Fusion reactor blanket assembly method

CN117877765BActive Publication Date: 2026-10-23HEFEI INSTITUTE OF PHYSICAL SCIENCE CHINESE ACADEMY OF SCIENCES
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410061966.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2026-10-23
Estimated Expiration
2044-01-16

AI Technical Summary

Technical Problem

现有的装配方案对包层与窗口的设计尺寸有一定的要求,且各组件均通过窗口进行输送,导致包层的装配效率差

Benefits of technology

[0059]将包层的装配分为两个阶段,分别为近合环真空室阶段与环状真空室阶段,近合环真空室阶段由于第二环瓣未合环连接,进而可以实现在近合环真空室内搭建装配平台与运载工装,且可通过第二环瓣位置进行直接吊装,不需要将各部件自环瓣上的窗口送入,极大提高包层的装配效率。安装完第一部分的包层后,再将第二环瓣合环连接,对最后一个第二环瓣内壁装配包层即可,整体装配效率高,对聚变堆的结构设计限制小,适用范围更广。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117877765B_ABST
    Figure CN117877765B_ABST
Patent Text Reader

Abstract

The present application relates to the field of nuclear fusion device construction technology, and discloses a fusion reactor blanket assembly method, a vacuum chamber comprises n-1 first ring petals and one second ring petal; the fusion reactor blanket assembly method comprises: connecting the first ring petals to form a near-annular vacuum chamber; building an assembly platform in the near-annular vacuum chamber, the assembly platform comprises a carrying tool; hoisting each component of the blanket to the carrying tool, and installing the blanket on the inner wall of each first ring petal; removing the assembly platform, connecting the second ring petal to form an annular vacuum chamber; building a conveying track and an auxiliary tool; conveying each component of the blanket to the auxiliary tool through the conveying track, and installing the blanket on the inner wall of the second ring petal; removing the auxiliary tool and the conveying track. The assembly of the blanket is divided into two stages, the overall assembly efficiency is high, the structural design of the fusion reactor is less limited, and the application range is wider.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of nuclear fusion equipment construction technology, and in particular to a method for assembling the blanket of a fusion reactor. Background Technology

[0002] The fusion reaction in a nuclear fusion reactor occurs within a toroidal vacuum chamber. During operation, the blanket must withstand neutron bombardment to provide fuel for fusion and receive a large amount of thermonuclear radiation. Therefore, the blanket is one of the important core components of a fusion reactor, and the successful assembly of the blanket is a crucial step in the construction of a nuclear fusion reactor.

[0003] Existing cladding assembly methods typically involve first closing the vacuum chamber into a ring, then hoisting the cladding through the upper window, or setting up tracks in the middle window to deliver the cladding components into the vacuum chamber for assembly. These existing assembly methods impose certain requirements on the design dimensions of the cladding and the windows, and since all components are transported through the windows, the assembly efficiency of the cladding is poor. Summary of the Invention

[0004] The technical problem to be solved by this invention is:

[0005] Existing cladding assembly methods are inefficient.

[0006] To address the aforementioned technical problems, this invention provides a method for assembling a fusion reactor blanket, wherein the blanket is installed on the inner wall of a vacuum chamber; the vacuum chamber includes n-1 first annular lobes and one second annular lobe; the fusion reactor blanket assembly method includes:

[0007] The first annular lobes are connected by a ring to form a near-ring vacuum chamber;

[0008] An assembly platform is constructed within the near-circular vacuum chamber, the assembly platform including transport tooling;

[0009] The components of the cladding are hoisted onto the transport fixture and transported to the preset installation position, whereby the cladding is installed on the inner wall of each of the first annular lobes.

[0010] The assembly platform is disassembled, and the second annular lobe is closed to form an annular vacuum chamber;

[0011] A transport track is built through the central window of the annular vacuum chamber, and auxiliary tooling is assembled inside the annular vacuum chamber.

[0012] The components of the cladding are transported to the interior of the auxiliary tooling via the transport track, and the cladding is installed on the inner wall of the second annular lobe;

[0013] Remove the auxiliary tooling and the transport track.

[0014] In one embodiment, the step of hoisting the components of the cladding to the transport fixture for delivery to a preset installation position, and installing the cladding on the inner wall of each of the first annular lobes, includes:

[0015] A shielding block pipeline is installed on the inner wall of the first annular lobe;

[0016] Install the shielding block on the inner wall of the first annular lobe, and connect the shielding block pipeline to the shielding block;

[0017] Install the first wall conduit on the shielding block;

[0018] The first wall is installed on the shielding block, and the first wall pipeline is connected to the first wall.

[0019] In one embodiment, installing the shielding block on the inner wall of the first annular lobe and connecting the shielding block pipeline to the shielding block includes:

[0020] Connect the shielding block to the support fixture;

[0021] The shielding block and the supporting fixture are hoisted together onto the transport fixture, and the supporting fixture is connected to the transport fixture;

[0022] The transport tooling moves on the assembly platform to move the shielding block to the corresponding installation position;

[0023] The shielding block is fixed on the inner wall of the first annular petal, and the shielding block pipeline is connected to the coolant inlet and outlet joints of the shielding block.

[0024] Remove the aforementioned support fixture.

[0025] In one embodiment, installing the first wall conduit on the shielding block includes:

[0026] Use a pipe bending tool to adjust the first wall pipe to a suitable state;

[0027] The first wall pipe is fixed to the shielding block.

[0028] In one embodiment, mounting the first wall on the shielding block and connecting the first wall conduit to the first wall includes:

[0029] Connect the heat sink of the first wall to the supporting fixture;

[0030] The heat sink and the supporting fixture are hoisted together onto the transport fixture, and the supporting fixture is connected to the transport fixture.

[0031] The transport tooling moves on the assembly platform to move the heat sink to the corresponding installation position of the shielding block;

[0032] The heat sink is connected and fixed to the shielding block, and the first wall pipe is connected to the coolant inlet and outlet joints of the heat sink.

[0033] A tungsten tile is provided for the first wall, and the tungsten tile is fixed to the heat sink;

[0034] Remove the aforementioned support fixture.

[0035] In one embodiment, the assembly platform is constructed within the near-closed ring vacuum chamber, the assembly platform comprising a transport fixture:

[0036] The assembly platform is located within the near-ring vacuum chamber. The distance between the assembly platform and the top of the near-ring vacuum chamber is 2 to 3 meters, and the distance between the assembly platform and the side wall of the near-ring vacuum chamber is 8 to 12 centimeters.

[0037] In one embodiment, the step of transporting the components of the cladding layer to the interior of the auxiliary tooling via the transport track, and installing the cladding layer on the inner wall of the second annular lobe, includes:

[0038] A shielding block pipeline is installed on the inner wall of the second annular lobe;

[0039] Install the shielding block on the inner wall of the second annular petal, and connect the shielding block pipeline to the shielding block;

[0040] Install the first wall conduit on the shielding block;

[0041] The first wall is installed on the shielding block, and the first wall pipeline is connected to the first wall.

[0042] In one embodiment, the installation of a shielding block conduit on the inner wall of the second annular lobe includes:

[0043] The shielding block pipeline is transported into the annular vacuum chamber via the transport track;

[0044] The shielding block pipeline is installed onto the inner wall of the second annular lobe.

[0045] In one embodiment, installing the shielding block on the inner wall of the second annular lobe and connecting the shielding block pipeline to the shielding block includes:

[0046] Connect the shielding block to the support fixture;

[0047] The shielding block and the supporting fixture are hoisted together onto the transport rail, and the transport rail transports the shielding block and the supporting fixture to the auxiliary fixture, and the supporting fixture and the auxiliary fixture are connected.

[0048] The auxiliary tooling moves the shielding block to the corresponding installation position;

[0049] The shielding block is fixed on the inner wall of the second annular petal, and the shielding block pipeline is connected to the coolant inlet and outlet joints of the shielding block.

[0050] Remove the aforementioned support fixture.

[0051] In one embodiment, mounting the first wall on the shielding block and connecting the first wall conduit to the first wall includes:

[0052] Connect the heat sink of the first wall to the supporting fixture;

[0053] The heat sink and the supporting fixture are hoisted together onto the transport rail, and the transport rail transports the heat sink and the supporting fixture to the auxiliary fixture, and the supporting fixture and the auxiliary fixture are connected.

[0054] The auxiliary tooling moves the heat sink to the corresponding installation position of the shielding block;

[0055] The heat sink is connected and fixed to the shielding block, and the first wall pipe is connected to the coolant inlet and outlet joints of the heat sink.

[0056] A tungsten tile is provided for the first wall, and the tungsten tile is fixed to the heat sink;

[0057] Remove the aforementioned support fixture.

[0058] Compared with existing technologies, the above-mentioned fusion reactor blanket assembly method has the following advantages:

[0059] The assembly of the blanket is divided into two stages: the near-ring vacuum chamber stage and the annular vacuum chamber stage. In the near-ring vacuum chamber stage, because the second annular lobe is not yet closed, an assembly platform and transport fixtures can be built within the near-ring vacuum chamber. Furthermore, components can be directly hoisted from the second annular lobe location, eliminating the need to send components in through the windows on the annular lobe, thus greatly improving the blanket assembly efficiency. After installing the first part of the blanket, the second annular lobe is closed, and the blanket is then assembled onto the inner wall of the last second annular lobe. This results in high overall assembly efficiency, fewer restrictions on the structural design of the fusion reactor, and a wider range of applications. Attached Figure Description

[0060] Figure 1A schematic diagram of the structure for installing the blanket in a near-ring vacuum chamber state in a fusion reactor blanket assembly method according to an embodiment of the present invention;

[0061] Figure 2 This is a schematic diagram of the cross-section of a vacuum chamber;

[0062] Figure 3 A schematic diagram of the structure for installing the cladding on the inner wall of the second annular lobe.

[0063] The meanings of the numbers in the attached diagram are as follows:

[0064] 10. Near-closed ring vacuum chamber; 11. First ring lobe; 15. Fan-shaped notch;

[0065] 20. Assembly platform; 21. Transport tooling;

[0066] 30. Cladding; 31. Shielding block; 32. First wall;

[0067] 40. Second annular lobe;

[0068] 50. Transport track; 51. Auxiliary tooling. Detailed Implementation

[0069] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of the present invention. However, the present invention can be practiced in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0070] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0071] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0072] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0073] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0074] It should be noted that when an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or there may be an intervening element. When an element is considered to be "connected to" another element, it can be directly connected to the other element or there may be an intervening element. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only possible implementation.

[0075] Please see Figures 1 to 3 The cladding 30 is installed on the inner wall of the vacuum chamber; the vacuum chamber includes n-1 first annular lobes 11 and 1 second annular lobe 40.

[0076] A fusion reactor blanket assembly method according to an embodiment of the present invention includes:

[0077] S1: The first annular lobes 11 are connected in a closed loop to form a near-closed loop vacuum chamber 10;

[0078] S2: An assembly platform 20 is built inside the near-ring vacuum chamber 10. The assembly platform 20 includes a transport tooling 21.

[0079] S3: Hoist each component of the cladding 30 to the transport fixture 21 to transport it to the preset installation position, and install the cladding 30 on the inner wall of each first annular petal 11;

[0080] S4: Remove the assembly platform 20 and connect the second annular lobe 40 to form an annular vacuum chamber;

[0081] S5: Construct a transport track 50 through the central window of the annular vacuum chamber, and assemble auxiliary tooling 51 inside the annular vacuum chamber;

[0082] S6: Transport each component of the cladding 30 to the interior of the auxiliary tooling 51 via the transport track 50, and install the cladding 30 on the inner wall of the second annular petal 40;

[0083] S7: Remove auxiliary tooling 51 and transport track 50.

[0084] The assembly of the cladding 30 within the vacuum chamber is divided into two construction stages. The first stage involves the first annular lobes 11 being joined together to form a near-closed-ring vacuum chamber 10. Since the second annular lobes 40 are not yet closed, a fan-shaped notch 15 is formed at the position of the second annular lobes 40 in the near-closed-ring vacuum chamber 10. This allows for the installation of the assembly platform 20 and the transport fixtures 21, facilitating the hoisting of various components. Furthermore, by setting multiple transport fixtures 21 on the assembly platform 20, the cladding 30 at multiple different positions can be installed simultaneously, greatly improving the installation efficiency of the cladding 30. After the cladding 30 is assembled within the first annular lobes 11, the second stage begins. The second annular lobes 40 are connected to the first annular lobes 11 to complete the closure, forming a complete annular vacuum chamber. In this stage, only the inner side of the second annular lobes 40 needs to be assembled with the cladding 30. By constructing a transport track 50 at the central window position of the second annular lobes 40, in conjunction with auxiliary fixtures 51, the inner wall of the second annular lobes 40 can be assembled with the cladding 30. The integral blanket 30 has high assembly efficiency and is suitable for use in fusion reactors of various sizes. It has a wider range of applications, fewer restrictions on the structural design of fusion reactors, and is more conducive to the construction and realization of the designed structure.

[0085] Further, in step S1, the first annular lobe 11 is fan-shaped and arc-shaped. The first annular lobe 11 are sequentially connected to form an annular structure with a fan-shaped notch 15, i.e., a near-annular vacuum chamber 10. It is understood that the specific number of the first annular lobe 11 is not limited, as long as the fan-shaped first annular lobe 11 can be assembled into a circular shape. In this embodiment, the vacuum chamber has a total of 8 annular lobes, of which 7 are first annular lobe 11 and 1 is second annular lobe 40.

[0086] Further, in step S2, the components of the assembly platform 20 are hoisted from the fan-shaped notch 15 of the near-ring vacuum chamber 10. The assembly platform 20 is ring-shaped and is disposed within the near-ring vacuum chamber 10. Please refer to [link / reference]. Figure 2 In the cross-sectional direction of the annular petals, the petals are arranged in a "D" shape. Nine cladding layers 30 are fitted onto the inner wall of the petals, with the shape of each cladding layer 30 corresponding to the curved surface shape of a corresponding position on the petal. During assembly, the cladding layers 30 are installed from top to bottom in the cross-sectional direction of the petals, and are mounted along a circular trajectory on the inner wall of each first annular petal 11. (See reference...) Figure 2 In the process, each cladding layer 30 is marked as A1 to A9 in a clockwise direction. The installation sequence is A4, A5, A6, A3, A7, A2, A1, A8, A9. First, the cladding layer 30 at position A4 corresponding to each first annular lobe 11 is installed, and then the cladding layer 30 at position A5 corresponding to each first annular lobe 11 is installed, and so on.

[0087] Furthermore, in step S2, the assembly platform 20 has a detachable layered structure, so that the height of the assembly platform 20 changes accordingly as the installation height of the cladding 30 decreases. Understandably, the transport fixture 21 is a multi-degree-of-freedom movable robotic arm. The specific structure of the transport fixture 21 is not limited here, as long as it can transport the components of the cladding 30 and assist personnel in adjusting the installation position of the components of the cladding 30. Multiple transport fixtures 21 can be provided to ensure simultaneous synchronous installation of the cladding 30 at multiple locations, thereby improving assembly efficiency. In this embodiment, the distance between the assembly platform 20 and the top of the near-ring vacuum chamber 10 is 2 to 3 meters, and the distance between the assembly platform 20 and the side wall of the near-ring vacuum chamber 10 is 8 to 12 centimeters; the dimensions of the assembly platform 20 here refer to the distance from the highest layer to the inner wall of the near-ring vacuum chamber 10.

[0088] Further, step S3 includes:

[0089] S31: Install a shielding block pipeline on the inner wall of the first annular lobe 11;

[0090] S32: Install the shielding block 31 on the inner wall of the first annular petal 11, and connect the shielding block pipeline to the shielding block 31;

[0091] S33: Install the first wall pipe on the shielding block 31;

[0092] S34: Install the first wall 32 on the shielding block 31, and connect the first wall pipeline to the first wall 32.

[0093] Furthermore, in step S31, the shielding block pipeline is relatively lightweight and can be directly transported to the construction personnel on the assembly platform 20 by hoisting, or it can be hoisted onto the transport fixture 21 and transported to the designated installation position by the transport fixture 21. According to the assembly and welding requirements of the pipeline, the construction personnel weld and fix the shielding block pipeline sequentially as the cladding 30 is assembled. Finally, the shielding block pipeline is led out of the vacuum chamber from the upper and lower neck tubes of the vacuum chamber and connected to the refrigeration system.

[0094] Further, step S32 includes:

[0095] S321: Connect the shielding block 31 to the support fixture;

[0096] S322: Hoist the shielding block 31 and the support fixture together onto the transport fixture 21, and connect the support fixture to the transport fixture 21;

[0097] S323: The transport tool 21 moves on the assembly platform 20 to move the shielding block 31 to the corresponding installation position;

[0098] S324: Fix the shielding block 31 to the inner wall of the first annular petal 11, and connect the shielding block pipeline to the coolant inlet and outlet joints of the shielding block 31;

[0099] S325: Remove the aforementioned support fixture.

[0100] The cladding 30 includes a shielding block 31 and a first wall 32. The first wall 32 is located on the side of the shielding block 31 near the interior of the vacuum chamber, and the shielding block 31 is fixed to the inner wall of the vacuum chamber. Because the shielding block 31 is relatively heavy, a transport fixture 21 is needed to assist the construction personnel in adjusting the installation position of the shielding block 31 before the personnel fix it to the inner wall of the vacuum chamber. Since the shielding block 31 has different shapes at different locations, the support fixture needs to be designed according to the shape of the shielding block 31 at different locations. The support fixture is used to connect the shielding block 31 to the transport fixture 21.

[0101] Further, step S33 includes:

[0102] S331: Adjust the first wall pipe to a suitable state using a pipe bending tool;

[0103] S332: Fix the first wall pipe to the shielding block 31.

[0104] The shielding block 31 contains internal piping, with a coolant inlet connector and a coolant outlet connector at each end. These two connectors are collectively referred to as coolant inlet and outlet connectors. The coolant inlet and outlet connectors are located on the outer surface of the shielding block 31. The coolant inlet and outlet connectors are connected to the piping of the shielding block, which is fixed to the inner wall of the vacuum chamber.

[0105] Further, step S34 includes:

[0106] S341: Connect the heat sink of the first wall 32 to the support fixture;

[0107] S342: Hoist the heat sink and the support fixture together onto the transport fixture 21, and connect the support fixture to the transport fixture 21;

[0108] S343: The transport tool 21 moves on the assembly platform 20 to move the heat sink to the corresponding installation position of the shielding block 31;

[0109] S344: Connect and fix the heat sink to the shielding block 31, and connect the first wall pipe to the coolant inlet and outlet joints of the heat sink;

[0110] S345: Provide a tungsten tile for the first wall 32 and fix the tungsten tile to the heat sink;

[0111] S346: Remove the aforementioned support fixture.

[0112] The first wall 32 includes a heat sink and a tungsten tile. The heat sink is the main load-bearing component of the first wall 32, and the tungsten tile is located on the side of the first wall 32 closer to the interior of the vacuum chamber. The shape of the first wall 32 corresponds to that of the shielding block 31, and the support fixture used to install the shielding block 31 can continue to be used during the installation of the first wall 32. Cooling pipes are also embedded inside the heat sink, with coolant inlet and coolant outlet connectors at both ends, respectively. The coolant inlet and outlet connectors of the heat sink are connected to the pipes in the first wall.

[0113] Repeat the steps of S3 above to install each cladding layer 30. After the cladding layer 30 is assembled on the inner wall of each first annular lobe 11, proceed to step S4.

[0114] Further, in step S4, the assembly platform 20 is removed from the near-ring vacuum chamber 10; then, the second annular lobe 40 is installed at the fan-shaped notch 15 of the near-ring vacuum chamber 10, realizing the ring-closing operation of the first annular lobe 11 and the second annular lobe 40, forming a complete annular vacuum chamber. Understandably, the second annular lobe 40 has the same shape and structure as the first annular lobe 11, and the cladding 30 structure within the second annular lobe 40 can also be the same as the cladding 30 structure within the first annular lobe 11.

[0115] Further, in step S5, please refer to Figure 3 A transport track 50 is constructed at the window position in the second annular lobe 40 to transport the component into the vacuum chamber. An auxiliary tooling 51 is then assembled within the vacuum chamber to assist the construction personnel in adjusting the installation position of the component, which is then fixed by the construction personnel to assemble the cladding 30 onto the inner wall of the second annular lobe 40. Understandably, the auxiliary tooling 51 is a multi-degree-of-freedom robotic arm; its specific structure is not limited here, as long as it can adjust the installation position of the cladding 30.

[0116] Further, step S6 includes:

[0117] S61: Install a shielding block pipeline on the inner wall of the second annular lobe 40;

[0118] S62: Install the shielding block 31 on the inner wall of the second annular petal 40, and connect the shielding block pipeline to the shielding block 31;

[0119] S63: Install the first wall pipe on the shielding block 31;

[0120] S64: Install the first wall 32 on the shielding block 31, and connect the first wall pipeline to the first wall 32.

[0121] The construction steps for installing the cladding 30 on the inner wall of the second annular petal 40 are the same as those for installing the cladding 30 on the inner wall of the first annular petal 11, and will not be repeated here.

[0122] Further, step S61 includes:

[0123] S611: The shielding block pipeline is transported to the annular vacuum chamber via the transport track 50;

[0124] S612: Install the shielding block pipeline onto the inner wall of the second annular lobe 40.

[0125] Further, step S62 includes:

[0126] S621: Connect the shielding block 31 to the support fixture;

[0127] S622: The shielding block 31 and the supporting fixture are hoisted together onto the transport rail 50. The transport rail 50 transports the shielding block 31 and the supporting fixture to the auxiliary fixture 51. The supporting fixture and the auxiliary fixture 51 are then connected.

[0128] S623: The auxiliary tooling 51 moves the shielding block 31 to the corresponding installation position;

[0129] S624: Fix the shielding block 31 on the inner wall of the second annular petal 40, and connect the shielding block pipeline to the coolant inlet and outlet joints of the shielding block 31;

[0130] S625: Remove the supporting fixture.

[0131] Further, step S63 includes:

[0132] S631: The first wall pipe is transported to the annular vacuum chamber via the transport track 50;

[0133] S632: Adjust the first wall pipe to a suitable state using a pipe bending tool;

[0134] S633: Fix the first wall pipe to the shielding block 31.

[0135] Further, step S64 includes:

[0136] S641: The heat sink and the support fixture are hoisted together onto the transport track 50, the transport track 50 transports the heat sink and the support fixture to the auxiliary fixture 51, and the support fixture is connected to the auxiliary fixture 51;

[0137] S642: The auxiliary tooling 51 moves the heat sink to the corresponding installation position of the shielding block 31;

[0138] S643: Connect and fix the heat sink to the shielding block 31, and connect the first wall pipe to the coolant inlet and outlet joints of the heat sink;

[0139] S644: Provide a tungsten tile for the first wall 32, and fix the tungsten tile to the heat sink;

[0140] S645: Remove the aforementioned support fixture.

[0141] Repeat step S6 above to assemble each cladding layer 30 onto the inner wall of the second annular lobe 40. After all cladding layers 30 are installed, proceed to step S7 to remove the auxiliary tooling 51 and the transport track 50, thus completing the cladding layer 30 assembly task in the vacuum chamber.

[0142] In summary, the embodiments of the present invention provide a fusion reactor blanket assembly method, the beneficial effects of which are:

[0143] The assembly of the blanket 30 is divided into two stages: the near-ring vacuum chamber 10 stage and the annular vacuum chamber stage. In the near-ring vacuum chamber 10 stage, since the second annular lobe 40 is not yet connected, the assembly platform 20 and transport tooling 21 can be built within the near-ring vacuum chamber 10. Furthermore, components can be directly hoisted through the second annular lobe 40, eliminating the need to send components in through the windows on the annular lobe, thus greatly improving the assembly efficiency of the blanket 30. After installing the first part of the blanket 30, the second annular lobe 40 is then connected, and the blanket 30 is assembled onto the inner wall of the last second annular lobe 40. This results in high overall assembly efficiency, fewer restrictions on the structural design of the fusion reactor, and a wider range of applications.

[0144] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0145] The embodiments described above are merely illustrative of several implementations of the present invention, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the invention patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these all fall within the protection scope of the present invention. Therefore, the protection scope of this invention patent should be determined by the appended claims.

Claims

1. A method for assembling the blanket of a fusion reactor, characterized in that, The cladding is installed on the inner wall of the vacuum chamber; the vacuum chamber includes n-1 first annular lobes and 1 second annular lobe. The fusion reactor blanket assembly method includes: The first annular lobes are connected in a closed loop to form a near-closed loop vacuum chamber; An assembly platform is constructed within the near-circular vacuum chamber, the assembly platform including transport tooling; The components of the cladding are hoisted onto the transport fixture and transported to the preset installation position, whereby the cladding is installed on the inner wall of each of the first annular lobes. The assembly platform is disassembled, and the second annular lobe is closed to form an annular vacuum chamber; A transport track is built through the central window of the annular vacuum chamber, and auxiliary tooling is assembled inside the annular vacuum chamber. The components of the cladding are transported to the interior of the auxiliary tooling via the transport track, and the cladding is installed on the inner wall of the second annular lobe; Remove the auxiliary tooling and the transport track; The step of hoisting the components of the cladding layer onto the transport fixture for delivery to a preset installation position, and installing the cladding layer on the inner wall of each of the first annular lobes, includes: Install a shielding block pipeline on the inner wall of the first annular lobe; install the shielding block on the inner wall of the first annular lobe and connect the shielding block pipeline to the shielding block; install a first wall pipeline on the shielding block; install the first wall on the shielding block and connect the first wall pipeline to the first wall.

2. The fusion reactor blanket assembly method according to claim 1, characterized in that, The step of installing the shielding block on the inner wall of the first annular lobe and connecting the shielding block pipeline to the shielding block includes: Connect the shielding block to the support fixture; The shielding block and the supporting fixture are hoisted together onto the transport fixture, and the supporting fixture is connected to the transport fixture; The transport tooling moves on the assembly platform to move the shielding block to the corresponding installation position; The shielding block is fixed on the inner wall of the first annular petal, and the shielding block pipeline is connected to the coolant inlet and outlet joints of the shielding block. Remove the aforementioned support fixture.

3. The fusion reactor blanket assembly method according to claim 2, characterized in that, The installation of the first wall conduit on the shielding block includes: Use a pipe bending tool to adjust the first wall pipe to a suitable state; The first wall pipe is fixed to the shielding block.

4. The fusion reactor blanket assembly method according to claim 3, characterized in that, The step of mounting the first wall on the shielding block and connecting the first wall pipeline to the first wall includes: Connect the heat sink of the first wall to the supporting fixture; The heat sink and the supporting fixture are hoisted together onto the transport fixture, and the supporting fixture is connected to the transport fixture. The transport tooling moves on the assembly platform to move the heat sink to the corresponding installation position of the shielding block; The heat sink is connected and fixed to the shielding block, and the first wall pipe is connected to the coolant inlet and outlet joints of the heat sink. A tungsten tile is provided for the first wall, and the tungsten tile is fixed to the heat sink; Remove the aforementioned support fixture.

5. The fusion reactor blanket assembly method according to claim 1, characterized in that, The assembly platform is constructed within the near-circular vacuum chamber, and the assembly platform includes a transport tooling: The assembly platform is located within the near-ring vacuum chamber. The distance between the assembly platform and the top of the near-ring vacuum chamber is 2 to 3 meters, and the distance between the assembly platform and the side wall of the near-ring vacuum chamber is 8 to 12 centimeters.

6. The fusion reactor blanket assembly method according to claim 1, characterized in that, The step of transporting the components of the cladding layer to the interior of the auxiliary tooling via the transport track, and installing the cladding layer on the inner wall of the second annular lobe, includes: A shielding block pipeline is installed on the inner wall of the second annular lobe; Install the shielding block on the inner wall of the second annular petal, and connect the shielding block pipeline to the shielding block; Install the first wall conduit on the shielding block; The first wall is installed on the shielding block, and the first wall pipeline is connected to the first wall.

7. The fusion reactor blanket assembly method according to claim 6, characterized in that, The shielding block pipeline installed on the inner wall of the second annular lobe includes: The shielding block pipeline is transported into the annular vacuum chamber via the transport track; The shielding block pipeline is installed onto the inner wall of the second annular lobe.

8. The fusion reactor blanket assembly method according to claim 7, characterized in that, The step of installing the shielding block on the inner wall of the second annular lobe and connecting the shielding block pipeline to the shielding block includes: Connect the shielding block to the support fixture; The shielding block and the supporting fixture are hoisted together onto the transport rail, and the transport rail transports the shielding block and the supporting fixture to the auxiliary fixture, and the supporting fixture and the auxiliary fixture are connected. The auxiliary tooling moves the shielding block to the corresponding installation position; The shielding block is fixed on the inner wall of the second annular petal, and the shielding block pipeline is connected to the coolant inlet and outlet joints of the shielding block. Remove the aforementioned support fixture.

9. The fusion reactor blanket assembly method according to claim 8, characterized in that, The step of mounting the first wall on the shielding block and connecting the first wall pipeline to the first wall includes: Connect the heat sink of the first wall to the supporting fixture; The heat sink and the supporting fixture are hoisted together onto the transport rail, and the transport rail transports the heat sink and the supporting fixture to the auxiliary fixture, and the supporting fixture and the auxiliary fixture are connected. The auxiliary tooling moves the heat sink to the corresponding installation position of the shielding block; The heat sink is connected and fixed to the shielding block, and the first wall pipe is connected to the coolant inlet and outlet joints of the heat sink. A tungsten tile is provided for the first wall, and the tungsten tile is fixed to the heat sink; Remove the aforementioned support fixture.

Citation Information

Patent Citations

  • Assembly structure of superconduction tokamak vacuum vessel

    KR1020080063910A