A four-in-one ground pressure monitoring method for a broken stope

By integrating microseismic monitoring equipment and ground pressure monitoring equipment, and combining multi-parameter comprehensive ground pressure monitoring and early warning indicators, the problem of inaccurate ground pressure monitoring in existing technologies has been solved, enabling accurate early warning of ground pressure disasters, ensuring mine production safety and improving production efficiency.

CN117848563BActive Publication Date: 2026-11-20河北钢铁集团沙河中关铁矿有限公司
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311732031.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-16
Publication Date
2026-11-20
Estimated Expiration
2043-12-16

AI Technical Summary

Technical Problem

Existing ground pressure monitoring methods cannot fully and accurately reflect the patterns before rock mass instability, leading to inaccurate early warning of ground pressure disasters and affecting mine production safety.

Method used

A four-in-one approach combining microseismic monitoring equipment and ground pressure monitoring equipment, including microseismic geophones, borehole stress gauges, anchor cable stress gauges, and roof delamination instruments, is adopted. By integrating multiple parameters into the ground pressure monitoring and early warning indicators, the mine risk index is calculated to achieve accurate early warning of ground pressure disaster events.

Benefits of technology

It enables accurate early warning of ground pressure disasters, ensures mine production safety, improves the early warning capability of ground pressure disasters, avoids excessive or inappropriate support measures, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117848563B_ABST
    Figure CN117848563B_ABST
Patent Text Reader

Abstract

The application discloses a kind of broken stope four-in-one ground pressure monitoring method, the method comprises the following steps: a. install microseismic monitoring equipment;B. install ground pressure monitoring equipment;C. obtain microseismic index danger index;D. obtain borehole stress index danger index, anchor cable stress index danger index and roof separation index danger index;E. calculate stope danger index;F. according to stope danger index, judge stope collapse safety risk, the greater stope danger index, the greater safety risk, when stope danger index exceeds set value, support measures are taken.The application adopts microseismic detector, borehole stress meter, anchor cable stress meter, roof separation instrument four-in-one ground pressure monitoring equipment, uses multi-parameter comprehensive ground pressure monitoring early warning index to judge stope safety risk, can make up the weak sensitivity of microseismic monitoring equipment to single point stress change, realize accurate early warning to ground pressure disaster event, ensure that mine production is safe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a four-in-one ground pressure monitoring method for crushed mining areas, which can achieve accurate early warning of ground pressure disasters and ensure the safe operation of mine production. It belongs to the field of mining technology. Background Technology

[0002] Minerals are essential basic materials for national production. With rapid economic development, the demand for ores has increased dramatically. To meet social needs, mines are simultaneously exploring deeper mining areas and improving the utilization rate of shallow, complex, and difficult-to-mine bodies. Crushed stopes are characterized by being loose, dispersed, soft, and weak. In terms of roadway excavation, the soft, fractured medium has low strength and high plasticity. After excavation, the surrounding rock deforms and moves towards the excavation space, with the deformation increasing over time, potentially even completely sealing off the entire roadway. Regarding ore body mining, the ore body suffers from low strength, well-developed joints and fissures, and mineral swelling upon contact with water, resulting in poor self-support of the pillars and sidewalls, and a tendency for the roof to collapse. In terms of support, the sidewalls and roof deformation in stopes with soft, fractured media exhibit creep deformation characteristics with a significant time effect. These characteristics are all directly manifested as ground pressure manifestations, which are one of the main reasons why underground mineral deposits are difficult to mine. Many mines in China are troubled by this problem. For example, Zhongguan Iron Mine, Xishimen Iron Mine, Zhangjiawa Iron Mine and many other mines have encountered frequent ground pressure manifestations, which make it difficult to advance and support the mining access road and cross-cutting roadway. This seriously restricts the mining progress and production efficiency, and seriously affects the safety of mine production.

[0003] Since the 1960s, my country has been using stress gauges and convergence gauges developed in coal mines for ground pressure monitoring in metal mines. In the early 1970s, Li Dianwen and others from the Safety Technology Research Institute of the Ministry of Metallurgical Industry successfully developed various portable acoustic emission monitoring systems. The Changsha Mining Research Institute successively researched and developed the DYF-1 and DYF-2 portable intelligent ground sound analyzers and the SDL-1 and SDL-2 multi-channel acoustic emission monitoring systems. The Beijing General Research Institute of Mining and Metallurgy developed, improved, and perfected a multi-channel rock mass acoustic emission monitoring and positioning system, forming a set of rock mass disaster analysis methods based on acoustic emission monitoring parameters. These methods have been applied to mines such as the Nankuang Mine of Hunan Xikuangshan Mining Bureau, Hongtoushan Copper Mine, Anqing Copper Mine, Fankou Lead-Zinc Mine, Shizhuyuan Nonferrous Metal Mine, and Shouwangfen Copper Mine, achieving good results in safety monitoring of some hazardous mine projects.

[0004] Over the past 20 years, Chinese scholars have made significant progress in the application of ground pressure monitoring equipment. In 2010, Wen Xing, a researcher at Changsha Mining Research Institute, and Li Hongjian of Guangxi Beishan Mining Development Co., Ltd., based on the actual conditions of a mine goaf, adopted a comprehensive monitoring scheme integrating acoustic emission and stress monitoring. Through reasonable and effective statistical analysis of ground pressure monitoring data, they successfully predicted a ground pressure disaster event and summarized the patterns of acoustic emission monitoring data before rock mass instability. Xiao Qing and Wu Suying of Jiangxi University of Science and Technology proposed establishing a mine microseismic monitoring system based on an ARM embedded system and a conventional pressure monitoring system. Through continuous data acquisition, three-dimensional background stress field analysis, and relying on network transmission technology, they achieved real-time monitoring and early warning of deep ground pressure activity, providing timely and reliable guidance for coal mine safety production. Xu Bigen et al. used acoustic emission monitoring and displacement monitoring to monitor ground pressure in the No. 4 extra-large goaf area of ​​Guangxi Beishan Mining Co., Ltd., reasonably and effectively analyzed the monitoring data, and proposed appropriate management systems to ensure mine safety production. The invention patent with publication number CN113958367A proposes a method for early warning and monitoring of ground pressure safety in soft rock roadways of underground mines. It proposes to combine the monitoring of surrounding rock stress and deformation in soft rock roadways to conduct comprehensive ground pressure monitoring, so as to guide safe production in mines.

[0005] However, existing ground pressure monitoring methods have certain limitations. Their monitoring data cannot fully and accurately reflect the patterns before rock mass instability, resulting in unsatisfactory monitoring effects. They cannot provide accurate early warnings of ground pressure disasters or guide safe production in mines. Therefore, it is necessary to explore new ground pressure monitoring methods. Summary of the Invention

[0006] The purpose of this invention is to address the shortcomings of existing technologies by providing a four-in-one ground pressure monitoring method for crushing and mining areas, so as to achieve accurate early warning of ground pressure disasters and ensure the safe operation of mine production.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: A four-in-one ground pressure monitoring method for crushed mining areas, the method comprising the following steps: a. Install microseismic monitoring equipment: Microseismic monitoring equipment is installed in mining areas with fractured rock masses. The microseismic monitoring equipment includes a microseismic geophone and a microseismic monitoring master station. The data output terminal of the microseismic geophone is connected to the microseismic monitoring master station via a cable. The microseismic monitoring master station is connected to the surface industrial control computer via a fiber optic ring network. b. Install ground pressure monitoring equipment: In selected mines with fractured rock masses, ground pressure monitoring equipment is installed in the bottom structural roadways, pre-controlled roof roadways, and ore access roadways. The ground pressure monitoring equipment includes borehole stress gauges, anchor cable stress gauges, roof separation meters, wireless data acquisition devices for borehole stress, anchor cable, and separation meters, as well as repeaters and ground pressure acquisition substations. The data output terminals of the borehole stress gauges, anchor cable stress gauges, and roof separation meters are connected to the wireless data acquisition devices for borehole stress, anchor cable, and separation meters via cables. The wireless data acquisition devices for borehole stress, anchor cable, and separation meters exchange information with the repeaters via a wireless communication network. The repeaters are connected to the ground pressure acquisition substations via cables, and the ground pressure acquisition substations are connected to an industrial control computer via a fiber optic ring network. c. Obtain the microseismic index hazard level: The microseismic monitoring data measured by the microseismic detector is transmitted to the microseismic monitoring master station via cable. The microseismic monitoring master station transmits the microseismic monitoring data to the industrial control computer via fiber optic ring network. The microseismic monitoring and early warning platform installed in the industrial control computer analyzes the microseismic monitoring data and obtains the microseismic index I1. d. Obtain the hazard indices for borehole stress, anchor cable stress, and roof delamination: Ground pressure monitoring data collected by borehole stress gauges, anchor cable stress gauges, and roof delamination gauges are transmitted via cables to the borehole stress wireless data acquisition unit, anchor cable wireless data acquisition unit, and roof delamination gauge wireless data acquisition unit, respectively. The borehole stress wireless data acquisition unit, anchor cable wireless data acquisition unit, and roof delamination gauge wireless data acquisition unit then transmit the ground pressure monitoring data to the repeater via a wireless communication network. After receiving the ground pressure monitoring data from the repeater, the ground pressure acquisition substation transmits the data to the industrial control computer via a fiber optic ring network. The stress online monitoring and early warning platform installed in the industrial control computer analyzes the ground pressure monitoring data to obtain the borehole stress index hazard index I2, the anchor cable stress index hazard index I3, and the roof delamination index hazard index I4. e. Calculate the mining area hazard index: I0 = K1I1 + K2I2 + K3I3 + K4I4 In the formula: I0 is the mining area hazard index; K1 is the microseismic index weighting coefficient; K2 is the borehole stress index weighting coefficient; K3 is the anchor cable stress index weighting coefficient; K4 is the roof delamination index weighting coefficient. f. Determine the safety risk of mine collapse based on the mine hazard index I0. The higher the mine hazard index I0, the greater the safety risk. When the mine hazard index I0 exceeds the set value, support measures shall be taken.

[0008] The calculation methods for the microseismic index, borehole stress index, anchor cable stress index, and roof delamination index in the above-mentioned four-in-one ground pressure monitoring method for fractured mining areas are as follows: I1 = Average energy value at monitoring points / Critical deformation energy value I2 = Maximum measured borehole stress at monitoring point / Red alert value for borehole stress I3 = Maximum measured value of anchor cable stress at monitoring point / Red warning value of anchor cable stress I4 = Maximum delamination value at monitoring point / Delamination red warning value In the formula, the average energy value of the monitoring point is calculated by the microseismic monitoring and early warning platform based on the microseismic monitoring data; the maximum measured value of the borehole stress at the monitoring point is measured by the borehole stress gauge; the maximum measured value of the anchor cable stress at the monitoring point is measured by the anchor cable stress gauge; and the maximum delamination value at the monitoring point is measured by the top plate delamination instrument.

[0009] In the above-mentioned four-in-one ground pressure monitoring method for fractured mining areas, the weighting coefficients K1, K2, K3, and K4 of the microseismic index, are all 0.25.

[0010] In the above-mentioned four-in-one ground pressure monitoring method for crushed mining areas, the anchor cable stress gauge can also be an anchor bolt stress gauge.

[0011] This invention employs a four-in-one ground pressure monitoring device that integrates a microseismic detector, a borehole stress gauge, an anchor cable stress gauge, and a roof delamination instrument. By utilizing multi-parameter comprehensive ground pressure monitoring and early warning indicators, it can assess the safety risks in the mining area. This can compensate for the weak sensitivity of microseismic monitoring equipment to single-point stress changes, enabling accurate early warning of ground pressure disasters and ensuring the safe operation of mine production. Attached Figure Description

[0012] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0013] Figure 1 This is a flowchart of the present invention; Figure 2 This is a schematic diagram of the -170m horizontal microseismic monitoring setup in an embodiment of the present invention; Figure 3 This is a schematic diagram of the -230m horizontal microseismic monitoring setup in an embodiment of the present invention; Figure 4 This is a schematic diagram of the ground pressure monitoring layout in the 8S1 mine chamber of this invention. Figure 5 This is a schematic diagram of the installation of the borehole stress gauge in an embodiment of the present invention; Figure 6 This is a schematic diagram of the installation of the anchor cable stress gauge and the top plate delamination instrument in an embodiment of the present invention; Figure 7 This is a schematic diagram of the ground pressure monitoring layout in the 8NM3 mine stope of this invention. Figure 8 This is a schematic diagram of the structure of the integrated ground pressure monitoring system used in this invention.

[0014] The labels in the diagram are as follows: 1. Top plate delamination meter, 2. Anchor cable stress gauge, 3. Borehole stress gauge, 4. Delamination meter wireless data acquisition device, 5. Anchor cable wireless data acquisition device, 6. Borehole stress wireless data acquisition device, 7. Repeater, 8. Ground pressure acquisition substation, 9. Microseismic detector, 10. Microseismic monitoring master station, 11. Industrial control computer, 12. Fiber optic ring network. Detailed Implementation

[0015] This invention provides a four-in-one ground pressure monitoring method for fractured mining areas. It proposes a combined dynamic and static load ground pressure monitoring method for complex fractured mining areas, employing a four-in-one monitoring approach encompassing "rock fracture vibration, surrounding rock stress dynamics, anchor bolt and cable support force, and roadway roof settlement." This method utilizes a four-in-one ground pressure monitoring system—microseismic geophone, borehole stress gauge, anchor cable stress gauge, and roof delamination meter—for on-site measurement. The microseismic geophone's monitoring range can cover the entire fractured area of ​​the mine. Borehole stress gauges, anchor cable stress gauges, and roof delamination meters are deployed in key mining areas such as drilling roadways and bottom structures where mine pressure manifestations are concentrated and active stress transfer is frequent. This compensates for the weak sensitivity of microseismic monitoring equipment to single-point stress changes and establishes a multi-parameter comprehensive ground pressure monitoring and early warning index. While guiding safe mine production, this method explores a new path for ground pressure monitoring in mines with similar geological conditions both domestically and internationally.

[0016] The integrated ground pressure monitoring system adopted in this invention includes an industrial control computer 11, microseismic monitoring equipment, and ground pressure monitoring equipment.

[0017] This invention includes the following steps: The first step is to determine the monitoring area of ​​the mining area and formulate a microseismic monitoring technical plan. A mining area with relatively fractured rock mass, which is extremely critical to safe production, is selected to install microseismic monitoring equipment to achieve the goal of "macroscopic, large-scale monitoring of the incubation, development, and fracturing of rock mass fractures." The microseismic monitoring equipment includes a microseismic detector 9, a microseismic monitoring master station 10, a UPS backup power supply, and cables. The monitoring data output terminal of the microseismic detector 9 is connected to the microseismic monitoring master station 10 via cables. The microseismic monitoring master station 10 is connected to an industrial control computer 11 via a fiber optic ring network 12, transmitting the monitoring data to the industrial control computer 11. The industrial control computer 11 is equipped with a microseismic monitoring and early warning platform, which analyzes the collected microseismic monitoring data to obtain the microseismic risk index I1. The second step is to identify key mines for monitoring and develop a ground pressure monitoring technical plan. Key mines with relatively fractured rock masses, which are critical to safe production, are selected. Ground pressure monitoring equipment is installed in areas such as bottom structural roadways, pre-controlled roof roadways, and ore access roadways. The ground pressure monitoring equipment mainly includes: 3 borehole stress gauges, 2 anchor cable stress gauges, 1 roof separation meter, 6 wireless data acquisition units for borehole stress, 5 wireless data acquisition units for anchor cables, 4 wireless data acquisition units for separation meters, 8 ground pressure acquisition substations, 7 repeaters, UPS power supplies, and cables. The ground pressure monitoring data collected by the borehole stress gauges, anchor cable stress gauges, and roof separation meter 1 are transmitted via cables to the 6 wireless data acquisition units for borehole stress, 5 wireless data acquisition units for anchor cables, and 4 wireless data acquisition units for separation meters. The delamination instrument wireless data acquisition unit 4 then transmits the ground pressure monitoring data to the repeater 7 through the wireless communication network. After receiving the ground pressure monitoring data from the repeater 7, the ground pressure acquisition substation 8 transmits the data to the industrial control computer 11 through the fiber optic ring network 12. The industrial control computer 11 is equipped with an online stress monitoring and early warning platform. The online stress monitoring and early warning platform analyzes the stress monitoring data collected by the borehole stress gauge 3, the anchor cable stress gauge 2, and the top plate delamination instrument 1 to obtain the borehole stress index danger index I2, the anchor cable stress index danger index I3, and the top plate delamination index danger index I4. Anchor cable stress gauge 2 is used to measure anchor cable stress. When anchor rods are used instead of anchor cables, anchor cable stress gauge 2 is replaced with anchor rod stress gauge.

[0018] The third step is to determine the stope hazard index (i.e., the comprehensive ground pressure monitoring safety early warning index). Based on the monitoring data from microseismic monitoring equipment and ground pressure monitoring equipment (i.e., changes in microseismic activity, borehole stress, anchor cable stress, and roof delamination), the stope hazard index I0 is calculated using a multi-parameter coupled analysis method. I0 = K1I1 + K2I2 + K3I3 + K4I4 In the formula: K1 is the weighting coefficient of the microseismic index; K2 is the weighting coefficient of the borehole stress index; K3 is the weighting coefficient of the anchor cable stress index; K4 is the weighting coefficient of the roof delamination index. The fourth step is to assess safety risks such as mine collapse based on the mine hazard index I0. The higher the mine hazard index I0, the greater the safety risk. When the mine hazard index I0 exceeds the set value, support measures should be taken promptly and control should be strengthened.

[0019] This invention employs a four-in-one ground pressure monitoring device consisting of a microseismic detector 9, a borehole stress gauge 3, an anchor cable stress gauge 2, and a roof delamination meter 1. The monitoring range of the microseismic detector 9 can cover the entire fractured area of ​​the mine. The borehole stress gauge 3, anchor cable stress gauge 2, and roof delamination meter 1 are deployed in key mining areas such as drilling roadways and bottom structures where mine pressure manifestations are concentrated and active stress transfer is frequent, to compensate for the weak sensitivity of the microseismic monitoring device to single-point stress changes. Furthermore, a multi-parameter comprehensive ground pressure monitoring and early warning index based on "rock fracture vibration, surrounding rock stress dynamics, anchor bolt and cable support force, and roadway roof settlement" is established. This index can be used to determine safety risks such as mining area collapses, and timely support measures can be taken to strengthen control. This can achieve accurate early warning of ground pressure disasters and ensure the safe operation of mine production.

[0020] This invention integrates microseismic monitoring equipment and ground pressure monitoring equipment into an organic whole. The four monitoring methods work together to achieve the best monitoring effect, which can significantly improve the early warning capability of mine ground pressure disasters and facilitate on-site organization and implementation. While guiding safe production in mines, it explores a new path for ground pressure monitoring in mines with similar geological conditions at home and abroad. Example

[0021] (1) A certain iron mine is a typical contact metasomatic skarn type magnetite deposit with abundant water and fractured ore and rock. It belongs to a typical complex, fractured, water-rich, and difficult-to-mine body. The underground support rate reaches more than 95%, and the ground pressure manifestation is severe. Underground mining has many safety risks such as roof falls and collapses, which seriously restrict the mining progress and production efficiency, and seriously affect the mine production safety. In order to ensure safe mining and improve mining production efficiency, it is urgent to build a four-in-one ground pressure comprehensive monitoring system.

[0022] (2) Determine the monitoring area of ​​the mining area and formulate a microseismic monitoring technical plan. In a certain iron mine, the -230m level is the first mining section, and the -170m level is the drilling section. The ore and rock in the northern area are relatively broken and unstable. Therefore, microseismic monitoring equipment is deployed in the northern areas of the -170m and -230m levels respectively. For example... Figure 2 , Figure 3 As shown, to achieve full coverage of microseismic monitoring in the northern part of the mining area while ensuring accuracy, a total of 12 measuring points were set up, with one microseismic detector installed at each measuring point. Among them, there are 5 measuring points at -170m (1# to 5#), with a spacing of approximately 170m between measuring points; and 7 measuring points at -230m (6# to 12#), with a spacing of approximately 150m between measuring points.

[0023] The microseismic monitoring equipment includes a microseismic detector 9, a microseismic monitoring master station 10, a UPS backup power supply, and cables. The microseismic monitoring master station 10 is connected to the microseismic detector 9 by a cable, and the microseismic monitoring master station 10 is connected to the nearest underground fiber optic ring network 12.

[0024] The microseismic monitoring master station 10 adopts the mine explosion-proof microseismic monitoring master station 10KJ551-F; the microseismic detector 9 adopts the mine intrinsically safe seismic sensor GZC10; the industrial control computer 11 adopts the LENOVO type; the UPS power supply adopts the KDW660-24B type; the cable adopts the MHYAV-10*2 type; the microseismic monitoring and early warning platform adopts the KJ551 microseismic monitoring system, which is installed in the industrial control computer.

[0025] Two microseismic monitoring master stations (10) are deployed in the control rooms at the -230m and -170m levels, respectively. The power supply for each master station (10) is taken from the nearest control room. Each master station (10) is also connected to a UPS power supply via cable, providing emergency power for 2 hours during underground power outages. The master stations (10) are connected to the microseismic detectors (9) via cables for signal transmission, and the master stations (10) supply power to the detectors (9). Each master station (10) is connected to the nearest ring network switch in each section of the underground network, linking to the underground fiber optic ring network, and transmitting signals to the surface microseismic monitoring industrial control computer (11) through the underground fiber optic ring network.

[0026] (3) Determine the ground pressure monitoring deployment scheme. As an organic whole, the ground pressure monitoring equipment needs to be used in conjunction with each other to achieve the best monitoring effect. Based on the actual mining conditions on site, the mining of the stope is divided into two types: large stope and small stope. Taking the 8S1 and 8NM3 stopes as examples, the specific monitoring schemes for the ground pressure monitoring equipment are carried out. The ground pressure monitoring schemes for other stopes can refer to this scheme. The monitoring area of ​​the 8S1 stope is the -170m horizontal rock drilling chamber and the -230m horizontal bottom structure roadway. The monitoring area of ​​the 8NM3 stope is the -230m horizontal bottom structure roadway and the -200m horizontal pre-control top roadway.

[0027] like Figure 4 , Figure 5 , Figure 6 As shown, the 8S1 stope has three ore extraction routes excavated from the cross-cutting roadway. At the intersection of the cross-cutting roadway and the ore extraction routes, the roof overhang area is large, making roof delamination prone to occur. A roof delamination meter 1 is installed at this location, and an anchor cable stress gauge 2 is installed 3m inward from the ore extraction route to ensure effective monitoring of the roof stress in the ore extraction route. In addition, four sets of borehole stress gauges 3 are installed on the pillars between the ore extraction routes and on both sides of the stope to monitor the stress in the pillars in real time.

[0028] Monitoring the stability of the stope roof is currently the most urgent problem to be solved in the mining area. Therefore, by installing ground pressure monitoring equipment in the drilling chamber, the changes in the roof support force and the settlement of the roof rock mass can be monitored in real time, thereby effectively managing the stability of the stope roof. The 8S1 stope -170m horizontal drilling chamber is approximately 35m long and 16m wide, with a safety pillar width of approximately 3m. In order to monitor the stress and displacement changes of the drilling chamber roof and sides during stope mining, four sets of roof separation gauges 1 and anchor cable stress gauges 2 are used together. In addition, two sets of anchor cable stress gauges 2 are installed at the middle positions of the two sides of the drilling chamber.

[0029] like Figure 7 As shown, the ground pressure monitoring layout of the bottom structure of the 8NM3 stope is similar to that of the 8S1 stope. The roof of the pre-controlled top roadway of the 8NM3 stope is another area that needs to be monitored. The stability of the pre-controlled top roadway is directly related to the next step of mining in the stope. Considering that there may be certain dangers in the recovery of equipment in this area, anchor cable stress gauges are installed in the pre-controlled top roadway of the 8NM3 stope, with one set installed every 10m, for a total of 5 sets.

[0030] The ground pressure monitoring equipment includes: 3 borehole stress gauges, 2 anchor cable stress gauges, 1 roof delamination meter, 6 borehole stress wireless data acquisition devices, 5 anchor cable wireless data acquisition devices, 4 delamination meter wireless data acquisition devices, 8 ground pressure acquisition substations, UPS power supply, and cables. Ground pressure acquisition substation 8 adopts the mine-use explosion-proof and intrinsically safe acquisition substation KJ615-F(A); UPS power supply adopts the mine-use explosion-proof DC regulated power supply KDW660 / 24B; borehole stress wireless data acquisition device 6 adopts the mine-use intrinsically safe borehole stress wireless data acquisition device 6KJ615-C(A); anchor cable wireless data acquisition device 5 adopts the mine-use intrinsically safe anchor cable wireless data acquisition device 5KJ615-C(A); delamination meter wireless data acquisition device 4 adopts the mine-use intrinsically safe delamination meter wireless data acquisition device 4KJ615-C(A); borehole stress gauge 3 adopts the mine-use intrinsically safe borehole stress gauge 3YHY30(A); anchor cable stress gauge 2 adopts the mine-use intrinsically safe roof delamination meter 1YHDW150W, roof delamination meter 1 adopts the mine-use intrinsically safe anchor cable stress gauge GMY400(A), and the cable adopts the MHYVP-6*2 type; the stress online monitoring and early warning platform adopts the KJ615 stress online monitoring system.

[0031] There are two ground pressure acquisition substations, namely the -230m and -170m level duty rooms. The power supply for the ground pressure acquisition substations is taken from the duty rooms nearby. At the same time, each ground pressure acquisition substation is connected to the UPS power supply via cable, which can provide emergency power supply for 2 hours in the event of a power outage underground.

[0032] Each borehole stress gauge 3 is equipped with a nearby wireless borehole stress data acquisition device 6, which is connected by a signal cable. The pressure signal from the borehole stress gauge 3 is converted into an electrical signal and transmitted to the wireless borehole stress data acquisition device 6. The wireless borehole stress data acquisition device 6 is equipped with a battery for self-powered operation and has an antenna to transmit the collected signal to the ground pressure acquisition substation 8.

[0033] Each anchor stress gauge 2 is equipped with a wireless anchor data acquisition device 5 nearby. The two are connected by a signal cable, which converts the pressure signal of the anchor stress gauge 2 into an electrical signal and transmits it to the wireless anchor data acquisition device 5. The wireless anchor data acquisition device 5 is equipped with a battery for self-powered operation and has an antenna to facilitate the transmission of the collected signal to the ground pressure acquisition substation 8.

[0034] A wireless data acquisition unit 4 is installed nearby for the roof separation meter 1, and the two are connected by a signal cable. The pressure signal from the roof separation meter 1 is converted into an electrical signal and transmitted to the wireless data acquisition unit 4. The wireless data acquisition unit 4 is equipped with a battery for self-powered operation and has an antenna to transmit the collected signal to the ground pressure acquisition substation 8. The roof separation meter 1 is self-powered by its internal battery.

[0035] No cable connections are required between the wireless data acquisition units or between them and the ground pressure acquisition substation 8. Automatic signal networking is possible between all wireless data acquisition units. The ground pressure acquisition substation 8 connects to the nearest ring network switch in each section of the mine, links to the underground fiber optic ring network, and transmits the signal to the surface ground pressure monitoring industrial control computer via the underground fiber optic ring network.

[0036] (4) Microseismic monitoring data analysis. The KJ551 microseismic monitoring and early warning platform was used for microseismic monitoring data analysis. Based on the microseismic monitoring results, the characteristics of the vibration waveform, the spatiotemporal evolution characteristics of microseismic events, and the corresponding characteristics of the vibration field and mining activities were analyzed. Microseismic event kernel density analysis, magnitude analysis, energy analysis, 24-hour event distribution analysis, the relationship between microseismic activity and mine production activities, the cumulative number of microseismic events and activity time history analysis, and three-dimensional analysis of rock mass stability were also conducted. The microseismic monitoring data analysis results for the roof and floor stability of a certain iron mine from October 11, 2022 to December 31, 2022 are as follows: The distribution of microseismic events in the roof, ore body, and floor of the No. 10 perforating vein is shown in Table 1. From the perspectives of frequency and energy, the roof accounts for 53.73% of the frequency and 24.21% of the energy, while the floor accounts for 5.88% of the frequency and 25.72% of the energy. Events near the ore body have the highest energy percentage (50.07%) and frequency percentage (40.39%). The 10SM3 stope is located between the -200m and -230m levels in the first mining section of the Zhongguan Iron Mine. It employs segmented open-cut mining followed by backfilling. During blasting, the ore body collapse generates enormous energy. After mining, the roof collapses, and the damage gradually extends towards higher roof levels. Therefore, the scale and extent of damage to the roof strata are much greater than those to the ore body and floor strata, as reflected in the microseismic monitoring data. Analysis from the perspective of average energy shows that the average energy of microseismic events on the floor is greater than that of events on the roof and near the ore body, indicating that high-energy events account for a large proportion of events on the floor, that is, the floor is affected by the collapsed ore body, resulting in large-scale rock mass fracturing.

[0037]

[0038] The energy level distribution of each stratum is shown in Table 2. Based on different energy levels, the microseismic system received a large number of low-energy events (0 < E < 100 J). Stratified analysis revealed that low-energy events accounted for the highest frequency in each stratum, exceeding the general proportion. In the ore body, low-energy events accounted for 94.23% of the frequency, while events exceeding 1000 J accounted for less than 4%. Regarding energy proportion, the 100-1000 J events accounted for a higher proportion than the general proportion in the roof, while events exceeding 1000 J accounted for over 90% in both the ore body and the floor.

[0039]

[0040] Comprehensive analysis reveals that microseismic events were primarily concentrated on the western side of the 7#-11# cross-section. Spatially, the microseismic monitoring data exhibited a "stepped" pattern, with fewer events at the top and more at the bottom. The lowest point was roughly at the -230m level, representing the lower mining layer, while the highest point ranged from -30 to -50m, the final cessation point of overburden collapse after mining. The area between these two points represents the main range of rock mass movement. The average energy at all monitoring points remained below the critical deformation energy value, and no warning signs were observed.

[0041] (5) Ground pressure monitoring data analysis. The KJ615 online stress monitoring and early warning platform was used to analyze ground pressure monitoring data. Based on the monitored borehole stress data, anchor cable stress data, and roof delamination changes, the stability of the stope roof and floor was analyzed. The results of the borehole stress monitoring data analysis for the 8S1 stope of a certain iron ore mine from October 11, 2022 to December 31, 2022 are shown in Table 3; the results of the anchor cable stress monitoring data analysis are shown in Table 4; and the results of the roof delamination monitoring data analysis are shown in Table 5. The analysis results show that no early warning occurred during the mining of the 8S1 stope.

[0042]

[0043]

[0044]

[0045] (6) Determine the comprehensive ground pressure monitoring safety early warning index. Based on the monitored microseismic activity, borehole stress, anchor cable stress, and roof delamination, the multi-parameter coupling analysis method is used to derive the stope hazard index I0. Further assess the safety risks such as stope collapse and take timely support measures to strengthen control.

[0046] I0 = K1I1 + K2I2 + K3I3 + K4I4 In the formula: I1 is the microseismic index hazard index, K1 is the microseismic index weighting coefficient; I2 is the borehole stress index hazard index, K2 is the borehole stress index weighting coefficient; I3 is the anchor cable stress index hazard index, K3 is the anchor cable stress index weighting coefficient; I4 is the roof delamination index hazard index, K4 is the roof delamination index weighting coefficient.

[0047] The risk index for each indicator is determined according to the following principles: The microseismic hazard index I1 = average energy value at monitoring points / critical deformation energy value = 4452 / 9200 = 0.48; The borehole stress hazard index I2 = maximum measured value of borehole stress at monitoring point (deep foundation point) / red warning value of borehole stress = 6.8 / 16 = 0.425; The anchor cable stress index hazard index I3 = maximum measured value of anchor cable stress at monitoring point (deep foundation point) / red warning value of anchor cable stress = 51.8 / 160 = 0.32; The risk index I4 for roof delamination is calculated as follows: Maximum delamination value at monitoring point (deep baseline) / Red warning value for delamination = 27.6 / 120 = 0.23. Weighting coefficients for each indicator were determined as follows: Since the selected monitoring points are all representative, the weights of the four monitoring devices were allocated equally, with each weight being 0.25. That is: K1 is the weighting coefficient for the microseismic index, with a value of 0.25; K2 is the weighting coefficient for borehole stress index, with a value of 0.25; K3 is the weighting coefficient for the anchor cable stress index, with a value of 0.25; K4 is the weighting coefficient of the roof delamination index, with a value of 0.25.

[0048] Based on the monitored microseismic activity, borehole stress, anchor cable stress, and roof delamination, a multi-parameter coupled analysis method was used to determine that the stope I0 = 0.36.

[0049] (7) Formulate comprehensive ground pressure prevention and control measures for the mining area. Based on the monitoring data such as micro-seismic activity, borehole stress, anchor cable stress, and roof delamination changes monitored in the mining area, and in combination with the engineering geological conditions and actual mining conditions of the mining area, the mining area hazard level is divided into four levels. According to different hazard levels, corresponding prevention and control measures can be adopted, as shown in Table 6.

[0050]

[0051] Based on monitoring data and the actual conditions of the mining area, the hazard index I0 of the 8S1 stope of a certain iron ore mine during the period from October 11, 2022 to December 31, 2022 was calculated to be 0.25 < 0.36 ≤ 0.5, with a hazard level of B and a weak impact trend. The design should consider the impact of rockburst, and the technical parameters and support methods of the main roadways and chambers should be optimized. Subsequent production practice verified that no safety risks such as roof collapse occurred during the mining of the 8S1 stope, and mining and ore extraction were successfully completed, with backfilling and roof connection completed.

[0052] By employing a "four-in-one" ground pressure monitoring system—comprising a microseismic detector (9 units), a borehole stress gauge (3 units), an anchor cable stress gauge (2 units), and a roof delamination meter (1 unit)—on-site measurements were conducted in key mines such as 8S1, where mine pressure manifestations were concentrated and active stress transfers were frequent in drilling roadways and bottom structures. This compensated for the weak sensitivity of the microseismic monitoring system to single-point stress changes. Furthermore, a comprehensive early warning index based on multi-parameter ground pressure monitoring—comprising "rock fracture vibration, surrounding rock stress dynamics, anchor bolt and cable support force, and roadway roof settlement"—was established. This further assessed safety risks such as mine collapses, allowing for timely support measures and enhanced control. This approach avoided both excessive and inappropriate support, ensuring safe mining operations while preventing excessive waste of resources and time, thus improving production progress. The overall mining and filling progress of the 8S1 mine was completed 5 days ahead of mines with similar geological conditions and structural parameters.

Claims

1. A four-in-one ground pressure monitoring method for crushed mining areas, characterized in that, The method includes the following steps: a. Install microseismic monitoring equipment: Microseismic monitoring equipment is installed in a mining area with fractured rock mass. The microseismic monitoring equipment includes a microseismic detector (9) and a microseismic monitoring master station (10). The data output terminal of the microseismic detector (9) is connected to the microseismic monitoring master station (10) via a cable. The microseismic monitoring master station (10) is connected to the surface industrial control computer (11) via an optical fiber ring network (12). b. Install ground pressure monitoring equipment: In selected mines with fractured rock masses, ground pressure monitoring equipment is installed in the bottom structural roadways, pre-controlled roof roadways, and ore access roadways. The ground pressure monitoring equipment includes a borehole stress gauge (3), an anchor cable stress gauge (2), a roof separation instrument (1), a borehole stress wireless data acquisition device (6), an anchor cable wireless data acquisition device (5), a separation instrument wireless data acquisition device (4), a repeater (7), and a ground pressure acquisition substation (8). The data output terminals of the borehole stress gauge (3), the anchor cable stress gauge (2), and the roof separation instrument (1) are... The wireless data acquisition devices are connected to the hole stress wireless data acquisition device (6), the anchor cable wireless data acquisition device (5), and the delamination instrument wireless data acquisition device (4) via cables. The hole stress wireless data acquisition device (6), the anchor cable wireless data acquisition device (5), and the delamination instrument wireless data acquisition device (4) exchange information with the repeater (7) through a wireless communication network. The repeater (7) is connected to the ground pressure acquisition substation (8) via a cable. The ground pressure acquisition substation (8) is connected to the industrial control computer (11) through an optical fiber ring network (12). c. Obtain the microseismic index hazard level: The microseismic monitoring data measured by the microseismic detector (9) is transmitted to the microseismic monitoring master station (10) via cable. The microseismic monitoring master station (10) transmits the microseismic monitoring data to the industrial control computer (11) via the fiber optic ring network (12). The microseismic monitoring and early warning platform installed in the industrial control computer (11) analyzes the microseismic monitoring data and obtains the microseismic index hazard index I1. d. Obtain the hazard indices for borehole stress, anchor cable stress, and roof delamination: The ground pressure monitoring data collected by the borehole stress gauge (3), anchor cable stress gauge (2), and top plate delamination instrument (1) are transmitted to the borehole stress wireless data acquisition device (6), anchor cable wireless data acquisition device (5), and delamination instrument wireless data acquisition device (4) respectively via cables. The borehole stress wireless data acquisition device (6), anchor cable wireless data acquisition device (5), and delamination instrument wireless data acquisition device (4) transmit the ground pressure monitoring data to the repeater (7) through the wireless communication network. After receiving the ground pressure monitoring data from the repeater (7), the ground pressure acquisition substation (8) transmits the data to the industrial control computer (11) through the fiber optic ring network (12). The stress online monitoring and early warning platform installed in the industrial control computer (11) analyzes the ground pressure monitoring data and obtains the borehole stress index danger index I2, anchor cable stress index danger index I3, and top plate delamination index danger index I4. e. Calculate the mining area hazard index: I0 = K1I1 + K2I2 + K3I3 + K4I4 In the formula: I0 is the mining area hazard index; K1 is the microseismic index weighting coefficient; K2 is the borehole stress index weighting coefficient; K3 is the anchor cable stress index weighting coefficient; K4 is the roof delamination index weighting coefficient. f. Determine the safety risk of mine collapse based on the mine hazard index I0. The higher the mine hazard index I0, the greater the safety risk. When the mine hazard index I0 exceeds the set value, support measures shall be taken.

2. The four-in-one ground pressure monitoring method for crushing and mining areas according to claim 1, characterized in that, The calculation methods for the microseismic index, borehole stress index, anchor cable stress index, and roof delamination index are as follows: I1 = Average energy value at monitoring points / Critical deformation energy value I2 = Maximum measured borehole stress at monitoring point / Red alert value for borehole stress I3 = Maximum measured value of anchor cable stress at monitoring point / Red warning value of anchor cable stress I4 = Maximum delamination value at monitoring point / Delamination red warning value The average energy value of the monitoring point is calculated by the microseismic monitoring and early warning platform based on the microseismic monitoring data; the maximum borehole stress value of the monitoring point is measured by the borehole stress gauge (3); the maximum anchor cable stress value of the monitoring point is measured by the anchor cable stress gauge (2); and the maximum delamination value of the monitoring point is measured by the top plate delamination instrument (1).

3. A four-in-one ground pressure monitoring method for a crushing and mining area according to claim 1 or 2, characterized in that, The weighting coefficients for the microseismic index K1, borehole stress index K2, anchor cable stress index K3, and roof delamination index K4 are all 0.

25.

4. The four-in-one ground pressure monitoring method for crushing and mining areas according to claim 3, characterized in that, The anchor cable stress gauge (2) can also be an anchor rod stress gauge.

Citation Information

Patent Citations

  • Underground mine soft rock roadway ground pressure safety early warning monitoring method

    CN113958367A

  • Rock burst danger monitoring and early warning method based on dynamic and static combined stress analysis

    CN111963243A

  • Rock burst intelligent monitoring and early warning device and method based on multi-field multi-source information fusion

    CN116591777A