Method for auxiliary seepage prevention of super-high pressure jet grouting pile for anti-seepage wall of high earth-rock dam with deep overburden

By arranging ultra-high pressure jet grouting interlocking piles around the anti-seepage wall of a high earth-rock dam with a deep overburden layer, the strength of the overburden soil is enhanced, solving the problem of cracks caused by the large stress and depth of the anti-seepage wall, and achieving a more stable anti-seepage effect.

CN117845835BActive Publication Date: 2026-11-24CHONGQING UNIV +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410150942.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2026-11-24
Estimated Expiration
2044-02-01

AI Technical Summary

Technical Problem

When the anti-seepage wall of a high earth-rock dam with a thick overburden layer is subjected to large vertical stress and great depth, it is prone to cracks and other damage, which affects the anti-seepage effect.

Method used

The ultra-high pressure jet grouting pile method is adopted, and ultra-high pressure jet grouting interlocking piles are arranged around the seepage barrier to enhance the strength of the overburden soil. The seepage barrier is formed by the ultra-high pressure jet grouting interlocking piles, which coordinate stress deformation and reduce the stress of the seepage barrier.

Benefits of technology

It effectively avoids cracks in the anti-seepage wall, enhances the anti-seepage effect, forms a more stable anti-seepage system, reduces the stress on the anti-seepage wall, and improves its impermeability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117845835B_ABST
    Figure CN117845835B_ABST
Patent Text Reader

Abstract

This invention discloses an ultra-high pressure jet grouting pile-assisted seepage prevention method for the seepage barrier wall of a high earth-rock dam with deep overburden, belonging to the technical field of building construction. It includes: arranging the front-end, back-end, and waste slurry sedimentation tanks; determining the reinforcement locations of the concrete seepage barrier wall, measuring and marking out the locations, and numbering them; drilling; using an ultra-high pressure jet grouting pile machine to perform ultra-high pressure jet grouting on the drilled holes and reinforcing them into single piles; moving the ultra-high pressure jet grouting pile machine to the next pile location, according to the reinforcement requirements of the seepage barrier wall of the high earth-rock dam with deep overburden, until all interlocking pile reinforcement is completed. This invention enhances the strength of the upstream and downstream overburden soil by setting up ultra-high pressure jet grouting interlocking piles, forming a more stable seepage prevention system and reducing the stress on the concrete seepage barrier wall; at the same time, the ultra-high pressure jet grouting interlocking piles themselves are seepage barriers, which can assist in seepage prevention and improve the seepage prevention effect of high earth-rock dams with deep overburden.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of building construction, specifically relating to an ultra-high pressure jet grouting pile-assisted seepage prevention method for a high earth-rock dam with a deep overburden layer. Background Technology

[0002] Earth-rock dams are a type of dam constructed using natural materials and have a long history of construction. They are widely used due to their relaxed foundation requirements, ease of construction, low cost, and good seismic performance. With in-depth research into the properties of earth-rock dam materials and advancements in construction technology, high earth-rock dams with deep overburden layers have developed rapidly. Because reservoir dams typically have complex foundation conditions, with most overburden layers being loose and permeable, seepage prevention design of the dam foundation has become one of the key issues restricting the construction of high earth-rock dams with deep overburden layers.

[0003] Currently, high earth-rock dams with deep overburden often employ a combined seepage prevention design consisting of a dam body seepage barrier layer (concrete face or asphalt concrete core wall), concrete cutoff walls (arranged in single or double rows, with double rows further divided into main and secondary curtains), and a grouting curtain in the deep foundation. These three sections of the seepage barrier are connected by different structural forms (such as galleries) to form an integrated seepage prevention system. The concrete cutoff wall is sandwiched within a relatively soft overburden layer. The wall structure is primarily subjected to water load, overburden pressure, and downward frictional resistance from uneven settlement. Under the combined action of these loads, the cutoff wall generally bears significant vertical stress. Furthermore, due to the great depth of the cutoff wall in high earth-rock dams with deep overburden, it is prone to generating significant tensile stress, leading to cracks and other damage, which is detrimental to seepage prevention. Summary of the Invention The purpose of this invention is to address the aforementioned shortcomings in the prior art by providing an ultra-high pressure jet grouting pile-assisted seepage prevention method for deep overburden high earth-rock dams. This method aims to solve the problems of existing seepage prevention walls bearing large vertical stresses and being prone to large tensile stresses due to their depth, which can lead to cracks and other damage, thus hindering seepage prevention.

[0004] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A method for seepage prevention using ultra-high pressure jet grouting piles as an auxiliary method for seepage prevention in high earth-rock dams with deep overburden layers includes the following steps: S1. Front desk setup for auxiliary seepage prevention construction of high earth-rock dam with deep overburden layer; S2. Background setup for auxiliary seepage prevention construction of high earth-rock dams with deep overburden layers; S3. Arrange the waste slurry sedimentation tank and connect it to the sludge discharge ditch arranged at the front in step S1. S4. Determine the reinforcement location of the concrete anti-seepage wall, measure and mark the reinforcement location, number all ultra-high pressure jet grouting piles, and measure and locate the core coordinates of the ultra-high pressure jet grouting piles on site. S5. Pre-drilling: Based on the coordinates of the pile center, pre-drilling is carried out at the location of the positioning pile until the hole reaches the bottom of the concrete anti-seepage wall, thus completing the hole formation. S6. Use an ultra-high pressure jet grouting machine to perform ultra-high pressure jet grouting on the formed holes and reinforce them into single piles; S7. Move the ultra-high pressure jet grouting pile host to the next pile position and repeat steps S5 and S6. According to the reinforcement requirements of the seepage prevention wall of the high earth-rock dam with deep overburden, continue until all interlocking pile reinforcement is completed.

[0005] This scheme applies ultra-high pressure jet grouting interlocking piles around the seepage barrier wall of an earth-rock dam. The ultra-high pressure jet grouting interlocking piles enhance the strength of the upstream and downstream overburden soil, reduce the stress on the concrete seepage barrier wall, and the ultra-high pressure jet grouting interlocking piles themselves are seepage barriers, which can assist in seepage prevention and improve the seepage prevention effect of high earth-rock dams with deep overburden layers.

[0006] Furthermore, the front desk setup in step S1 specifically includes: The ultra-high pressure jet grouting pile main unit is located at the coordinate position of the ultra-high pressure jet grouting pile core. Two dam foundation boxes are erected vertically on the left and right sides of the lower part of the ultra-high pressure jet grouting pile main unit. A steel sleeper beam is horizontally installed at the lower part of the dam foundation box. A mud discharge ditch is set in the direction parallel to the steel sleeper beam. The mud discharge ditch is located inside the two steel sleeper beams. A mud discharge pump is set on the left side of the ultra-high pressure jet grouting pile main unit and above the mud discharge ditch. From right to left, a drill rod flushing frame, a pilot hole mud pump, and a pilot hole unit are set on the left side of the ultra-high pressure jet grouting pile main unit. A crane is set on the front side of the ultra-high pressure jet grouting pile main unit.

[0007] Furthermore, the background setup in step S2 specifically includes: The cement silo and the automatic mixing system are arranged side by side and connected to each other. A mud storage tank is placed above the automatic mixing system, and a water tank is placed to the left of the mud storage tank. An air compressor unit, a main cement slurry pump, a water pump, and a standby high-pressure pump are arranged in order from left to right on the upper part of the mud storage tank and the water tank.

[0008] Furthermore, step S4 specifically includes: On the thick overburden high earth-rock dam cutoff wall, the downstream side of the concrete cutoff wall or near the concrete cutoff wall, determine the location that needs to be reinforced, carry out the measurement and layout, and use ultra-high pressure jet grouting interlocking single row piles for reinforcement. Ultra-high pressure jet grouting interlocking single-row piles are set on both sides of the concrete anti-seepage wall. All ultra-high pressure jet grouting interlocking single-row piles are numbered, and the core coordinates of the ultra-high pressure jet grouting interlocking single-row piles are measured and located on site.

[0009] Furthermore, step S4 specifically includes: On the anti-seepage wall of a high earth-rock dam with a thick overburden layer, the location that needs to be reinforced is determined on the upstream and downstream sides of the concrete anti-seepage wall or near the concrete anti-seepage wall. Measurement and layout are carried out, and ultra-high pressure jet grouting interlocking double / multi-row piles are used for reinforcement. Ultra-high pressure jet grouting interlocking double / multi-row piles are installed on both sides of the concrete cutoff wall. All ultra-high pressure jet grouting interlocking double / multi-row piles are numbered, and the core coordinates of the ultra-high pressure jet grouting interlocking double / multi-row piles are measured and located on site.

[0010] Step S4 specifically includes: On the thick overburden high earth-rock dam seepage wall, downstream of the concrete seepage wall or near the concrete seepage wall, determine the location that needs to be reinforced, carry out measurement and layout, and use ultra-high pressure jet grouting interlocking grid-shaped piles or interlocking rectangular piles for reinforcement. Ultra-high pressure jet grouting grid-shaped piles or interlocking rectangular piles are installed on both sides of the concrete seepage barrier. All of the ultra-high pressure jet grouting interlocking grid-shaped piles or interlocking rectangular piles are numbered, and the coordinates of the pile center of the ultra-high pressure jet grouting interlocking grid-shaped piles or interlocking rectangular piles are measured and located on site. Furthermore, the pre-hole construction in step S5 specifically includes: Using a pneumatic down-the-hole hammer and casing drilling process, drill to the elevation of the bottom of the concrete anti-seepage wall. If there is a layer of sand and gravel, install casing simultaneously. If the drilling progresses smoothly, drill to the bottom of the seepage barrier and then lift the drill. If the drill bit gets stuck, lift the drill bit and switch to a regular down-the-hole hammer. If it is still difficult to advance the hole, switch to an exploration drill rig, rotate the drill bit, and allow the slurry to form naturally until the hole reaches the bottom of the concrete cutoff wall. Then lift the drill bit and move the machine to complete the hole.

[0011] Further, step S6 includes: The ultra-high pressure jet grouting pile machine is positioned, and the drill rod is lowered into the casing. The drill rod is lowered into the bottom of the concrete anti-seepage wall and grout is sprayed from bottom to top. The drill rod is lifted while grouting is being sprayed. First, a section of casing is pulled out and grout is sprayed. Then, another section of casing is pulled out and the next section is sprayed until all grouting is completed. The drill rod and casing are then pulled out and reinforced into a single pile.

[0012] Furthermore, the ultra-high pressure jet grouting pile host is an RJP ultra-high pressure jet grouting pile host; The RJP ultra-high pressure jet grouting pile main unit is in place, and the drill rod is lowered into the casing. The drill rod is lowered into the bottom of the concrete anti-seepage wall and sprayed from bottom to top. Ultra-high pressure jet grouting is used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jet cutting of the soil in the upper section; The second step involves spraying ultra-high pressure hardener and compressed air into the lower section of the soil foundation after the first cutting to cut the soil again, in order to increase the cutting depth and increase the reinforcement diameter. Several mud discharge holes are drilled on the casing. Excess cement slurry flows upward through the space between the drill rod and the casing, and then seeps into the upper soil layer through the mud discharge holes on the casing to reinforce the upper soil layer. The drill rod is lifted while grouting is applied. First, a section of casing is pulled out, grout is injected, then another section of casing is pulled out, and the next section is injected, until all grouting is completed. Then, the drill rod and casing are pulled out and reinforced into a monopile.

[0013] Furthermore, the ultra-high pressure jet grouting pile host is the MJS ultra-high pressure jet grouting pile host; The MJS ultra-high pressure jet grouting pile host was in place, and the drill rod was lowered into the casing. The drill rod was lowered into the bottom of the concrete anti-seepage wall and sprayed from bottom to top. Ultra-high pressure jet grouting was used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jet cutting of the soil in the upper section; The second step involves spraying ultra-high pressure hardener and compressed air into the lower section of the soil foundation after the first cutting to cut the soil again, in order to increase the cutting depth and increase the reinforcement diameter. The MJS ultra-high pressure jet grouting machine drill rod is equipped with a mud discharge port. Excess cement-containing slurry is transported to the ground through the mud discharge port along the mud discharge pipe. The excess cement-containing slurry is then injected into the shallow dam foundation to further reinforce the dam foundation and resist liquefaction. The drill rod is lifted while grouting is applied. First, a section of casing is pulled out, grout is injected, then another section of casing is pulled out, and the next section is injected, until all grouting is completed. Then, the drill rod and casing are pulled out and reinforced into a monopile.

[0014] The ultra-high pressure jet grouting pile-assisted seepage prevention method for high earth-rock dams with deep overburden layers provided by this invention has the following beneficial effects: 1. This invention enhances the strength of the upstream and downstream overburden soil by setting up ultra-high pressure jet grouting interlocking piles, forming a more stable seepage prevention system and reducing the stress on the concrete seepage prevention wall; and after the jet grouting body of the interlocking piles solidifies, it works in conjunction with the seepage prevention wall to deform under stress, playing a seepage prevention role and reducing the stress on the seepage prevention wall, which can effectively prevent the seepage prevention wall from cracking and other damage.

[0015] 2. The ultra-high pressure jet grouting interlocking piles set in this invention can strengthen the joints of concrete anti-seepage walls. At the same time, since the ultra-high pressure jet grouting interlocking piles themselves are anti-seepage bodies, they can assist in anti-seepage and enhance the system's impermeability.

[0016] 3. This invention uses ultra-high pressure jet grouting to directly pressurize and transport the hardened cement slurry, spray it, cut the strata, mix it, and concentrate it into mud, thus comprehensively reinforcing the foundation and enabling deep foundation reinforcement.

[0017] 4. This invention uses ultra-high pressure jet grouting to cut and damage the soil layer twice. The first time is the upper section of ultra-high pressure water jet cutting the soil. The second time is the lower section of ultra-high pressure hardener and compressed air sprayed on the basis of the first soil layer cutting to cut the soil again. This construction method can increase the cutting depth and increase the reinforcement diameter.

[0018] 5. This invention combines rigid impermeable walls and flexible cement-soil in a "rigid-flexible" synergistic manner, possessing the dual advantages of both structures and exhibiting superior technical and economic efficiency. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the front desk layout of the present invention; Figure 2 This is a schematic diagram of the background layout and waste slurry sedimentation tank layout of the present invention; Figure 3 This is a schematic diagram of the ultra-high pressure jet grouting interlocking single-row pile reinforcement for core wall earth-rock dams according to the present invention; Figure 4 This is a schematic diagram of the ultra-high pressure jet grouting interlocking single-row pile reinforcement for panel earth-rock dams according to the present invention; Figure 5 This is a schematic diagram of the RJP method used in the ultra-high pressure jet grouting piles of this invention. Figure 6 This is a schematic diagram of the ultra-high pressure jet grouting double / multi-row pile reinforcement for core wall earth-rock dams according to the present invention; Figure 7 This is a schematic diagram of the ultra-high pressure jet grouting double / multi-row pile reinforcement for panel earth-rock dams according to the present invention; Figure 8 This is a schematic diagram of the MJS method used in the ultra-high pressure jet grouting pile of this invention. Figure 9 This is a schematic diagram of the reinforcement of an earth-rock dam with ultra-high pressure jet grouting well-shaped piles close to the anti-seepage wall according to the present invention; Figure 10 This is a schematic diagram of the ultra-high pressure jet grouting rectangular pile reinforcement of earth-rock dams, based on the present invention, close to the seepage prevention wall; Figure 11 This is a schematic diagram of the ultra-high pressure jet grouting well-shaped pile interval anti-seepage wall reinforcement for earth-rock dams according to the present invention; Figure 12 This is a schematic diagram of the ultra-high pressure jet grouting rectangular pile interval anti-seepage wall reinforcement for earth-rock dams according to the present invention; Figure 13 This is a flowchart of the ultra-high pressure jet grouting pile-assisted seepage prevention method for a high earth-rock dam with a deep overburden layer, according to the present invention.

[0020] The components include: 1. Ultra-high pressure jet grouting pile main unit; 2. Dam foundation box; 3. Sludge drainage ditch; 4. Sludge pump; 5. Drill rod flushing frame; 6. Pre-hole drilling mud pump; 7. Pre-hole drilling unit; 8. Crane; 9. Steel sleeper beam; 10. Waste slurry sedimentation tank; 11. Cement slurry main pump; 12. Water pump; 13. Backup high-pressure pump; 14. Automatic mixing system; 15. Slurry storage tank; 16. Cement tank; 17. Water tank; 18. Air compressor unit; 19. Concrete anti-seepage wall; 20. Ultra-high pressure jet grouting ring. 21. Single-row pile; 22. Clay core wall; 23. Rockfill; 24. Concrete panel; 25. Ultra-high pressure hardener; 26. Ultra-high pressure water; 27. Excess grout; 28. Upper reinforced soil layer; 29. ​​Casing; 20. Mud discharge hole; 30. Compressed air; 31. Ultra-high pressure jet grouting interlocking double / multi-row pile; 32. Mud discharge port; 33. Mud discharge pipe; 34. Reinforced shallow dam foundation; 35. Ultra-high pressure jet grouting interlocking grid-shaped pile; 36. Ultra-high pressure jet grouting interlocking rectangular pile. Detailed Implementation

[0021] The specific embodiments of the present invention are described below to enable those skilled in the art to understand the present invention. However, it should be understood that the present invention is not limited to the scope of the specific embodiments. For those skilled in the art, various changes are obvious as long as they are within the spirit and scope of the present invention as defined and determined by the appended claims. All inventions utilizing the concept of the present invention are protected.

[0022] Example 1 refer to Figures 1-5 and Figure 13 This embodiment provides an ultra-high pressure jet grouting pile-assisted seepage prevention method for a high earth-rock dam with a deep overburden layer. This method enhances the strength of the upstream and downstream overburden soil, forming a more stable seepage prevention system and effectively preventing cracks and other damage to the seepage prevention wall. The specific steps include: Step S1: Set up the front desk, which includes the following: refer to Figure 1 The front-end layout of this embodiment includes main equipment such as ultra-high pressure jet grouting pile host 1, pre-hole drilling unit 7, crane 8, and drill rod flushing frame 5; The layout of its various devices is as follows: The ultra-high pressure jet grouting pile host 1 is located at the coordinate position of the ultra-high pressure jet grouting pile core. Two dam foundation boxes 2 are erected vertically on the left and right sides of the lower part of the ultra-high pressure jet grouting pile host 1. A steel sleeper beam 9 is horizontally installed at the lower part of the dam foundation box 2. A mud discharge ditch 3 is set in the direction parallel to the steel sleeper beam 9. The mud discharge ditch 3 is inside the two steel sleeper beams 9. A mud discharge pump 4 is set on the left side of the ultra-high pressure jet grouting pile host 1 and above the mud discharge ditch 3. From right to left, a drill rod flushing frame 5, a pilot hole mud pump 6, and a pilot hole unit 7 are set on the left side of the ultra-high pressure jet grouting pile host 1. A crane 8 is set on the front side of the ultra-high pressure jet grouting pile host 1.

[0023] As a preferred embodiment, the steel sleeper beam 9 is preferably, but not limited to, made of H300 steel. 300 type steel.

[0024] As a preferred embodiment, the crane 8 is preferably, but not limited to, a 25T model.

[0025] Step S2: Configure the backend, which includes the following: refer to Figure 2 The background setup in this embodiment includes main equipment such as a cement slurry main pump 11, a water pump 12, a standby high-pressure pump 13, an air compressor unit 18, a water tank 17, a cement silo 16, an automatic mixing system 14, and a mud storage tank 15.

[0026] The layout of its various devices is as follows: The cement silo 16 and the automatic mixing system 14 are arranged side by side. The mud storage tank 15 is arranged above the automatic mixing system 14. The water tank is placed to the left of the mud storage tank 15. The air compressor unit 18, the main cement slurry pump 11, the water pump 12 and the standby high pressure pump 13 are arranged from left to right on the upper part of the mud storage tank 15 and the water tank 17.

[0027] As a preferred embodiment, the crane 8 is preferably, but not limited to, an 80T model.

[0028] Step S3, the arrangement of waste slurry sedimentation tank 10, specifically includes the following: The waste slurry sedimentation tank 10 is connected to the sludge discharge ditch 3. The waste slurry sedimentation tank occupies a large area and can be surrounded by soil to store waste slurry for sedimentation. At the same time, the soil is transported away in a timely manner to keep the site clean.

[0029] Step S4: Determine the reinforcement location, measure and lay out the lines, number the ultra-high pressure jet grouting piles, accurately measure and locate the pile core coordinates on site, and protect the piles. This specifically includes the following: refer to Figure 3 and Figure 4 In this embodiment, the locations that need reinforcement are determined on the upper and lower reaches of the thick overburden high earth-rock dam cutoff wall, close to the concrete cutoff wall 19, or near the concrete cutoff wall 19. Measurement and layout are carried out, and ultra-high pressure jet grouting interlocking single-row piles 20 are used for reinforcement. The ultra-high pressure jet grouting interlocking single-row piles 20 are set on both sides of the concrete cutoff wall 19. In this embodiment, the strength of the upper and lower overburden soil is enhanced by setting ultra-high pressure jet grouting interlocking single-row piles 20, forming a more stable seepage prevention system and reducing the stress on the concrete cutoff wall 19. Meanwhile, the ultra-high pressure jet grouting interlocking single-row pile 20 can strengthen the joints of the concrete anti-seepage wall 19. Since the ultra-high pressure jet grouting interlocking pile itself is an anti-seepage body, it can assist in anti-seepage and enhance the system's anti-seepage performance.

[0030] All ultra-high pressure jet grouting interlocking single-row piles 20 were numbered, and the pile center coordinates of the ultra-high pressure jet grouting interlocking single-row piles 20 were accurately measured and located on site, and pile protection was carried out.

[0031] Step S5, pre-hole construction, specifically includes the following: First, use a pneumatic down-the-hole hammer and casing drilling process to drill to the elevation of the bottom of the seepage barrier. If there is a layer of sand and gravel, a casing 28 needs to be installed simultaneously. Several mud discharge holes 281 are opened on the casing wall.

[0032] If the drilling progresses smoothly, drill to the bottom of the seepage barrier and then lift the drill. If the drill bit gets stuck, lift the drill bit and switch to a regular down-the-hole hammer. If it is still difficult to advance the hole, switch to an exploration drill rig, rotate the drill bit, and allow the slurry to form naturally until the bottom of the seepage barrier is reached. Then lift the drill bit and move the rig to complete the hole.

[0033] As a preferred embodiment, this embodiment preferably, but is not limited, uses a steel sleeve 28.

[0034] Step S6: Use the ultra-high pressure jet grouting machine 1 to perform ultra-high pressure jet grouting on the drilled holes and reinforce them into single piles; refer to Figure 5 In this embodiment, the ultra-high pressure jet grouting pile host 1 is an RJP host, and its specific process is as follows: The RJP main unit was in place, and the site was ensured that the piling machine was stable and level.

[0035] The drill rod is lowered into the casing and then injected from bottom to top into the bottom of the concrete anti-seepage wall 19. Ultra-high pressure jet grouting is used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jetting at 25 mm in the upper section to cut the soil. The second step involves spraying ultra-high pressure hardener 24 and compressed air 29 onto the lower section of the soil layer after the first cutting, to cut the soil again. This embodiment employs a two-stage cutting process to break down the soil layer, thereby increasing the cutting depth and the reinforcement diameter.

[0036] Several mud discharge holes 281 are opened on the casing 28. Excess slurry 26 containing cement returns upward through the space between the drill rod and the casing 28, and then seeps into the upper soil layer through the mud discharge holes 281 on the casing 28 to reinforce the upper soil layer.

[0037] While the drill rod is being lifted, grout is being sprayed. First, a section of casing 28 is pulled out and grout is sprayed. Then, another section of casing 28 is pulled out and the next section is sprayed, until all the grouting is completed. The drill rod and casing 28 are then pulled out and reinforced into a monopile.

[0038] Step S7: Move the RJP main unit to the next pile location, and repeat steps S5 and S6 to complete the reinforcement of all ultra-high pressure jet grouting interlocking single-row piles.

[0039] Steps S1 to S7 of this embodiment can be carried out before and after the construction of the earth-rock dam anti-seepage wall. The ultra-high pressure jet grouting piles can be close to the anti-seepage wall or at a certain distance.

[0040] After the interlocking pile jet grouting body of this embodiment solidifies, it deforms in conjunction with the seepage barrier wall under stress, which can play a role in seepage prevention and reduce the stress of the seepage barrier wall, thereby forming a more stable seepage prevention system.

[0041] Example 2 refer to Figures 1-2 ,as well as Figures 6-8 ,as well as Figure 13 This embodiment provides an ultra-high pressure jet grouting pile-assisted seepage prevention method for high earth-rock dams with deep overburden layers. This method addresses the problems of existing seepage barriers bearing significant vertical stress and being prone to tensile stress due to their depth, leading to cracks and other damage that hinders seepage prevention. The specific steps include: Step T1: Set up the front desk, which includes the following: refer to Figure 1 The front-end layout of this embodiment includes main equipment such as ultra-high pressure jet grouting pile host 1, pre-hole drilling unit 7, crane 8, and drill rod flushing frame 5; The layout of its various devices is as follows: The ultra-high pressure jet grouting pile host 1 is located at the coordinate position of the ultra-high pressure jet grouting pile core. Two dam foundation boxes 2 are erected vertically on the left and right sides of the lower part of the ultra-high pressure jet grouting pile host 1. A steel sleeper beam 9 is set horizontally at the lower part of the dam foundation box 2. A mud discharge ditch 3 is set in the direction parallel to the steel sleeper beam 9. The mud discharge ditch 3 is inside the two steel sleeper beams 9. A mud discharge pump 4 is set above the mud discharge ditch 3 on the left side of the ultra-high pressure jet grouting pile host 1. From right to left, a drill rod flushing frame 5, a pilot hole mud pump 6, and a pilot hole unit 7 are set on the left side of the ultra-high pressure jet grouting pile host 1. A crane 8 is set on the front side of the ultra-high pressure jet grouting pile host 1.

[0042] As a preferred embodiment, the steel sleeper beam 9 is preferably, but not limited to, made of H300 steel. 300 type steel.

[0043] As a preferred embodiment, the crane 8 is preferably, but not limited to, a 25T model.

[0044] Step T2: Configure the backend system, which includes the following: refer to Figure 2 The background setup in this embodiment includes main equipment such as a cement slurry main pump 11, a water pump 12, a standby high-pressure pump 13, an air compressor unit 18, a water tank 17, a cement silo 16, an automatic mixing system 14, and a mud storage tank 15.

[0045] The layout of its various devices is as follows: The cement silo 16 and the automatic mixing system 14 are arranged side by side. The mud storage tank 15 is arranged above the automatic mixing system 14. The water tank is placed to the left of the mud storage tank 15. The air compressor unit 18, the main cement slurry pump 11, the water pump 12 and the standby high pressure pump 13 are arranged from left to right on the upper part of the mud storage tank 15 and the water tank 17.

[0046] As a preferred embodiment, the crane 8 is preferably, but not limited to, an 80T model.

[0047] Step T3, the arrangement of waste slurry sedimentation tank 10, specifically includes the following: Waste slurry sedimentation tank 10 is connected to sludge discharge ditch 3; waste slurry sedimentation tank 10 occupies a large area, can be enclosed with soil, stores waste slurry for sedimentation, and at the same time, soil is transported away in a timely manner to keep the site clean.

[0048] Step T4: Determine the reinforcement location of the concrete anti-seepage wall, measure and mark the reinforcement location, number all ultra-high pressure jet grouting piles, and measure and locate the core coordinates of the ultra-high pressure jet grouting piles on site. This specifically includes the following: refer to Figure 6 and Figure 7 On the thick overburden high earth-rock dam seepage wall, the upstream and downstream of the concrete seepage wall 19 or near the concrete seepage wall 19, determine the location that needs to be reinforced, and carry out measurement and layout. For conditions with poorer and deeper overburden soil, this embodiment employs ultra-high pressure jet grouting interlocking double / multi-row piles 30 for reinforcement. These piles are installed on both sides of the concrete cutoff wall 19. By installing these piles, the strength of the upstream and downstream overburden soil is enhanced, forming a more stable seepage prevention system and reducing stress on the concrete cutoff wall 19. Simultaneously, the ultra-high pressure jet grouting interlocking double / multi-row piles 30 can reinforce the joints of the concrete cutoff wall 19. Since the ultra-high pressure jet grouting interlocking piles themselves are seepage prevention elements, they can assist in seepage prevention and enhance the system's impermeability. All ultra-high pressure jet grouting interlocking double / multi-row piles 30 are numbered, and the coordinates of the pile cores are accurately measured and located on-site, with proper pile protection measures implemented.

[0049] Step T5, pilot hole construction, specifically includes the following: First, use the pneumatic down-the-hole hammer and casing drilling process to drill to the elevation of the bottom of the seepage barrier. If there is a layer of sand and gravel, a casing 28 needs to be installed simultaneously. If the drilling progresses smoothly, drill to the bottom of the seepage barrier and then lift the drill. If the drill bit gets stuck, lift the drill bit and switch to a regular down-the-hole hammer. If it is still difficult to advance the hole, switch to an exploration drill rig, rotate the drill bit, and allow the slurry to form naturally until the bottom of the seepage barrier is reached. Then lift the drill bit and move the rig to complete the hole.

[0050] As a preferred embodiment, this embodiment preferably, but is not limited, uses a steel sleeve 28.

[0051] Step T6: Use the ultra-high pressure jet grouting pile main unit 1 to perform ultra-high pressure jet grouting on the drilled holes and reinforce them into single piles; refer to Figure 8 In this embodiment, the ultra-high pressure jet grouting pile host 1 is an MJS host, and its specific process is as follows: With the MJS host in place, the site was ensured that the piling machine was stable and level.

[0052] The drill rod is lowered into the casing and then injected from bottom to top into the bottom of the concrete anti-seepage wall 19. Ultra-high pressure jet grouting is used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jetting at 25 mm in the upper section to cut the soil. The second step involves spraying ultra-high pressure hardener 24 and compressed air 29 onto the lower section of the soil layer after the first cutting, to cut the soil again. This embodiment employs a two-stage cutting process to break down the soil layer, thereby increasing the cutting depth and the reinforcement diameter.

[0053] The MJS main unit drill pipe is equipped with a mud discharge port 31. Excess slurry 26 containing cement is transported to the ground through the mud discharge port 31 along the mud discharge pipe 32. The excess slurry 26 containing cement is then injected into the shallow dam foundation to further reinforce the dam foundation and resist liquefaction.

[0054] While the drill rod is being lifted, grout is being sprayed. First, a section of casing 28 is pulled out and grout is sprayed. Then, another section of casing 28 is pulled out and the next section is sprayed, until all the grouting is completed. The drill rod and casing 28 are then pulled out and reinforced into a monopile.

[0055] Step T7: Move the MJS main unit to the next pile location, and repeat steps T5 and T6 to complete the reinforcement of all ultra-high pressure jet grouting double / multi-row piles.

[0056] Steps T1 to T7 in this embodiment can be carried out before and after the construction of the earth-rock dam seepage prevention wall. The ultra-high pressure jet grouting piles can be close to the seepage prevention wall or at a certain distance.

[0057] After the interlocking pile jet grouting body of this embodiment solidifies, it deforms in conjunction with the seepage barrier wall under stress, which can play a role in seepage prevention and reduce the stress of the seepage barrier wall, thereby forming a more stable seepage prevention system.

[0058] Example 3 The difference between this embodiment and Embodiment 1 lies in the reinforcement method in step S4; refer to Figures 9-12In this embodiment, the reinforcement method adopts ultra-high pressure jet grouting interlocking grid-shaped pile 34 or ultra-high pressure jet grouting interlocking rectangular pile 35 for reinforcement. The reinforcement location is determined on the seepage prevention wall of the high earth-rock dam with thick overburden, downstream of the seepage prevention wall, or near the seepage prevention wall.

[0059] Although specific embodiments of the invention have been described in detail with reference to the accompanying drawings, this should not be construed as limiting the scope of protection of this patent. Various modifications and variations that can be made by a person skilled in the art without inventive effort within the scope described in the claims still fall within the scope of protection of this patent.

Claims

1. A method for seepage prevention using ultra-high pressure jet grouting piles as an auxiliary method for seepage control in high earth-rock dams with deep overburden layers, characterized in that... Includes the following steps: S1. Front desk setup for auxiliary seepage prevention construction of high earth-rock dam with deep overburden layer; S2. Background setup for auxiliary seepage prevention construction of high earth-rock dams with deep overburden layers; S3. Arrange the waste slurry sedimentation tank and connect it to the sludge discharge ditch arranged at the front in step S1. S4. Determine the reinforcement location of the concrete anti-seepage wall, measure and mark the reinforcement location, number all ultra-high pressure jet grouting piles, and measure and locate the core coordinates of the ultra-high pressure jet grouting piles on site. S5. Pre-drilling: Based on the coordinates of the pile center, pre-drilling is carried out at the location of the positioning pile until the hole reaches the bottom of the concrete anti-seepage wall, thus completing the hole formation. S6. Use an ultra-high pressure jet grouting machine to perform ultra-high pressure jet grouting on the formed holes and reinforce them into single piles; S7. Move the ultra-high pressure jet grouting pile host to the next pile position and repeat steps S5 and S6. According to the reinforcement requirements of the seepage prevention wall of the high earth-rock dam with deep overburden, until all interlocking pile reinforcement is completed. The front desk setup in step S1 specifically includes: The ultra-high pressure jet grouting pile main unit is located at the coordinate position of the ultra-high pressure jet grouting pile core. Two dam foundation boxes are erected vertically on the left and right sides of the lower part of the ultra-high pressure jet grouting pile main unit. A steel sleeper beam is horizontally installed at the lower part of the dam foundation box. A mud discharge ditch is set in the direction parallel to the steel sleeper beam. The mud discharge ditch is located inside the two steel sleeper beams. A mud discharge pump is set on the left side of the ultra-high pressure jet grouting pile main unit and above the mud discharge ditch. From right to left, a drill rod flushing frame, a pilot hole mud pump, and a pilot hole unit are respectively set on the left side of the ultra-high pressure jet grouting pile main unit. A crane is set on the front side of the ultra-high pressure jet grouting pile main unit. The background setup in step S2 specifically includes: The cement silo and the automatic mixing system are arranged side by side, and the cement silo and the automatic mixing system are connected; a mud storage tank is arranged above the automatic mixing system, and a water tank is placed to the left of the mud storage tank. An air compressor unit, a main cement slurry pump, a water pump, and a standby high-pressure pump are arranged sequentially from left to right above the mud storage tank and the water tank; step S4 specifically includes: On the anti-seepage wall of a high earth-rock dam with a thick overburden layer, the location that needs to be reinforced is determined on the upstream and downstream sides of the concrete anti-seepage wall or near the concrete anti-seepage wall. Measurement and layout are carried out, and ultra-high pressure jet grouting interlocking double / multi-row piles are used for reinforcement. The ultra-high pressure jet grouting interlocking double / multi-row piles are installed on both sides of the concrete anti-seepage wall. All the ultra-high pressure jet grouting interlocking double / multi-row piles are numbered, and the core coordinates of the ultra-high pressure jet grouting interlocking double / multi-row piles are measured and located on site.

2. The method for seepage prevention using ultra-high pressure jet grouting piles assisted by a deep overburden layer high earth-rock dam seepage prevention wall as described in claim 1, characterized in that, The pre-hole construction in step S5 specifically includes: Using a pneumatic down-the-hole hammer and casing drilling process, drill to the elevation of the bottom of the concrete anti-seepage wall. If there is a layer of sand and gravel, install casing simultaneously. If the drilling progresses smoothly, drill to the bottom of the seepage barrier and then lift the drill. If the drill bit gets stuck, lift the drill bit and switch to a regular down-the-hole hammer. If it is still difficult to advance the hole, switch to an exploration drill rig, rotate the drill bit, and allow the slurry to form naturally until the hole reaches the bottom of the concrete cutoff wall. Then lift the drill bit and move the machine to complete the hole.

3. The method for seepage prevention using ultra-high pressure jet grouting piles as an auxiliary method for seepage prevention in high earth-rock dams with deep overburden layers according to claim 1, characterized in that, Step S6 includes: The ultra-high pressure jet grouting pile main unit is in place, and the drill rod is lowered into the casing. The drill rod is lowered into the bottom of the concrete anti-seepage wall and grout is sprayed from bottom to top. The drill rod is lifted and grout is sprayed at the same time. First, a section of casing is pulled out and grout is sprayed. Then, another section of casing is pulled out and the next section is sprayed until all grouting is completed. The drill rod and casing are then pulled out and reinforced into a single pile.

4. The method for seepage prevention using ultra-high pressure jet grouting piles assisted by a deep overburden layer high earth-rock dam seepage prevention wall according to claim 3, characterized in that, The ultra-high pressure jet grouting pile host is the RJP ultra-high pressure jet grouting pile host; The RJP ultra-high pressure jet grouting pile host was in place, and the drill rod was lowered into the casing. The drill rod was lowered into the bottom of the concrete anti-seepage wall and sprayed from bottom to top. Ultra-high pressure jet grouting was used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jet cutting of the soil in the upper section. The second step involves spraying ultra-high pressure hardener and compressed air into the lower section of the soil foundation after the first cutting to cut the soil again, in order to increase the cutting depth and increase the reinforcement diameter. Several mud discharge holes are drilled on the casing. Excess cement slurry flows upward through the space between the drill rod and the casing, and then seeps into the upper soil layer through the mud discharge holes on the casing to reinforce the upper soil layer. The drill rod is lifted while grouting is applied. First, a section of casing is pulled out, grout is injected, then another section of casing is pulled out, and the next section is injected, until all grouting is completed. Then, the drill rod and casing are pulled out and reinforced into a monopile.

5. The method for seepage prevention using ultra-high pressure jet grouting piles assisted by a deep overburden layer high earth-rock dam seepage control wall according to claim 3, characterized in that, The ultra-high pressure jet grouting pile host is the MJS ultra-high pressure jet grouting pile host; The MJS ultra-high pressure jet grouting pile host was in place, and the drill rod was lowered into the casing. The drill rod was lowered into the bottom of the concrete anti-seepage wall and sprayed from bottom to top. Ultra-high pressure jet grouting was used to cut and destroy the soil layer twice. The first instance involved ultra-high pressure water jet cutting of the soil in the upper section. The second step involves spraying ultra-high pressure hardener and compressed air into the lower section of the soil foundation after the first cutting to cut the soil again, in order to increase the cutting depth and increase the reinforcement diameter. The main ultra-high pressure jet grouting pile is equipped with a mud discharge port on the drill rod. Excess cement slurry is transported to the ground through the mud discharge port along the mud discharge pipe. The excess cement slurry is then injected into the shallow dam foundation to further reinforce the dam foundation and resist liquefaction. The drill rod is lifted while grouting is applied. First, a section of casing is pulled out, grout is injected, then another section of casing is pulled out, and the next section is injected, until all grouting is completed. Then, the drill rod and casing are pulled out and reinforced into a monopile.

Citation Information

Patent Citations

  • Porous pipe method large-diameter high-pressure jet grouting pile construction method

    CN104563099A

  • High pressure jet grouting pile waterproof curtain construction device and method

    CN104929114A

  • Anti-seepage reinforcing structure for dam body of small earth and rockfill dam

    CN219508493U