Method for installing a rock mass stress measuring sensor
By combining the guide tube and sealing device with a pneumatic grouting system and fine-grained grout, the orientation problem in the installation process of the three-dimensional stress sensor was solved, achieving efficient coupling between the sensor and the surrounding rock, and ensuring the accuracy of the measurement results and the reliability of the installation.
Patent Information
- Application Number
- CN202311824508.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-12-27
AI Technical Summary
Existing three-dimensional stress sensors are difficult to fix precisely in the design orientation of the sensing unit during installation, and are affected by disturbances during subsequent grouting processes, resulting in a large deviation between the measurement results and the actual results. Traditional grouting methods cannot achieve full coupling between the three-dimensional sensor and the surrounding rock of the borehole.
A combination of guide tubes and sealing devices is used to achieve precise directional installation of the sensor through threaded connections. A pneumatic grouting system is used to ensure efficient coupling between the sensor and the surrounding rock of the borehole, and fine-grained grouting material is used to achieve high-pressure grouting.
This enables rapid and reliable sensor installation, ensures accurate measurement results and full coupling between the sensor and the surrounding rock, and reduces installation costs.
Smart Images

Figure CN117803383B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rock mass stress measurement technology, and specifically to a method for installing a rock mass stress measurement sensor. Background Technology
[0002] Stress is a crucial force source causing deformation and failure in underground rock masses. Understanding the distribution patterns of underground rock mass stress (including initial in-situ stress and mining-induced stress) is essential for rock mass engineering design and construction. Therefore, accurately measuring the magnitude of rock mass stress is a critical task in rock mass engineering. Currently, different methods exist for measuring initial in-situ stress and mining-induced stress. Sensor measurement is a direct stress measurement method, characterized by accurate results, low cost, and convenient operation, and is widely used in measuring mining-induced stress parameters.
[0003] Sensor-based measurement methods typically involve installing stress sensors in pre-drilled boreholes within the rock mass, followed by grouting and sealing to monitor stress at the sensor location. Traditional borehole stress gauges primarily measure stress in the vertical direction at measurement points in rock engineering, limiting their application. With advancements in sensor materials and equipment manufacturing technology, three-dimensional stress sensors integrating three sensing units have emerged, enabling direct measurement of triaxial stress at near-field and far-field measurement points in the surrounding rock of rock engineering projects. However, the installation of three-dimensional stress sensors faces challenges. The main issue is that the three-dimensional stress sensor placed in the borehole is a "black box," making it difficult to precisely fix the designed orientation of each sensing unit during installation. Furthermore, the sensor is susceptible to disturbances from subsequent grouting processes, and traditional grouting methods struggle to achieve full coupling between the three-dimensional stress sensor and the borehole surrounding rock, leading to significant deviations between measurement and actual results. Therefore, there is an urgent need to develop a new method for installing rock mass stress sensors to achieve rapid and reliable installation and full coupling with the borehole surrounding rock. Summary of the Invention
[0004] The purpose of this invention is to provide a method for installing a rock mass stress measurement sensor, which requires less equipment, is inexpensive, and enables rapid and reliable installation of the stress measurement sensor in the rock mass.
[0005] To achieve the above objectives, the present invention provides a method for installing a rock mass stress measurement sensor, comprising the following steps: S1: Construction monitoring, drilling, and hole cleaning Based on the tunnel engineering, a nearly horizontal downward monitoring borehole is drilled in the rock mass of the stress monitoring area using a pneumatic rock drill or a rock drilling rig to the measuring point position. After the drilling is completed, a compressed air pipe is used to clean the borehole and remove drill cuttings and water inflow from the monitoring borehole. S2: Assemble stress sensors, guide tubes, and sealing devices. The stress sensor, sealing device, and several guide tubes are connected by threads and placed inside the monitoring borehole. The stress sensor cable is led out from inside the guide tube and sealing device to the outside of the tube. The sealing device is placed between the last two guide tubes near the borehole opening. The grouting pipe in the sealing device is extended by screws and also led out of the guide tube. Multiple guide tubes can be extended by threads to adapt to different monitoring borehole depths. The threaded contact parts need to be welded to prevent loosening during installation. Then, the monitoring position of the sensor is marked on the surface of the guide tube tail outside the borehole with a marker. S3: Install a pneumatic grouting system The pneumatic grouting system is assembled from a pneumatic grouting pump, grouting pipe, mixing tank, compressed air hose, grouting hose, and pressure gauge. It is then connected to the grouting pipe and the compressed air steel pipe in the tunnel project. Resin anchoring agent is used to monitor the sealing of the borehole opening to prevent hole punching during grouting. S4: Prepare grouting fluid and perform pneumatic grouting. Based on the monitored borehole volume, a certain amount of fluid slurry is prepared by mixing powdered grout with water in a mixing tank according to the ratio. The pneumatic grouting system is started and the control valve at the end of the grouting pipe is opened to grout the monitored borehole until the pressure of the pneumatic grouting pump increases sharply and the slurry is no longer consumed. Then the control valve at the end of the grouting pipe is closed. S5: Stress Data Monitoring and Acquisition After grouting is completed, a sign is set up and the initial reading of the stress sensor is recorded immediately. Then, the stress sensor monitoring data is collected periodically using a data acquisition device. Data collection is stopped when the grout and surrounding rock have fully solidified and the long-term strength data tends to stabilize. As a preferred technical solution, the diameter of the monitoring borehole in step S1 is 40-90 mm, the depth is 1.5-20.0 m, and the downward angle is 2-5°.
[0006] As a preferred technical solution, the guide tube in step S2 is made of metal, each section is 1.0 to 1.5 m long, has an inner diameter of 38 to 88 mm, a wall thickness of 2 to 5 mm, and has internal and external threads at both ends. The sections are connected and extended by the threads.
[0007] As a preferred technical solution, the sealing device in step S2 is cylindrical, with a length of 0.3~1.0m and a diameter of 40~90mm. The sealing device includes a metal tube, a metal annular disc, a capsule, nozzles, and a cavity. The sealing device is a metal tube with internal and external threads at both ends for connection to a guide tube of the same diameter. The outer surface of the metal tube is the capsule. The capsule is connected to both ends of the metal tube via a metal annular disc with a thickness of 5~10mm and a diameter of 40~90mm to form the cavity. The metal annular disc at the head is equipped with 3~5 slurry nozzles with a diameter of 5~25mm. The cavity is connected to a steel grouting pipe with a diameter of 15~25mm inside the metal tube. The grouting pipe can be extended in multiple sections by threaded connection, with each section being 0.5~1.5m long. m; The high-pressure grout delivered by the pneumatic grouting system flows into the cavity through the grouting pipe, causing the capsule to expand rapidly and seal the monitoring borehole. The grout is then ejected through the nozzle until it fills the monitoring borehole sealed by the sealing device, achieving the purpose of full coupling between the grout and the surrounding rock of the borehole and the stress sensor under high pressure.
[0008] As a preferred technical solution, the pneumatic grouting system in step S3 uses compressed air as power and includes a pneumatic grouting pump, a grouting pipe, a mixing tank, a compressed air hose, an injection hose, and a pressure gauge. During operation, compressed air is delivered to the pneumatic grouting pump through the compressed air hose to enable it to work. Under the action of pump pressure, the grout in the mixing tank is drawn in by the grouting pipe and injected into the monitoring borehole through the injection hose, the injection pipe, and the sealing device.
[0009] As a preferred technical solution, the pneumatic grouting pump has a flow rate of 10-30 m³ / h. 3 / h, with a maximum grouting pressure of not less than 10MPa.
[0010] As a preferred technical solution, the grouting material in step S4 is a powdered mixed dry material containing an early setting and early strength agent, a cementing material and ultrafine sand.
[0011] As a further improvement, the grouting material shall have a strength of not less than 30 MPa after 2 hours of solidification and a long-term strength of not less than 70 MPa.
[0012] As a preferred technical solution, the stress sensor in steps S1 and S5 is a cylindrical metal component with waterproof function, which can monitor any or all three directions of the triaxial stress in the rock mass, with a range of not less than 60 MPa and a measurement accuracy of 0.01 MPa.
[0013] The beneficial effects of this invention are: (1) The use of the guide tube ensures the accurate orientation of the monitoring position after the sensor is installed, avoiding the "black box" problem in the installation process. The guide tube itself can be extended to match monitoring boreholes of different depths, making it highly adaptable. (2) The cable is led out from inside the guide pipe and the sealing device so that the cable will not be damaged during the grouting process; the use of the sealing device and the arrangement of the grouting pipe facilitates the smooth realization of grouting after the guide pipe is in place, and the high grouting pressure is ensured by the efficient sealing monitoring borehole, which enables the stress sensor to be fully coupled with the surrounding rock of the borehole under high pressure grouting.
[0014] (3) The grouting material has fine particles and good fluidity. It does not produce bleeding or segregation during the grouting process. Compared with traditional cement grout and other grouting materials, it has the advantages of short setting time, good coupling effect and high early setting and final setting strength.
[0015] By employing the above technical solution, this invention provides a method for installing a rock mass stress measurement sensor. First, a slightly inclined borehole is drilled down to the measurement point in the stress area to be measured, and the borehole is cleaned using a compressed air pipe. Second, the stress sensor, guide pipe, and sealing device are assembled. Third, a pneumatic grouting system is installed. Then, grouting fluid is prepared and pneumatic grouting is performed. Finally, stress sensor data is monitored periodically until the data stabilizes before data acquisition is stopped. This installation method requires less equipment, is low-cost, and enables rapid and reliable installation of the stress measurement sensor in rock mass. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the installation of the stress sensor of the present invention; Figure 2 This is a schematic diagram showing the connection between the stress sensor, the sealing device, and the guide tube. Figure 3 This is a schematic diagram of the overall structure of the pneumatic grouting system; In the diagram: 1-Rock mass, 2-Monitoring borehole, 3-Pneumatic grouting system, 4-Groove, 5-Stress sensor, 6-Guide pipe, 7-Sealing device, 8-Groove pipe, 9-Control valve, 10-Cable, 11-Data collector, 12-Resin anchoring agent, 13-Monitoring orientation mark; 301-Pneumatic grouting pump, 302-Drainage pipe, 303-Pressure gauge, 304-Compressed air hose, 305-Groove hose, 306-Mixing tank, 501-X-direction sensing unit, 502-Y-direction sensing unit, 503-Z-direction sensing unit, 701-Metal pipe, 702-Annular disc, 703-Nozzle, 704-Capsule, 705-Cavity. Detailed Implementation
[0017] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0018] Figures 1-3This is a schematic diagram of the structure and installation of the present invention. First, a monitoring borehole 2 with a diameter of 40–90 mm, a depth of 1.5–20.0 m, and a downward angle of 2–5° is drilled in the rock mass 1 of the tunnel sidewall where the stress to be measured. Immediately after drilling, a compressed air pipe is used to remove drill cuttings and water seepage from the borehole. Second, based on the depth of the monitoring borehole 2, multiple sections of threaded metal guide pipe 6 (each section is 1.0–1.5 m long, has a borehole diameter of 38–88 mm, a wall thickness of 2–5 mm, and internal and external threads at both ends) are connected to the following components: a sealing device 7 (placed between the last two sections of guide pipe 6, with 3–5 slurry nozzles 703 of 5–25 mm diameter on the head metal annular disc 702; a capsule 704 and a metal tube 701 forming a cavity 705 connected to the grouting pipe 8); and a stress sensor 5 (with a measuring range of not less than 60 MPa and a measuring accuracy of 0.01 MPa). The screw-in assembly (MPa) is completed, and all threaded connections are welded. The monitoring position mark 13 of the stress sensor 5 is marked on the surface of the guide tube 6 with a marker. The cable 10 and the grouting pipe 8 are led out of the pipe through the guide tube 9. Next, the pneumatic grouting pump 301 (flow rate 10-30 m³ / h) is used. 3 / h, pressure not less than 10MPa), grouting pipe 302, pressure gauge 303, compressed air hose 304, grouting hose 305 and mixing tank 306 are connected and assembled to form a pneumatic grouting system 3, which is connected to the grouting pipe 8 and the compressed air steel pipe in the tunnel project. The monitoring borehole 2 is sealed with resin anchoring agent 12 to prevent the borehole from being punched during grouting; then, based on the volume of the monitoring borehole 2, a certain amount of grout with good fluidity 4 is prepared in the mixing tank 306 by adding water and mixing according to the proportion of powdered grouting material (a powdered dry mixture containing early setting and early strength agent, cementing material and ultrafine sand). The grouting system 3 consists of a pumping pipe 302, a pressure gauge 303, a compressed air hose 304, a grouting hose 305 and a mixing tank 306. The grouting system 3 is connected and assembled to form a pneumatic grouting system 3, which is connected to the grouting pipe 8 and the compressed air steel pipe in the tunnel project. The grouting system 3 ... (MPa), start the pneumatic grouting system 3 and open the tail control valve 9 of the grouting pipe 8 to grout the monitoring borehole 2 until the pressure of the pneumatic grouting pump 301 increases sharply and the grout is no longer consumed. Then close the tail control valve 9 of the grouting pipe 8 to stop grouting. Finally, after the grouting is completed, set up a sign and immediately record the initial reading of the stress sensor 5. Then use the data acquisition device 11 to periodically collect the monitoring data of the stress sensor 5 until the data tends to stabilize and stop the acquisition. Example 1
[0019] A certain mine has a designed production capacity of 2 million tons per year. The ore body is a double-layered structure, with average thicknesses of 6.70 m and 5.67 m for the upper and lower layers, respectively. The average P2O5 content is 22.48% and 26.90%, respectively, with a dip angle of 15°. The clayey shale interlayer in the middle of the ore body has an average thickness of 1.01 m. The lithology of the strata is mainly dolomite, sandstone, shale, and mudstone, while the ore layer lithology is phosphorite. The mine design adopts a development scheme of conveyor belt inclined shaft + auxiliary inclined ramp, and intermediate conveyor belt transportation. The ore mined in the stope is transferred through the panel conveyor belt roadway to the intermediate transport conveyor belt, and then transported to the inclined shaft conveyor belt to be brought to the surface. The east and west mining areas are ventilated separately. The east mining area adopts a diagonal ventilation system, with air intake on both wings and centralized exhaust ventilation in the central vertical shaft. The mining methods are pseudo-dipping strip approach followed by backfilling and pseudo-dipping strip approach followed by backfilling, with separate mining and transportation. The tunneling project revealed that the surrounding rock lithology was mainly dolomite and phosphorite, with highly developed joints and fissures, and widespread geological structures such as karst caves and faults, resulting in significant variations in surrounding rock quality. The tunnel support primarily employs an anchor-mesh-shotcrete technique. However, practice has shown that some areas of the surrounding rock are unstable, exhibiting roof falls and spalling, which are difficult to control effectively. Therefore, it is urgent to measure the secondary stress during tunnel excavation to provide fundamental data for engineering construction and tunnel support design. The main mine tunnel cross-section is designed as a three-centered arch, 4.5 m wide, with a wall height of 2.2 m and an arch height of 1.5 m. The mine plans to install three-dimensional stress sensors (range 40 MPa, accuracy 0.01 MPa) to measure the surrounding rock stress. Given the above conditions, the implementation steps of the method of this invention are as follows: (S1) Construction monitoring borehole and hole cleaning: Based on the trackless roadway sidewall of the 1890m section, a monitoring borehole 2 with a diameter of 55 mm, a depth of 3.0 m, and a downward angle of 3° was drilled in the rock mass 1 of the stress monitoring area of the roadway sidewall using a YT28 pneumatic rock drill. After the construction of borehole 2 was completed, the drill cuttings and water inflow in the hole were removed immediately by compressed air pipe.
[0020] (S2) Assemble the stress sensor, guide tube and sealing device: Connect the stress sensor 5 with a range of 40MPa and a measurement accuracy of 0.01MPa, two guide tubes 6 (each 1.0m, outer diameter 40mm, wall thickness 3mm), and a sealing device 7 (length 0.8m, outer diameter 50mm) by threaded connection. The sealing device 7 (with 3 nozzles with a diameter of 5mm on the head annular disc) is placed between the two guide tubes 6. Weld all threaded connections. Mark the monitoring position mark 13 of the stress sensor 5 on the tail surface of the guide tube 6 with a marker. The cable 10 of the stress sensor 5 is led out from the inside of the guide tube 6 and the sealing device 7 to the outside of the tube. The grouting pipe 8 (diameter 25mm, length of each section 0.5m) inside the sealing device 7 is also extended and led out to the outside of the guide tube 6.
[0021] (S3) Install the pneumatic grouting system: Install the pneumatic grouting pump 301 (flow rate 10m³ / h) 3 / h, maximum grouting pressure 10MPa), grouting pipe 302, pressure gauge 303, compressed air hose 304, grouting hose 305 and mixing tank 306 are connected and assembled to form a pneumatic grouting system 3, which is connected to the grouting pipe 8 and the compressed air steel pipe in the tunnel project. MSCKb2850 resin anchoring agent 12 is used to monitor the borehole 2 and seal the borehole opening to prevent the borehole from being punched during grouting.
[0022] (S4) Prepare grouting fluid and perform pneumatic grouting: Based on the volume of the monitored borehole 2, add water to the powdered grouting material (a dry powdered mixture containing early setting and early strength agent, cementing material and ultrafine sand) in the mixing tank 306 according to the water-cement ratio of 1:7.69 to prepare a certain amount of grout with good fluidity (strength of 32 MPa after 2 hours of solidification, long-term strength of 80 MPa). Start the pneumatic grouting system 3 and open the tail control valve 9 of the grouting pipe 8 to grout the monitored borehole 2 until the pressure of the pneumatic grouting pump 301 increases sharply and the grout is no longer consumed. Then close the tail control valve 9 of the grouting pipe 8 to stop grouting.
[0023] (S5) Stress data monitoring and acquisition: After grouting is completed, set up a sign and immediately record the initial reading of stress sensor 5. Then, use data acquisition device 11 to periodically collect the monitoring data of stress sensor 5 until the data tends to stabilize and then stop the acquisition.
[0024] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.
Claims
1. A method for installing a rock mass stress measurement sensor, characterized in that, Including the following steps: S1: Construction monitoring, drilling, and hole cleaning Based on the tunnel engineering, a nearly horizontal downward monitoring borehole is drilled in the rock mass of the stress monitoring area using a pneumatic rock drill or a rock drilling rig to the measuring point position. After the drilling is completed, a compressed air pipe is used to clean the borehole and remove drill cuttings and water inflow from the monitoring borehole. S2: Assemble stress sensors, guide tubes, and sealing devices. The stress sensor, sealing device, and several guide tubes are connected by threads and placed inside the monitoring borehole. The stress sensor is placed before the first guide tube near the bottom of the borehole. The stress sensor cable is led out from inside the guide tube and the sealing device to the outside of the tube. The sealing device is placed between the last two guide tubes near the borehole opening. The grouting pipe in the sealing device is extended by a screw connection and also led out to the outside of the guide tube. Multiple guide tubes can be extended by threads to adapt to different monitoring borehole depths. The threaded contact parts need to be welded to prevent loosening during installation. Then, the monitoring position of the sensor is marked on the surface of the guide tube tail outside the borehole with a marker. The sealing device is cylindrical, 0.3–1.0 m in length and 40–90 mm in diameter. It comprises a metal tube, a metal annular disc, a capsule, nozzles, and a cavity. The sealing device consists of a metal tube with internal and external threads at both ends, connected to a guide tube with threads of equal diameter. The outer surface of the metal tube forms the capsule. The capsule is connected to both ends of the metal tube via a 5–10 mm thick, 40–90 mm diameter metal annular disc, forming the cavity. The head of the metal annular disc has 3–5 slurry nozzles with a diameter of 5–25 mm. The cavity is connected to a 15–25 mm diameter steel grouting pipe inside the metal tube. The grouting pipe is extended in multiple sections via threaded connections, each section being 0.5–1.5 m long. High-pressure grout delivered by the pneumatic grouting system flows into the cavity through the grouting pipe, causing the capsule to rapidly expand and seal the monitoring borehole. The grout is then ejected through the nozzles until the monitoring borehole sealed by the sealing device is completely filled, achieving full coupling between the grout, the surrounding rock of the borehole, and the stress sensor. S3: Install a pneumatic grouting system The pneumatic grouting system is assembled from a pneumatic grouting pump, grouting pipe, mixing tank, compressed air hose, grouting hose, and pressure gauge. It is then connected to the grouting pipe and the compressed air steel pipe in the tunnel project. Resin anchoring agent is used to monitor the sealing of the borehole opening to prevent hole punching during grouting. S4: Prepare grouting fluid and perform pneumatic grouting. Based on the monitored borehole volume, a certain amount of fluid slurry is prepared by mixing powdered grout with water in a mixing tank according to the ratio. The pneumatic grouting system is started and the control valve at the end of the grouting pipe is opened to grout the monitored borehole until the pressure of the pneumatic grouting pump increases sharply and the slurry is no longer consumed. Then the control valve at the end of the grouting pipe is closed. S5: Stress Data Monitoring and Acquisition After grouting is completed, a sign is set up and the initial reading of the stress sensor is recorded immediately. Then, the stress sensor monitoring data is collected periodically using a data acquisition device. Data acquisition is stopped when the grout and surrounding rock have fully solidified and the long-term strength data tends to stabilize.
2. The installation method of the rock mass stress measurement sensor as described in claim 1, characterized in that: The monitoring borehole in step S1 has a diameter of 40–90 mm, a depth of 1.5–20.0 m, and a downward angle of 2–5°.
3. The installation method of the rock mass stress measurement sensor as described in claim 1, characterized in that: The guide tube in step S2 is made of metal, each section is 1.0 to 1.5 m long, has an inner diameter of 38 to 88 mm, a wall thickness of 2 to 5 mm, and has internal and external threads at both ends. The sections are connected and extended by the threads.
4. The installation method of the rock mass stress measurement sensor as described in claim 1, characterized in that: The pneumatic grouting system in step S3 uses compressed air as power and includes a pneumatic grouting pump, a grouting pipe, a mixing tank, a compressed air hose, an injection hose, and a pressure gauge.
5. The installation method of the rock mass stress measurement sensor as described in claim 4, characterized in that: The pneumatic grouting pump has a flow rate of 10-30 m³ / h. 3 / h, with a maximum grouting pressure of not less than 10MPa.
6. The installation method of the rock mass stress measurement sensor as described in claim 1, characterized in that: The grouting material in step S4 is a powdered mixed dry material containing an early-setting and early-strength agent, a cementing material, and ultrafine sand.
7. The installation method of the rock mass stress measurement sensor as described in claim 6, characterized in that: The grouting material has a strength of not less than 30 MPa after 2 hours of solidification and a long-term strength of not less than 70 MPa.
8. The installation method of the rock mass stress measurement sensor as described in claim 1, characterized in that: The stress sensor is a cylindrical metal component with waterproof function. It can monitor any or all three directions of triaxial stress in the rock mass, with a range of not less than 60 MPa and a measurement accuracy of 0.01 MPa.
Citation Information
Patent Citations
Device and method for measuring initial velocity of gas emission from borehole of coal bed
CN104695940A
Hole sealing device for rapidly sealing drill holes
CN206468324U