Water-stopping positioning structure between steel hanging box cofferdam and pile casing and construction method thereof
By installing inverted L-shaped angle steel and upturned steel plates in the reserved holes in the bottom plate of the steel cofferdam, combined with an annular water-stopping platform and rubber water-stopping belt, the water-stopping and positioning problems between the steel cofferdam and the casing were solved, achieving rapid and reliable sealing and positioning, and improving construction safety and efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
- Filing Date
- 2023-12-05
- Publication Date
- 2026-07-21
AI Technical Summary
In the construction of deep-water high-pile foundations, the lack of effective water-stopping facilities between the steel cofferdam and the casing makes the construction of underwater sealing plates difficult, posing risks of leakage and backflow, and the positioning is inaccurate, affecting construction safety and efficiency.
Inverted L-shaped angle steel and upturned steel plates are installed in the reserved holes in the bottom plate of the steel cofferdam. Combined with the annular water-stop platform and rubber water-stop belt, sealing and positioning are achieved by elastic overlap and pouring epoxy quick-setting concrete.
This method achieves rapid and reliable water sealing between the steel cofferdam and the casing, reduces the risk of leakage and backflow, improves construction safety and efficiency, and ensures the stability and positioning accuracy of the cofferdam.
Smart Images

Figure CN117868182B_ABST