Vertical shaft hoist bucket coal refuse loading device and method

By designing a vertical shaft hoisting bucket loading device, the automatic adjustment of the bucket is achieved by using guide wheels and lever cylinders, which solves the problem of requiring multiple operators in the existing technology and improves safety and efficiency.

CN117886199BActive Publication Date: 2026-11-20LINYI HUIBAOLING IRON ORE CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410221764.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2026-11-20
Estimated Expiration
2044-02-28

AI Technical Summary

Technical Problem

The existing process of loading gangue into buckets in mining projects requires three people to work together, which is inconvenient to operate and poses high safety risks.

Method used

Design a vertical shaft hoisting bucket loading device, including a bucket guiding device and a lever device. The bucket is automatically adjusted in direction using guide wheels and lever cylinders, reducing manual intervention. The angle of the bucket and the position of the lifting ring are automatically adjusted through the cooperation of the guide rail and the lever.

Benefits of technology

It enables automatic adjustment of the bucket's direction, saves manpower, is easy to operate, reduces safety risks, and improves the efficiency of waste removal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117886199B_ABST
    Figure CN117886199B_ABST
Patent Text Reader

Abstract

The application discloses a kind of vertical shaft hoisting bucket loading device and gangue loading method, specifically relates to the technical field of mine machinery, including bucket, bucket guide device and pole device, guide rail is arranged on the outside wall of bucket, bucket guide device includes placing rack and guide wheel, in the process that bucket falls from the top end of placing rack to the base of placing rack, guide wheel slides on guide rail to make the rotational movement of bucket around its own axis in placing rack, and after the contact of bucket and placing rack base, the plane of the axis of two lifting lugs of bucket and bucket which are symmetrically arranged is parallel to the vertical section of gangue chute, pole device includes fixed frame, and pole device that is hinged with fixed frame, pole cylinder that can drive pole to rotate and is connected with pole and pole cylinder switch that is fixed on the base of placing rack are driven by pole cylinder, and the lifting ring of bucket is pushed away from gangue chute by pole cylinder driving pole.The application can automatically adjust the direction of bucket, save manpower, and is easy and safe to operate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mining machinery technology, and in particular to a vertical shaft hoisting bucket loading device and loading method. Background Technology

[0002] Mining operations typically use buckets for loading gangue. The loading process is as follows: The first worker controls the lifting and lowering of the bucket. The empty bucket rotates during lowering. When the bucket is close to the loading platform, the second worker adjusts the angle of the bucket's lifting rings to ensure they are perpendicular to the vertical section of the chute. After the bucket reaches the loading platform, the lifting rings and the ropes pulling them are pushed away from the loading opening to prevent them from interfering with the loading. Finally, a third worker manually opens the chute baffle, and gangue is unloaded from the top of the chute. The gangue slides through the chute into the bucket. Once the bucket is full, unloading stops, the third worker closes the chute baffle, and a signal is given for the first worker to lift the bucket and the gangue. The entire loading process requires the cooperation of three people, which is labor-intensive, and the second worker operates near the bucket, which poses a high safety risk. Summary of the Invention

[0003] The purpose of this invention is to provide a vertical shaft hoisting bucket loading device and method to solve the problems existing in the prior art, enabling the bucket to automatically adjust its direction, saving manpower, and making operation convenient, safe and reliable.

[0004] To achieve the above objectives, the present invention provides the following solution:

[0005] This invention provides a vertical shaft hoisting bucket loading device, including a bucket, a bucket guiding device, and a lever device. A guide rail is provided on the outer wall of the bucket. The bucket guiding device includes a guide wheel and a placement frame for placing the bucket. The placement frame is fixedly mounted on a loading platform. The guide wheel is mounted on the placement frame. During the process of the bucket falling from the top of the placement frame to the base of the placement frame, the guide wheel can slide on the guide rail, thereby causing the bucket to rotate around its own axis within the placement frame. After the bucket contacts the base of the placement frame, the two symmetrically arranged lifting lugs of the bucket and the bucket's... The plane containing the axis is parallel to the vertical section of the chute. The lever device includes a fixed frame, a lever, a lever cylinder, and a lever cylinder switch. The fixed frame is fixed on the loading platform. One end of the lever is hinged to the fixed frame. The free end of the lever cylinder is connected to the other end of the lever. The lever cylinder can drive the lever to rotate, thereby causing the lever to move the lifting ring of the bucket away from the chute. The fixed end of the lever cylinder is fixedly connected to the fixed frame. The lever cylinder switch is electrically connected to the lever cylinder. The lever cylinder switch is fixed on the base of the placement frame and is used to contact the bucket.

[0006] Preferably, the guide rail includes two V-shaped guide rails of the same size and shape arranged symmetrically, and the two V-shaped guide rails are connected at the highest point. There are two guide wheels, and the two guide wheels are arranged symmetrically. When the bucket contacts the base of the placement frame, the two guide wheels are located at the connection point of the two V-shaped guide rails.

[0007] Preferably, the bucket guide device further includes a flared mouth, the cross-section of which gradually decreases from top to bottom, and the smaller end of the flared mouth is fixedly connected to the placement frame.

[0008] Preferably, the system further includes a hydraulic cylinder for the chute baffle, a pressure sensor, and a control system. The control system is signal-connected to the hydraulic cylinder for the chute baffle and the pressure sensor. The hydraulic cylinder for the chute baffle is connected to the chute baffle. The pressure sensor is mounted on the base of the placement frame. The control system can receive signals from the pressure sensor, thereby controlling the hydraulic cylinder for the chute baffle to open and close the chute baffle.

[0009] Preferably, it also includes a camera, which is positioned above the bucket guide device to monitor the loading process.

[0010] This invention also provides a method for loading waste rock using the aforementioned vertical shaft hoisting bucket loading device. The operator first controls the hoist to vertically lower the bucket from the upper platform to the loading platform. When the bucket falls into the placement frame, the guide wheel contacts and slides on the guide rail as the bucket falls, causing the bucket to rotate around its own axis within the placement frame until it contacts the base of the placement frame. At this point, the plane containing the two symmetrically arranged lifting lugs of the bucket and the axis of the bucket is parallel to the vertical section of the waste rock chute. Okay, at the same time, the lever cylinder switch set on the base of the placement frame is turned on. The lever cylinder drives the lever to rotate away from the chute, which in turn moves the lifting ring of the bucket, pushing the lifting ring and the rope pulling the lifting ring to the side away from the chute. Then, after the lever cylinder automatically rebounds, the operator opens the chute baffle, allowing the gangue in the chute to fall into the bucket automatically. When the bucket is filled with a certain mass of gangue, the operator closes the chute baffle and controls the hoist to lift the bucket upward.

[0011] The present invention achieves the following technical effects compared to the prior art:

[0012] This invention provides a vertical shaft hoisting bucket loading device and method. The bucket falls vertically into a placement frame, and the guide wheel contacts and slides on the guide rail as the bucket falls, causing the bucket to rotate around its own axis within the placement frame. This automatically adjusts the angle of the bucket. When the bucket contacts the base of the placement frame, the plane containing the two symmetrically arranged lifting lugs on the bucket and the axis of the bucket is parallel to the vertical section of the chute. Simultaneously, the bucket activates a lever cylinder switch located on the base of the placement frame, causing the lever cylinder to move towards... Rotating the lever away from the chute causes the lifting ring of the bucket to move, pushing the lifting ring and the rope of the pulling ring to the side away from the chute. During the lowering of the bucket to the loading platform, the bucket's direction can be automatically adjusted, and the lifting ring and the rope of the pulling ring can be pushed to the side away from the loading opening. This prevents the lifting ring and rope from affecting the falling of the gangue, saves manpower, is easy to operate, and eliminates the need for operators to work near the bucket, reducing safety risks such as mechanical injury, falling objects, and falls from heights, and improving gangue removal efficiency. Attached Figure Description

[0013] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0014] Figure 1 This is a schematic diagram of the structure of the vertical shaft hoisting bucket loading device in Example 1;

[0015] Figure 2 This is a front view of the vertical shaft hoisting bucket loading device of Example 1 after the bucket has fallen onto the placement frame;

[0016] Figure 3 This is a side view of the vertical shaft hoisting bucket loading device of Example 1 after the bucket has fallen onto the placement frame;

[0017] Figure 4 This is a top view of the vertical shaft hoisting bucket loading device of Example 1 after the bucket has fallen onto the placement frame.

[0018] In the diagram: 1. Bucket; 2. Guide rail; 3. Lifting ring; 4. Lifting lug; 5. Placement rack; 6. Guide wheel; 7. Horn mouth; 8. Placement rack base; 9. Lever cylinder switch; 10. Pressure sensor; 11. Fixing frame; 12. Lever; 13. Lever cylinder. Detailed Implementation

[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] The purpose of this invention is to provide a vertical shaft hoisting bucket loading device and method to solve the problems existing in the prior art, enabling automatic adjustment of the bucket's direction, saving manpower, and providing convenient, safe and reliable operation.

[0021] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0022] Example 1

[0023] This embodiment provides a vertical shaft hoisting bucket loading device, such as... Figure 1-4As shown, the device includes a bucket 1, a bucket 1 guide device, and a lever 12. A guide rail 2 is provided on the outer wall of the bucket 1. The bucket 1 guide device includes a guide wheel 6 and a placement frame 5 for placing the bucket 1. The placement frame 5 is fixedly set on the loading platform. The guide wheel 6 is set on the placement frame 5 and can rotate around its axis. During the process of the bucket 1 falling from the top of the placement frame 5 to the base 8 of the placement frame 5, the guide wheel 6 can slide on the guide rail 2, thereby causing the bucket 1 to rotate around its own axis within the placement frame 5. After the bucket 1 contacts the base 8 of the placement frame 5, the two symmetrically arranged lifting lugs 4 of the bucket 1 and the plane where the axis of the bucket 1 is located... The vertical cross-section of the chute is parallel to the surface of the chute. The lever device includes a fixed frame 11, a lever 12, a lever cylinder 13, and a lever cylinder switch 9. The fixed frame 11 is fixed on the loading platform. One end of the lever 12 is hinged to the fixed frame 11. The free end of the lever cylinder 13 is connected to the other end of the lever 12. The lever cylinder 12 can drive the lever 12 to rotate, thereby causing the lever 12 to move the lifting ring 3 of the bucket 1 away from the chute. The fixed end of the lever cylinder 12 is fixedly connected to the fixed frame 11. The lever cylinder switch 9 is electrically connected to the lever cylinder 13. The lever cylinder switch 9 is fixed on the base 8 of the placement frame 5 and is used to contact the bucket 1. Under the action of the hoist, the bucket 1 falls vertically into the placement frame 5. As the bucket 1 falls, the guide wheel 6 contacts the guide rail 2 and slides on the guide rail 2, causing the bucket 1 to rotate around its own axis within the placement frame 5. This automatically adjusts the angle of the bucket 1. When the bucket 1 contacts the base 8 of the placement frame 5, the plane containing the two symmetrically arranged lifting lugs 4 on the bucket 1 and the axis of the bucket 1 is parallel to the vertical section of the chute. At the same time, the bucket 1 activates the lever cylinder switch 9 located on the base 8 of the placement frame 5. The lever cylinder 13 drives the lever 12 to rotate away from the chute. This causes the lever 12 to move the lifting ring 3 of the bucket 1, pushing the lifting ring 3 and the rope pulling the lifting ring 3 to the side away from the chute. During the process of lowering the bucket 1 to the loading platform, the direction of the bucket 1 can be automatically adjusted. At the same time, the lifting ring 3 of the bucket 1 and the rope pulling the lifting ring 3 can be pushed to the side away from the loading opening, avoiding the lifting ring 3 and the rope from affecting the falling process of the gangue. The manpower required for the entire loading process is reduced from 3 people to 1 person, saving manpower and making the operation convenient. There is no need for operators to work manually near the bucket 1, reducing the safety risks of mechanical injury, falling objects, and falls from heights, and improving the efficiency of gangue removal.

[0024] In a further preferred embodiment of this invention, the guide rail 2 comprises two symmetrically arranged V-shaped guide rails 2 of the same size and shape, connected at their highest points. Two guide wheels 6 are also provided, symmetrically arranged. When the bucket 1 contacts the base 8 of the placement frame 5, the two guide wheels 6 are positioned at the connection point of the two V-shaped guide rails 2. As the bucket 1 falls, the guide wheels 6 contact and slide along the V-shaped guide rails 2. The interaction between the guide wheels 6 and the V-shaped guide rails 2 causes the bucket 1 to rotate and automatically adjust its direction. The two guide wheels 6 and the two V-shaped guide rails ensure that the bucket 1 falls smoothly from the placement frame 5.

[0025] In a further preferred embodiment of this invention, the guide device for the bucket 1 further includes a flared opening 7, the cross-section of which gradually decreases from top to bottom, and the smaller end of the flared opening 7 is fixedly connected to the placement frame 5, so that the flared opening 7 facilitates the bucket 1 falling into the placement frame 5.

[0026] In a further preferred embodiment of this invention, the vertical shaft hoisting bucket loading device further includes a chute baffle hydraulic cylinder, a pressure sensor 10, and a control system. The control system is signal-connected to the chute baffle hydraulic cylinder and the pressure sensor 10. The chute baffle hydraulic cylinder is connected to the chute baffle. The pressure sensor 10 is mounted on the base 8 of the placement frame 5. The control system can receive the signal emitted by the pressure sensor 10, thereby controlling the chute baffle hydraulic cylinder to open and close the chute baffle. The chute baffle is normally closed. When the empty bucket 1 falls onto the base 8 of the placement frame 5, the pressure sensor 10 sends a first signal to the control system. The control system controls the hydraulic cylinder of the chute baffle to open the chute baffle, allowing the gangue in the chute to fall into the bucket 1. When the bucket 1 is filled with a certain mass of gangue, the pressure sensor 10 sends a second signal to the control system. The control system controls the hydraulic cylinder of the chute baffle to close the chute baffle.

[0027] In a further preferred embodiment of this invention, the vertical shaft hoisting bucket loading device also includes a camera. The camera is positioned above the bucket 1 guide device to monitor the loading process, facilitating real-time control of the loading process by the operator.

[0028] Example 2

[0029] This embodiment provides a method for loading waste rock using the vertical shaft hoisting bucket loading device of Embodiment 1. The operator first controls the hoist to vertically lower the bucket 1 from the upper platform to the loading platform. When the bucket 1 falls into the placement frame 5, the guide wheel 6 contacts the guide rail 2 as the bucket 1 falls and slides on the guide rail 2, causing the bucket 1 to rotate around its own axis within the placement frame 5 until the bucket 1 contacts the base 8 of the placement frame 5. At this point, the plane containing the two symmetrically arranged lifting lugs 4 of the bucket 1 and the axis of the bucket 1 is parallel to the vertical section of the waste rock chute. At the same time, the lever cylinder switch 9 set on the base 8 of the placement frame 5 is turned on the bucket 1. The lever cylinder 13 drives the lever 12 to rotate away from the chute, so that the lever 12 moves the lifting ring 3 of the bucket 1, pushing the lifting ring 3 and the rope pulling the lifting ring 3 to the side away from the chute. Then, after the lever cylinder 13 automatically rebounds, the operator opens the chute baffle, so that the gangue in the chute automatically falls into the bucket 1. When the bucket 1 is filled with a certain mass of gangue, the operator closes the chute baffle, stops loading, and controls the hoist to lift the bucket 1 upward.

[0030] Specific examples have been used to illustrate the principles and implementation methods of this invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this invention. Furthermore, those skilled in the art will recognize that, based on the ideas of this invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this invention.

Claims

1. A vertical shaft hoisting bucket loading device, characterized in that: The device includes a bucket, a bucket guide device, and a lever device. A guide rail is provided on the outer wall of the bucket. The bucket guide device includes guide wheels and a placement frame for placing the bucket. The placement frame is fixedly mounted on a loading platform. The guide wheels are mounted on the placement frame. During the process of the bucket falling from the top of the placement frame to the base of the placement frame, the guide wheels can slide on the guide rail, causing the bucket to rotate around its own axis within the placement frame. After the bucket contacts the base of the placement frame, the plane containing the two symmetrically arranged lifting lugs of the bucket and the axis of the bucket is parallel to the vertical section of the chute. The guide rail includes two symmetrically arranged V-shaped guide rails of the same size and shape, connected at the highest point. The guide wheel has two symmetrically arranged guide wheels. When the bucket contacts the base of the placement frame, the two guide wheels are located at the connection of the two V-shaped guide rails. The lever device includes a fixed frame, a lever, a lever cylinder, and a lever cylinder switch. The fixed frame is fixed on the loading platform. One end of the lever is hinged to the fixed frame. The free end of the lever cylinder is connected to the other end of the lever. The lever cylinder can drive the lever to rotate, thereby causing the lever to move the lifting ring of the bucket away from the chute. The fixed end of the lever cylinder is fixedly connected to the fixed frame. The lever cylinder switch is electrically connected to the lever cylinder. The lever cylinder switch is fixed on the base of the placement frame and is used to contact the bucket.

2. The vertical shaft hoisting bucket loading device according to claim 1, characterized in that: The bucket guide device also includes a flared mouth, the cross-section of which gradually decreases from top to bottom, and the smaller end of the flared mouth is fixedly connected to the placement frame.

3. The vertical shaft hoisting bucket loading device according to claim 1, characterized in that: It also includes a hydraulic cylinder for the chute baffle, a pressure sensor, and a control system. The control system is signal-connected to the hydraulic cylinder for the chute baffle and the pressure sensor. The hydraulic cylinder for the chute baffle is connected to the chute baffle. The pressure sensor is mounted on the base of the placement frame. The control system can receive the signal emitted by the pressure sensor, thereby controlling the hydraulic cylinder for the chute baffle to open and close the chute baffle.

4. The vertical shaft hoisting bucket loading device according to claim 3, characterized in that: It also includes a camera, which is positioned above the bucket guide device to monitor the loading process.

5. A method for loading waste rock using the vertical shaft hoisting bucket loading device as described in any one of claims 1-4, characterized in that: The operator first controls the hoist to vertically lower the bucket from the upper platform to the loading platform. When the bucket falls into the placement frame, the guide wheel contacts the guide rail as the bucket falls and slides on the guide rail, causing the bucket to rotate around its own axis within the placement frame until the bucket contacts the base of the placement frame. At this point, the plane containing the two symmetrically arranged lifting lugs of the bucket and the axis of the bucket is parallel to the vertical section of the chute. Simultaneously, the bucket opens the lever cylinder switch located on the base of the placement frame. The lever cylinder drives the lever to rotate away from the chute, causing the lever to actuate the lifting ring of the bucket, pushing the lifting ring and the rope pulling the lifting ring to the side away from the chute. Then, after the lever cylinder automatically rebounds, the operator opens the chute baffle, allowing the gangue in the chute to automatically fall into the bucket. When the bucket is filled with a certain mass of gangue, the operator closes the chute baffle and controls the hoist to lift the bucket upwards.

Citation Information

Patent Citations

  • Automatic finishing equipment of metal drum

    CN208086709U

  • Telescopic garbage can

    CN210192464U

  • Bucket device for vertical shaft construction

    CN216072923U

  • Energy-absorbing automatic constant weight loading gear

    CN2700302Y