Construction method of shield tunnel curve section with isochoric pressure propulsion
By using the equal-zone pressure propulsion method and segment deflection calculation, the problem of inconsistent alignment during the construction of curved sections of shield tunnels was solved, thereby improving the stability and safety of the tunnel structure.
Patent Information
- Application Number
- CN202410146644.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-02-01
AI Technical Summary
In the construction of curved sections of shield tunnels, the existing technology uses an unequal pressure propulsion method, which causes lateral forces to be generated during the shield turning process. This makes it impossible to guarantee the consistency of the design alignment, propulsion alignment and assembly alignment, resulting in defects such as segment damage, misalignment and torsion, which affect the stability and safety of the tunnel structure.
The equal-zone pressure propulsion method is adopted. By adjusting the thrust of the hydraulic cylinders in each zone of the tunnel boring machine to be consistent, and combining the calculated design deflection and segment assembly deflection, the deflection of the tunnel boring machine in the curved section is ensured to be consistent, conform to the design centerline, and meet the alignment requirements.
This effectively avoids defects such as segment breakage, misalignment, and torsion during shield tunnel construction on curved sections, ensuring the overall strength, rigidity, and stability of the tunnel structure and improving the operational safety of the tunnel.
Smart Images

Figure CN117780369B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of shield tunnel construction technology, and in particular to a method for constructing curved sections of shield tunnels using equal-pressure advance. Background Technology
[0002] Rail transit is an important direction for urban development. However, its route selection is constrained by urban planning and building structures, resulting in numerous curved sections with increasingly smaller radii of curvature. In curved sections of shield tunnels, shield tunneling often employs a method combining turning rings with adjustments to the hydraulic jack thrust, i.e., using unequal pressure zones for propulsion. This method cannot effectively guarantee consistency between the design alignment, propulsion alignment, and assembly alignment. It cannot eliminate the lateral forces generated during shield turning, nor can it quantify the degree of damage and misalignment of shield segments. Furthermore, excessive pressure differences can cause continuous segment damage, misalignment, and torsion, leading to tunnel leakage and affecting the safe operation of trains. Summary of the Invention
[0003] To address the aforementioned issues, this invention aims to propose a method for constructing curved sections of shield tunnels using equal-pressure propulsion. During the shield tunneling process on curved sections, the equal-pressure propulsion method is employed to ensure the overall strength, stiffness, and stability of the tunnel structure. The deflection of the shield tunnel is achieved by adjusting the assembly deflection between the tunnel segments, thus aligning with the design centerline of the curved shield tunnel and meeting the alignment requirements.
[0004] To achieve the above objectives, the technical solution of the present invention is implemented as follows:
[0005] A method for constructing curved sections of shield tunnels using equal-pressure advance includes the following steps:
[0006] S1: Equal zone pressure propulsion: that is, the forward thrust provided by the hydraulic cylinders of the tunnel boring machine propulsion system to each zone of the tunnel boring machine is consistent;
[0007] S2: Design deflection calculation: Once the section of the line is determined, its design alignment is fixed, and the design deflection of each loop is also determined. The design deflection can be calculated.
[0008] S3: Calculation of shield tunneling curve deflection: The shield's own deflection is the difference between the extension of the right and left hydraulic cylinders for each ring advanced by the shield. When the difference is positive, the shield turns left; when it is negative, the shield turns right.
[0009] S4: Segment Assembly Deflection Calculation: When advancing the shield tunnel on a curve, the assembly deflection between each ring of segments is adjusted according to the calculation results to achieve the deflection of the shield tunnel, which matches the design centerline of the curved shield tunnel and meets the alignment requirements.
[0010] Furthermore, in step S1: the use of equal zone pressure propulsion specifically refers to: obtaining the geometric parameters, environmental parameters and construction parameters of the tunnel segment currently being excavated by the tunnel boring machine, and maintaining equal zone pressure propulsion.
[0011] Furthermore, in step S2: the calculation of the design deflection specifically refers to:
[0012] When the design turning radius of the shield tunnel is R, the outer diameter of the segment is D, and the width of the segment is H, the design deflection Δh of each ring segment is:
[0013]
[0014] Furthermore, in step S3: the calculation of the shield tunneling curve deflection specifically refers to:
[0015] Assume a1 is the stroke of the left hydraulic cylinder before propulsion; b1 is the stroke of the right hydraulic cylinder before propulsion; k1 is the mileage before propulsion; a2 is the stroke of the left hydraulic cylinder after propulsion; b2 is the stroke of the right hydraulic cylinder after propulsion; k2 is the mileage after propulsion.
[0016] Therefore, the stroke difference between the left cylinder before and after its advancement is (a2-a1); the stroke difference between the right cylinder before and after its advancement is (b2-b1).
[0017] When the actual travel of the ring tunnel boring machine is (k2-k1); the deflection amount designed for this ring is Δh, which is achieved by step S1; the actual deflection amount of the travel of this ring tunnel boring machine is h=(b2-b1)-(a2-a1);
[0018] Considering the deviation between the actual construction length of each ring and the design width of the tunnel lining segments, it is necessary to calculate the theoretical deflection of this ring, i.e.
[0019]
[0020] When the actual deflection j of the ring is equal to the design deflection Δh, the shield tunneling trajectory can be guaranteed to be consistent with the design trajectory; therefore, the stroke difference between the left and right cylinders after tunneling must satisfy the following:
[0021]
[0022] Furthermore, in step S4: the calculation of segment assembly deflection specifically refers to:
[0023] Based on the principle of maintaining consistency among the design alignment, the advance alignment, and the assembly alignment, when the design deflection Δh, the theoretical deflection j per ring of the shield, and the deflection Q per ring of the tunnel segment are equal, the three lines are considered coaxial, representing the ideal state for shield tunneling construction.
[0024] Q = j = Δh;
[0025] When the wedge shape of the tunnel segment is d, and assuming that there are n segment assembly points in any ring, and the segment deflection at the i-th assembly point is si, then...
[0026]
[0027] Since the segments are rigid, each ring can only have one segment deflection Q. Simultaneously, due to the fixed number of assembly points and the fixed wedge shape, the segment deflection Q can only be selected from the n segment deflections si (i = 1…n) at the assembly point, denoted as Sop. To ensure that the assembly alignment and design alignment are consistent with the advance alignment, the ideal segment deflection at the assembly point is...
[0028] Sop = Q = Δh;
[0029] However, due to factors such as the radius of the tunnel curve, the wedge shape of the segments, and the number of assembly points, Sop cannot be completely consistent with Δh. Therefore, it is necessary to select the deflection of the assembly point closest to Δh as the deflection Q of the ring segment.
[0030] Furthermore, the segment assembly deflection refers to the difference in width between the left and right sides of the segment at a specified assembly point.
[0031] Beneficial effects: In the shield tunneling process of curved sections, this invention adopts the equal-zone pressure propulsion method, which does not generate lateral force. From a mechanical perspective, it fundamentally eliminates the mechanical state in which adverse defects such as segment damage, misalignment, and torsion occur, ensuring the overall strength, stiffness, and stability of the tunnel structure. By adjusting the assembly deflection between segments, the required deflection of the segments in this ring is calculated to achieve the desired tunnel curvature. During segment assembly, the segments are assembled according to the required deflection to achieve the deflection of the shield tunnel, thus conforming to the design centerline of the curved shield tunnel and meeting the alignment requirements. From a deformation perspective, this invention solves the deformation conditions that lead to adverse defects such as segment damage, misalignment, and torsion. Attached Figure Description
[0032] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. In the drawings:
[0033] Figure 1 This is a flowchart of the shield tunnel curved section construction method with equal zone pressure propulsion as described in an embodiment of the present invention;
[0034] Figure 2 This is a simplified diagram illustrating the calculation of the required deflection amount according to the design alignment for the shield tunnel curved section construction method with equal zone pressure propulsion as described in this embodiment of the invention.
[0035] Figure 3This is a schematic diagram of the curved section shield tunneling before advancing any ring of the shield tunneling process according to the equal zone pressure advancement method for curved section construction of shield tunnels as described in an embodiment of the present invention.
[0036] Figure 4 This is a schematic diagram of the curved section shield tunneling construction method of equal zone pressure propulsion described in the embodiment of the present invention, after any ring of shield tunneling has been advanced, but before segment assembly has been completed.
[0037] Figure 5 This is a schematic diagram showing the completion of the construction of any one ring of the curved section shield tunnel after assembly in the shield tunneling method of equal zone pressure propulsion described in the embodiment of the present invention.
[0038] Figure 6 This is a segment assembly diagram of the shield tunnel curved section construction method with equal zone pressure propulsion as described in an embodiment of the present invention. Detailed Implementation
[0039] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other.
[0040] The present invention will now be described in detail with reference to the accompanying drawings and embodiments.
[0041] Example 1
[0042] See Figure 1-6 A method for constructing curved sections of shield tunnels using equal-pressure advance, comprising the following steps:
[0043] S1: Using equal zone pressure propulsion: that is, the forward thrust provided by the hydraulic cylinders of the shield machine propulsion system to each zone of the shield machine remains consistent; in step S1: using equal zone pressure propulsion specifically means: obtaining the geometric parameters, environmental parameters and construction parameters of the tunnel section currently being excavated by the shield machine, and maintaining equal zone pressure propulsion.
[0044] This part of the embodiment is no different from conventional propulsion. In particular, it should be noted that the so-called isobaric pressure in this embodiment is isobaric pressure in a broad sense, that is, it includes absolute isobaric pressure as well as the case of relative isobaric pressure with a small pressure difference.
[0045] S2: Design Deflection Calculation: Once the section of the line is determined, its design alignment is fixed, and the design deflection for each loop is also determined. The design deflection can then be calculated. In step S2: the design deflection calculation specifically refers to:
[0046] like Figure 2 As shown, when the design turning radius of the shield tunnel is R, the outer diameter of the segment is D, and the width of the segment is H, the design deflection Δh of each ring segment is:
[0047]
[0048] S3: Calculation of shield tunneling curve deflection: The shield's own deflection is the difference between the extension of the right and left hydraulic cylinders for each ring advanced by the shield. When the difference is positive, the shield turns left; when it is negative, the shield turns right.
[0049] Figure 3 To advance the strokes of the front left and right hydraulic cylinders, the strokes are a1 and b1, respectively; Figure 4 To advance the stroke of the left and right hydraulic cylinders, the strokes are a2 and b2 respectively; Figure 5 The left and right hydraulic cylinder strokes after assembly are shown as a3 and b3 respectively. These three diagrams illustrate the shield tunneling and assembly process. Figure 3 and Figure 4 The deflection of the tunnel boring machine can then be calculated. Table 1 shows the deflection of the tunnel boring machine itself. Figures 3-5 The meaning of each symbol and the geometric relationship between each indicator.
[0050] Table 1 Deflection Calculation Table
[0051]
[0052] In step S3: the calculation of shield tunneling curve deflection specifically refers to:
[0053] Assume a1 is the stroke of the left hydraulic cylinder before propulsion; b1 is the stroke of the right hydraulic cylinder before propulsion; k1 is the mileage before propulsion; a2 is the stroke of the left hydraulic cylinder after propulsion; b2 is the stroke of the right hydraulic cylinder after propulsion; k2 is the mileage after propulsion.
[0054] Therefore, the stroke difference between the left cylinder before and after its advancement is (a2-a1); the stroke difference between the right cylinder before and after its advancement is (b2-b1).
[0055] When the actual travel of the ring tunnel boring machine is (k2-k1); the deflection amount designed for this ring is Δh, which is achieved by step S1; the actual deflection amount of the travel of this ring tunnel boring machine is h=(b2-b1)-(a2-a1);
[0056] Considering the deviation between the actual construction length of each ring and the design width of the tunnel lining segments, it is necessary to calculate the theoretical deflection of this ring, i.e.
[0057]
[0058] When the actual deflection j of the ring is equal to the design deflection Δh, the shield tunneling trajectory can be guaranteed to be consistent with the design trajectory; therefore, the stroke difference between the left and right cylinders after tunneling must satisfy the following:
[0059]
[0060] S4: Segment assembly deflection calculation: When the shield tunnel is advanced on a curved tunnel, the assembly deflection between each ring of segments is adjusted according to the calculation results to achieve the deflection of the shield tunnel, which matches the design centerline of the curved shield tunnel and meets the alignment requirements.
[0061] In step S4: the calculation of segment assembly deflection specifically refers to:
[0062] The segment assembly deflection refers to the assembly deflection as the difference in width between the left and right sides of the segment at a specified assembly point.
[0063] Based on the principle of maintaining consistency among the design alignment, the advance alignment, and the assembly alignment, when the design deflection Δh, the theoretical deflection j per ring of the shield, and the deflection Q per ring of the tunnel segment are equal, the three lines are considered coaxial, representing the ideal state for shield tunneling construction.
[0064] Q = j = Δh;
[0065] like Figure 6 As shown: When the wedge shape of the segment is d, assuming that there are n segment assembly points in any ring, and the segment deflection at the i-th assembly point is si, then...
[0066]
[0067] Since the segments are rigid, each ring can only have one segment deflection Q. Simultaneously, due to the fixed number of assembly points and the fixed wedge shape, the segment deflection Q can only be selected from the n segment deflections si (i = 1…n) at the assembly point, denoted as Sop. To ensure that the assembly alignment and design alignment are consistent with the advance alignment, the ideal segment deflection at the assembly point is...
[0068] Sop = Q = Δh;
[0069] However, due to factors such as the radius of the tunnel curve, the wedge shape of the segments, and the number of assembly points, Sop cannot be completely consistent with Δh. Therefore, it is necessary to select the deflection of the assembly point closest to Δh as the deflection Q of the ring segment.
[0070] In this embodiment, the required deflection amount for the ring assembly point is obtained according to the above method, and the assembly is carried out; after the assembly is completed, the assembly line is consistent with the design line and the advancement line.
[0071] Application Example: A shield tunnel makes a right turn with a radius of R = 300m, a segment width H of 1200mm, and an outer diameter D of 6.2m. Before advancement, the length of the left hydraulic cylinder is b1 = 600mm and the length of the right hydraulic cylinder is a1 = 600mm. After advancement, the length of the left hydraulic cylinder is b2 and the length of the right hydraulic cylinder is a2. The difference in tunneling mileage for a certain ring is 1250mm (i.e., k2-k1). The number of assembly points per ring in this section is n = 16, and the wedge amount is d = 40mm.
[0072] S1 maintains constant pressure difference propulsion;
[0073] S2 design linear deflection:
[0074]
[0075] S3 shield tunneling deflection:
[0076] according to
[0077]
[0078]
[0079] b2-a2=25.8mm
[0080] By controlling the difference between the left and right hydraulic cylinders to be 25.8mm, it can be ensured that the tunnel boring machine's propulsion line is consistent with the design line.
[0081] S4 segment assembly deflection:
[0082] according to
[0083] The deflection amount at each assembly point is shown in Table 2.
[0084] Table 2. Deflection at each assembly point
[0085] Assembly points Deflection (mm) Remark 1 -15.31 2 -28.28 3 -36.96 4 -40.00 5 -36.96 6 -28.28 7 -15.31 8 0.00 9 15.31 10 28.28 Best 11 36.96 12 40.00 13 36.96 14 28.28 Best 15 15.31 16 0.00
[0086] As can be seen from Table 2, for this ring, the assembly point closest to the theoretical deflection of 24.8mm is point 10 or 14, with a corresponding deflection of 28.28mm. In actual construction, the deflection of this ring is 28.28mm, which can approximately satisfy the consistency between the assembly line, the advancement line, and the design line, thus completing the construction advancement of this ring.
[0087] In summary, this embodiment employs a uniform pressure advance method during shield tunneling on curved sections to ensure the overall strength, stiffness, and stability of the tunnel structure. It utilizes adjustments to the deflection between tunnel segments to achieve shield tunnel deflection, aligning with the design centerline of the curved shield tunnel. This embodiment departs from the traditional method of controlling shield attitude through differential pressure zones to advance shields on curved sections, effectively resolving issues such as segment misalignment, damage, leakage, torsion, and floating that are prone to occur in traditional shield tunneling methods on curved sections.
[0088] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for constructing curved sections of shield tunnels using equal-pressure advance, characterized in that, Includes the following steps: S1: Equal zone pressure propulsion: that is, the forward thrust provided by the hydraulic cylinders of the tunnel boring machine propulsion system to each zone of the tunnel boring machine is consistent; S2: Design deflection calculation: Once the section of the line is determined, its design alignment is fixed, and the design deflection of each loop is also determined. The design deflection can be calculated. In step S2: the calculation of the design deflection specifically refers to: When the design turning radius of the shield tunnel is R, the outer diameter of the segment is D, and the width of the segment is H, the design deflection Δh of each ring segment is: ; S3: Calculation of shield tunneling curve deflection: In step S3: the calculation of shield tunneling curve deflection specifically refers to: Assume a1 is the stroke of the left hydraulic cylinder before propulsion; b1 is the stroke of the right hydraulic cylinder before propulsion; k1 is the mileage before propulsion; a2 is the stroke of the left hydraulic cylinder after propulsion; b2 is the stroke of the right hydraulic cylinder after propulsion; k2 is the mileage after propulsion. Therefore, the stroke difference between the left cylinder before and after its advancement is a2-a1; the stroke difference between the right cylinder before and after its advancement is b2-b1. The actual travel of the tunnel boring machine in this ring is k2-k1; the design deflection of this ring is... This is achieved through step S1; the actual deflection of the shield machine's stroke in this ring is h=(b2-b1)-(a2-a1); The actual length of each ring during construction deviates from the designed width of the tunnel lining segments, requiring calculation of the theoretical deflection amount for that ring. When the theoretical deflection j of this loop is equal to the design deflection j... When the strokes are equal, the tunnel boring machine's (TBM) propulsion alignment matches the design alignment; therefore, the stroke difference between the left and right hydraulic cylinders after propulsion must satisfy the following: ; S4: Segment assembly deflection calculation: When the shield tunnel is advanced on a curved tunnel, the assembly deflection between each ring of segments is adjusted according to the calculation results to achieve the deflection of the shield tunnel, which matches the design centerline of the curved shield tunnel and meets the alignment requirements. In step S4: the calculation of segment assembly deflection specifically refers to: Based on the principle of maintaining consistency among the design alignment, propulsion alignment, and assembly alignment, when the design deflection... When the theoretical deflection j of each ring of the shield, the deflection Q of each ring of the tunnel segment, and the other two are equal, it is considered that the three lines are coaxial, which is the ideal state for shield tunneling construction. ; When the wedge shape of the tunnel segment is d, and assuming that there are n segment assembly points in any ring, and the segment deflection at the i-th assembly point is si, then... ; Since the segments are rigid, each ring can only have one segment deflection Q. Simultaneously, due to the fixed number of assembly points and the fixed wedge shape, the segment deflection Q can only be selected from the n segment deflections si at the assembly point, denoted as Sop. To ensure that the assembly alignment and design alignment are consistent with the advance alignment, the ideal segment deflection at the assembly point is... Sop=Q= ; However, due to the influence of tunnel curve radius, segment wedge amount, and number of assembly points, SOP cannot fully meet the requirements. If they are consistent, select the closest one. The deflection of the assembly point is taken as the segment deflection Q of the ring.
2. The method for constructing curved sections of shield tunnels using equal-pressure propulsion according to claim 1, characterized in that, In step S1: Using equal-pressure propulsion specifically means: obtaining the geometric parameters, environmental parameters, and construction parameters of the tunnel segment currently being excavated by the tunnel boring machine, and maintaining equal-pressure propulsion.
3. The method for constructing curved sections of shield tunnels using equal-pressure propulsion according to claim 1, characterized in that, The segment assembly deflection refers to the difference in width between the left and right sides of the segment at a specified assembly point.
Citation Information
Patent Citations
Construction method for tunnelling small-radius curve segment of tunnel through shield method
CN101975068A
Construction method for reducing damaged segments and offset deformation by small-radius curved shield tunneling
CN106703817A