A combined spin riveting process

By employing a combined riveting process that integrates pre-riveting and final riveting, the processing problem of racetrack-shaped annular protruding parts has been solved, improving product quality and yield, reducing production costs, and enhancing the company's competitiveness.

CN117840374BActive Publication Date: 2026-11-24SHENZHEN EVERWIN PRECISION TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311791472.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2026-11-24
Estimated Expiration
2043-12-25

AI Technical Summary

Technical Problem

Existing riveting processes suffer from problems such as interference between the cutting tool and the product, long processing time, product deformation, and high defect rate when machining parts with racetrack-shaped annular protrusions, resulting in high production costs and failing to meet workpiece processing requirements.

Method used

A combined riveting process is adopted, which combines pre-riveting and final riveting. Several processing points are set along the circumference of the racetrack-shaped annular protrusion part. The first and second rivet heads are used to perform pre-riveting and final riveting respectively. The process combines directional riveting around the Z-axis and transverse pressing riveting along the X-axis, which overcomes the defects of traditional riveting.

Benefits of technology

It improved the product yield and appearance quality, reduced production costs, enhanced processing efficiency and the company's market competitiveness, and reduced the scrap rate of raw materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117840374B_ABST
    Figure CN117840374B_ABST
Patent Text Reader

Abstract

This invention discloses a combined riveting process applicable to the riveting of parts with racetrack-shaped annular protrusions. The process includes the following steps: S1 Pre-riveting: Several processing points are set along the racetrack-shaped annular protrusion. The part is placed in a riveting device, and a first riveting head is used to pre-rivet the processing points sequentially along the circumference of the racetrack-shaped annular protrusion, causing a first deformation of the racetrack-shaped annular protrusion to obtain an intermediate part; S2 Final riveting: The intermediate part is placed in the riveting device, and a second riveting head is used to final rivet the processing points sequentially along the circumference of the intermediate part, causing a second deformation of the intermediate part to obtain a riveted workpiece. This combined riveting process is applicable to the processing of parts with racetrack-shaped annular protrusions, and improves product quality, increases processing efficiency, reduces production costs, and increases product yield.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of riveting technology, and in particular to a combined rotary riveting process. Background Technology

[0002] The riveting process is used in the processing of exterior parts such as the top cover of new energy batteries. However, the workpieces processed by the traditional riveting process in the existing technology are mostly parts with circular edge structures. In the processing of parts with racetrack-shaped annular convex edge structures, the cutting head and the product interfere with each other. The spiral cutting method has a long processing time, and the oblique cutting head causes the straight edge of the product to be concave and deformed. The defect rate of the product is high. Not only can it not meet the processing requirements of the workpiece, but the production cost is also high, which reduces the competitive advantage in the market.

[0003] Therefore, it is essential to provide a riveting process suitable for parts with racetrack-shaped annular flange structures. Summary of the Invention

[0004] The purpose of this invention is to solve the above-mentioned problems and provide a combined riveting process that is suitable for processing parts with racetrack-shaped annular protrusions, and improves product quality, increases processing efficiency, reduces production costs, and increases product yield.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows:

[0006] A combined riveting process, applicable to the riveting of parts with racetrack-shaped annular protrusions, includes the following steps:

[0007] S1 Pre-riveting: Several processing points are set along the racetrack-shaped annular protrusion. The part is placed in the riveting device and the first rivet head is used to pre-rivet the processing points in sequence along the circumference of the racetrack-shaped annular protrusion, so as to cause the racetrack-shaped annular protrusion of the part to produce the first deformation, and an intermediate part is obtained.

[0008] S2 Final riveting: The intermediate part is placed in the riveting device and the second riveting head is used to perform final riveting on the processing points along the circumference of the intermediate part in sequence, so as to cause the intermediate part to produce a second deformation and obtain a riveted workpiece.

[0009] Preferably, the number of processing points is set to 6-10.

[0010] Preferably, the runway-shaped annular protrusion includes a first long side and a second long side arranged in parallel, and a first arc-shaped side and a second arc-shaped side respectively connected to both sides of the first long side and the second long side, wherein the first arc-shaped side and the second arc-shaped side are symmetrically arranged.

[0011] The number of processing points is set to 6; the processing points include a first processing point, a second processing point, a third processing point, a fourth processing point, a fifth processing point, and a sixth processing point; the first processing point is located in the area connecting the first long side and the first arc-shaped side, the second processing point is located at the midpoint of the first arc-shaped side, the third processing point is located in the area connecting the second long side and the first arc-shaped side, the fourth processing point is located in the area connecting the second long side and the second arc-shaped side, the fifth processing point is located at the midpoint of the second arc-shaped side, and the sixth processing point is located in the area connecting the first long side and the second arc-shaped side.

[0012] Preferably, the first rivet head includes a first connector and a first pressure roller assembly disposed on the first connector; the first pressure roller assembly includes a first connecting arm and a pre-riveting pressure roller disposed on the first connecting arm, the first connecting arm includes a first connecting portion and an inclined portion inclined at a certain angle relative to the first connecting portion, the first connecting portion is connected to the first connector, the inclined portion is used to set the pre-riveting pressure roller, and the pre-riveting pressure roller is coaxially disposed with the inclined portion.

[0013] Preferably, the first connecting portion is arranged parallel to the axial direction of the first connecting member, and the tilt angle of the inclined portion relative to the horizontal plane is 30-60°.

[0014] Preferably, the riveting device further includes a main shaft arranged along the Z-axis, and the first riveting head and / or the second riveting head are disposed on the main shaft. The main shaft can drive the first riveting head and / or the second riveting head to move or rotate along the X-axis, Y-axis or Z-axis.

[0015] Preferably, the pre-riveting process specifically includes the following steps:

[0016] S11, with the first processing point as the initial position, align the first connecting arm with the first processing point, and use the pre-riveting roller to pre-rivet the first processing point;

[0017] S12, rotate the first connecting arm to the first angle so that the pre-riveting roller corresponds to the second processing point, and use the pre-riveting roller to perform pre-riveting processing on the second processing point;

[0018] S13, rotate the first connecting arm to the second angle so that the pre-riveting pressure roller corresponds to the third processing point, and use the pre-riveting pressure roller to perform pre-riveting processing on the third processing point;

[0019] S14, move the first rivet head along the X-axis to the position corresponding to the fourth processing point, and use the pre-riveting roller to perform pre-riveting processing on the fourth processing point;

[0020] S15, rotate the first connecting arm to the third angle so that the pre-riveting pressure roller corresponds to the fifth processing point, and use the pre-riveting pressure roller to perform pre-riveting processing on the fifth processing point;

[0021] S16, rotate the first connecting arm to the initial position so that the pre-riveting roller corresponds to the sixth processing point, and use the pre-riveting roller to perform pre-riveting processing on the sixth processing point;

[0022] S17, After the pre-riveting of the sixth processing point is completed, the first rivet head is moved along the X-axis to the position corresponding to the first processing point.

[0023] Preferably, the second rivet head includes a second connector and a second pressure roller assembly disposed on the second connector; the second pressure roller assembly includes a second connecting arm and a final riveting pressure roller disposed on the second connecting arm, the second connecting arm is disposed on the outer wall of the second connector along the Z-axis, and the final riveting pressure roller is vertically and rotatably connected to the second connecting arm.

[0024] Preferably, the final riveting process specifically includes the following steps:

[0025] S21, with the first processing point as the second initial position, move the final riveting roller to the position corresponding to the first processing point, and perform final riveting on the first processing point that has undergone pre-riveting.

[0026] S22, rotate the second connecting arm to the first angle so that the final riveting roller corresponds to the second processing point, and use the final riveting roller to perform final riveting on the second processing point;

[0027] S23, rotate the second connecting arm to the second angle so that the final riveting roller corresponds to the third processing point, and use the final riveting roller to perform final riveting on the third processing point;

[0028] S24, move the second rivet head along the X-axis to the position corresponding to the fourth processing point, and use the final riveting roller to perform final riveting on the fourth processing point;

[0029] S25, rotate the second connecting arm to the third angle so that the final riveting roller corresponds to the fifth processing point, and use the final riveting roller to perform final riveting on the fifth processing point;

[0030] S26, rotate the second connecting arm to the second initial position so that the final riveting roller corresponds to the sixth processing point, and use the final riveting roller to perform final riveting on the sixth processing point;

[0031] S27, after the final riveting of the sixth processing point is completed, the second riveting head is moved along the X-axis to the position corresponding to the first processing point.

[0032] Preferably, the thickness of the runway-shaped annular protrusion is 0.5-0.9 mm.

[0033] The beneficial effects of this invention include at least the following:

[0034] The combined riveting process of this invention is applicable to the riveting of parts with racetrack-shaped annular protrusions. It includes pre-riveting and riveting, with the pre-riveting and riveting processes performed using a first riveting head and a second riveting head, respectively. The combined riveting process involves setting several processing points along the circumference of the part with the racetrack-shaped annular protrusion. The pre-riveting and riveting processes are performed sequentially corresponding to these processing points. This novel riveting process combines directional riveting around the Z-axis and transverse pressure riveting along the X-axis along the processing path. It overcomes the shortcomings of traditional riveting methods for riveting parts with racetrack-shaped annular protrusions and the resulting product quality, ensuring product quality and appearance, improving product yield, reducing raw material scrap rates, lowering production costs, and enhancing the company's competitiveness in the market. Attached Figure Description

[0035] Figure 1 This is a schematic diagram of the structure of the part with a racetrack-shaped annular protrusion according to an embodiment of the present invention;

[0036] Figure 2 This is a schematic diagram of the structure of the first rivet head;

[0037] Figure 3 This is a schematic diagram of the second rivet head.

[0038] Figure 4 This is a process flow diagram for the pre-riveting process;

[0039] Figure 5 This is a process flow diagram for the final riveting process;

[0040] Figure 6 This is an illustration of the appearance of the product obtained after riveting process according to an embodiment of the present invention.

[0041] Among them, 11 is the first processing point, 12 is the second processing point, 13 is the third processing point, 14 is the fourth processing point, 15 is the fifth processing point, 16 is the sixth processing point, 21 is the first connecting piece, 22 is the first pressure roller assembly, 221 is the first connecting arm, 222 is the pre-riveting pressure roller, 31 is the second connecting piece, 32 is the second pressure roller assembly, 321 is the second connecting arm, and 322 is the final riveting pressure roller. Detailed Implementation

[0042] To facilitate understanding of the present invention, a more complete description will be given below with reference to the accompanying drawings. Preferred embodiments of the invention are shown in the drawings. However, the invention can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided to provide a thorough and complete understanding of the disclosure of the invention.

[0043] It should be noted that when a component is said to be "fixed to" another component, it can be directly attached to the other component or there may be an intervening component. When a component is said to be "connected to" another component, it can be directly connected to the other component or there may be an intervening component.

[0044] In this invention, the use of terms such as "first," "second," etc., is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. The X, Y, and Z axes are mutually perpendicular in space.

[0045] The orientations or positional relationships indicated in this invention are based on the orientations or positional relationships shown in the accompanying drawings. They are only for the purpose of facilitating the description of this invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0046] Example

[0047] A combined riveting process, applicable to the riveting of parts with racetrack-shaped annular protrusions, includes the following steps:

[0048] S1 Pre-riveting: Several processing points are set along the racetrack-shaped annular protrusion. The part is placed in the riveting device and the first rivet head is used to pre-rivet the processing points in sequence along the circumference of the racetrack-shaped annular protrusion, so as to cause the racetrack-shaped annular protrusion of the part to produce the first deformation, and an intermediate part is obtained.

[0049] S2 Final Riveting Process: The intermediate part is placed in the riveting device, and a second riveting head is used to perform final riveting on the processing points sequentially along the circumference of the intermediate part, so as to cause the intermediate part to undergo a second deformation, resulting in a riveted workpiece. It can be understood that the intermediate part is obtained by gradually deforming it through several pre-riveting processes along the racetrack-shaped annular protrusion until it is finally processed into the first deformation; during the final riveting process, the second deformation is formed by gradually deforming the intermediate part through several final riveting processes until it is finally processed into the final deformation; in this embodiment of the invention, the number of pre-riveting processes and the number of final riveting processes are not specifically limited, but the number of pre-riveting processes and the number of final riveting processes is preferably sufficient to obtain the intermediate part and the riveted workpiece.

[0050] The combined riveting process of this invention is applicable to the riveting of parts with racetrack-shaped annular protrusions. It includes pre-riveting and riveting, performed using a first riveting head and a second riveting head, respectively. The combined riveting process involves setting several processing points along the circumference of the part with racetrack-shaped annular protrusions. The pre-riveting and riveting are performed sequentially corresponding to these processing points. This novel riveting process combines directional riveting around the Z-axis and lateral pressure riveting along the X-axis, overcoming the shortcomings of traditional riveting methods for parts with racetrack-shaped annular protrusions and affecting product quality. It ensures product quality and appearance, improves yield, reduces raw material scrap, lowers production costs, and enhances the company's competitiveness in the market. Furthermore, the combined riveting process of this invention requires minimal modification to traditional riveting equipment, further reducing production costs and contributing to cost reduction and efficiency improvement for enterprises.

[0051] Preferably, the number of processing points is set to 6-10.

[0052] See Figure 1 As shown, the overall shape of the runway-shaped annular protrusion is similar to that of a runway-shaped elongated hole. Specifically, it includes a first long side and a second long side arranged in parallel, as well as a first arc-shaped side and a second arc-shaped side connected to both sides of the first long side and the second long side, respectively. The first arc-shaped side and the second arc-shaped side are symmetrically arranged.

[0053] Preferably, the number of processing points is set to 6; the processing points include a first processing point 11, a second processing point 12, a third processing point 13, a fourth processing point 14, a fifth processing point 15, and a sixth processing point 16; the first processing point 11 is located in the area connecting the first long side and the first arc-shaped side, the second processing point 12 is located at the midpoint of the first arc-shaped side, the third processing point 13 is located in the area connecting the second long side and the first arc-shaped side, the fourth processing point 14 is located in the area connecting the second long side and the second arc-shaped side, the fifth processing point 15 is located at the midpoint of the second arc-shaped side, and the sixth processing point 16 is located in the area connecting the first long side and the second arc-shaped side.

[0054] The number of processing points ensures the uniformity of deformation at each processing point during the riveting process of the part, while avoiding the increase in processing time and cost caused by too many processing points.

[0055] Preferably, such as Figure 2As shown, the first rivet head includes a first connecting member 21 and a first pressure roller assembly 22 disposed on the first connecting member 21. The first pressure roller assembly 22 includes a first connecting arm 221 and a pre-riveting pressure roller 222 disposed on the first connecting arm 221. The first connecting arm 221 includes a first connecting portion and an inclined portion inclined at a certain angle relative to the first connecting portion. The first connecting portion is connected to the first connecting member 21, and the inclined portion is used to set the pre-riveting pressure roller 222. The pre-riveting pressure roller 222 is coaxially disposed with the inclined portion. Specifically, the inclined portion is provided with a first mounting hole for setting the pre-riveting pressure roller 222, and the pre-riveting pressure roller 222 is rotatably connected in the first mounting hole. The first connecting arm 221 is connected to the first connecting member 21 through the first connecting portion. Specifically, the outer wall of the first connecting member 21 is provided with a first mounting groove for setting the first connecting portion, and the first connecting portion is embedded in the first mounting groove through a fixing connector. The first connector 21 includes a first main body and a first adapter post located at one end of the first main body away from the first pressure roller assembly 22; the first main body has a second mounting hole arranged along its axial direction inside.

[0056] Preferably, the first connecting portion is arranged parallel to the axial direction of the first connecting member 21, and the tilt angle of the inclined portion relative to the horizontal plane is 30-60°; in this embodiment, the tilt angle is preferably 45°, so as to facilitate the operation of the pre-riveting pressure roller 222 and ensure that the deformation of the convex edge is appropriate.

[0057] Preferably, the riveting device further includes a spindle arranged along the Z-axis, with the first riveting head and / or the second riveting head mounted on the spindle. The spindle is capable of driving the first riveting head and / or the second riveting head to move or rotate along the X-axis, Y-axis, or Z-axis. In some embodiments, the first riveting head and the second riveting head are mounted on the same spindle, with the first connecting arm 221 of the first riveting head and the second connecting arm 321 of the second riveting head offset to prevent interference between their movements. In other embodiments, the first riveting head and the second riveting head are mounted on two separate spindles, meaning the pre-riveting and final riveting processes are performed at two different processing positions, further improving the production efficiency of the riveting process by using an assembly line approach.

[0058] like Figure 4 As shown, the pre-riveting process specifically includes the following steps:

[0059] S11, with the first processing point 11 as the initial position, the first connecting arm 221 is aligned with the first processing point 11, and the pre-riveting roller 222 is used to pre-rivet the first processing point 11.

[0060] S12, the first connecting arm 221 is rotated to a first angle so that the pre-riveting pressure roller 222 corresponds to the second processing point 12, and the pre-riveting pressure roller 222 is used to pre-rive the second processing point 12; in this embodiment of the invention, when pre-riveting the second processing point 12, the pre-riveting pressure roller 222 over-presses the second processing point 12 along the Z direction by 0.1±0.02mm; after the first connecting arm 221 is rotated to the first angle, the first connecting arm 221 rotates 90° around the Z axis relative to the initial position;

[0061] S13, rotate the first connecting arm 221 to the second angle so that the pre-riveting pressure roller 222 corresponds to the third processing point 13, and use the pre-riveting pressure roller 222 to perform pre-riveting processing on the third processing point 13; after rotating the first connecting arm 221 to the second angle, the first connecting arm 221 rotates 180° around the Z-axis relative to the initial position.

[0062] S14, move the first rivet head along the X-axis to the position corresponding to the fourth processing point 14, and use the pre-riveting pressure roller 222 to perform pre-riveting processing on the fourth processing point 14;

[0063] S15, the first connecting arm 221 is rotated to the third angle, so that the pre-riveting pressure roller 222 corresponds to the fifth processing point 15, and the pre-riveting pressure roller 222 is used to pre-rive the fifth processing point 15; after rotating the first connecting arm 221 to the third angle, the first connecting arm 221 rotates 270° around the Z-axis relative to the initial position; in this embodiment of the invention, when pre-riveting the fifth processing point 15, the pre-riveting pressure roller 222 over-presses the fifth processing point 15 along the Z direction by 0.1±0.02mm;

[0064] S16, rotate the first connecting arm 221 to the initial position so that the pre-riveting roller 222 corresponds to the sixth processing point 16, and use the pre-riveting roller 222 to perform pre-riveting processing on the sixth processing point 16; that is, after rotating the first connecting arm 221 to correspond to the initial position, the first connecting arm 221 rotates 360° around the Z-axis relative to the initial position.

[0065] S17, after the pre-riveting of the sixth processing point 16 is completed, the first rivet head is moved along the X-axis to the position corresponding to the first processing point 11.

[0066] The process of pre-riveting is repeated several times, with steps S11 to S17 forming one cycle, until the edge of the racetrack-shaped annular protrusion is pre-riveted to form the first deformation and the pre-riveting process is stopped.

[0067] In this embodiment, the first connecting arm 221 and the pre-riveting roller 222 rotate clockwise around the Z-axis by a first angle, a second angle, and a third angle in sequence. In other embodiments, the first connecting arm 221 and the pre-riveting roller 222 may also rotate counterclockwise around the Z-axis by a first angle, a second angle, and a third angle in sequence. When rotating counterclockwise, the starting processing point of the pre-riveting process changes to the sixth processing point 16.

[0068] like Figure 3 As shown, the second rivet head includes a second connecting member 31 and a second pressure roller assembly 32 disposed on the second connecting member 31; the second pressure roller assembly 32 includes a second connecting arm 321 and a final riveting pressure roller 322 disposed on the second connecting arm 321, the second connecting arm 321 is disposed on the outer wall of the second connecting member 31 along the Z-axis, and the final riveting pressure roller 322 is vertically and rotatably connected to the second connecting arm 321;

[0069] Specifically, the final riveting roller 322 is vertically disposed on the inner side of the second connecting arm 321. The second connecting arm 321 has a third mounting hole for mounting the final riveting roller 322, and the final riveting roller 322 is rotatably connected to the third mounting hole. The second connecting member 31 includes a second main body and a second adapter post disposed at one end of the second main body away from the second roller assembly 32. The second adapter post is coaxially disposed with the second main body, and a fourth mounting hole is axially disposed inside the second main body. Specifically, the second main body has a second mounting groove for mounting the second connecting arm 321, and the second connecting arm 321 is disposed in the second mounting groove by a fixed connecting member.

[0070] like Figure 5 As shown, the final riveting process specifically includes the following steps:

[0071] S21, with the first processing point 11 as the second initial position, move the final riveting roller 322 to correspond to the first processing point 11, and perform final riveting on the first processing point 11 that has undergone pre-riveting.

[0072] S22, rotate the second connecting arm 321 to the first angle so that the final riveting roller 322 corresponds to the second processing point 12, and use the final riveting roller 322 to perform final riveting on the second processing point 12;

[0073] In this embodiment of the invention, when performing final riveting on the second processing point 12, the final riveting pressure roller 322 applies overpressure of 0.1±0.02mm along the Z direction to the second processing point 12; the second connecting arm 321 is rotated to the first angle by rotating the second connecting arm 321 90° around the Z axis relative to the second initial position;

[0074] S23, rotate the second connecting arm 321 to the second angle so that the final riveting roller 322 corresponds to the third processing point 13, and use the final riveting roller 322 to perform final riveting on the third processing point 13; after rotating the second connecting arm 321 to the second angle, the second connecting arm 321 rotates 180° around the Z-axis relative to the second initial position;

[0075] S24, move the second rivet head along the X-axis to the position corresponding to the fourth processing point 14, and use the final riveting pressure roller 322 to perform final riveting on the fourth processing point 14;

[0076] S25, rotate the second connecting arm 321 to the third angle so that the final riveting roller 322 corresponds to the fifth processing point 15, and use the final riveting roller 322 to perform final riveting on the fifth processing point 15;

[0077] After rotating the second connecting arm 321 to the third angle, the second connecting arm 321 rotates 270° around the Z-axis relative to the initial position; in this embodiment of the invention, when performing final riveting on the fifth processing point 15, the final riveting pressure roller 322 applies overpressure of 0.1±0.02mm along the Z direction to the fifth processing point 15;

[0078] S26, rotate the second connecting arm 321 to the second initial position so that the final riveting roller 322 corresponds to the sixth processing point 16, and use the final riveting roller 322 to perform final riveting on the sixth processing point 16; after rotating the second connecting arm 321 to correspond to the second initial position, the second connecting arm rotates 360° around the Z-axis relative to the second initial position.

[0079] S27, after the final riveting of the sixth processing point 16 is completed, the second riveting head is moved along the X-axis to the position corresponding to the first processing point 11.

[0080] Steps S21 to S27 constitute one cycle, and the pre-riveting process is repeated several times until the edge of the intermediate part is riveted to form the second deformation, at which point the final riveting process stops. In this embodiment, the second connecting arm 321 and the final riveting pressure roller 322 rotate clockwise around the Z-axis by a first angle, a second angle, and a third angle in sequence. In other embodiments, the second connecting arm 321 and the final riveting pressure roller 322 may also rotate counterclockwise around the Z-axis by a first angle, a second angle, and a third angle in sequence. When rotating counterclockwise, the starting processing point of the final riveting process changes to the sixth processing point 16.

[0081] The thickness of the runway-shaped annular protrusion is 0.5-0.9 mm. In this embodiment, the thickness of the runway-shaped annular protrusion is 0.8 mm.

[0082] Along the racetrack-shaped annular protrusion, the machining points are successively riveted using pre-riveting and final riveting processes. The pre-riveting process uses a pre-riveting pressure roller 222 at an inclined angle to create a first deformation on the protrusion. Then, the final riveting process uses a final riveting pressure roller 322 parallel to the horizontal plane to process the protrusion that has undergone the first deformation, ultimately resulting in a riveted part. Figure 6 As shown, the riveting process described in this invention processes the parts point by point, avoiding the concave deformation of the straight edge of the product caused by the spiral cutting in the traditional riveting process, thus improving the appearance and quality of the final part.

[0083] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0084] The above embodiments merely illustrate preferred implementations of the present invention, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of the invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these all fall within the protection scope of the present invention. Therefore, the protection scope of this invention should be determined by the appended claims.

Claims

1. A combined riveting process, characterized in that: The riveting process applicable to parts with racetrack-shaped annular flanges includes the following steps: S1 Pre-riveting: Several processing points are set along the racetrack-shaped annular convex edge. The part is placed in the riveting device and the first riveting head is used to pre-rivet the processing points in sequence along the circumference of the racetrack-shaped annular convex edge, so that the racetrack-shaped annular convex edge of the part produces a first deformation inward, and an intermediate part is obtained. S2 final riveting: The intermediate part is placed in the riveting device and the second riveting head is used to perform final riveting on the processing points along the circumference of the obtained intermediate part in sequence, so that the intermediate part produces a second deformation and a riveted workpiece is obtained. The riveting process is used to process the parts point by point using the riveting process: along the racetrack-shaped annular protrusion, the parts are riveted by pre-riveting and final riveting processes. The pre-riveting process uses a pre-riveting pressure roller with an inclined angle to process the protrusion to form the first deformation. Then, the final riveting process uses a final riveting pressure roller parallel to the horizontal plane to process the protrusion that has formed the first deformation, and finally obtains the riveted part.

2. The combined riveting process according to claim 1, characterized in that: The number of processing points is set to 6-10.

3. The combined riveting process according to claim 1, characterized in that: The runway-shaped annular protrusion includes a first long side and a second long side arranged in parallel, and a first arc-shaped side and a second arc-shaped side respectively connected to both sides of the first long side and the second long side, wherein the first arc-shaped side and the second arc-shaped side are arranged symmetrically. The number of processing points is set to 6; the processing points include a first processing point, a second processing point, a third processing point, a fourth processing point, a fifth processing point, and a sixth processing point; the first processing point is located in the area connecting the first long side and the first arc-shaped side, the second processing point is located at the midpoint of the first arc-shaped side, the third processing point is located in the area connecting the second long side and the first arc-shaped side, the fourth processing point is located in the area connecting the second long side and the second arc-shaped side, the fifth processing point is located at the midpoint of the second arc-shaped side, and the sixth processing point is located in the area connecting the first long side and the second arc-shaped side.

4. The combined riveting process according to claim 3, characterized in that: The first rivet head includes a first connector and a first pressure roller assembly disposed on the first connector; the first pressure roller assembly includes a first connecting arm and a pre-riveting pressure roller disposed on the first connecting arm, the first connecting arm includes a first connecting portion and an inclined portion inclined at a certain angle relative to the first connecting portion, the first connecting portion is connected to the first connector, the inclined portion is used to set the pre-riveting pressure roller, and the pre-riveting pressure roller is coaxially disposed with the inclined portion.

5. The combined riveting process according to claim 4, characterized in that: The first connecting portion is arranged parallel to the axis of the first connecting member, and the tilt angle of the inclined portion relative to the horizontal plane is 30-60°.

6. The combined riveting process according to claim 1, characterized in that: The riveting device further includes a main shaft arranged along the Z-axis, and the first riveting head and / or the second riveting head are disposed on the main shaft. The main shaft can drive the first riveting head and / or the second riveting head to move along the X-axis, Y-axis or Z-axis and rotate along the Z-axis.

7. The combined riveting process according to claim 4, characterized in that, The pre-riveting process specifically includes the following steps: S11, with the first processing point as the initial position, align the first connecting arm with the first processing point, and use the pre-riveting roller to pre-rivet the first processing point; S12, rotate the first connecting arm to the first angle so that the pre-riveting roller corresponds to the second processing point, and use the pre-riveting roller to perform pre-riveting processing on the second processing point; S13, rotate the first connecting arm to the second angle so that the pre-riveting pressure roller corresponds to the third processing point, and use the pre-riveting pressure roller to perform pre-riveting processing on the third processing point; S14, move the first rivet head along the X-axis to the position corresponding to the fourth processing point, and use the pre-riveting roller to perform pre-riveting processing on the fourth processing point; S15, rotate the first connecting arm to the third angle so that the pre-riveting pressure roller corresponds to the fifth processing point, and use the pre-riveting pressure roller to perform pre-riveting processing on the fifth processing point; S16, rotate the first connecting arm to the initial position so that the pre-riveting roller corresponds to the sixth processing point, and use the pre-riveting roller to perform pre-riveting processing on the sixth processing point; S17, After the pre-riveting of the sixth processing point is completed, the first rivet head is moved along the X-axis to the position corresponding to the first processing point.

8. The combined riveting process according to claim 3, characterized in that: The second rivet head includes a second connector and a second pressure roller assembly disposed on the second connector; the second pressure roller assembly includes a second connecting arm and a final riveting pressure roller disposed on the second connecting arm, the second connecting arm is disposed on the outer wall of the second connector along the Z-axis, and the final riveting pressure roller is vertically and rotatably connected to the second connecting arm.

9. The combined riveting process according to claim 8, characterized in that: The final riveting process specifically includes the following steps: S21, with the first processing point as the second initial position, move the final riveting roller to the position corresponding to the first processing point, and perform final riveting on the first processing point that has undergone pre-riveting. S22, rotate the second connecting arm to the first angle so that the final riveting roller corresponds to the second processing point, and use the final riveting roller to perform final riveting on the second processing point; S23, rotate the second connecting arm to the second angle so that the final riveting roller corresponds to the third processing point, and use the final riveting roller to perform final riveting on the third processing point; S24, move the second rivet head along the X-axis to the position corresponding to the fourth processing point, and use the final riveting roller to perform final riveting on the fourth processing point; S25, rotate the second connecting arm to the third angle so that the final riveting roller corresponds to the fifth processing point, and use the final riveting roller to perform final riveting on the fifth processing point; S26, rotate the second connecting arm to the second initial position so that the final riveting roller corresponds to the sixth processing point, and use the final riveting roller to perform final riveting on the sixth processing point; S27, after the final riveting of the sixth processing point is completed, the second riveting head is moved along the X-axis to the position corresponding to the first processing point.

10. The combined riveting process according to claim 1, characterized in that: The thickness of the runway-shaped annular protrusion is 0.5-0.9 mm.

Citation Information

Patent Citations

  • Bracket bearing manufacturing method

    CN107626834A

  • Spin riveting head

    CN219004453U