Shale oil horizontal well productivity prediction method and device, storage medium and equipment
By analyzing and normalizing the geological and construction parameters of shale oil horizontal wells, a production capacity prediction model was established, which solved the problem of inaccurate production capacity prediction in existing technologies and achieved more accurate production capacity prediction and optimization of construction parameters.
Patent Information
- Application Number
- CN202211193611.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-28
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-09-28
AI Technical Summary
Existing methods for predicting the productivity of shale oil horizontal wells cannot accurately predict the productivity of horizontal wells, mainly because the influence of factors such as porosity, saturation, pressure coefficient, and fracturing fluid usage is unclear.
By analyzing the geological and production parameters of the test vertical well, the potential index relationship was determined. Combined with the geological and construction parameters of the horizontal well, the production capacity prediction model was established. This included the normalization calculation of parameters such as free oil porosity, brittleness index, cluster fluid addition, cluster discharge, and sand addition intensity. Multi-parameter regression analysis was used to establish the production capacity prediction model.
It has achieved relatively accurate prediction of shale oil horizontal well productivity, reduced prediction errors, provided a basis for selecting horizontal well segmentation and clustering and fracturing construction parameters, and saved costs.
Smart Images

Figure CN117846582B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of oil and gas exploration technology, and more specifically, to a method, apparatus, storage medium, and equipment for predicting the production capacity of shale oil horizontal wells. Background Technology
[0002] Shale oil reservoirs have extremely poor fluidity, requiring volumetric fracturing of horizontal wells to increase the complexity of the fracture network and improve single-well production. The productivity of shale oil horizontal wells is affected by both geological and engineering factors, including porosity, saturation, pressure coefficient, fracturing fluid usage, and other factors. The main factors controlling productivity are unclear, making it difficult to accurately predict the productivity index of shale oil horizontal wells.
[0003] There is currently no effective solution to the above problems. Summary of the Invention
[0004] This invention provides a method, apparatus, storage medium, and equipment for predicting the production capacity of shale oil horizontal wells, thereby at least solving the technical problem that existing methods for predicting the production capacity of shale oil horizontal wells cannot accurately predict the production capacity of horizontal wells.
[0005] According to one aspect of the present invention, a method for predicting the production capacity of a shale oil horizontal well is provided, comprising: analyzing and processing first geological parameters and first production parameters obtained from a test vertical well to determine a first potential index relationship; determining a second potential index based on the first potential index relationship and second geological parameters of the horizontal well, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, wherein the construction parameters include clustered fluid injection rate, clustered discharge rate and sand injection intensity, and the normalized result includes: a first normalized result and a second normalized result; and establishing a production capacity prediction model based on the normalized result to predict the production capacity.
[0006] Optionally, the step of analyzing and processing the first geological parameters and first production parameters obtained from the test well to determine the first potential index relationship includes: obtaining the first geological parameters of a single layer of the test well and obtaining the first production parameters, wherein the geological parameters include reservoir parameters and mechanical parameters, and the first production parameters include: first production time, first production system, first daily oil production, and first cumulative oil production; establishing multiple initial potential index relationships based on the reservoir parameters, the mechanical parameters, and the first production parameters, and determining multiple initial potential indices, wherein each initial potential index relationship corresponds to one initial potential index; determining the potential index with the highest initial potential index from the multiple initial potential indices as the first potential index, and determining the initial potential index relationship corresponding to the first potential index as the first potential index relationship, wherein the potential index is used to characterize the oil production capacity of the target formation corresponding to the test well.
[0007] Optionally, determining the second potential index based on the first potential index relationship and the second geological parameters of the horizontal well includes: determining the geological parameter type based on the first potential index relationship; determining the second geological parameter from all geological parameters of the horizontal well based on the geological parameter type; and substituting the second geological parameter into the first potential index relationship to obtain the second potential index.
[0008] Optionally, before normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, the method further includes: determining the effective fracture section length based on the second potential index, wherein the effective fracture section length is the section where the second potential index is greater than a lower limit d, and the lower limit d is obtained based on the first potential index and the first production parameters; if the effective fracture section length exists, normalizing the second potential index and the construction parameters of the horizontal well; if the effective fracture section length does not exist, determining that the target formation has no oil production capacity.
[0009] Optionally, the second potential index and the construction parameters of the horizontal well are normalized to obtain a normalized result, including: weighting the second potential index to obtain a thickness weighted value of the second potential index; determining the thickness of the second potential index based on the thickness weighted value of the second potential index; normalizing the thickness of the second potential index to obtain a first normalized result; determining a first normalized calculation formula for the cluster liquid addition volume, a second normalized calculation formula for the cluster discharge volume, and a third normalized calculation formula for the sand addition intensity; and performing normalization calculations using the first normalized calculation formula, the second normalized calculation formula, and the third normalized calculation formula respectively to obtain a second normalized result.
[0010] Optionally, based on the above normalization results, a capacity forecasting model is established to forecast capacity, including: establishing the above capacity forecasting model using regression analysis based on the above first normalization results and the above second normalization results; and using the above capacity forecasting model to forecast capacity.
[0011] According to another aspect of the present invention, a production capacity prediction device for shale oil horizontal wells is also provided, comprising: a first processing module for analyzing and processing first geological parameters and first production parameters obtained from a test vertical well to determine a first potential index relationship; a second processing module for determining a second potential index based on the first potential index relationship and second geological parameters of the horizontal well, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; a third processing module for normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, wherein the construction parameters include clustered fluid injection rate, clustered discharge rate and sand injection intensity, and the normalized result includes: a first normalized result and a second normalized result; and a modeling module for establishing a production capacity prediction model based on the normalized result to predict production capacity.
[0012] According to another aspect of the present invention, a non-volatile storage medium is also provided, which stores a plurality of instructions adapted for a processor to load and execute any one of the above-described shale oil horizontal well production prediction methods.
[0013] According to another aspect of the present invention, a processor is also provided, which is used to run a program, wherein the program is configured to execute any of the above-described shale oil horizontal well production prediction methods during runtime.
[0014] According to another aspect of the present invention, an electronic device is also provided, including a memory and a processor, wherein the memory stores a computer program and the processor is configured to run the computer program to perform any of the above-described shale oil horizontal well production prediction methods.
[0015] In this embodiment of the invention, a first potential index relationship is determined by analyzing and processing the first geological parameters and first production parameters obtained from the test vertical well. Based on the first potential index relationship and the second geological parameters of the horizontal well, a second potential index is determined, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index. The second potential index and the construction parameters of the horizontal well are normalized to obtain normalized results, wherein the construction parameters include clustered fluid addition rate, clustered discharge rate, and sand addition intensity, and the normalized results include: a first normalized result and a second normalized result. Based on the normalized results, a production capacity prediction model is established to predict production capacity, achieving the purpose of determining the potential index based on geological parameters, construction parameters, and production parameters, and then establishing a prediction model. This achieves the technical effect of using a prediction model to predict the production capacity of horizontal wells, thereby solving the technical problem that existing shale oil horizontal well production capacity prediction methods cannot accurately predict the production capacity of horizontal wells. Attached Figure Description
[0016] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this application, illustrate exemplary embodiments of the invention and, together with their description, serve to explain the invention and do not constitute an undue limitation thereof. In the drawings:
[0017] Figure 1 This is a flowchart of a shale oil horizontal well productivity prediction method according to an embodiment of the present invention;
[0018] Figure 2 This is a schematic diagram of an optional normalized capacity potential index calculation chart according to an embodiment of the present invention;
[0019] Figure 3 This is a schematic diagram illustrating the relationship between optional normalized fracturing operation parameters and 180-day cumulative production according to an embodiment of the present invention.
[0020] Figure 4 This is a schematic diagram illustrating the accuracy analysis of an optional horizontal well productivity prediction model according to an embodiment of the present invention;
[0021] Figure 5 This is a schematic diagram of a map simplification device according to an embodiment of the present invention. Detailed Implementation
[0022] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0023] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0024] Example 1
[0025] According to an embodiment of the present invention, an embodiment of a method for predicting the production capacity of shale oil horizontal wells is provided. It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions. Furthermore, although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in a different order than that shown here.
[0026] Figure 1 This is a flowchart of a shale oil horizontal well productivity prediction method according to an embodiment of the present invention, as shown below. Figure 1 As shown, the method includes the following steps:
[0027] Step S102: Analyze and process the first geological parameters and first production parameters obtained from the test well to determine the first potential index relationship;
[0028] Step S104: Based on the first potential index relationship and the second geological parameters of the horizontal well, determine the second potential index, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index.
[0029] Step S106: Normalize the second potential index and the construction parameters of the horizontal well to obtain normalized results. The construction parameters include the amount of liquid added to the cluster, the amount of liquid discharged from the cluster, and the sand addition intensity. The normalized results include: a first normalized result and a second normalized result.
[0030] Step S108: Based on the above normalization results, establish a capacity forecasting model to forecast capacity.
[0031] In this embodiment of the invention, the execution body of the shale oil horizontal well production prediction method provided in steps S102 to S108 above is a production prediction system. The production prediction system is used to obtain the first geological parameters and the first production parameters of the test vertical well, as well as the construction parameters and the second geological parameters of the horizontal well. The parameters are analyzed and processed to obtain the production potential index. The production potential index and the construction parameters are normalized, and a shale oil horizontal well production prediction model is established based on the processing results.
[0032] As an optional implementation, by collecting and organizing the geological parameters and production data of vertical wells with single-layer oil testing in the target area, the key geological factors affecting the production of vertical wells are analyzed and determined, and a first production potential index is established; the fracturing construction parameters and production data of horizontal wells in the target area are collected and organized, and a second production potential index of horizontal wells is calculated based on the above-mentioned first production potential index; the production potential index, fracturing section length, and fracturing construction parameters are normalized; finally, a shale oil horizontal well production prediction model is established using a multi-parameter regression analysis method for prediction.
[0033] This invention comprehensively considers the impact of geological and engineering parameters on production capacity, optimizes key parameters, establishes a production potential index, and also considers the influence of closure stress on fracturing operation parameters and the effects of different proppant types, forming a normalized method. The horizontal well production capacity prediction model has a good linear relationship with actual production and a small prediction error. It can be widely applied in the exploration and development of unconventional oil and gas such as shale oil and tight oil, providing a basis for horizontal well segmentation and clustering, as well as the selection of fracturing operation parameters, thus saving costs.
[0034] In an optional embodiment, the step of analyzing and processing the first geological parameters and first production parameters obtained from the test well to determine the first potential index relationship includes: obtaining the first geological parameters of a single layer of the test well and obtaining the first production parameters, wherein the geological parameters include reservoir parameters and mechanical parameters, and the first production parameters include: first production time, first production system, first daily oil production, and first cumulative oil production; establishing multiple initial potential index relationships based on the reservoir parameters, the mechanical parameters, and the first production parameters, and determining multiple initial potential indices, wherein each initial potential index relationship corresponds to one initial potential index; determining the potential index with the highest initial potential index from the multiple initial potential indices as the first potential index, and determining the initial potential index relationship corresponding to the first potential index as the first potential index relationship, wherein the potential index is used to characterize the oil production capacity of the target formation corresponding to the test well.
[0035] In this embodiment of the invention, geological parameters and production data of single-layer test wells in the target area are collected and organized. The collected geological parameters include two categories: reservoir parameters and mechanical parameters. Reservoir parameters include: total porosity, permeability, oil saturation, free oil porosity, adsorbed oil porosity, organic carbon content, chloroform bitumen "A", hydrocarbon generation, and hydrocarbon expulsion. Mechanical parameters include: brittleness index, minimum horizontal principal stress, and biaxial stress difference. Production data includes: production time, production system, daily oil production, and cumulative oil production.
[0036] As an optional implementation, through analysis and processing, key geological factors affecting the production of vertical wells are identified, and a production potential index is established. This includes: establishing correlations between various reservoir parameters, mechanical parameters, and daily oil production; selecting key geological parameters affecting the production capacity of shale oil vertical wells, namely free oil porosity and brittleness index; and establishing a production potential index IP through regression analysis, such as... Figure 2 The diagram shown illustrates the calculation of the normalized capacity potential index. The specific formula is as follows:
[0037]
[0038] Among them, IP stands for Production Potential Index, which reflects the oil-producing capacity of the formation itself; Free oil porosity, in %; I b The brittleness index is expressed as a percentage.
[0039] In one optional embodiment, determining the second potential index based on the first potential index relationship and the second geological parameters of the horizontal well includes: determining the geological parameter type based on the first potential index relationship; determining the second geological parameter from all geological parameters of the horizontal well based on the geological parameter type; and substituting the second geological parameter into the first potential index relationship to obtain the second potential index.
[0040] In this embodiment of the invention, fracturing construction parameters and production data of horizontal wells in the target area are collected and organized. The collected fracturing construction parameters include: fracturing section length, number of fracturing sections, number of clusters per section, section spacing, cluster spacing, fluid addition per section, fluid addition per cluster, sand addition per section, sand addition per cluster, cluster discharge rate, and proppant type.
[0041] In an optional embodiment, before normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, the method further includes: determining the effective fracture section length based on the second potential index, wherein the effective fracture section length is the section where the second potential index is greater than a lower limit d, and the lower limit d is obtained based on the first potential index and the first production parameters; if the effective fracture section length exists, normalizing the second potential index and the construction parameters of the horizontal well; if the effective fracture section length does not exist, determining that the target formation has no oil production capacity.
[0042] In this embodiment of the invention, the effective fracturing section length is determined according to the second potential index. The effective fracturing section refers to the layer where the second potential index is greater than the lower limit d. The lower limit d is obtained based on the relationship between the first potential index and production, indicating that when the second potential index is lower than the lower limit d, the layer has no oil production capacity.
[0043] In one optional embodiment, the second potential index and the construction parameters of the horizontal well are normalized to obtain a normalization result, including: weighting the second potential index to obtain a second potential index thickness weighted value; determining the thickness of the second potential index based on the second potential index thickness weighted value; and normalizing the thickness of the second potential index to obtain the first normalization result.
[0044] In this embodiment of the invention, the capacity potential index is first weighted by thickness to obtain the capacity potential index thickness weighted value (I). pn This is used to obtain the capacity potential index multiplied by the thickness, where the thickness is the effective fracturing section length. Furthermore, to reduce the impact of different dimensions and orders of magnitude of parameters on the regression accuracy, the capacity potential index multiplied by the thickness is normalized. The specific formula is as follows:
[0045]
[0046] Where H is the total thickness of the effective modified well section, in meters; I pi h represents the production potential index of the i-th modified well section, which is dimensionless; i The effective thickness of the i-th well section is expressed in meters (m). pn It is a thickness-weighted capacity potential index, dimensionless.
[0047] Among them, the effective fracturing section H is the section where the production potential index IP > d and normal fracturing operations have been carried out. d is the lower limit of the production potential index obtained from the production test data of vertical wells and its correlation with the production potential index.
[0048] As an optional implementation, the capacity potential index is normalized, and the specific formula is as follows:
[0049]
[0050] Among them, I pphn The normalized capacity potential index is a decimal; I pph The value is a thickness-weighted average of fracturing thickness and production potential index, dimensionless; I pmax The maximum fracturing thickness * production potential index thickness weighted value in the study well is dimensionless.
[0051] In one optional embodiment, the above-mentioned cluster liquid addition amount, cluster discharge amount, and sand addition intensity are normalized to obtain a normalized result, including: determining a first normalized calculation formula for the above-mentioned cluster liquid addition amount, a second normalized calculation formula for the above-mentioned cluster discharge amount, and a third normalized calculation formula for the above-mentioned sand addition intensity; and performing normalization calculations using the above-mentioned first normalized calculation formula, the above-mentioned second normalized calculation formula, and the above-mentioned third normalized calculation formula to obtain the above-mentioned second normalized result.
[0052] It should be noted that, as Figure 3 The diagram shows the relationship between normalized fracturing operation parameters and 180-day cumulative production. (a) represents the relationship between the normalized displacement index and 180-day cumulative production; (b) represents the relationship between the normalized proppant strength index and 180-day cumulative production; and (c) represents the relationship between the normalized fluid volume index and 180-day cumulative production. Because the minimum horizontal principal stress differs for horizontal wells at different depths, the fracturing effect varies even with the same fracturing operation parameters. Therefore, stress normalization of the fracturing operation parameters is proposed to obtain the stress-normalized cluster proppant volume index, stress-normalized cluster proppant volume index, and stress-normalized cluster displacement index. The normalization formulas are as follows:
[0053] Optionally, the second normalized calculation formula for the above-mentioned cluster displacement is the normalized cluster displacement index calculation formula: Irn =f(R,F s ,R max );I rn R is the stress-normalized cluster displacement, dimensionless; R is the cluster displacement, in meters. 3 / min; R max The stress-normalized maximum cluster density is a constant, in meters. 3 / min; F s is the stress normalization factor, which is dimensionless.
[0054] Optionally, the third normalized calculation formula for the sand addition strength is the normalized sand addition strength index calculation formula: I sn =f(V n ,F s V nmax ); where I sn The normalized sand strength index is dimensionless; F s V is the closed-loop stress normalization factor, which is dimensionless; n Normalized cluster proppant addition (normalized according to the proppant strength of each type of proppant), in meters. 3 V nmax The maximum sand addition for stress normalization is a constant, in meters. 3 .
[0055] Optionally, the first normalized calculation formula for the above-mentioned cluster addition volume is the normalized liquid volume index calculation formula: I ln =f(V l ,F s V lmax ); where I ln The normalized addition volume index is dimensionless; F s V is the closed-loop stress normalization factor, which is dimensionless; l The volume of liquid added to the cluster is expressed in m³. 3 V lmax The maximum cluster liquid addition rate under stress normalization is a constant, in units of m³. 3 .
[0056] Optional, the formula for calculating the stress normalization factor: Where P0 is the closure stress of the horizontal well with minimum closure stress, a constant, in MPa; P h The average closure stress of the fractured section of a horizontal well is expressed in MPa.
[0057] As an optional implementation, since the minimum horizontal principal stress varies for horizontal wells at different burial depths, the fracturing effect will differ even when using the same fracturing parameters. Therefore, stress normalization of the fracturing parameters is proposed to obtain the stress-normalized cluster fluid injection index, stress-normalized cluster proppant injection index, and stress-normalized cluster discharge index. Correlation relationships are established between the horizontal wells controlling the study area and the production potential index, as well as the normalized engineering factors (normalized cluster fluid injection, normalized cluster proppant injection, etc.). Table 1 shows the normalized engineering parameters, production potential index, and production statistics.
[0058] Table 1. Normalized Data and Production Statistics
[0059]
[0060]
[0061] In one optional embodiment, based on the above normalization results, a capacity forecasting model is established to forecast capacity, including: based on the above normalization results, a regression analysis method is used to establish the above capacity forecasting model; and the above capacity forecasting model is used to forecast capacity.
[0062] In this embodiment of the invention, a multi-parameter regression analysis method is used to establish a shale oil horizontal well productivity prediction model, as shown in the following formula:
[0063] P i =f(I sn IP, l, I rn ,I ln );
[0064] Among them, P i The production of a horizontal well in day i, in units of 10. 4 t.
[0065] It should be noted that, in the process of establishing the shale oil horizontal well production capacity prediction model, the parameters that are explicitly involved in constructing the shale oil horizontal well production capacity include: production capacity potential index, effective fracture section length, stress normalized cluster discharge rate, stress normalized cluster sand addition rate, and stress normalized cluster fluid addition rate.
[0066] As an optional embodiment, such as Figure 4 The diagram shown illustrates the accuracy analysis of the horizontal well productivity prediction model. Multi-parameter regression analysis was used to obtain the normalized potential index, sand addition intensity index, displacement index, and liquid volume index, respectively, in relation to the cumulative production over 180 days in the horizontal well productivity prediction model.
[0067] P 180 =1.116I sn +0.349IP +0.115I rn +0.048Iln -0.561;
[0068] Among them, P 180 The production of a horizontal well over 180 days, in units of 10. 4 t; I sn The normalized sand addition intensity index is dimensionless; IP is the production potential index; I rn I represents the stress-normalized cluster displacement, which is dimensionless. ln The normalized liquid addition index is dimensionless.
[0069] Through the above steps, the impact of geological and engineering parameters on production capacity can be comprehensively considered, key parameters can be optimized, a production potential index can be established, and the influence of closure stress on fracturing construction parameters and different proppant types can be considered, forming a normalized method. The horizontal well production capacity prediction model has a good linear relationship with actual production and a small prediction error. It can be widely used in unconventional oil and gas exploration and development such as shale oil and tight oil, providing a basis for horizontal well segmentation and clustering and the selection of fracturing construction parameters, thus saving costs.
[0070] Example 2
[0071] According to an embodiment of the present invention, an apparatus embodiment for implementing the above-described map simplification method is also provided. Figure 5 This is a schematic diagram of a map simplification device according to an embodiment of the present invention, such as... Figure 5 As shown, the above-mentioned device includes: a first processing module 50, a second processing module 52, a third processing module 54, and a creation module 56, wherein:
[0072] The first processing module 50 is used to analyze and process the first geological parameters and first production parameters obtained from the test well, and determine the first potential index relationship.
[0073] The second processing module 52 is used to determine the second potential index based on the first potential index relationship and the second geological parameters of the horizontal well. The second potential index is used to characterize the oil production capacity of the horizontal well in the target formation. The second geological parameters include: free oil porosity and brittleness index.
[0074] The third processing module 54 is used to normalize the second potential index and the construction parameters of the horizontal well to obtain normalized results. The construction parameters include the amount of liquid added to the cluster, the amount of liquid discharged from the cluster, and the sand addition intensity. The normalized results include: a first normalized result and a second normalized result.
[0075] Module 56 is established to build a capacity forecasting model based on the above normalization results for capacity forecasting.
[0076] It should be noted that the first processing module 50, the second processing module 52, the third processing module 54 and the establishment module 56 mentioned above correspond to steps S102 to S108 in Embodiment 1. The four modules and the corresponding steps implement the same instances and application scenarios, but are not limited to the content disclosed in Embodiment 1.
[0077] It should be noted that the preferred implementation of this embodiment can be found in the relevant description in Embodiment 1, and will not be repeated here.
[0078] According to embodiments of the present invention, an embodiment of a computer-readable storage medium is also provided. Optionally, in this embodiment, the computer-readable storage medium can be used to store the program code executed by the map simplification method provided in Embodiment 1.
[0079] Optionally, in this embodiment, the computer-readable storage medium may be located in any computer terminal in a group of computer terminals in a computer network, or in any mobile terminal in a group of mobile terminals.
[0080] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: analyzing and processing the first geological parameters and first production parameters obtained from the test well to determine a first potential index relationship; determining a second potential index based on the first potential index relationship and the second geological parameters of the horizontal well, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, wherein the construction parameters include clustered fluid addition rate, clustered discharge rate and sand addition intensity, and the normalized result includes: a first normalized result and a second normalized result; and establishing a production capacity prediction model based on the normalized result to predict production capacity.
[0081] Optionally, the aforementioned computer-readable storage medium is configured to store program code for performing the following steps: obtaining the first geological parameters of the single-layer test well and obtaining the first production parameters, wherein the geological parameters include reservoir parameters and mechanical parameters, and the first production parameters include: a first production time, a first production regime, a first daily oil production, and a first cumulative oil production; establishing multiple initial potential index relationships based on the reservoir parameters, the mechanical parameters, and the first production parameters, and determining multiple initial potential indices, wherein each initial potential index relationship corresponds to one initial potential index; determining the potential index with the highest initial potential index from the multiple initial potential indices as the first potential index, and determining the initial potential index relationship corresponding to the first potential index as the first potential index relationship, wherein the potential index is used to characterize the oil production capacity of the target formation corresponding to the test well.
[0082] Optionally, the aforementioned computer-readable storage medium is configured to store program code for performing the following steps: determining a geological parameter type based on the first potential index relationship; determining a second geological parameter from all geological parameters of the horizontal well based on the geological parameter type; and substituting the second geological parameter into the first potential index relationship to obtain the second potential index.
[0083] Optionally, the aforementioned computer-readable storage medium is configured to store program code for performing the following steps: determining an effective fracture section length based on a second potential index, wherein the effective fracture section length is a segment where the second potential index is greater than a lower limit d, the lower limit d being obtained based on the first potential index and the first production parameters; if the effective fracture section length exists, normalizing the second potential index and the construction parameters of the horizontal well; if the effective fracture section length does not exist, determining that the target formation has no oil production capacity.
[0084] Optionally, the aforementioned computer-readable storage medium is configured to store program code for performing the following steps: weighting the second potential index to obtain a second potential index thickness weighted value; determining the second potential index thickness based on the second potential index thickness weighted value; normalizing the second potential index thickness to obtain a first normalization result; determining a first normalized calculation formula for the cluster liquid addition amount, a second normalized calculation formula for the cluster discharge amount, and a third normalized calculation formula for the sand addition intensity; and performing normalization calculations using the first normalized calculation formula, the second normalized calculation formula, and the third normalized calculation formula respectively to obtain the second normalized result.
[0085] Optionally, the aforementioned computer-readable storage medium is configured to store program code for performing the following steps: establishing the aforementioned capacity forecasting model based on the aforementioned normalization results using regression analysis; and using the aforementioned capacity forecasting model to forecast capacity.
[0086] According to embodiments of the present invention, an embodiment of a processor is also provided. Optionally, in this embodiment, the computer-readable storage medium described above can be used to store the program code executed by the map simplification method provided in Embodiment 1 above.
[0087] This application provides an electronic device, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, it performs the following steps: analyzing and processing first geological parameters and first production parameters obtained from a test vertical well to determine a first potential index relationship; determining a second potential index based on the first potential index relationship and second geological parameters of a horizontal well, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, wherein the construction parameters include clustered fluid injection rate, clustered discharge rate, and sand injection intensity, and the normalized result includes: a first normalized result and a second normalized result; and establishing a production capacity prediction model based on the normalized result to predict production capacity.
[0088] This application also provides a computer program product, which, when executed on a data processing device, is suitable for executing an initialization program with the following steps: analyzing and processing first geological parameters and first production parameters obtained from a test vertical well to determine a first potential index relationship; determining a second potential index based on the first potential index relationship and second geological parameters of a horizontal well, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; normalizing the second potential index and the construction parameters of the horizontal well to obtain a normalized result, wherein the construction parameters include clustered fluid injection rate, clustered discharge rate, and sand injection intensity, and the normalized result includes: a first normalized result and a second normalized result; and establishing a production capacity prediction model based on the normalized result to predict production capacity.
[0089] The sequence numbers of the above embodiments of the present invention are for descriptive purposes only and do not represent the superiority or inferiority of the embodiments.
[0090] In the above embodiments of the present invention, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions of other embodiments.
[0091] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. The device embodiments described above are merely illustrative; for example, the division of units described above can be a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between units or modules may be electrical or other forms.
[0092] The units described above as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0093] Furthermore, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.
[0094] If the aforementioned integrated units are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, read-only memory (ROM), random access memory (RAM), portable hard drives, magnetic disks, or optical disks.
[0095] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A method for predicting the production capacity of shale oil horizontal wells, characterized in that, include: The first geological parameters and first production parameters obtained from the test well were analyzed and processed to determine the first potential index relationship. Based on the first potential index formula and the second geological parameters of the horizontal well, a second potential index is determined, wherein the second potential index is used to characterize the oil production capacity of the horizontal well in the target formation, and the second geological parameters include: free oil porosity and brittleness index; The second potential index and the construction parameters of the horizontal well are normalized to obtain normalized results. The construction parameters include the amount of liquid added to the cluster, the amount of liquid discharged from the cluster, and the sand addition intensity. The normalized results include: a first normalized result and a second normalized result. Based on the normalization results, a capacity forecasting model is established to predict capacity. The normalization process for the second potential index and the construction parameters of the horizontal well is as follows: The normalization result includes weighting the second potential index to obtain a thickness-weighted value, expressed as follows: Where H is the total thickness of the effective modified well section. The second potential index for the i-th modified well section. The effective thickness of the i-th modified well section; The thickness is weighted by the second potential index; the thickness of the second potential index is determined based on this weighted value, expressed as: Second potential index thickness = Fracturing thickness × Weighted value of second potential index thickness; the second potential index thickness is then normalized to obtain the first normalized result, expressed as: , This is the first normalization result. The thickness of the second potential index; To study the maximum second potential index thickness in the well, a first normalized calculation formula for the cluster fluid addition volume was determined. The second normalized calculation formula for the cluster displacement The third normalized calculation formula for the added sand strength. ,in, The normalized liquid addition index, The normalization factor for closed stress is... The amount of liquid added to the cluster. To determine the maximum cluster liquid addition amount under stress normalization, For stress-normalized cluster displacement, For cluster size, To determine the maximum cluster size under stress normalization, The normalized sand strength index, To normalize the amount of sand added to the cluster, The stress normalization factor is calculated as the maximum amount of sand added under stress normalization. ; The closure stress of a horizontal well is the minimum closure stress. To handle the average closure stress of the fractured section of a horizontal well, normalization calculations are performed using the first normalization calculation formula, the second normalization calculation formula, and the third normalization calculation formula, respectively, to obtain the second normalization result.
2. The method according to claim 1, characterized in that, The analysis and processing of the first geological parameters and first production parameters obtained from the test well to determine the first potential index relationship includes: The first geological parameters of the single-layer test well and the first production parameters are obtained, wherein the geological parameters include reservoir parameters and mechanical parameters, and the first production parameters include first production time, first production system, first daily oil production, and first cumulative oil production. Based on the reservoir parameters, the mechanical parameters, and the first production parameters, multiple initial potential index relationships are established, and multiple initial potential indices are determined, wherein each initial potential index relationship corresponds to one initial potential index; The highest potential index among the multiple initial potential indices is determined as the first potential index, and the initial potential index relationship corresponding to the first potential index is determined as the first potential index relationship, wherein the potential index is used to characterize the oil production capacity of the target formation corresponding to the test well.
3. The method according to claim 1, characterized in that, The determination of the second potential index based on the first potential index relationship and the second geological parameters of the horizontal well includes: The geological parameter type is determined based on the first potential index relationship; The second geological parameter is determined from all geological parameters of the horizontal well based on the geological parameter type; Substituting the second geological parameter into the first potential index formula yields the second potential index.
4. The method according to claim 2, characterized in that, Before normalizing the second potential index and the construction parameters of the horizontal well to obtain the normalized result, the method further includes: The effective fracturing section length is determined based on the second potential index, wherein the effective fracturing section length is the section where the second potential index is greater than the lower limit d, and the lower limit d is obtained based on the first potential index and the first production parameters; In the presence of the effective fracturing section length, the second potential index and the construction parameters of the horizontal well are normalized. If the effective fracturing section length is not available, then the target formation is determined to have no oil production capacity.
5. The method according to claim 1, characterized in that, Based on the normalization results, a capacity forecasting model is established to predict capacity, including: Based on the first normalization result and the second normalization result, the capacity prediction model is established using regression analysis. The capacity forecasting model described above is used for capacity forecasting.
6. A shale oil horizontal well productivity prediction device, characterized in that, include: The first processing module is used to analyze and process the first geological parameters and first production parameters obtained from the test well, and determine the first potential index relationship. The second processing module is used to determine the second potential index based on the first potential index formula and the second geological parameters of the horizontal well. The second potential index is used to characterize the oil production capacity of the horizontal well in the target formation. The second geological parameters include: free oil porosity and brittleness index. The third processing module is used to normalize the second potential index and the construction parameters of the horizontal well to obtain normalized results. The construction parameters include the amount of liquid added to the cluster, the amount of liquid discharged from the cluster, and the sand addition intensity. The normalized results include: a first normalized result and a second normalized result. A module is established to build a capacity forecasting model based on the normalization results for capacity forecasting. The third processing module is further used to perform weighted processing on the second potential index to obtain a thickness-weighted value for the second potential index, expressed as follows: Where H is the total thickness of the effective modified well section. The second potential index for the i-th modified well section. The effective thickness of the i-th modified well section; The thickness is weighted by the second potential index; the thickness of the second potential index is determined based on this weighted value, expressed as: Second potential index thickness = Fracturing thickness × Weighted value of second potential index thickness; the second potential index thickness is then normalized to obtain the first normalized result, expressed as: , This is the first normalization result. The thickness of the second potential index; To study the maximum second potential index thickness in the well, a first normalized calculation formula for the cluster fluid addition volume was determined. The second normalized calculation formula for the cluster displacement The third normalized calculation formula for the added sand strength. ,in, The normalized liquid addition index, The normalization factor for closed stress is... The amount of liquid added to the cluster. To determine the maximum cluster liquid addition amount under stress normalization, For stress-normalized cluster displacement, For cluster size, To normalize the maximum cluster size, The normalized sand strength index, To normalize the amount of sand added to the cluster, The stress normalization factor is calculated as the maximum amount of sand added under stress normalization. ; The closure stress of a horizontal well is the minimum closure stress. To handle the average closure stress of the fractured section of a horizontal well, normalization calculations are performed using the first normalization calculation formula, the second normalization calculation formula, and the third normalization calculation formula, respectively, to obtain the second normalization result.
7. A non-volatile storage medium, characterized in that, The non-volatile storage medium stores multiple instructions, which are adapted to be loaded by a processor and executed by the shale oil horizontal well production prediction method according to any one of claims 1 to 5.
8. A processor, characterized in that, The processor is used to run a program, wherein the program is configured to execute the shale oil horizontal well production prediction method according to any one of claims 1 to 5 when running.
9. An electronic device comprising a memory and a processor, characterized in that, The memory stores a computer program, and the processor is configured to run the computer program to perform the shale oil horizontal well production prediction method according to any one of claims 1 to 5.
Citation Information
Patent Citations
Method for dynamically predicting and calculating productivity of compact conglomerate reservoir
CN112381259A
Tight oil fractured horizontal well productivity main control factor judgment and productivity prediction method
CN112561144A