A prefabricated retaining wall drainage pipe fixing device, a construction process thereof and a prefabricated retaining wall

By designing the inner and outer ring structures and the grouting liquid, the problem of deformation incoordination when the drainage pipe comes into contact with the concrete was solved, achieving close contact between the drainage pipe and the concrete, preventing soil erosion and concrete damage, and extending the service life of the drainage pipe.

CN117779680BActive Publication Date: 2026-11-20THE GUANGDONG NO 3 WATER CONSERVANCY & HYDRO ELECTRIC ENG BOARD CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311713487.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2026-11-20
Estimated Expiration
2043-12-13

AI Technical Summary

Technical Problem

In existing river retaining walls, the different deformation properties of drainage pipes when in contact with concrete can lead to gaps or excessive tightness, causing soil erosion or concrete damage.

Method used

The system employs an inner and outer ring structure, with grouting liquid filling the space between the inner and outer rings. A rubber pad and reinforcing sleeve are also installed between the inner and outer rings. The inner ring can move radially, and the elasticity of the rubber pad and the extensibility of the grouting liquid ensure a tight contact between the drainage pipe and the concrete.

Benefits of technology

This effectively avoids deformation inconsistencies caused by changes in water pressure and temperature, ensures close contact between the drainage pipe and the concrete, prevents soil erosion and concrete damage, and extends the service life of the drainage pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117779680B_ABST
    Figure CN117779680B_ABST
Patent Text Reader

Abstract

The present application belongs to the technical field of retaining wall structure in river engineering, and particularly relates to a prefabricated retaining wall drainage pipe fixing device, a construction process thereof and a prefabricated retaining wall. The prefabricated retaining wall drainage pipe fixing device comprises an inner ring and an outer ring, the inner ring is arranged inside the outer ring, and a grouting liquid is filled between the inner ring and the outer ring; the inner ring comprises a plurality of inner ring bodies, the plurality of inner ring bodies are arranged in a ring structure in the circumferential direction; the upper end and / or the lower end of the inner ring body is provided with a flange; the outer ring comprises an outer ring body, the upper end and / or the lower end of the outer ring body is provided with a flange; the flange and the flange are arranged oppositely, and the flange and the flange are embedded in the radial direction. The present application sets the inner ring and the outer ring, injects a liquid with a certain elasticity between the inner ring and the outer ring, and the inner ring can move in the radial direction, so as to achieve the expansion and contraction of the drainage pipe fixing device, ensure the close contact between the drainage pipe and the concrete, and prevent seepage caused by water pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of retaining wall structures in river engineering, specifically relating to a prefabricated retaining wall drainage pipe fixing device and its construction process, and a prefabricated retaining wall. Background Technology

[0002] River ecological retaining walls are used to protect the ecological environment of riverbanks. They serve both ecological and environmental protection purposes, as well as providing a scenic view and preventing soil erosion. Constructing river retaining walls on both sides of a river can promote the exchange of surface water and groundwater, restore the growth environment of plants and animals in the river, and provide habitats for aquatic plants and animals.

[0003] River ecological retaining walls mainly include gabion retaining walls, precast concrete retaining walls, and eco-bag retaining walls. Among them, precast concrete retaining walls are a new type of retaining wall structure using precast concrete blocks as building materials. Precast concrete retaining walls are widely used in engineering projects due to their ease of construction. Common precast concrete retaining walls, in order to divert surface water into the river, have drainage holes installed within the concrete blocks. Drainage pipes are installed within these drainage holes, connecting the side adjacent to the soil and the side adjacent to the river, thus diverting surface water or groundwater into the river channel.

[0004] As disclosed in prior art CN116219946A, a retaining structure for spacing safety and ecology includes a masonry structure, a retaining wall, a drainage system, and a greening system. The masonry structure is fixed at a predetermined position on the outside of a river channel or slope. The retaining wall is cast between the masonry structure and the river channel or slope. The greening system is located on the outer side of the masonry structure. The drainage system includes several drainage pipes embedded in the retaining wall. One end of each drainage pipe extends out from one side of the retaining wall, and the other end connects to the greening system. By setting up a drainage system, internal accumulated water can be drained in a timely manner, while simultaneously irrigating and maintaining the external greening system. In addition, by setting up a greening system, different greening schemes can be selected and adjusted as needed, greatly improving the aesthetic effect and thus achieving both safety and ecological benefits. The prior art CN219118057U discloses a small-to-medium-sized river ecological retaining wall, including a flower trough retaining wall. The water-facing side of the flower trough retaining wall has a stepped structure, and flower troughs are opened on the surface of the stepped structure. Multiple water inlets are opened on the other side of the flower trough retaining wall, and drainage pipes are pre-embedded in the water inlets, with the drainage pipes inclined towards the trough side. A railing is connected to the top of the flower trough retaining wall. The flower trough retaining wall is set above a stone powder cushion layer. The bottom of the water-facing side of the flower trough retaining wall is reinforced with dry-laid stone. A filter bag is set at the end of the water inlet away from the water-facing side. This device solves the problem that existing river retaining walls cannot take into account both the mutual bank function and the landscape function, and the slope is too steep, which is easy to cause people to fall. It has the characteristics of effectively taking into account both the mutual bank function and the ecological function, and the stepped slope can avoid people falling.

[0005] However, in the existing river retaining wall technology, the drainage pipe is directly installed in the drainage hole opened in the concrete, and the drainage pipe is in direct contact with the retaining wall. During the installation and use of the drainage pipe, due to the different deformation properties of the drainage pipe and the concrete, gaps may appear between the drainage pipe and the concrete, resulting in soil erosion, or the pipe may be too tight, causing damage to the concrete.

[0006] Therefore, there is an urgent need to provide a precast retaining wall drainage pipe fixing device and its construction process, as well as a precast retaining wall, to ensure that the drainage pipe and the precast retaining wall are in close contact and that the concrete is not easily damaged. Summary of the Invention

[0007] In order to solve the above-mentioned technical problems in the prior art, the present invention provides a prefabricated retaining wall drainage pipe fixing device and its construction process, as well as a prefabricated retaining wall.

[0008] To achieve the above objectives, the technical solution of the present invention is as follows:

[0009] A prefabricated retaining wall drainage pipe fixing device includes an inner ring and an outer ring. The inner ring is disposed inside the outer ring, and grouting liquid is filled between the inner ring and the outer ring. The inner ring includes a plurality of inner ring bodies, which form a ring structure along the circumference. A flange is provided at the upper end and / or lower end of the inner ring body. The outer ring includes an outer ring body, and a flange is provided at the upper end and / or lower end of the outer ring body. The flange and the flange are arranged opposite to each other, and the flange and the flange are radially interlocked.

[0010] Furthermore, the flange is provided with a radial guide post, and the flange is provided with a radial guide groove, the guide post extending into the guide groove; or, the flange is provided with a radial guide groove, and the flange is provided with a radial guide post, the guide post extending into the guide groove.

[0011] Furthermore, the guide post has a circular cross-section.

[0012] Furthermore, the number of inner ring bodies is at least 2.

[0013] Furthermore, a plurality of internal teeth are provided on the outer side wall of the inner ring body, and the internal teeth are arranged radially along the inner ring body.

[0014] Furthermore, the inner teeth are configured as several columns, and the several columns of inner teeth are distributed in a circumferential array along the inner ring body.

[0015] Furthermore, at least one row of internal teeth is provided on the outer side wall of each inner ring body.

[0016] Furthermore, when the flange and the protrusion have the smallest engagement gap, the internal teeth abut against the inner sidewall of the outer ring body.

[0017] Furthermore, the number of outer ring bodies is one or more, and the multiple outer ring bodies form a ring structure along the circumferential direction.

[0018] Furthermore, the inner sidewall of the outer ring body is provided with a plurality of external teeth, which are arranged radially along the outer ring body.

[0019] Furthermore, the outer teeth are configured as several columns, and the several columns of outer teeth are distributed in a circumferential array along the outer ring body.

[0020] Furthermore, at least one row of external teeth is provided on the inner sidewall of each outer ring body.

[0021] Furthermore, when the flange and the protrusion have the smallest engagement gap, the outer teeth abut against the outer side wall of the inner ring body.

[0022] Furthermore, the prefabricated retaining wall drainage pipe fixing device also includes a rubber pad layer, which is disposed inside the inner ring.

[0023] Furthermore, the prefabricated retaining wall drainage pipe fixing device also includes a reinforcing sleeve, which is disposed inside the rubber pad layer.

[0024] Furthermore, the grouting liquid is an aqueous solution of sodium silicate.

[0025] This invention also provides a construction process for a precast retaining wall drainage pipe fixing device, used for constructing the aforementioned precast retaining wall drainage pipe fixing device, specifically including:

[0026] S1. Before the precast retaining wall is poured, the inner ring and the outer ring are pre-embedded in the precast retaining wall, and then the precast retaining wall is poured.

[0027] S2. Install a rubber pad on the outside of the drain pipe with the reinforcing sleeve, and install the drain pipe with the rubber pad and the reinforcing sleeve into the inner ring.

[0028] S3. Grouting is performed between the inner ring and the outer ring, and the construction is completed.

[0029] Furthermore, during grouting, grouting is stopped when the rubber pad layer is compressed to 50% of its original thickness.

[0030] Furthermore, before grouting, pressure sensors are embedded at both ends of the rubber pad. Grouting is then performed, and the pressure sensors are used to detect the pressure on the rubber pad. The real-time average value of the pressure values ​​collected by the two pressure sensors is taken as P. The real-time average value corresponding to when the rubber pad is compressed to 50% of its original thickness is set as P1. A judgment value P2 is set. From the start of grouting, grouting is performed by gradually increasing the grouting speed until liquid overflow is observed at the joint of the inner and outer rings. Then, the grouting speed is kept constant until the real-time average value reaches P2. Then, grouting is performed by gradually decreasing the grouting speed until the real-time average value reaches P1.

[0031] The present invention also provides a precast retaining wall, comprising a precast retaining wall block, wherein one side of the precast retaining wall block is a soil-adjacent side and the other side is a river-adjacent side; a drainage pipe is provided inside the precast retaining wall block, and the aforementioned precast retaining wall drainage pipe fixing device is provided between the drainage pipe and the precast retaining wall block.

[0032] Furthermore, the drainage pipe is inclined downwards from the side adjacent to the soil to the side adjacent to the river, and a filter bag is installed inside the end of the drainage pipe near the side adjacent to the soil.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] The precast retaining wall drainage pipe fixing device provided by the present invention sets an inner ring and an outer ring, injects a liquid with a certain elasticity between the inner ring and the outer ring, and the inner ring can move radially, thereby achieving the expansion and contraction of the drainage pipe fixing device, ensuring tight contact between the drainage pipe and the concrete, and preventing seepage due to water pressure.

[0035] The precast retaining wall drainage pipe fixing device provided by the present invention has a rubber pad layer on the outside of the drainage pipe. Combined with the inner and outer rings, it can ensure that the two different materials, concrete and drainage pipe, do not deform in a coordinated manner due to temperature changes, thus avoiding damage to the concrete.

[0036] The prefabricated retaining wall drainage pipe fixing device provided by the present invention provides a reinforcing sleeve on the outside of the drainage pipe to protect the drainage pipe from deformation under pressure and enhance the service life of the drainage pipe. Attached Figure Description

[0037] Figure 1 This is a schematic diagram of the prefabricated retaining wall drainage pipe fixing device of the present invention.

[0038] Figure 2 This is a schematic diagram of the cross-sectional structure of the prefabricated retaining wall drainage pipe fixing device of the present invention.

[0039] Figure 3 This is a schematic diagram of the inner and outer rings of the present invention.

[0040] Figure 4 This is a schematic diagram of the horizontal structure of the prefabricated retaining wall of the present invention.

[0041] Figure 5 This is a schematic diagram of the prefabricated retaining wall in the vertical direction according to the present invention.

[0042] Explanation of reference numerals in the attached figures:

[0043] 1. Inner ring; 101. Inner ring body; 102. Flange; 103. Guide post; 104. Internal tooth; 2. Outer ring; 201. Outer ring body; 202. Flange; 203. Guide groove; 204. External tooth; 3. Rubber pad; 4. Reinforcing sleeve; 5. Drainage pipe; 6. Precast retaining wall block. Detailed Implementation

[0044] The technical solution of the present invention will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention. All other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.

[0045] It should be noted that, unless otherwise specifically stated, the relative arrangement, numerical expressions, and values ​​of the components and steps described in these embodiments should not be construed as limiting the scope of the invention. Furthermore, it should be understood that, for ease of description, the dimensions of the various components shown in the drawings are not necessarily drawn to actual scale; for example, the thickness, width, length, or distance of some units may be enlarged relative to other structures.

[0046] The following description of exemplary embodiments is merely illustrative and is not intended to limit the invention or its application or use in any way. Techniques, methods, and apparatus known to those skilled in the art may not be discussed in detail herein, but where applicable, such techniques, methods, and apparatus should be considered part of this specification.

[0047] Example 1

[0048] This embodiment provides a prefabricated retaining wall drainage pipe fixing device, such as... Figure 1 As shown, the device includes an inner ring 1 and an outer ring 2. The inner ring 1 is located inside the outer ring 2, and the space between the inner ring 1 and the outer ring 2 is filled with grouting liquid. The precast retaining wall drainage pipe fixing device also includes a rubber pad 3, which is located inside the inner ring 1. The precast retaining wall drainage pipe fixing device also includes a reinforcing sleeve 4, which is located inside the rubber pad 3. The drainage pipe 5 is made of commonly used PVC material. During use, the outer ring 2 is surrounded by precast concrete retaining wall blocks 6.

[0049] The grouting liquid is an aqueous solution of sodium silicate. After solidification, the sodium silicate solution forms a silica gel. This silica gel possesses a certain strength and elasticity, thus it can absorb pressure and has extensibility. In this embodiment, the sodium silicate aqueous solution used can be within the concentration range commonly used in adhesives with existing technology.

[0050] like Figure 2 As shown, the inner ring 1 includes a plurality of inner ring bodies 101, which form a ring structure along the circumference. In this embodiment, the inner ring 1 is divided into 8 inner ring bodies 101. In other embodiments, the inner ring 1 can also be divided into 2, 3, 4 or other numbers of inner ring bodies.

[0051] The inner ring body 101 has a flange 102 at its upper and / or lower ends; the outer ring 2 includes an outer ring body 201, and a flange 202 is provided at its upper and / or lower ends; the flange 102 and the flange 202 are arranged opposite to each other, and the flange 101 and the flange 202 are radially fitted together. The structures of the inner ring 1 and outer ring 2 in this embodiment are as follows: Figure 3 As shown, in this embodiment, flanges 102 are provided at both the upper and lower ends of the inner ring body 101, and flanges 202 are provided at both the upper and lower ends of the outer ring body 201. The flanges 102 and flanges 202 are fitted together. In other embodiments, only one of the upper and lower ends of the inner ring body 101 may be provided with a flange 102, while the other may not have a flange; correspondingly, only one of the upper and lower ends of the outer ring body 201 may be provided with a flange 202 corresponding to the flange 102, while the other may not have a flange structure.

[0052] Specific interlocking structures, such as Figure 3 As shown, a radial guide post 103 is provided on the flange 102, and a radial guide groove 203 is provided on the flange 202, with the guide post 103 extending into the guide groove 203; in other embodiments, a radial guide groove may also be provided on the flange 102, and a radial guide post may be provided on the flange 202, with the guide post extending into the guide groove.

[0053] The guide post 103 has a circular cross-section, which facilitates processing and reduces friction. The fit between the guide post 103 and the guide groove 203 should allow for smooth movement with minimal gap to reduce grout overflow during the grouting process. However, some grout overflow is unavoidable during grouting. This overflow helps to expel air between the inner ring 1 and the outer ring 2, thereby achieving complete filling of the grout and improving the expansion and contraction performance of the drainage pipe fixing device.

[0054] A plurality of internal teeth 104 are provided on the outer side wall of the inner ring body 101, and the internal teeth 104 are arranged radially along the inner ring body 101. The internal teeth 104 are arranged in several rows, and the several rows of internal teeth 104 are distributed in a circumferential array along the inner ring body 101. At least one row of internal teeth 104 is provided on the outer side wall of each inner ring body 101. In this embodiment, there are a total of 8 rows of internal teeth 104, and one row of internal teeth 104 is provided on each inner ring body 101. When the engagement gap between the flange 102 and the flange 202 is minimal, the internal teeth 104 abut against the inner side wall of the outer ring body 201. This avoids severe deformation of the inner ring body 101 and damage to the inner ring when the water pressure in the drain pipe is high. At the same time, the position of the inner ring 1 can also be positioned by the internal teeth 104 before grouting.

[0055] The number of outer ring bodies 201 is one or more, and multiple outer ring bodies 201 form a ring structure along the circumference. When there is one outer ring body 201, the outer ring body 201 is ring-shaped and is set in the drainage hole of the precast retaining wall block; when there are multiple outer ring bodies 201, the installation is more convenient. During the grouting process and use, the outer ring 2 is restricted by the precast retaining wall block and does not move, while the inner ring 1 is subjected to the pressure of the water pressure in the drainage pipe and moves outward or inward, thereby realizing the expansion and contraction of the fixing device, ensuring that the precast retaining wall block and the drainage pipe are always in close contact and preventing seepage.

[0056] The inner wall of the outer ring body 201 is provided with a plurality of external teeth 204, which are arranged radially along the outer ring body 201. The external teeth 204 are arranged in a plurality of rows, which are distributed in a circumferential array along the outer ring body 201. At least one row of external teeth 204 is provided on the inner wall of each outer ring body 201. When the engagement gap (horizontal direction) between the flange 102 and the protrusion 202 is at its minimum, the external teeth 204 abut against the outer wall of the inner ring body 101.

[0057] In this embodiment, the outer ring body 201 is a complete ring. Eight rows of external teeth 204 are provided on the inner sidewall of the outer ring body 201. The eight rows of external teeth 204 correspond to the eight rows of internal teeth 104, and the internal teeth 104 and external teeth 204 are staggered in the vertical direction.

[0058] Example 2

[0059] This embodiment provides a construction process for a prefabricated retaining wall drainage pipe fixing device, used for constructing the prefabricated retaining wall drainage pipe fixing device provided in Embodiment 1, specifically including:

[0060] S1. Before the precast retaining wall is poured, the inner ring 1 and the outer ring 2 are pre-embedded in the precast retaining wall, and then the precast retaining wall is poured; after the pouring is completed, wait for the precast retaining wall to dry.

[0061] S2. A rubber pad 3 is fitted on the outside of the drain pipe 5 with the reinforcing sleeve 4, and the drain pipe 5 with the rubber pad 3 and the reinforcing sleeve 4 is installed into the inner ring 1.

[0062] S3. Grouting is performed between the inner ring 1 and the outer ring 2, and the construction is completed.

[0063] During grouting, grouting is stopped when the rubber pad 3 is compressed to 50% of its original thickness. At this point, the rubber pad 3 is kept under pressure on the internal drainage pipe 5, and the grout between the inner ring 1 and the outer ring 2 is kept elastic after curing.

[0064] Preferably, before grouting, pressure sensors are embedded at both ends of the rubber pad 3. Grouting is then performed, and the pressure sensors are used to detect the pressure on the rubber pad. The real-time average value of the pressure values ​​collected by the two pressure sensors is taken as P. The real-time average value corresponding to when the rubber pad is compressed to 50% of its original thickness is set as P1. A judgment value P2 is set. From the start of grouting, grouting is performed by gradually increasing the grouting speed until liquid overflow is observed at the junction of the inner and outer rings. Then, the grouting speed is kept constant until the real-time average value reaches P2. Then, grouting is performed by gradually decreasing the grouting speed until the real-time average value reaches P1.

[0065] Example 3

[0066] This embodiment provides a prefabricated retaining wall, including a plurality of prefabricated retaining wall blocks 6, one side of which is adjacent to the soil and the other side is adjacent to the river; a drainage pipe 5 is provided inside the prefabricated retaining wall block 6, and a prefabricated retaining wall drainage pipe fixing device provided in Embodiment 1 is provided between the drainage pipe 5 and the prefabricated retaining wall block 6.

[0067] The drainage pipe is inclined downward from the side adjacent to the soil to the side adjacent to the river to facilitate drainage. A filter bag is installed inside the end of the drainage pipe near the soil side. The filter bag can filter out impurities such as mud and sand to prevent the drainage pipe from being blocked.

[0068] The above specific embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to examples, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A construction process for a precast retaining wall drainage pipe fixing device, used for constructing a precast retaining wall drainage pipe fixing device, characterized in that, The precast retaining wall drainage pipe fixing device includes an inner ring and an outer ring. The inner ring is disposed inside the outer ring, and grouting liquid is filled between the inner ring and the outer ring. The inner ring includes several inner ring bodies, which form a ring structure along the circumference. Flanges are provided at the upper and lower ends of the inner ring bodies. The outer ring includes an outer ring body, with flanges provided at the upper and lower ends. The flanges and flanges are arranged opposite to each other and are radially interlocked. The precast retaining wall drainage pipe fixing device also includes a rubber pad layer disposed inside the inner ring. The precast retaining wall drainage pipe fixing device also includes a reinforcing sleeve disposed inside the rubber pad layer. The specific construction process includes: S1. Before the precast retaining wall is poured, the inner ring and the outer ring are pre-embedded in the precast retaining wall, and then the precast retaining wall is poured. S2. Install a rubber pad on the outside of the drain pipe with the reinforcing sleeve, and install the drain pipe with the rubber pad and the reinforcing sleeve into the inner ring. S3. Grouting is performed between the inner ring and the outer ring, and the construction is completed; During grouting, stop grouting when the rubber pad layer is compressed to 50% of its original thickness. Before grouting, pressure sensors are embedded at both ends of the rubber pad. Grouting is then performed, and the pressure sensors are used to detect the pressure on the rubber pad. The real-time average value of the pressure values ​​collected by the two pressure sensors is taken as P. The real-time average value corresponding to when the rubber pad is compressed to 50% of its original thickness is set as P1. A judgment value P2 is set. From the start of grouting, grouting is performed with the grouting speed gradually increasing until liquid overflow is observed at the joint of the inner and outer rings. Then, the grouting speed is kept constant until the real-time average value reaches P2. Then, grouting is performed with the grouting speed gradually decreasing until the real-time average value reaches P1.

2. The construction process according to claim 1, characterized in that, The flange is provided with a radial guide post, and the flange is provided with a radial guide groove, the guide post extending into the guide groove; or, the flange is provided with a radial guide groove, and the flange is provided with a radial guide post, the guide post extending into the guide groove.

3. The construction process according to claim 1, characterized in that, The number of inner ring bodies is at least 2.

4. The construction process according to claim 1, characterized in that, The inner ring body has a plurality of internal teeth on its outer side wall, and the internal teeth are arranged radially along the inner ring body.

5. The construction process according to claim 4, characterized in that, The inner teeth are configured in several columns, and the columns of inner teeth are distributed in a circumferential array along the inner ring body.

6. The construction process according to claim 5, characterized in that, When the gap between the flange and the protrusion is at its minimum, the internal teeth abut against the inner sidewall of the outer ring body.

7. The construction process according to claim 1, characterized in that, The number of outer ring bodies is one or more, and the multiple outer ring bodies form a ring structure along the circumferential direction.

8. The construction process according to claim 1, characterized in that, The inner sidewall of the outer ring body is provided with a plurality of external teeth, which are arranged radially along the outer ring body; the external teeth are arranged in a plurality of columns, which are distributed in a circumferential array along the outer ring body.

9. The construction process according to claim 1, characterized in that, The grouting liquid is an aqueous solution of sodium silicate.

Citation Information

Patent Citations

  • Safe and ecological retaining structure and construction method thereof

    CN116219946A

  • Ecological retaining wall for small and medium-sized river channels

    CN219118057U

  • Pipeline damping is personally experienced sth. part of body and is set up pipeline shock absorber that this pipeline damping was personally experienced sth. part of body

    CN204664630U

  • Silencing protective sleeve for building water supply and drainage pipeline

    CN211667298U