A prefabricated masonry reinforced soil embankment construction method for a vehicle test field

By constructing reinforced earth embankments using precast components, the problem of uneven settlement of embankments at the automotive test track was solved, the overall strength and bearing capacity of the roadbed were improved, and the requirements for special road use were met.

CN117779541BActive Publication Date: 2026-07-21CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA FIRST HIGHWAY ENGINEERING CO LTD
Filing Date
2023-12-29
Publication Date
2026-07-21
Patent Text Reader

Abstract

The application discloses a kind of prefabricated masonry reinforced soil embankment construction methods of automobile test field, comprising the following steps: (1) establishing the embankment electronic model of automobile test field, obtains the data of to be masonry roadbed;(2) field measurement lofting, and to field foundation excavation, backfill, compaction, leveling;(3) to be masonry roadbed is divided into multiple regions along the direction of automobile travel;(4) masonry embankment bottom layer prefabricated retaining wall, paving bottom layer reinforced soil layer;(5) masonry first layer prefabricated block layer;(6) on the first layer prefabricated block layer of masonry completion paving geogrid net;(7) repeat step (4)-(6), until the masonry of embankment main body is completed, and finally complete pavement layer construction.The method is simple in construction, uses prefabricated component to masonry automobile test field reinforced soil embankment, guarantees the integrity of its structure, has good anti-deformation ability, improves the overall strength and bearing capacity of roadbed, meets the use demand of special road of automobile test field.
Need to check novelty before this filing date? Find Prior Art