A quick installation method of embedded iron parts in a foundation room of an extra-large vertical continuous casting machine

By designing bolt positioning and winch lifting methods in the foundation chamber of the extra-large vertical continuous casting machine, the problem of difficult installation of pre-embedded iron parts was solved, enabling a fast and accurate installation process and improving construction efficiency and benefits.

CN117862445BActive Publication Date: 2026-11-24SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311730014.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2026-11-24
Estimated Expiration
2043-12-15

AI Technical Summary

Technical Problem

In the construction of extra-large vertical continuous casting machines, it is difficult to align the bolt holes of the embedded iron parts with the top plate, resulting in low installation efficiency and affecting the construction progress and difficulty.

Method used

The embedded iron parts are fixed with bolts on the embedded plate. The bolt holes are formed by positioning and drilling. The embedded iron parts are vertically lifted by a winch to ensure that the bolts correspond to the holes. The installation is completed by pouring concrete.

Benefits of technology

It improves the accuracy and efficiency of the installation of embedded iron parts, saves construction time, and enhances the benefits of the installation project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117862445B_ABST
    Figure CN117862445B_ABST
Patent Text Reader

Abstract

This invention relates to a rapid installation method for embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine, comprising the following steps: S1: Designing the embedded iron parts; S2: Locating and marking the positions of the embedded iron parts on the top plate of the foundation chamber according to their required locations, and drilling holes to form several bolt holes on the top plate; S3: Placing embedded plates at corresponding positions on the bottom plate, and marking out the bolt holes on the embedded plates to form several bolt marking points; S4: Performing plug welding on the bolt holes on the embedded plates according to the bolt marking points to fix the bolts to the embedded plates and form the embedded iron parts; S5: Welding four nuts to the bolt heads at the four corners of the embedded iron parts, and connecting the nuts to the wire rope of the winch; S6: Vertically lifting the embedded iron parts using the winch, and inserting the bolts into the bolt holes; S7: Pouring concrete between the top plate and the bottom plate. This invention can greatly improve the installation efficiency of embedded iron parts, saving time and increasing efficiency for subsequent installation projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of vertical continuous casting machines, and in particular relates to a method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine. Background Technology

[0002] With the development of my country's industry, a large number of high-quality projects are being undertaken, especially those involving precision engineering. These projects require high precision in the installation of embedded iron parts. Therefore, it is necessary to improve the accuracy of the fabrication and installation of embedded iron parts, increase the efficiency of their installation, and save time and improve the efficiency of subsequent installation projects.

[0003] In the traditional construction of continuous casting machine structures, the construction period is tight. Especially in the construction of extra-large vertical continuous casting machines, the embedded iron parts used in the foundation chamber are large in size and heavy in weight. It is difficult to align the bolt holes of the embedded iron parts with the top plate, which makes the installation of the embedded iron parts difficult, the installation efficiency is low, and the speed cannot keep up with the progress, which greatly increases the construction period and construction difficulty in the later stage. Summary of the Invention

[0004] The main objective of this invention is to propose a method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine, which can effectively solve the problems in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution:

[0006] A method for rapid installation of embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine includes the following steps:

[0007] S1: Design embedded iron parts, the embedded iron parts include embedded plates, and the top of the embedded plates is fixedly installed with several bolts, which are distributed in a rectangular pattern;

[0008] S2: Based on the required placement of the embedded iron parts, mark the location on the top plate of the foundation room and drill holes to form several bolt holes on the top plate, and determine the position of the embedded plate and the bolt holes.

[0009] S3: Place the embedded plate at the corresponding position on the base plate, and lay out the bolt holes on the embedded plate to form several bolt laying points on the embedded plate;

[0010] S4: According to the bolt layout point, perform through-hole plug welding on the embedded plate to fix the bolt on the embedded plate to form a pre-embedded iron part. At this time, the bolt and the bolt hole position correspond to each other.

[0011] S5: Weld four nuts to the bolt heads at the four corners of the embedded iron parts. The nuts are connected to the wire rope of the winch. The winch is set above the top plate.

[0012] S6: The embedded iron parts are vertically lifted by a winch, the bolts are inserted into the bolt holes, and the embedded iron parts are installed in place after being lifted to a certain height.

[0013] S7: Concrete is poured between the top slab and the bottom slab, and the embedded iron parts are installed.

[0014] Preferably, in step S1, the bolt is an M30 bolt.

[0015] Preferably, in step S7, a pad is placed at the bottom of the nut when pouring concrete.

[0016] Preferably, in step S8: after the concrete pouring is completed, the bolt holes need to be sealed by grouting.

[0017] This invention provides a method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine, which has the following beneficial effects;

[0018] This invention creates several bolt layout points by laying out bolt holes on an embedded plate, and then performing plug welding on the embedded plate according to the bolt layout points to fix the bolts to the embedded plate and form embedded iron parts. In this way, the bolts and bolt hole positions correspond, and the embedded iron parts can be accurately positioned after being vertically lifted by a winch, which greatly improves the installation efficiency of the embedded iron parts and saves time and increases efficiency for subsequent installation projects. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the top plate positioning and layout of the present invention;

[0020] Figure 2 This is a schematic diagram of the structure of the embedded iron parts of the present invention;

[0021] Figure 3 This is a schematic diagram of the concrete pouring process according to the present invention. Detailed Implementation

[0022] To make the objectives, technical solutions, and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings.

[0023] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0024] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," and "counterclockwise," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting this invention.

[0025] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the stated features. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified. Furthermore, the terms "installed," "connected," and "linked" should be interpreted broadly; for example, they may refer to a fixed connection, a detachable connection, or an integral connection; they may refer to a mechanical connection or an electrical connection; they may refer to a direct connection or an indirect connection through an intermediate medium; and they may refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0026] Examples, such as Figure 1-2 As shown, a method for rapid installation of embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine includes the following steps:

[0027] S1: Design embedded iron parts, the embedded iron parts include embedded plates 2, and a number of bolts 3 are fixedly installed on the top of the embedded plates, the number of bolts 3 being distributed in a rectangular shape;

[0028] S2: Based on the required placement of the embedded iron parts, mark the position on the top plate of the foundation chamber and drill holes to form several bolt holes on the top plate, and determine the position of the embedded plate and the bolt holes.

[0029] S3: Place the embedded plate 2 at the corresponding position on the base plate, and lay out the bolt holes on the embedded plate 2 to form several bolt laying points on the embedded plate;

[0030] S4: According to the bolt layout point, perform through-hole plug welding on the embedded plate 2 to fix the bolt 3 on the embedded plate 2 to form a pre-embedded iron part. At this time, the bolt 3 corresponds to the bolt through-hole position.

[0031] S5: Weld four nuts 4 to the heads of bolts 3 at the four corners of the embedded iron parts. The nuts 4 are connected to the wire rope of the winch. The winch is set above the top plate.

[0032] S6: The embedded iron parts are vertically lifted by a winch, bolt 3 is inserted into the bolt hole, and the embedded iron parts are installed in place after being lifted to a certain height.

[0033] S7: Concrete is poured between the top slab and the bottom slab, and the embedded iron parts are installed.

[0034] In one specific embodiment, in step S1, the bolt 3 is an M30 bolt.

[0035] In one specific embodiment, in step S7, a pad 5 is placed at the bottom of the nut 4 when pouring concrete.

[0036] In one specific embodiment, in step S8: after the concrete pouring is completed, the bolt holes need to be sealed by grouting.

[0037] This invention creates several bolt layout points by laying out bolt holes on the embedded plate 2, and then performing plug welding on the embedded plate according to the bolt layout points to fix the bolts 3 on the embedded plate to form pre-embedded iron parts. In this way, the bolts and bolt holes correspond to each other. After the pre-embedded iron parts are vertically lifted by a winch, they can be accurately positioned, which greatly improves the installation efficiency of the pre-embedded iron parts and saves time and improves efficiency for the subsequent installation project.

[0038] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine, characterized in that, Includes the following steps: S1: Design embedded iron parts, the embedded iron parts include embedded plates, and the top of the embedded plates is fixedly installed with several bolts, which are distributed in a rectangular pattern; S2: Based on the required placement of the embedded iron parts, mark the location on the top plate of the foundation room and drill holes to form several bolt holes on the top plate, and determine the position of the embedded plate and the bolt holes. S3: Place the embedded plate at the corresponding position on the base plate, and lay out the bolt holes on the embedded plate to form several bolt laying points on the embedded plate; S4: According to the bolt layout point, perform through-hole plug welding on the embedded plate to fix the bolt on the embedded plate to form a pre-embedded iron part. At this time, the bolt and the bolt hole position correspond to each other. S5: Weld four nuts to the bolt heads at the four corners of the embedded iron parts. The nuts are connected to the wire rope of the winch. The winch is set above the top plate. S6: The embedded iron parts are vertically lifted by a winch, the bolts are inserted into the bolt holes, and the embedded iron parts are installed in place after being lifted to a certain height. S7: Concrete is poured between the top slab and the bottom slab, and the embedded iron parts are installed.

2. The method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine according to claim 1, characterized in that: In step S1, the bolt is an M30 bolt.

3. The method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine according to claim 1, characterized in that: In step S7, a pad is placed at the bottom of the nut when pouring concrete.

4. The method for rapid installation of pre-embedded iron parts in the foundation chamber of an extra-large vertical continuous casting machine according to claim 1, characterized in that: In step S8: After the concrete pouring is completed, the bolt holes need to be sealed by grouting.

Citation Information

Patent Citations

  • Foundation bolt pre-embedding positioning device

    CN214883792U

  • Machine foundation and construction method therefor

    JP2006257680A