Long-span box girder bridge transverse deformation coordination splicing method and system
By optimizing the cross-sectional dimensions and spacing of the diaphragms, and using finite element numerical analysis and bearing capacity verification, the design redundancy problem of diaphragms in long-span box girder bridges was solved, resulting in a reduction in the amount of work and an improvement in economic efficiency.
Patent Information
- Application Number
- CN202311536197.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-17
AI Technical Summary
In the reconstruction and expansion of long-span box girder bridges, the lack of clear optimization methods for diaphragm design has led to excessive redundancy in the design, wasting materials and extending the construction period.
By optimizing the cross-sectional dimensions and spacing of the transverse diaphragms and reducing the number of transverse diaphragms, and by employing finite element numerical analysis and bearing capacity verification, the optimal splicing scheme is established, providing a method and system for coordinated splicing of transverse deformation in large-span box girder bridges.
It effectively reduces the amount of work, avoids design redundancy, reduces waste of manpower and material resources, and improves the economy and design efficiency of engineering projects.
Smart Images

Figure CN117763653B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of large-span box girder assembly and widening technology, and in particular relates to a method and system for coordinating the lateral deformation of large-span box girder bridges. Background Technology
[0002] Box girders are a common beam section type in existing highway bridges. In the reconstruction and expansion of box girder bridges, widening the old bridge can make full use of the existing structure and save economic costs, which is a common approach.
[0003] To reduce the difference in deflection between the two box girders on the widened sides, a practical method is to install transverse diaphragms. However, the design optimization methods for transverse diaphragms are unclear, often leading to excessive redundancy, wasted materials, and extended construction periods. Summary of the Invention
[0004] The purpose of this invention is to overcome the defects of the prior art and provide a method and system for coordinating the lateral deformation of large-span box girder bridges.
[0005] The objective of this invention can be achieved through the following technical solutions:
[0006] This invention clarifies the design optimization process for diaphragms. By optimizing the cross-sectional dimensions of the diaphragms to increase the spacing between them and reduce the number of diaphragms, the amount of work can be effectively reduced, excessive design redundancy can be avoided, waste of manpower and resources can be reduced, and the economic efficiency of the project can be improved.
[0007] The first aspect of this invention provides a method for coordinated splicing of transverse deformation in long-span box girder bridges, comprising the following steps:
[0008] S1: Propose a splicing connection scheme: determine the longitudinal spacing L between the transverse diaphragms, the cross-sectional height h of the transverse diaphragm, the cross-sectional width b of the transverse diaphragm, and the elastic modulus E of the transverse diaphragm material;
[0009] S2: Preliminary verification of the splicing connection scheme: The selected design specifications are used to perform load-bearing capacity verification and analysis on the splicing connection scheme in S1. If it does not meet the specifications, it is returned to S1 for modification. If it meets the specifications, proceed to the next step.
[0010] S3: Optimize the longitudinal spacing L between transverse diaphragms in the splicing connection scheme: Increase the transverse diaphragm spacing L and perform load-bearing capacity verification analysis until the verification result does not meet the specification requirements. Take the last transverse diaphragm spacing L1 that meets the specification requirements and record the current combination of b1, h1, and L1 as P1.
[0011] S4: Optimize the cross-sectional height h and width b of the diaphragm in the splicing connection scheme: Increase the cross-sectional height h or width of the diaphragm respectively, that is, increase the calculated value of the moment of inertia I of the section;
[0012] S5: Verify the limits of the cross-sectional height h, cross-sectional width b, and longitudinal spacing L between cross-sections in the diaphragm widening connection scheme: Determine whether the increased cross-sectional height h and cross-sectional width b have reached their respective height limits. max The extreme value of the width is b max If the extreme value is not reached, the diaphragm spacing is increased by an equivalent amount and the bearing capacity is checked and analyzed until the check result does not meet the specification requirements. The final diaphragm spacing L that meets the specification requirements is then taken. i (1 < i ≤ n), record the current combination as b. i h i L i The combination is P i (1<i≤n), and return to S4. If the extreme value is reached, then proceed to S6.
[0013] S6: Optimize the longitudinal spacing L between transverse diaphragms, the cross-sectional height h of the transverse diaphragm, and the cross-sectional width b of the transverse diaphragm in the widening connection scheme: The values of the cross-sectional height h and the cross-sectional width b are the extreme values of the height h. max Width extreme value b max In this case, increase the value of the diaphragm spacing and perform load-bearing capacity verification analysis until the verification result does not meet the specification requirements. Then, take the final diaphragm spacing L that meets the specification requirements. n Record b that meets the specification requirements n h n L n The combination is P n ;
[0014] S7: Determine the optimal splicing connection scheme: Select P1-P n One combination is used to establish a splicing connection scheme.
[0015] Furthermore, the specific steps for bearing capacity verification and analysis in steps S2, S3, S4, S5, and S6 are as follows:
[0016] Establish a finite element numerical analysis model;
[0017] Calculate the combined effect value of the transverse diaphragms in the width-splitting connection scheme; and
[0018] The bearing capacity was verified according to the selected specifications.
[0019] Furthermore, the specific formula for the bearing capacity verification analysis is as follows:
[0020] γ0S≤R;
[0021] R = R(E, h, b);
[0022] Wherein, γ0 is the importance coefficient of the bridge structure, which is determined according to the safety level of the bridge structure design; S is the design value of the effect of the action combination; R is the design value of the bearing capacity; E is the elastic modulus of the diaphragm material; b is the width of the diaphragm section; and h is the height of the diaphragm section.
[0023] R is a parameter that can be directly obtained by those skilled in the art through relevant calculation formulas. E can be used to look up material strength design parameters, and h and b can be used to look up geometric design parameters. The design value can then be obtained by consulting the design documents. These parameters are all known to those skilled in the art and can be uniquely determined based on the actual situation.
[0024] Furthermore, in steps S4 and S5, the cross-sectional height h of the diaphragm is first increased, and when h increases to h max Then, increase the cross-sectional width of the diaphragm by b to b max .
[0025] Furthermore, in steps S4 and S5, the extreme value h of the diaphragm height max The height of the box girder at the location of the diaphragm section shall not exceed the height of the box girder.
[0026] Furthermore, in steps S4 and S5, when longitudinal prestressed steel bars of the box girder are provided within 5 cm above the lower edge of the diaphragm section, the extreme value of the diaphragm height h max It should be h max +5cm, and the extreme value of height h max The height of the box girder should not exceed the height of the section where the diaphragm is located.
[0027] Furthermore, in steps S4 and S5, the extreme value b of the width of the diaphragm... max The following requirements must be met:
[0028] b max ≤1 / 3h max ;
[0029] b max ≤0.2L n ;
[0030] Among them, L n This refers to the longitudinal spacing between the horizontal partitions.
[0031] Furthermore, in steps S4 and S5, the values of the diaphragm cross-section width b and the diaphragm cross-section height h are increased and iteratively calculated, specifically as follows:
[0032] First, the single increment of the cross-sectional width b and cross-sectional height h of the diaphragm is taken as 10%b and 10%h, respectively.
[0033] When the bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 1%b and 1%h, respectively.
[0034] When the load-bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 0.1%b and 0.1%h, respectively.
[0035] The iteration stops and the loop exits when the load-bearing capacity calculation requirements of the selected specification cannot be met.
[0036] Furthermore, in the currently recorded combination n, the cumulative increments of the diaphragm cross-sectional width b and the diaphragm cross-sectional height h should not exceed P. n-1 50% of each item.
[0037] Furthermore, in step S7, the formula for selecting the most suitable solution is:
[0038] Opt = Min{CoSt pi ×Comt pi};
[0039] In the formula, Cost pi For the splicing connection scheme P i The corresponding total construction cost, Comt pi To assess the feasibility of construction, an expert evaluation method was used to evaluate the widening and connection scheme P. i To score;
[0040] in,
[0041] Cost pi =R i +C i +J i +T i ;
[0042] In the formula, R i For the labor cost corresponding to the width-splitting connection scheme Pi, C i J represents the material cost corresponding to the splicing connection scheme Pi. i T represents the mechanical cost corresponding to the splicing connection scheme Pi. i Other construction costs.
[0043] The economic accounting methods used here are common techniques in this field, involving basic concepts of "engineering economics." They can be easily calculated in the field of engineering finance, and the basic formula is: Cost = Quantity × Unit Price. These parameters are known to those skilled in the art and can be uniquely determined based on the actual situation.
[0044] A second aspect of the present invention provides a lateral deformation coordinated splicing system for long-span box girder bridges, comprising:
[0045] Memory, used to store computer programs;
[0046] A processor is used to execute the computer program to implement the steps of the above-described method for coordinated splicing of transverse deformation of large-span box girder bridges.
[0047] Compared with the prior art, the present invention has the following beneficial effects:
[0048] (1) By optimizing the cross-sectional dimensions of the diaphragm to increase the spacing between the diaphragms and reduce the number of diaphragms, this invention can effectively reduce the amount of work, avoid excessive design redundancy, reduce the waste of manpower and material resources, and improve the economy of the project.
[0049] (2) The specific steps of the present invention can provide a complete and feasible optimization process for the cross diaphragm splicing scheme, which facilitates designers to optimize the design, reduce working hours and improve efficiency. Attached Figure Description
[0050] Figure 1 This is a flowchart illustrating the method for coordinated splicing of lateral deformation in a long-span box girder bridge according to Embodiment 1 of the present invention.
[0051] Figure 2 This is a schematic diagram of the mechanical system and related parameters of the method for coordinated splicing of transverse deformation in long-span box girder bridges according to the present invention. Detailed Implementation
[0052] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. These embodiments are based on the technical solution of the present invention and provide detailed implementation methods and specific operating procedures. However, the scope of protection of the present invention is not limited to the following embodiments.
[0053] Unless otherwise specified in this technical solution, the component model, material name, connection structure, control method, and other features are considered to be common technical features disclosed in the prior art.
[0054] In the description of this invention, it should be understood that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0055] In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined. Furthermore, the terms "mounted," "connected," and "connected" should be understood in a broad sense, for example, they may be fixedly connected, detachably connected, or integrally connected; they may be bolted or welded; they may be directly connected or indirectly connected through an intermediary, or they may be internal communication between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] In order to increase the spacing of the transverse diaphragms, reduce the number of transverse diaphragms, reduce the amount of work, and avoid excessive design redundancy, the present invention provides a method for coordinating and splicing transverse deformation of a long-span box girder bridge. The steps are described in Figure 1 As shown, the relevant mechanical system and related parameters are described in Figure 2 As shown, it includes the following steps:
[0057] S1: Propose a widening connection scheme: establish the longitudinal spacing L between transverse diaphragms, the cross-sectional height h of the transverse diaphragms, the cross-sectional width b of the transverse diaphragms, and the elastic modulus E of the transverse diaphragm material;
[0058] S2: Preliminary verification of the widening connection scheme: select the design specification to carry out the bearing capacity verification analysis on the widening connection scheme in S1. If it does not meet the specification requirements, return to S1 for modification; if it meets the specification requirements, proceed to the next step;
[0059] S3: Optimize the longitudinal spacing L between the transverse diaphragms in the widening connection scheme: increase the transverse diaphragm spacing L and carry out the bearing capacity verification analysis until the verification result does not meet the specification requirements, take the last transverse diaphragm spacing L1 that meets the specification requirements, and record the current combination of b1, h1, and L1 as P1;
[0060] S4: Optimize the cross-sectional height h and cross-sectional width b of the transverse diaphragm in the widening connection scheme: respectively increase the cross-sectional height or cross-sectional width of the transverse diaphragm, that is, increase the calculated value of the cross-sectional moment of inertia I;
[0061] S5: Verify the limit values of the cross-sectional height h and cross-sectional width b of the transverse diaphragm, and the limit value of the longitudinal spacing L between the transverse diaphragms in the widening connection scheme: determine whether the increased cross-sectional height h and cross-sectional width b of the transverse diaphragm respectively reach the height extreme value h max The width extreme value is b max If the extreme value is not reached, increase the transverse diaphragm spacing equally and carry out the bearing capacity verification analysis until the verification result does not meet the specification requirements, take the last transverse diaphragm spacing L that meets the specification requirements i (1<i≤n), record the current combination as b i , h i , L i The combination is Pi (1<i≤n), and return to S4. If the extreme value is reached, proceed to S6;
[0062] S6: Optimize the longitudinal spacing L between diaphragms, the cross-section height h of the diaphragm, and the cross-section width b of the diaphragm in the widened splicing connection scheme: When the values of the cross-section height h of the diaphragm and the cross-section width b of the diaphragm are the height extreme value h max and the width extreme value b max , increase the value of the diaphragm spacing and conduct a bearing capacity verification analysis until the verification result no longer meets the specification requirements. Take the last diaphragm spacing L that meets the specification requirements n , and record the combination of b n , h n , and L n that meets the specification requirements as P n ;
[0063] S7: Determine the optimal widened splicing connection scheme: Select one combination from P1-P n to determine the widened splicing connection scheme.
[0064] In some specific embodiments, please refer again to Figure 1 , in steps S2, S3, S4, S5, and S6, the specific steps of the bearing capacity verification analysis are:
[0065] Establish a finite element numerical analysis model;
[0066] Calculate the combined action effect value of the diaphragms in the widened splicing connection scheme; and
[0067] Verify the bearing capacity according to the selected specifications.
[0068] In a more specific embodiment, please refer again to Figure 1 , the specific formula for the bearing capacity verification analysis is:
[0069] γ0S≤R;
[0070] R=R(E, h, b);
[0071] where γ0 is the importance coefficient of the bridge structure, determined according to the safety level of the bridge structure design; S is the design value of the combined action effect; R is the design value of the bearing capacity, E is the elastic modulus of the diaphragm material, b is the cross-section width of the diaphragm, and h is the cross-section height of the diaphragm.
[0072] R can be directly obtained by those skilled in the art through relevant calculation formulas, wherein the material strength design parameters can be queried from E, and the geometric design parameters can be queried from h and b, and then the design values can be obtained by querying the design documents. These parameters are known to those skilled in the art and can be uniquely determined according to actual conditions.
[0073] For some specific implementation methods, please refer to [link / reference]. Figure 1 As shown, in steps S4 and S5, the cross-sectional height h of the diaphragm is first increased. When h increases to h max Then, increase the cross-sectional width of the diaphragm by b to b max .
[0074] For some specific implementation methods, please refer to [link / reference]. Figure 1 As shown, in steps S4 and S5, the extreme value h of the diaphragm height max The height of the box girder at the location of the diaphragm section shall not exceed the height of the box girder.
[0075] For more detailed implementation methods, please refer to [link / reference]. Figure 1 As shown, in steps S4 and S5, when longitudinal prestressed steel bars of the box girder are provided within 5cm above the lower edge of the diaphragm section, the extreme value of the diaphragm height h max It should be h max +5cm, and the extreme value of height h max The height of the box girder should not exceed the height of the section where the diaphragm is located.
[0076] For some specific implementation methods, please refer to [link / reference]. Figure 1 As shown, in steps S4 and S5, the extreme value b of the width of the diaphragm max The following requirements must be met:
[0077] b max ≤1 / 3h max ;
[0078] b max ≤0.2L n ;
[0079] Among them, L n This refers to the longitudinal spacing between the horizontal partitions.
[0080] For some specific implementation methods, please refer to [link / reference]. Figure 1 As shown, in steps S4 and S5, the values of the diaphragm cross-section width b and the diaphragm cross-section height h are increased and iteratively calculated, specifically as follows:
[0081] First, the single increment of the cross-sectional width b and cross-sectional height h of the diaphragm is taken as 10%b and 10%h, respectively.
[0082] When the bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 1%b and 1%h, respectively.
[0083] When the load-bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 0.1%b and 0.1%h, respectively.
[0084] The iteration stops and the loop exits when the load-bearing capacity calculation requirements of the selected specification cannot be met.
[0085] Furthermore, in the currently recorded combination n, the cumulative increments of the diaphragm cross-sectional width b and the diaphragm cross-sectional height h should not exceed P. n-1 50% of each item.
[0086] For some specific implementation methods, please refer to [link / reference]. Figure 1 As shown, in step S7, the formula for selecting the most suitable solution is:
[0087] Opt = Min{Cost} pi ×Comt pi );
[0088] In the formula, Cost pi For the splicing connection scheme P i The corresponding total construction cost, Comt pi To assess the feasibility of construction, an expert evaluation method was used to evaluate the widening and connection scheme P. i To score;
[0089] in,
[0090] Cost pi =R i +C i +J i +T i ;
[0091] In the formula, R i For the labor cost corresponding to the width-splitting connection scheme Pi, C i J represents the material cost corresponding to the splicing connection scheme Pi. i T represents the mechanical cost corresponding to the splicing connection scheme Pi. i Other construction costs.
[0092] The economic accounting methods used here are common techniques in this field, involving basic concepts of "engineering economics." They can be easily calculated in the field of engineering finance, and the basic formula is: Cost = Quantity × Unit Price. These parameters are known to those skilled in the art and can be uniquely determined based on the actual situation.
[0093] This invention also provides a lateral deformation coordinated splicing system for long-span box girder bridges, comprising:
[0094] Memory, used to store computer programs;
[0095] A processor is used to execute the computer program to implement the steps of the above-described method for coordinated splicing of transverse deformation of large-span box girder bridges.
[0096] Each of the above implementation methods can be implemented individually, or in any combination of two or more.
[0097] The above implementation methods will be described in more detail below with reference to specific embodiments.
[0098] Example 1
[0099] In this embodiment, a set of initial design schemes for the cross diaphragm of a bridge with widening is obtained from a certain actual engineering design scheme, with the relevant parameters being: b = 0.3m, h = 1.2m, and L = 2m.
[0100] Based on the structural characteristics of the bridges on both sides before widening, h was selected. max Given a box girder height of 2.7m, correspondingly, b max For 0.9m and 0.2L n The smaller values in the S6 are used; the increases of b, h, and L are made by equal increments, with single increments of 0.1m, 0.2m, and 0.2m respectively. When b and h are close to their extreme values and L is close to its extreme value in S6, and a single increment cannot make the structure meet the specification requirements, the increment is reduced.
[0101] Proceed to step S2 to verify the above scheme. The result meets the specification requirements.
[0102] Proceed to step S3, increase the diaphragm spacing L by the same amount until the structural verification result does not meet the specification requirements, and take the final diaphragm spacing L that meets the specification requirements, resulting in P1: b1 = 0.3m, h1 = 1.2m, L1 = 2.6m.
[0103] Proceed to step S4. When increasing the moment of inertia I of the cross section, first increase h. When h increases to h... max Then increase b. Therefore, first increase the cross-sectional height to h = 1.4m.
[0104] Entering step S5, it is determined that b and h have not both reached their extreme values. Therefore, the diaphragm spacing L is increased by an equal amount until the structural verification result does not meet the specification requirements. The final diaphragm spacing L that meets the specification requirements is taken, resulting in P2: b2 = 0.3m, h2 = 1.4m, L2 = 2.8m. At the same time, the process returns to step S4 and enters the loop.
[0105] After the above iterations, before both b and h reach their extreme values, the following schemes are obtained:
[0106] Scheme number n <![CDATA[b n ]]> <![CDATA[h n ]]> <![CDATA[L n ]]> 1 0.3 1.2 2.6 2 0.3 1.4 2.8 3 0.3 1.6 2.8 4 0.3 1.8 3.0 5 0.3 2.0 3.0 6 0.3 2.2 3.0 7 0.3 2.4 3.2 8 0.3 2.6 3.2 9 0.3 2.7 3.2 10 0.4 2.7 3.2 11 0.5 2.7 3.4 12 0.6 2.7 3.4
[0107] Continuing to increase b, the increment reaches an extreme value of 0.68m before reaching 0.1m. At this point, proceed to step S6. Further increasing L reveals that an equivalent increase of 0.2m does not meet the specifications, therefore the increment is reduced, ultimately resulting in L = 3.44m. At this point, P... 13 :b13 =0.68m, h 13 =2.7m, L 13 =3.44m.
[0108] Moving to step S7, it can be seen that the increase in the spacing between the transverse diaphragms after P7 is relatively small, while the cross-sectional dimensions of the transverse diaphragms need to be significantly increased. Therefore, the scheme after P7 is not economically advantageous. Thus, P7: b7 = 0.3m, h7 = 2.4m, L7 = 3.2m is selected as the optimized recommended scheme.
[0109] Example 2
[0110] This embodiment provides a lateral deformation coordinated splicing system for long-span box girder bridges, including:
[0111] Memory, used to store computer programs;
[0112] The processor is used to execute computer programs to implement the steps of the method for coordinated splicing of lateral deformation of large-span box girder bridges in Embodiment 1.
[0113] The above description of the embodiments is provided to enable those skilled in the art to understand and use the invention. It will be apparent to those skilled in the art that various modifications can be made to these embodiments, and the general principles described herein can be applied to other embodiments without inventive effort. Therefore, the present invention is not limited to the above embodiments, and any improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the invention should be within the protection scope of the present invention.
Claims
1. A method for coordinated splicing of transverse deformation in a long-span box girder bridge, characterized in that, Includes the following steps: S1: Propose a splicing connection scheme: determine the longitudinal spacing L between the transverse diaphragms, the cross-sectional height h of the transverse diaphragm, the cross-sectional width b of the transverse diaphragm, and the elastic modulus E of the transverse diaphragm material; S2: Preliminary verification of the splicing connection scheme: The selected design specifications are used to perform load-bearing capacity verification and analysis on the splicing connection scheme in S1. If it does not meet the specifications, it is returned to S1 for modification. If it meets the specifications, proceed to the next step. S3: Optimize the longitudinal spacing L between transverse diaphragms in the splicing connection scheme: Increase the transverse diaphragm spacing L and perform load-bearing capacity verification analysis until the verification result does not meet the specification requirements. Take the last transverse diaphragm spacing L1 that meets the specification requirements and record the current combination of b1, h1, and L1 as P1. S4: Optimize the cross-sectional height h and width b of the diaphragm in the splicing connection scheme: increase the cross-sectional height h or the cross-sectional width of the diaphragm respectively; S5: Verify the extreme values of the cross-section height h and cross-section width b of the diaphragm, and the longitudinal spacing L between diaphragms in the widening connection scheme: determine whether the increased cross-section height h and cross-section width b of the diaphragm have respectively reached the height extreme value h max and the width extreme value b max . If the extreme values are not reached, equally increase the diaphragm spacing and conduct a bearing capacity verification analysis, until the verification result fails to meet the specification requirements. Take the last diaphragm spacing L that meets the specification requirements i (1<i≤n), record the current combination as b i , h i , L i combination as P i (1<i≤n), and return to S4. If the extreme values are reached, proceed to S6; S6: Optimize the longitudinal spacing L between transverse diaphragms, the cross-sectional height h of the transverse diaphragm, and the cross-sectional width b of the transverse diaphragm in the widening connection scheme: The values of the cross-sectional height h and the cross-sectional width b are the extreme values of the height h. max Width extreme value b max In this case, increase the value of the diaphragm spacing and perform load-bearing capacity verification analysis until the verification result does not meet the specification requirements. Then, take the final diaphragm spacing L that meets the specification requirements. n Record b that meets the specification requirements n h n L n The combination is P n ; S7: Determine the optimal splicing connection scheme: Select P1-P n One combination is used to establish a splicing connection scheme.
2. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In steps S2, S3, S5, and S6, the specific steps for the bearing capacity verification analysis are as follows: Establish a finite element numerical analysis model; Calculate the combined effect value of the transverse diaphragms in the width-splitting connection scheme; and The bearing capacity was verified according to the selected specifications.
3. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 2, characterized in that, The specific formula for the bearing capacity verification analysis is as follows: γ0S≤R; R = R(E, h, b); Wherein, γ0 is the importance coefficient of the bridge structure, which is determined according to the safety level of the bridge structure design; S is the design value of the effect of the action combination; R is the design value of the bearing capacity; E is the elastic modulus of the diaphragm material; b is the width of the diaphragm section; and h is the height of the diaphragm section.
4. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In steps S4 and S5, the cross-sectional height h of the diaphragm is first increased. When h increases to h max Then, increase the cross-sectional width of the diaphragm by b to b max .
5. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In steps S4 and S5, the extreme value h of the diaphragm height max The height of the box girder at the location of the diaphragm section shall not exceed the height of the box girder.
6. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 5, characterized in that, In steps S4 and S5, when longitudinal prestressed steel bars for the box girder are provided within 5 cm above the lower edge of the diaphragm section, the extreme value of the diaphragm height h is... max It should be h max +5cm, and the extreme value of height h max The height of the box girder should not exceed the height of the section where the diaphragm is located.
7. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In steps S4 and S5, the extreme value of the width of the diaphragm is b. max The following requirements must be met: b max ≤1 / 3h max ; b max ≤0.2L n ; Among them, L n This refers to the longitudinal spacing between the horizontal partitions.
8. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In steps S4 and S5, the values of the diaphragm cross-section width b and the diaphragm cross-section height h are increased and iteratively calculated, specifically as follows: First, the single increment of the cross-sectional width b and cross-sectional height h of the diaphragm is taken as 10%b and 10%h, respectively. When the bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 1%b and 1%h, respectively. When the load-bearing capacity calculation requirements of the selected specification cannot be met, the single increment values of the diaphragm section width b and the diaphragm section height h are reduced to 0.1%b and 0.1%h, respectively. The iteration stops and the loop exits when the load-bearing capacity calculation requirements of the selected specification cannot be met. Furthermore, in the currently recorded combination n, the cumulative increments of the diaphragm cross-sectional width b and the diaphragm cross-sectional height h should not exceed P. n-1 50% of each item.
9. The method for coordinated splicing of transverse deformation in a long-span box girder bridge according to claim 1, characterized in that, In step S7, the formula for selecting the most suitable solution is: Opt=Min{Cost pi ×Comt pi }; In the formula, Cost pi For the splicing connection scheme P i The corresponding total construction cost, Comt pi To assess the feasibility of construction, an expert evaluation method was used to evaluate the widening and connection scheme P. i To score; in, Cost pi =R i +C i +J i +T i ; In the formula, R i For the labor cost corresponding to the width-splitting connection scheme Pi, C i J represents the material cost corresponding to the splicing connection scheme Pi. i T represents the mechanical cost corresponding to the splicing connection scheme Pi. i Other construction costs.
10. A lateral deformation coordinated splicing system for long-span box girder bridges, characterized in that, include: Memory, used to store computer programs; A processor, used to execute the computer program to implement the steps of the method for coordinated splicing of transverse deformation of a long-span box girder bridge as described in any one of claims 1-9.
Citation Information
Patent Citations
Infra-red apparatus
CA1157367A
Mathematical optimization algorithm-based universal method for standardized design of separated steel box composite girder bridge
CN114818440A