An assembling method of a pile fixing chamber of an offshore wind power platform

By constructing fixed and moving ring beams at segmented workstations and assembling them as a whole at the final assembly station, and using tie rod pre-positioning fixtures and hydraulic cylinder hoisting fixtures to assist in the installation, the problems of operational difficulties and long timeframes in the assembly process of the offshore wind power platform's pile chamber were solved, achieving rapid and efficient assembly and improving the utilization rate of the dock.

CN117868073BActive Publication Date: 2026-11-24SHANGHAIGUAN SHIPBUILDING IND
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410123108.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2026-11-24
Estimated Expiration
2044-01-30

AI Technical Summary

Technical Problem

The existing assembly method for the pile chamber of offshore wind power platforms requires the installation of each component step by step, which leads to operational difficulties, long time, and difficulty in precision control, affecting the closing time of the wind power platform in the dock.

Method used

The fixed ring beam, moving ring beam and fixed pile frame are constructed at the segmented work station, and the whole assembly is carried out at the general assembly work station. The installation is assisted by tie rod pre-positioning fixtures and hydraulic cylinder hoisting fixtures to ensure accuracy and efficiency. The reverse construction and flipping hoisting methods are adopted.

Benefits of technology

It shortened the assembly cycle, improved the utilization rate of the dock, solved the difficulties in assembly operations and precision control problems, and improved construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868073B_ABST
    Figure CN117868073B_ABST
Patent Text Reader

Abstract

An assembly method for a pile fixing chamber of an offshore wind power platform relates to the field of offshore wind power platform manufacturing technology. In this invention, since the main load-bearing structure of the pile fixing frame is at its upper height, to ensure good installation conditions for the upper structure, the top plate is used as a formwork for reverse construction during segmented construction. After completion, the pile fixing chamber is hoisted and turned over, ensuring assembly accuracy. The fixed ring beam, moving ring beam, and pile fixing frame are constructed at the segmented workstations, assembled at the final assembly workstation, and then hoisted onto the main deck for final assembly. This method solves the problems of difficult operation and long assembly cycle associated with the original bottom-up, step-by-step assembly method. This invention significantly improves assembly speed, shortens the assembly cycle, and increases dock utilization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of offshore wind power platform manufacturing technology, and in particular to an assembly method for the pile fixing chamber of an offshore wind power platform. Background Technology

[0002] With its long coastline and numerous coastal islands, China boasts abundant offshore wind energy resources and enormous potential for offshore wind power development. Self-elevating wind turbine installation platforms are widely used in the installation of offshore wind turbines. These platforms consist of a hull, legs, and anchoring chambers. During operation, a lifting device drives the legs to extend to the seabed, allowing the platform to stand upright. The legs then lift the hull, raising it a certain distance above the sea surface to form a stable platform unaffected by waves. The platform hull has four anchoring zones, each with an anchoring chamber above the main deck. The anchoring chamber houses the lifting device. The anchoring chamber serves as the connecting link and force transmission structure for the platform hull's lifting and lowering operations along the legs, primarily bearing the entire platform's weight load during lifting and lowering operations.

[0003] Existing methods for assembling pile chambers on platform hulls typically involve installing individual pile chambers one by one from the bottom up after the main hull of the platform has been assembled and formed; for example... Figure 1 As shown, ① a temporary support structure is installed on the main deck 1 of the platform hull's fixed pile area, and the moving ring beam 4 is positioned first; ② a temporary support is installed above the moving ring beam 4, and the fixed ring beam 3 is positioned first, ensuring the installation height of the fixed ring beam 3; ③ eight sets of buffer disc springs 6 are installed above the fixed ring beam 3; ④ the fixed pile frame 2 is lifted, and its upper eight sets of openings are aligned with the center lines of the eight sets of buffer disc springs 6 and the upper eight sets of openings of the fixed ring beam 3, so that the lower surface of the upper end of the fixed pile frame 2 rests on the eight sets of buffer disc spring assemblies; ⑤ due to the installation of the tie rod 7... Since the direction of installation of the lifting cylinder 5 can only be from the bottom to the top of the fixed ring beam 3, the 8 sets of tie rods 7 are inserted one by one into the above-mentioned installation openings. ⑥ Since the installation direction of the lifting cylinder 5 can only be from the bottom to the top of the fixed ring beam 3, the 8 sets of lifting cylinders 5 are installed after the 8 sets of tie rods 7 are installed. ⑦ The lower end of the lifting cylinder 5 is hinged to the moving ring beam 4 through the 8 sets of cylinder pins. ⑧ The upper end of the lifting cylinder 5 is hinged to the fixed ring beam 3 and the tie rod through the 8 sets of cylinder pins. ⑨ Finally, the nuts at the upper end of the tie rods 7 are tightened to fix the pile frame 2 and complete the overall assembly.

[0004] The aforementioned method for assembling the pile chamber can only be implemented step-by-step according to the assembly sequence; the next step cannot proceed until the previous one is completed. Furthermore, the installation of these components requires the assistance of a crane, which takes considerable time. Because the lifting device is integrated inside the pile chamber, the manual operating space is limited, further extending the equipment installation time. Additionally, the limited operating space presents significant challenges in controlling the precise dimensions of the fixed ring beam 3, the lifting cylinder 5, and the tie rod 7. These factors contribute to a longer overall assembly cycle for the pile chamber, consequently extending the time required for the wind turbine platform to be assembled in the dock. To address these issues, this invention provides a novel method for assembling the pile chamber of an offshore wind turbine platform. Summary of the Invention

[0005] The purpose of this invention is to provide an assembly method for the pile chamber of an offshore wind power platform, which facilitates assembly operations, shortens the construction cycle, reduces dock occupancy time, and improves dock turnover utilization.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: An assembly method for a pile fixing chamber of an offshore wind power platform, the pile fixing chamber comprising a pile fixing frame, a fixed ring beam, a movable ring beam, a lifting cylinder, a buffer disc spring, and a tie rod; the pile fixing frame is welded and fixed to the main deck; the fixed ring beam is assembled to the top of the pile fixing frame via the buffer disc spring and the tie rod; the upper end of the lifting cylinder is hinged to the fixed ring beam via a cylinder pin, and the lower end is hinged to the movable ring beam via a cylinder pin; the assembly method for the pile fixing chamber of the offshore wind power platform includes the following steps: 1) Construct fixed ring beams, moving ring beams and pile frames at segmented work stations; the pile frames are constructed in reverse using the top plate as a formwork, and after completion, the pile frames are hoisted and turned over, and temporarily placed upright on the formwork. 2) Erect a high-support jig at the final assembly station and temporarily fix the fixed ring beam on the high-support jig; 3) Install 8 sets of buffer disc springs above the fixed ring beam; 4) Install 8 sets of tie rods, pass the tie rods through the tie rod holes on the fixed ring beam from bottom to top, set the tie rod pre-positioning fixture above the fixed ring beam, and use a fastening nut to fasten the tie rods at the top of the tie rod pre-positioning fixture (13); 5) Use the hydraulic cylinder hoisting fixture to lift the lifting cylinder, and hinge the upper end of the lifting cylinder to the fixed ring beam and the tie rod through the hydraulic cylinder pin. After the connection is completed, remove the tie rod pre-positioning fixture and the hydraulic cylinder hoisting fixture. 6) Install the pile fixing frame. Adjust the level of the pre-built pile fixing frame at the section work station and lift it up. Align the center lines of the 8 sets of openings at the top of the pile fixing frame with the 8 sets of tie rods. Slowly lower the crane to the height and finally pass the tie rods through the openings of the pile fixing frame. Tighten the nuts at the top of the tie rods to complete the assembly of the pile fixing frame and the fixed ring beam. 7) While performing the above assembly operations, at another final assembly station, the moving ring beam is placed on a temporary support structure of a certain height in advance, and temporary support structures are arranged in advance at the positions where the fixed pile frame is expected to be placed around the moving ring beam. 8) Lift up the assembled structure from step 6 and place it on the temporary support structure from step 7. Use a plumb bob to align the center lines of the fixed ring beam and the moving ring beam so that their center lines remain concentric. 9) Extend each of the 8 lifting cylinders one by one using a manual pump station or other means, and hinge the lower end of the lifting cylinder to the moving ring beam using the 8 cylinder pins to complete the assembly of the moving ring beam and the lifting cylinder. 10) Adjust and install 4 sets of guide columns and other outfitting components according to the actual installation position of the pile fixing frame; 11) Hoist the assembled structure from step 10 to the main deck of the platform and weld the pile frame to the main deck.

[0007] The above-mentioned assembly method for the offshore wind power platform pile fixing chamber includes a tie rod pre-positioning fixture comprising a left tube and a right tube. Both the left and right tubes are provided with reinforcing ribs and bolt ears. Fastening bolts are used to pass through the bolt ears to fasten the left and right tubes together, so that the two form a tubular structure. A jack is used to support the lower end of the reinforcing rib.

[0008] The above-mentioned assembly method for the offshore wind power platform pile fixing chamber, wherein the hydraulic cylinder hoisting fixture consists of two parts, left and right, with the two parts having the same structure. One side of the hydraulic cylinder hoisting fixture has a round hole that is fastened to the lifting cylinder with fasteners, and the other side has a round hole that is set as a lifting lug hole.

[0009] The present invention has the following advantages: The assembly method of the offshore wind power platform pile fixing chamber of the present invention, since the main load-bearing structure of the pile fixing frame is at its upper end in the height direction, in order to ensure that the upper structure of the pile fixing frame is in good installation conditions, adopts reverse construction with the top plate as the formwork during segmented construction. After completion, the pile fixing chamber is hoisted and turned over to ensure assembly accuracy. The fixed ring beam, moving ring beam and pile fixing frame are constructed at the segmented work station, assembled at the general assembly work station, and then hoisted as a whole to the main deck for assembly. This solves the disadvantages of the original step-by-step installation from bottom to top and the long assembly cycle. The present invention greatly improves the assembly speed, shortens the assembly cycle and improves the utilization rate of the dock. Attached Figure Description

[0010] Figure 1 A schematic diagram of the structure for installing the pile chamber on the main deck; Figure 2 This is a top view of the pile-fixing chamber; Figure 3 This is a schematic diagram of a fixed ring beam structure; Figure 4 This is a schematic diagram of a moving ring beam structure; Figure 5 A schematic diagram of a fixed ring beam erected on a high-support frame; Figure 6 This is a schematic diagram of the assembly of the fixed pile frame and the fixed ring beam; Figure 7 This is a schematic diagram of the moving ring beam assembly. Figure 8 Schematic diagram of the pre-positioning fixture for the tie rod; Figure 9 Top view of the pre-positioning fixture for the tie rod; Figure 10 Schematic diagram of hydraulic cylinder hoisting fixture; The labels in the diagram represent: 1. Main deck, 2. Pile frame, 3. Fixed ring beam, 4. Moving ring beam, 5. Lifting cylinder, 6. Buffer disc spring, 7. Tie rod, 8. Guide column, 9. Slide groove, 10. Pile leg, 11. High support frame, 12. Temporary support structure, 13. Tie rod pre-positioning fixture, 14. Cylinder hoisting fixture, 13-1. Left pipe body, 13-2. Right pipe body, 13-3. Reinforcing rib, 13-4. Jack, 13-5. Bolt lug. Detailed Implementation

[0011] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0012] The present invention discloses an assembly method for a pile fixing chamber of an offshore wind power platform. The pile fixing chamber includes a pile fixing frame 2, a fixed ring beam 3, a moving ring beam 4, a lifting cylinder 5, a buffer disc spring 6, a tie rod 7, a guide column 8, etc. The pile fixing chamber is installed on the main deck 1 of the platform hull. Corresponding pin holes are provided on the fixed ring beam 3, the moving ring beam 4 and the pile legs 10. The lifting and lowering operation of the platform hull is carried out by a hydraulic pin-type lifting method.

[0013] The present invention provides an assembly method for a fixed pile chamber of an offshore wind power platform, wherein the structure of the fixed ring beam 3 is as follows: Figure 3 As shown, the structure of the moving ring beam is as follows: Figure 4 As shown, firstly, the fixed pile frame 2, fixed ring beam 3, and moving ring beam 4 are constructed at the segmented construction sites respectively. Since the main load-bearing structure of the fixed pile frame 2 is at its upper end in the height direction, in order to ensure that the upper structure of the fixed pile frame 2 is in good installation conditions and facilitates construction, the top plate is used as the formwork for reverse construction during segmented construction. After completion, the fixed pile frame 2 is hoisted and turned over.

[0014] The present invention discloses an assembly method for a pile fixing chamber of an offshore wind power platform. The pile fixing chamber is assembled as a whole at the general assembly station, and then the assembly is hoisted to the main deck 1 for welding. The assembly steps at the general assembly station are as follows: 1) such as Figure 5As shown, a high support jig 11 is erected on the horizontal ground of the final assembly station, and the fixed ring beam 3 is temporarily fixed to the top of the high support jig 11; 8 sets of buffer disc springs 6 are installed above the fixed ring beam 3. 2) Install 8 sets of tie rods 7: such as Figure 6 As shown, due to the structural shape, the tie rod 7 can only pass through the tie rod hole on the fixed ring beam 3 from bottom to top. At this time, the tie rod pre-positioning fixture 13 is used above the fixed ring beam 3 to temporarily support the tie rod 7. The height is adjusted using jack 13-4, and the tie rod 7 is pre-tightened with a fastening nut at the top of the tie rod pre-positioning fixture 13 to prevent the tie rod 7 from sliding down. 3) Assemble 8 sets of lifting cylinders 5: Due to the structural shape, the lifting cylinders 5 can only be assembled from bottom to top. Since the lifting points of the lifting cylinders 5 cannot meet the requirements of the lifting, the cylinder lifting fixture 14 is used for lifting. The jacks 13-4 are used in conjunction to hinge the upper end of the lifting cylinders 5 to the fixed ring beam 3 and the tie rod 7 through the cylinder pin. After the connection is completed, the tie rod prepositioning fixture 13 and the cylinder lifting fixture 14 are removed. 4) Install the pile fixing frame 2: Adjust the level of the pile fixing frame 2 that has been pre-built at the segmented work station and lift it up. Align the center lines of the 8 sets of openings at the upper end of the pile fixing frame 2 with the 8 sets of tie rods 7. Slowly lower the crane to the height and finally pass the tie rods 7 through the openings of the pile fixing frame 2. Tighten the nuts at the upper end of the tie rods 7 to complete the assembly of the pile fixing frame 2 and the fixed ring beam 3. 5) For example Figure 7 As shown, at another assembly station, the moving ring beam 4 is placed on a temporary support structure 12 of a certain height in advance, and the temporary support structure 12 is arranged in advance at the positions where the fixed pile frame 2 is expected to be placed around the moving ring beam 4. The overall structure assembled in the previous step is lifted up and placed on the temporary support structure 12. The center lines of the fixed ring beam 3 and the moving ring beam 4 are aligned with a plumb bob to make their center lines concentric. The eight sets of lifting cylinders 5 are extended one by one by means of manual pump station, etc. The lower end of the lifting cylinder 5 is hinged to the moving ring beam 4 through the eight sets of cylinder pins to complete the assembly of the moving ring beam 4 and the lifting cylinder 5. 6) Adjust and install 4 sets of guide columns 8 and other outfitting components according to the actual installation position of the pile fixing frame 2; ensure that the guide columns 8 can move freely in the sliding groove 9.

[0015] 7) The assembled structure at the final assembly station will be hoisted to the main deck 1 of the platform, and the pile frame 2 will be welded and fixed to the main deck 1.

[0016] This invention discloses an assembly method for a pile-fixing chamber of an offshore wind power platform. The assembly process utilizes a tie rod pre-positioning fixture 13, comprising a left tube 13-1 and a right tube 13-2. Both the left tube 13-1 and the right tube 13-2 are equipped with reinforcing ribs 13-3 and bolt lugs 13-5. Fastening bolts are passed through the bolt lugs 13-5 to secure the left tube 13-1 and the right tube 13-2 together, forming a tubular structure. A jack 13-4 supports the lower end of the reinforcing rib 13-3. This fixture serves to pre-support the tie rod 7 and also facilitates precise positioning during assembly when the upper end of the lifting cylinder 5 is hinged to the fixed ring beam 3 and the tie rod 7 via cylinder pins.

Claims

1. A method for assembling a pile fixing chamber for an offshore wind power platform, the pile fixing chamber comprising a pile fixing frame (2), a fixed ring beam (3), a moving ring beam (4), a lifting cylinder (5), a buffer disc spring (6), and a tie rod (7); the pile fixing frame (2) is welded and fixed to the main deck (1), the fixed ring beam (3) is assembled with the top of the pile fixing frame (2) via the buffer disc spring (6) and the tie rod (7), the upper end of the lifting cylinder (5) is hinged to the fixed ring beam (3) via a cylinder pin, and the lower end is hinged to the moving ring beam (4) via a cylinder pin, characterized in that: The assembly method of the offshore wind power platform pile fixing chamber includes the following steps: 1) Construct a fixed ring beam (3), a moving ring beam (4) and a fixed pile frame (2) at the segmented work site; the fixed pile frame (2) is constructed in reverse with the top plate as the formwork, and after completion, the fixed pile frame (2) is hoisted and turned over, and temporarily placed in the forward direction on the formwork; 2) Erect a high support jig (11) at the final assembly station and temporarily fix the fixed ring beam (3) on the high support jig (11); 3) Install 8 sets of buffer disc springs (6) above the fixed ring beam (3); 4) Install 8 sets of tie rods (7), pass the tie rods (7) through the tie rod holes on the fixed ring beam (3) from bottom to top, set the tie rod prepositioning fixture (13) above the fixed ring beam (3), and use a fastening nut to fasten the tie rods (7) at the top of the tie rod prepositioning fixture (13); 5) Use the hydraulic cylinder hoisting fixture (14) to lift the lifting cylinder (5), and connect the upper end of the lifting cylinder (5) to the fixed ring beam (3) and the tie rod (7) through the hydraulic cylinder pin. After the connection is completed, remove the tie rod prepositioning fixture (13) and the hydraulic cylinder hoisting fixture (14). 6) Install the pile fixing frame (2). Adjust the horizontal height of the pile fixing frame (2) that has been pre-built in the segmented work position and lift it up. Align the center lines of the 8 sets of openings at the upper end of the pile fixing frame (2) with the 8 sets of tie rods (7). Slowly lower the height of the crane and finally pass the tie rods (7) through the openings of the pile fixing frame (2). Tighten the nuts at the upper end of the tie rods (7) to complete the assembly of the pile fixing frame (2) and the fixed ring beam (3). 7) While performing the above assembly operations, the moving ring beam (4) is placed on a temporary support structure (12) of a certain height in another general assembly station in advance, and the temporary support structure (12) is arranged in advance at the position where the fixed pile frame (2) is expected to be placed around the moving ring beam (4). 8) Lift up the assembled structure in step 6 and place it on the temporary support structure (12) in step 7. Use a plumb bob to align the center lines of the fixed ring beam (3) and the moving ring beam (4) so ​​that their center lines remain concentric. 9) Extend the 8 sets of lifting cylinders (5) one by one by means of manual pump station, and hinge the lower end of the lifting cylinder (5) to the moving ring beam (4) through the 8 sets of cylinder pins to complete the assembly of the moving ring beam (4) and the lifting cylinder (5); 10) Adjust and install 4 sets of guide columns (8) and other outfitting components according to the actual installation position of the pile fixing frame (2); 11) Hoist the assembled structure from step 10 to the main deck (1) of the platform and weld the pile frame (2) to the main deck (1).

2. The assembly method of the pile fixing chamber for an offshore wind power platform according to claim 1, characterized in that: The pre-positioning fixture (13) for the tie rod includes a left tube (13-1) and a right tube (13-2). Both the left tube (13-1) and the right tube (13-2) are provided with reinforcing ribs (13-3) and bolt ears (13-5). The left tube (13-1) and the right tube (13-2) are fastened together by passing fastening bolts through the bolt ears (13-5) so that the two form a tubular structure. A jack (13-4) is used to support the lower end of the reinforcing rib (13-3).

3. The assembly method of the pile fixing chamber for an offshore wind power platform according to claim 2, characterized in that: The hydraulic cylinder hoisting fixture (14) consists of two parts, left and right, with the two parts having the same structure. One side of the hydraulic cylinder hoisting fixture (14) is fastened to the lifting cylinder (5) with fasteners, and the other side is set as a lifting lug hole.

Citation Information

Patent Citations

  • Mounting structure of pile fixing chamber and lifting device of offshore wind power platform

    CN106638528A

  • Multifunctional self-elevating offshore wind power construction platform

    CN214939976U