tunnel face as described in any one of claims 1-4 further includes the following steps: S1: Based on the thickness of the steel arch frame (120), adjust the vertical height of the second slide block (6) and the height difference between the output shaft (54) and the input shaft (52), and install a drill rod chuck hole (7) at the same height as the output shaft (54) on the push beam (1), and make the transmission mechanism (5) located between the rock drilling machine (3) and the drill rod chuck hole (7), and the drill rod chuck hole (7) located at the drilling end of the push beam (1); S2: Connect the rock drilling machine (3) to the input shaft (52), and select an appropriate number of intermediate rods (92) according to the distance between the steel arch frame (120) and the working face (110) in actual construction. Then connect the intermediate rods (92) to the first section rod (91) to form the extension drill rod (9). Then connect the extension drill rod (9) to the output shaft (54), and the extension drill rod (9) passes through the drill rod chuck hole (7). S3: Operate the drilling mechanism, control the position of the drilling mechanism and control the tilt angle of the propulsion beam (1), so that the transmission mechanism (5) and the extension drill rod (9) are located between the steel arch frame (120) and the tunnel face (110), and align the first section rod (91) with the borehole on the design outline to start the small-angle drilling construction of the tunnel perimeter eye; S4: After the first section of the rod (91) is drilled into the surrounding rock, a section of the first section of the rod (91) is left in place. Then the transmission mechanism (5) is moved backward, the propulsion beam (1) is lowered, the extension rod (9) is separated from the output shaft (54), a new intermediate rod (92) is installed on the extension rod (9), the extension rod (9) is connected to the output shaft (54), and then the propulsion beam (1) is raised to continue drilling.
Citation Information
Patent Citations
Tunnel periphery hole rock drilling method and stepped rock drilling machine
CN111827889A
Multiple head drilling unit for loose soil drill
EP0893570A1
Offset device for rock drill, and rock drill comprising the same
JP2015121044A