A thermal reservoir fracturing method

By employing thermal fracturing, variable viscosity multi-stage injection, and chemical activation techniques, combined with intra-fracture temporary plugging, the problem of complex fracture network formation in dolomite thermal reservoirs was solved. This enabled efficient utilization of fracturing fluid and thermal energy conversion, reduced seismic risk, and enhanced the conductivity of the thermal reservoir.

CN117759214BActive Publication Date: 2026-11-20SINOPEC OILFIELD SERVICE CORPORATION +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311469843.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-07
Publication Date
2026-11-20
Estimated Expiration
2043-11-07

AI Technical Summary

Technical Problem

Existing technologies are insufficient to effectively address the complex fracture network formation in dolomite thermal reservoirs. Fracturing operations carry seismic risks, suffer from severe fluid loss, have low fracturing fluid utilization rates, and are difficult to achieve efficient thermal energy conversion.

Method used

By employing thermal fracturing, variable viscosity multi-stage injection, chemical activation, and intra-fracture plugging techniques, and through micro-injection testing, small-scale fracturing testing, and main fracturing operations, combined with the alternating injection of clean water, slickwater, gel, and high-temperature gelling acid, fracture extension and complexity can be controlled.

Benefits of technology

It effectively forms a complex artificial fracture network, reduces construction pressure, improves fracturing fluid utilization, expands fractures, enhances the conductivity of thermal reservoirs, and provides ample heat exchange space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117759214B_ABST
    Figure CN117759214B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of petroleum engineering, in particular to a hot reservoir fracturing method. The method comprises the following steps: performing micro-injection test; performing small-scale fracturing test, including respectively injecting clean water, slickwater and gel into the formation in a stepwise increasing injection rate / stepwise decreasing injection rate manner; performing constant injection rate alternating injection test by using clean water and gelling acid; and performing main fracturing operation. The hot fracturing process, variable-viscosity multi-stage injection process, chemical activation process and temporary in-fracture plugging process can realize the extension and complexity control of the fractured carbonate rock hot reservoir.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of petroleum engineering technology, and more specifically to a thermal reservoir fracturing method. Background Technology

[0002] Hot dry rock is a clean, safe, and renewable new type of geothermal resource, characterized by abundant reserves, wide distribution, and enormous development potential. Developing hot dry rock is of great significance for alleviating the pressure on my country's traditional fossil fuels and optimizing its energy structure. It can not only alleviate the national energy crisis but also reduce greenhouse gas emissions. Dolomite is a rare geothermal reservoir both domestically and internationally. However, its fundamental theories and technologies are relatively weak, and it is still in the exploratory stage, lagging significantly behind developed countries in terms of technology. Unlike granite-type hot dry rock, dolomite formations have better overall porosity and permeability conditions, faster filtration rates, and complex geological conditions. Limited by factors such as high temperature, high pressure, and tightness of the reservoir, fracturing is difficult, and the formation of complex fracture networks is challenging. Reservoir fracturing requires the use of technologies such as "hydraulic shear fracturing," "thermal fracturing," and "multiple activation" to create a fracture network with optimal fracture surface size, width, density, and orientation to form a "giant underground heat exchanger," achieving efficient conversion and utilization of thermal energy over a long lifespan—something conventional fracturing technologies struggle to achieve. Based on domestic and international experience in hot dry rock fracturing, an increase in the pumped fluid volume and a change in the pumped discharge rate can cause a surge in net pressure within the fracture and uneven energy propagation. This can lead to a construction risk that may induce a large earthquake during a certain fracturing injection stage or after the pump is stopped. Limited measures and methods have brought considerable difficulties to the construction of artificial thermal reservoirs. Summary of the Invention

[0003] The purpose of this invention is to address the shortcomings of existing technologies by providing a thermal reservoir fracturing method that employs thermal fracturing, variable viscosity multi-stage injection, chemical activation, and intra-fracture temporary plugging techniques to achieve control over fracture extension and complexity in carbonate thermal reservoir fracturing.

[0004] This invention discloses a thermal reservoir fracturing method, comprising the following steps:

[0005] Perform micro-injection testing;

[0006] Small-scale fracturing tests were conducted, including injecting water, slickwater, and gel into the formation in a stepped increase / step decrease manner.

[0007] A constant-flow-alternating injection test was conducted using water and gelling acid;

[0008] The main fracturing operation is carried out, which employs a variable viscosity multi-stage injection, chemical activation, and intra-fracturing temporary plugging process.

[0009] Preferably, the micro-injection test includes:

[0010] Inject fracturing fluid into the formation at a specified flow rate, stop the pump and test the pressure drop for no less than a specified duration, and obtain the original formation pressure, reservoir permeability and formation compressibility physical properties.

[0011] Preferably, the specified displacement is 0.3-0.6m³. 3 / min, where the specified duration is 60 hours.

[0012] Preferably, the small-scale fracturing test includes:

[0013] Under pressure-limited conditions, the clean water discharge rate is increased in stages. At each stage, the pressure is observed to stabilize before further increasing the discharge rate. The discharge rate is increased or decreased in stages with a specified step size, until the discharge rate is reduced to 0 m³ / s. 3 After observing that the pressure is stable after / min, stop measuring the pressure drop;

[0014] Under pressure-limited conditions, the slickwater discharge rate is increased in stages. At each stage, the pressure is observed to stabilize before further increasing the discharge rate. The discharge rate is increased or decreased in stages with a specified step size, until the discharge rate is reduced to 0 m³. 3 After observing that the pressure is stable after / min, stop measuring the pressure drop;

[0015] Under pressure-limited conditions, the flow rate of the adhesive is increased in stages. At each stage, the pressure is observed to stabilize before further increasing the flow rate. The flow rate is increased or decreased in specified increments until it reaches 0 m³. 3 After observing that the pressure stabilized after 1 minute, the pressure measurement was stopped and the pressure was reduced.

[0016] Preferably, the pressure limiting condition refers to a pressure limit of 85 MPa, and the specified step size is 0.5 m. 3 / min.

[0017] Preferably, the main fracturing operation includes pumping fracturing fluid, and the pumped fracturing fluid includes:

[0018] Alternately inject clean water, slippery water, adhesive liquid, and high-temperature gelling acid, wherein the slippery water is injected in a variable flow rate manner.

[0019] Preferably, the pumping of fracturing fluid is divided into multiple stages and executed sequentially, with a certain time interval between the completion of each stage before the next stage is executed.

[0020] More preferably, the pumped fracturing fluid further includes:

[0021] Temporary plugging agent is administered when the pumped fluid volume reaches 25% and 85-87% at each stage.

[0022] Preferably, the fracturing fluid injection is performed in four stages sequentially.

[0023] The first stage includes sequentially injecting water, hydrochloric acid, slippery water, adhesive, slippery water, high-temperature gelling acid, and slippery water;

[0024] The second stage includes the sequential injection of slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water;

[0025] The third stage includes sequentially injecting slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water;

[0026] The fourth stage includes sequentially injecting slippery water, adhesive, slippery water, adhesive, and slippery water.

[0027] Preferably, the temporary plugging agent is a mixture of three specifications of temporary plugging agents with degradation times of 6h, 24h and 120h, respectively, in a 1:1:1 ratio.

[0028] The beneficial effects of this invention are as follows:

[0029] 1. First, micro-injection fracturing is conducted to obtain basic physical properties such as original formation pressure, reservoir permeability, and formation compressibility. Second, small-scale fracturing tests are performed using clear water, slickwater, and linear gel to obtain parameters such as reservoir physical properties, formation pressure, closure pressure, wellbore friction of different types of fluids, fracturing fluid filtration coefficient, and fracturing fluid efficiency, providing a basis for optimizing the main fracturing scheme. Third, constant-flow alternating injection fracturing tests are conducted, with alternating pumping of gelling acid in groups to dissolve and chemically react with natural reservoir fractures, activating mineral-filled natural fractures and effectively reducing construction pressure. Finally, a fracturing process of "variable viscosity multi-stage injection + chemical activation + intra-fracture temporary plugging" is used to complete the main fracturing operation, promoting the formation of a complex artificial fracture network. This method can effectively solve the problem of difficult formation of complex fracture networks in carbonate thermal reservoirs, providing sufficient space for geothermal well group interconnection and heat exchange.

[0030] 2. During the micro-injection testing phase, clean water, slickwater, and gel were injected into the formation using a stepped increase / decrease flow rate, achieving thermal fracturing and enhancing the formation's "thermal fracturing" effect, inducing the formation of a high-permeability zone near the wellbore. In the main fracturing operation phase, slickwater and gel were injected alternately, and the fracturing fluid injection was divided into multiple stages executed sequentially. Slickwater was injected using a variable flow rate method, achieving multi-stage variable viscosity and variable flow rate injection. Vertically, this resulted in a fully balanced fracture morphology, initiation, propagation, and extension, reducing fracturing fluid loss, improving fracturing fluid utilization, and expanding the fractures. The first stage used conventional acid, while the second and third stages used high-temperature gel acid, achieving a chemical activation process. This enhanced acid penetration, resulting in non-uniform etching and self-supporting fracture formation. Furthermore, deep penetration and alternating group pumping of gel acid activated mineral filling of natural fractures. During the main fracturing construction phase, an in-fracture temporary plugging process is adopted. When the pumped fluid volume reaches 25% and 85% at each stage, a temporary plugging agent is injected. By using large particles to bridge and small particles to fill, the hydraulic fracture is induced to temporarily plug and change direction at the fracture tip, thereby increasing the overall complexity of the fracture and ultimately achieving the goal of "expanding volume first and then promoting complexity". Attached Figure Description

[0031] Figure 1 This is a schematic diagram of the method flow of the present invention;

[0032] Figure 2 This is a schematic diagram of the construction curve of microseismic events in the crack during the first stage of the clear water low-pressure test;

[0033] Figure 3 The statistical histogram of microseismic events from the first low-pressure water slick test.

[0034] Figure 4 This is a schematic diagram of microseismic frequencies in a typical cyclic soft fracturing process during construction.

[0035] Figure 5 A schematic diagram comparing microseismic events before and after the addition of the temporary plugging agent;

[0036] Figure 6 This is a schematic diagram showing the distribution of micro-vibration points at different stages after the use of the fourth group of adhesive in the first section.

[0037] Figure 7 This is a schematic diagram showing the distribution of microseismic points at different stages after the use of gelling acid in the second group of the first section.

[0038] Figure 8 This is a schematic diagram showing the distribution of micro-vibration points at different stages when using the first high-viscosity adhesive. Detailed Implementation

[0039] To make the technical problems, technical solutions, and beneficial effects to be solved by this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of this application.

[0040] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.

[0041] It should be understood that, when used in this application specification and the appended claims, the term "comprising" indicates the presence of the described features, integrals, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or a collection thereof.

[0042] It should also be understood that the term “and / or” as used in this application specification and the appended claims means any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.

[0043] As used in this application specification and the appended claims, the term "if" may be interpreted, depending on the context, as "when," "once," "in response to determination," or "in response to detection." Similarly, the phrase "if determined" or "if detected [the described condition or event]" may be interpreted, depending on the context, as meaning "once determined," "in response to determination," "once detected [the described condition or event]," or "in response to detection [the described condition or event]."

[0044] Furthermore, in the description of this application and the appended claims, the terms "first," "second," "third," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0045] References to "one embodiment" or "some embodiments" in this specification mean that one or more embodiments of this application include a specific feature, structure, or characteristic described in connection with that embodiment. Therefore, the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in still other embodiments," etc., appearing in different parts of this specification do not necessarily refer to the same embodiment, but rather mean "one or more, but not all, embodiments," unless otherwise specifically emphasized. The terms "comprising," "including," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized. "A plurality" means "two or more."

[0046] Example 1

[0047] Figure 1 A preferred embodiment of this application is shown. Figure 1 A schematic flowchart of a thermal reservoir fracturing method according to the first embodiment of this application is shown. For ease of explanation, only the parts relevant to this embodiment are shown, and are described in detail below:

[0048] This invention discloses a thermal reservoir fracturing method, comprising the following steps:

[0049] Step 1: Perform micro-injection testing;

[0050] Step 2, conduct small-scale fracturing tests, including injecting water, slickwater, and gel into the formation in a stepped increase / step decrease manner;

[0051] Step 3: Use water and gelling acid to perform a constant flow rate alternating injection test;

[0052] Step 4: Perform the main fracturing operation, which adopts a variable viscosity multi-stage injection, chemical activation, and intra-fracturing temporary plugging process.

[0053] In one embodiment, the micro-injection test in step 1 includes:

[0054] With 0.3-0.6m 3 Injecting fracturing fluid into the formation at a rate of / min allows for clear observation of formation fracturing pressure. After stopping the pump, the pressure drop is tested for at least 60 hours to obtain physical properties such as original formation pressure, reservoir permeability, and formation compressibility.

[0055] In one embodiment, the small-scale fracturing test in step 2 includes:

[0056] Step 201, Low-Pressure Test of Clean Water: Under a pressure limit of 85 MPa, the clean water discharge rate is increased in stages. At each stage, the pressure is observed to be stable before further increasing the discharge rate, in increments of 0.5 m³ / s. 3 / min step increments to increase or decrease displacement, displacement reduced to 0m 3 After observing that the pressure is stable after / min, stop measuring the pressure drop;

[0057] Step 202, Slickwater pressure test: Under a pressure limit of 85MPa, the slickwater discharge rate is increased in stages. At each stage, the pressure is observed to be stable before further increasing the discharge rate, in increments of 0.5m. 3 / min step increments to increase or decrease displacement, displacement reduced to 0m 3 After observing that the pressure is stable after / min, stop measuring the pressure drop;

[0058] Step 203, low-pressure test of adhesive: Under the pressure limit of 85MPa, the adhesive flow rate is increased in stages. At each stage, the pressure is observed to be stable before further increasing the flow rate, in increments of 0.5m. 3 / min step increments to increase or decrease displacement, displacement reduced to 0m 3 After observing that the pressure stabilized after 1 minute, the pressure measurement was stopped and the pressure was reduced.

[0059] This step addresses the issue of low fracture complexity near the wellbore by employing a thermal fracturing process. This involves conducting small-scale test fracturing before each fracturing stage, injecting three types of liquids—clean water, slickwater, and gel—into the formation in a stepped increase and decrease manner to enhance the "thermal fracturing" effect and induce the formation of a high-permeability zone near the wellbore.

[0060] Step 3, constant displacement alternating injection test includes:

[0061] With a certain displacement, such as 2.0m 3 The system sequentially pumps water, gelling acid, and water at a rate of / min. Based on the low filtration loss and deep penetration characteristics of gelling acid, the pumps are alternately injected in groups to activate mineral filling of natural fractures, reduce the construction pressure of carbonate reservoirs, and observe the pressure changes at each stage.

[0062] In one embodiment, the main fracturing operation in step 4 includes pumping fracturing fluid, the pumped fracturing fluid comprising:

[0063] Alternately inject clean water, slippery water, adhesive liquid, and high-temperature gelling acid, wherein the slippery water is injected in a variable flow rate manner.

[0064] In one embodiment, the fracturing fluid injection is divided into four stages and executed sequentially, with a certain time interval between the completion of each stage before the next stage is executed. Wherein:

[0065] The first stage includes sequentially injecting water, hydrochloric acid, slippery water, adhesive, slippery water, high-temperature gelling acid, and slippery water;

[0066] The second stage includes the sequential injection of slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water;

[0067] The third stage includes sequentially injecting slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water;

[0068] The fourth stage includes sequentially injecting slippery water, adhesive, slippery water, adhesive, and slippery water.

[0069] This pump injection method addresses the issue of insufficient crack propagation capacity by employing a variable viscosity multi-stage injection process, which increases the total injection volume by 3500-4000m³ in each construction segment. 3 Increase the volume of construction fluid to improve the effective utilization rate of the fluid; maintain the main construction discharge rate at 3-6 m³ / h. 3 The flow rate is increased to raise the net pressure within the fracture, promoting fracture extension. Slickwater is injected using a variable flow rate method to achieve a fully balanced fracture morphology and propagation longitudinally. Each group uses a pre-filled and alternately injected fracturing fluid with a viscosity of 15-35 mPa·s (i.e., after the temporary plugging agent is added, a pre-filled fracturing fluid of 15-35 mPa·s is injected) to reduce fracturing fluid loss, improve fracturing fluid utilization, and extend the fracture.

[0070] This pumping method addresses the problem of insufficient fracture conductivity by employing a chemical activation process: the first stage uses conventional acid (20% pre-acid 30m). 3 The second and third stages use high-temperature gelling acid (20% gelling acid, 40-50 ml). 3 This process involves enhancing the deep penetration of acid to create non-uniform etching, leading to self-supporting fractures. Furthermore, it employs gelling acid deep penetration and alternating group pumping to activate mineral filling of natural fractures. A temporary plugging process is used within the fracture; at each stage, when the pumped fluid volume reaches 25% and 85-87%, a temporary plugging agent is injected. This induces temporary plugging and redirection of the hydraulic fracture at the fracture tip through large-particle bridging and small-particle filling, increasing the overall complexity of the fracture and ultimately achieving the goal of "first expanding volume, then promoting complexity."

[0071] Example 2

[0072] This embodiment uses a hot dry rock well fracturing process as an example to illustrate the method. The hot dry rock well fracturing includes a first stage and a second stage of fracturing operations. Through analysis of the two stages of fracturing operations and the adaptability analysis of the fracturing process, the fracturing capabilities of various liquids in creating fractures and stimulating natural fractures were clarified, verifying the strong feasibility of the fracturing process of "thermal fracturing + variable viscosity multi-stage injection + chemical activation + intra-fracture temporary plugging" in the field. Through post-fracturing fracture morphology inversion and fracture spatial distribution analysis, the vertical fracture height ranges from 4400 to 4800 m, the main fracture half-length is approximately 600 m, and the longest fracture's affected area is approximately 1300 m, forming a complex and uniform fracture network with vertical fractures. By utilizing the source mechanism of microseismic events for geostress inversion, it was revealed that the fractures are mainly tensile and shear fractures, with some fractures being pure shear fractures. The first main fracturing fracture is dominated by high-angle fractures, oriented northwest-southeast, with the maximum horizontal principal stress oriented near northwest. The second main fracturing fracture is mainly oriented northwest, consisting of high-angle and medium-high-angle fractures. Under the premise that there is no communication between the two sections, through simulation of fracture morphology and stimulated reservoir volume, it was predicted that the total stimulated volume of the two sections was increased by 62.16% compared with the design, achieving an effect that exceeded expectations.

[0073] Vertically, geothermal reservoir stimulation utilizes techniques such as variable displacement, multiple liquids, and alternating injection to achieve a fully balanced initiation, propagation, and extension of fracturing fractures. Horizontally, it employs methods such as using clear water, small displacement, and intra-fracture deflection to connect with natural fractures or create multiple fracture patterns, thereby maximizing the effectiveness of geothermal reservoir construction.

[0074] For rocks with high hardness, high geostress gradient, and high fracture pressure gradient (fracture pressure reaching 103 MPa), a thermal fracturing process is employed. Alternating injection of low-viscosity fluid (1–3 mPa·s) and high-viscosity fluid (20–50 mPa·s) at varying flow rates (slickwater for low-viscosity fluid and gel for high-viscosity fluid, injected alternately) utilizes the temperature difference effect to generate micro-fractures. The low-viscosity slickwater activates micro-fractures and natural fractures, while the high-viscosity fluid propagates the fractures.

[0075] To address the large biaxial stress difference (13–17.4 MPa), variable viscosity (1–3 mPa·s low viscosity fluid and 20–50 mPa·s high viscosity fluid, with slickwater used for low viscosity fluid and gel-like fluid used for high viscosity fluid) and variable flow rate (1–6–1 m³ / min) were employed, i.e., variable flow rate of slickwater and multi-stage injection (4 stages per segment), to achieve a fully balanced fracture initiation, propagation and extension in the longitudinal direction.

[0076] Two low-viscosity acid systems were used. In the first stage of each construction section, a 20% increase in pre-acid concentration (30m³) was added. 3 In the middle and later stages (i.e., the second and third stages), increase the amount of gelling acid by 20% to 40-50 mg. 3Pre-treatment with acid is used to reduce formation fracturing pressure. In the mid-to-late stages, deep penetration with gelling acid forms complex acid etching channels, maximizing the connection of distant well geothermal reservoirs along the fracture length and achieving full reservoir plane modification. In addition, alternating pumping of gelling acid in groups provides chemical stimulation to dissolve natural fractures, activating mineral filling of natural fractures, effectively reducing construction pressure and improving the flow channel conductivity of geothermal reservoir construction.

[0077] Three types of temporary plugging agents were used to achieve the "in-fracture reversal" technique, increasing the net pressure during construction and significantly enhancing the complexity and extension distance of the fracture laterally, thereby improving the reliability of inter-well connectivity. The degradation times of the three types of temporary plugging agents were 6 hours, 24 hours, and 120 hours, respectively.

[0078] In the first stage of the low-pressure water test using this method, the crack microseismic event construction curve showed the occurrence of multiple micro-fractures, with approximately 1100 microseismic events monitored. Figure 2 As shown in the figure. The results indicate that by injecting clean water at a low flow rate, thermal rupture is generated by utilizing the temperature difference effect, resulting in a large number of microcracks.

[0079] This method uses the statistical histogram of microseismic events from the first segment of the slickwater low-pressure test, such as... Figure 3 As shown, the frequency of microseismic events increases with increasing displacement and oil pressure. Net pressure is positively correlated with construction displacement; increasing displacement can effectively increase the complex reversal capability of cracks. The number and extent of microseismic events are most significantly affected by displacement and fluid volume; therefore, a higher displacement should be maintained as much as possible during the main construction phase.

[0080] Figure 4 This is a typical cyclic soft fracturing process during construction, and a significant increase in microseismic frequency was observed after implementation. Furthermore, this segment had the highest proportion of high-energy microseismic time. It is evident that the microseismic frequency changes more significantly with displacement and fluid volume. Circulating soft fracturing increases the complexity of the fracture.

[0081] In this embodiment, during the main fracturing stage, three temporary plugging agents with a compressive strength of 30 MPa and a temperature resistance of 160℃ were selected. The degradation times were 6 hours, 24 hours, and 120 hours, with degradation rates exceeding 99%, achieving a good temporary plugging and redirection effect without damaging the reservoir. The dosage of the temporary plugging agent was optimized based on indoor plugging experiments, testing results of fracturing and temporary plugging, and the design parameters of the fractures to be plugged. The dosage of the temporary plugging agent added per application was 100–200 kg / application. Using slickwater as the construction fluid for adding and transporting the temporary plugging agent into the fracture improved the rate at which the temporary plugging agent formed a bridging zone in the slickwater, thereby enhancing the plugging effect. A low discharge rate of 2–3 m³ / min was used. 3Injecting temporary plugging agent at a rate of / min helps to increase the instantaneous concentration of the plugging agent, thereby improving the sealing efficiency and pressure response amplitude. The instantaneous concentration of the temporary plugging agent is generally maintained at 10-20%. By comparing microseismic events before and after the addition of the temporary plugging agent, such as... Figure 5 As shown, after the temporary plugging agent was applied, the number of microseismic events increased significantly; the temporary plugging agent had a certain effect in blocking the main direction; the temporary plugging direction was the dominant direction, and the number of events in the non-dominant direction increased, but the dominant direction gradually became apparent again as the liquid volume increased.

[0082] In this embodiment, during the main fracturing stage, alternating injections of low-viscosity and high-viscosity fluids were used to generate microcracks by utilizing the temperature difference effect. Variable viscosity, variable flow rate, and multi-stage injection were employed to achieve a fully balanced fracture initiation, propagation, and extension in the longitudinal direction. The viscosity of the slickwater was 1–3 MPa·s, and the viscosity of the gel was 15–35 MPa·s. The statistical data on the construction parameters used in the variable viscosity fracturing process are shown in Table 1.

[0083] Table 1. Construction Parameters for Variable Viscosity Fracturing

[0084]

[0085] By comparing and analyzing the distribution of microseismic points at different stages using the adhesive in the fourth group of the first section, such as... Figure 6 As shown, an increase in remote microseismic events occurred within two and a half hours after the well was put into operation, and the newly added microseismic events were mainly distributed in the near-wellbore area after two and a half hours.

[0086] In this embodiment, during the main fracturing phase, two low-viscosity acid systems were employed: pre-treatment with acid near the wellbore, deep penetration with gelled acid, and alternating pumping in groups to reduce formation fracturing pressure and activate mineral filling of natural fractures. The statistical data on the construction parameters used in the acid activation process are shown in Table 2.

[0087] Table 2. Statistical Table of Construction Parameters for Acid Activation Process

[0088]

[0089] By comparing and analyzing the distribution of microseismic points at different stages after the use of gelling acid in the second group of the first segment, such as... Figure 7 As shown, a significant crack propagation effect was observed within 0.5 hours; the thickened acid was more effective when crack propagation was insufficient; and the thickened acid had a certain long-distance etching effect when used during the period when the crack system had not significantly propagated.

[0090] In this embodiment, high-viscosity adhesive (15–35 mPa·s) was alternately injected during the main fracturing stage to expand the fracture. The statistical data on the construction parameters used in the adhesive activation process are shown in Table 3.

[0091] Table 3. Statistical Table of Construction Parameters for Adhesive Activation Process

[0092]

[0093] Comparing the distribution of microseismic points at different stages using the first segment of adhesive (left 14:45, middle 17:22, right 19:16), as shown in the statistics. Figure 8 As shown, an increase in distal microseismic events (warm-colored spots) occurred within 2.5 hours after deployment, and after 2.5 hours, the newly added microseismic events were mainly distributed in the near-wellbore area. The application of the adhesive during the mid-construction period can significantly promote fracture propagation and has an effective timeframe.

[0094] Based on well temperature profile data, the fracture height is approximately 120m. Analysis of the fluid inlet channel reveals a complex multi-channel fracture formation along the vertical direction. Comparison of two sets of pre- and post-fracturing water absorption capacity indices shows that the post-fracturing water absorption capacity reaches 122.1 m³ / (d·MPa), 2.91 times that before fracturing, and 119.5 m³ / (d·MPa), an increase of 7.56 times compared to before fracturing. This indicates that, unlike granite formations, the dolomite formation in the Sure 1 well has better overall porosity and permeability conditions and a faster filtration rate. The fracturing practice in the Sure 1 well demonstrates the strong feasibility of the "thermal fracturing + variable viscosity multi-stage injection + chemical activation + temporary plugging within the fracture" fracturing process. The large-volume, complex fracture network artificially generated in this operation provides ample heat exchange space for subsequent interconnected circulation and heat exchange, achieving a good stimulation effect.

[0095] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process may be rearranged without departing from the scope of this disclosure. The appended method claims provide elements of various steps in an exemplary order and are not intended to limit the scope to the specific order or hierarchy described.

[0096] In the above detailed description, various features are combined together in a single embodiment to simplify this disclosure. This approach to disclosure should not be construed as reflecting an intention that embodiments of the claimed subject matter require more features than are explicitly stated in each claim. Rather, as reflected in the appended claims, the invention is presented with fewer features than all of the features of the single disclosed embodiment. Therefore, the appended claims are hereby explicitly incorporated into the detailed description, wherein each claim stands alone as a preferred embodiment of the invention.

[0097] The disclosed embodiments have been described above to enable any person skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be applied to other embodiments without departing from the spirit and scope of this disclosure. Therefore, this disclosure is not limited to the embodiments given herein, but is consistent with the broadest scope of the principles and novel features disclosed in this application.

[0098] The foregoing description includes examples of one or more embodiments. It is certainly impossible to describe all possible combinations of components or methods in order to describe the above embodiments, but those skilled in the art will recognize that further combinations and arrangements of the various embodiments are possible. Therefore, the embodiments described herein are intended to cover all such changes, modifications, and variations that fall within the scope of the appended claims. Furthermore, the term "comprising" as used in the specification or claims is interpreted in a manner similar to the term "including," as it is used as a conjunction in the claims. Additionally, the use of any term "or" in the specification of the claims is intended to mean "non-exclusive or."

[0099] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A method for fracturing a thermal reservoir, characterized in that, Includes the following steps: Microinjection testing was performed, including injections of 0.3-0.6 μm. 3 Inject fracturing fluid into the formation at a rate of / min, stop the pump and test the pressure drop for no less than 60 hours, and obtain the original formation pressure, reservoir permeability and formation compressibility physical properties. Small-scale fracturing tests were conducted, including injecting water, slickwater, and gel into the formation using a stepped increase / step decrease in discharge rate, respectively. A constant-flow-rate alternating injection test was conducted using water and gelling acid. The constant-flow-rate alternating injection test included injections at a flow rate of 2.0 m³ / s. 3 At a constant discharge rate of / min, water, gelling acid and water were pumped sequentially to activate mineral filling of natural fractures, reduce the construction pressure of carbonate reservoir, and observe the pressure changes at each stage. The main fracturing operation is carried out, which employs a variable viscosity multi-stage injection, chemical activation, and intra-fracturing temporary plugging process.

2. The thermal reservoir fracturing method according to claim 1, characterized in that, The small-scale fracturing test includes: Under pressure-limited conditions, the clean water discharge rate is increased in stages. At each stage, the pressure is observed to stabilize before further increasing the discharge rate. The discharge rate is increased or decreased in stages with a specified step size, until the discharge rate is reduced to 0 m³ / s. 3 After observing that the pressure is stable after / min, stop measuring the pressure drop; Under pressure-limited conditions, the slickwater discharge rate is increased in stages. At each stage, the discharge rate is increased only after the pressure stabilizes. The discharge rate is increased or decreased in stages with a specified step size, until the discharge rate is reduced to 0 m³. 3 After observing that the pressure is stable after / min, stop measuring the pressure drop; Under pressure-limited conditions, the flow rate of the adhesive is increased in stages. At each stage, the pressure is observed to stabilize before further increasing the flow rate. The flow rate is increased or decreased in specified increments until it reaches 0 m³. 3 After observing that the pressure stabilized after 1 minute, the pressure measurement was stopped and the pressure was reduced.

3. The thermal reservoir fracturing method according to claim 2, characterized in that: The pressure limiting condition refers to a pressure limit of 85 MPa, and the specified step size is 0.5 m. 3 / min.

4. The thermal reservoir fracturing method according to claim 1, characterized in that, The main fracturing operation includes pumping fracturing fluid, which includes: Alternately inject clean water, slippery water, adhesive liquid, and high-temperature gelling acid, wherein the slippery water is injected in a variable flow rate manner.

5. The thermal reservoir fracturing method according to claim 4, characterized in that: The fracturing fluid injection is divided into multiple stages and executed sequentially. After each stage of injection is completed, a certain time interval is left before the next stage of injection is executed.

6. The thermal reservoir fracturing method according to claim 5, characterized in that, The pumped fracturing fluid also includes: Temporary plugging agent is administered when the pumped fluid volume reaches 25% and 85-87% at each stage.

7. The thermal reservoir fracturing method according to claim 5, characterized in that, The fracturing fluid injection is divided into four stages and executed sequentially. The first stage includes sequentially injecting water, hydrochloric acid, slippery water, adhesive, slippery water, high-temperature gelling acid, and slippery water; The second stage includes the sequential injection of slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water; The third stage includes sequentially injecting slippery water, adhesive, slippery water, high-temperature gel acid, and slippery water; The fourth stage includes sequentially injecting slippery water, adhesive, slippery water, adhesive, and slippery water.

8. The thermal reservoir fracturing method according to claim 6, characterized in that: The temporary plugging agent delivered is a mixture of three specifications of temporary plugging agents with degradation times of 6h, 24h and 120h, respectively, in a 1:1:1 ratio.

9. The thermal reservoir fracturing method according to claim 8, characterized in that: The temporary plugging agent has a compressive strength of 30 MPa and a temperature resistance of 160℃. The degradation rate of the temporary plugging agent is over 99%, and the amount of temporary plugging agent added into the crack is 100-200 kg / time.

Citation Information

Patent Citations

  • Acid fracturing method for improving water yield of geothermal well of limestone reservoir

    CN112796728A

  • Hot dry rock hydraulic fracturing method

    CN114263451A