Horizontal fatigue test system and test method in oxygen-controlled liquid lead-bismuth environment

By designing the communicating vessel and controlling the float lifting of the horizontal fatigue testing system, the problems of long oxygen control time, low accuracy, and high cost in the oxygen control test of liquid lead-bismuth alloy were solved, achieving rapid and accurate oxygen control and improved safety.

CN117907129BActive Publication Date: 2026-11-24TIANJIN UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410101495.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2026-11-24
Estimated Expiration
2044-01-25

AI Technical Summary

Technical Problem

Existing oxygen control testing systems for liquid lead-bismuth alloys suffer from problems such as long oxygen control time, low accuracy, high risk, and high cost. In particular, the operation of high-pressure inert gas pressurization and lead-bismuth shielded pumps is complex and costly.

Method used

A horizontal fatigue testing system is adopted, which uses the principle of communicating vessels to balance the air pressure in the test unit and the liquid storage unit. The liquid lead-bismuth content is controlled by the raising and lowering of the float, avoiding high-pressure gas pressure and lead-bismuth shielded pumps, simplifying the structure and reducing costs.

Benefits of technology

It achieves rapid and precise oxygen control, reduces the safety risks and operational complexity of the device, reduces the amount of lead and bismuth used, and improves the safety and operability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117907129B_ABST
    Figure CN117907129B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of nuclear engineering technology and discloses a horizontal fatigue testing system and method for an oxygen-controlled liquid lead-bismuth environment. The system includes a test unit, a test loading unit, a liquid storage unit, and a communication unit. The test unit includes a test chamber heater, a test chamber, and a test oxygen sensor. The test loading unit provides the loading force. The liquid storage unit includes a liquid storage tank heater, a liquid storage tank cavity, a float, a float lifting motor, a liquid oxygen sensor, an inlet pipe, an outlet pipe, a thermocouple, a lower level gauge, an upper level gauge, and a shut-off valve. The communication unit includes a liquid lead-bismuth communication subunit and a gas communication subunit. This invention not only significantly reduces the amount of liquid lead-bismuth used but also uses the principle of communicating vessels to balance the gas pressure within the test unit and the liquid storage unit, thereby controlling the liquid lead-bismuth content in the test unit through the lifting and lowering of the float. It cleverly avoids the dangers introduced by using high-pressure gas pressurization and the high cost and operational complexity associated with using a lead-bismuth shielded pump.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of nuclear engineering technology, specifically, it relates to a fatigue testing system and method in a liquid lead-bismuth environment. Background Technology

[0002] Nuclear energy, as a clean energy source, has broad development prospects. However, the Three Mile Island and Chernobyl nuclear power plant accidents have exacerbated concerns about nuclear safety. Considering the economics of nuclear energy, nuclear waste disposal, and nuclear proliferation, the United States proposed the concept of Gen-IV nuclear power reactors in 1999. Among them, the lead-cooled fast reactor has become one of the two reactor types with the greatest development potential in Gen-IV reactor systems due to its outstanding advantages. Liquid lead-bismuth alloy has been selected as the coolant for lead-cooled fast reactors due to its high boiling point, high density, chemical inertness, large heat capacity, small neutron absorption cross section, and good shielding properties.

[0003] However, the corrosiveness of liquid lead-bismuth alloys to in-pile materials has become a key issue affecting the performance of lead-bismuth reactors. Research has found that controlling the oxygen content of liquid lead-bismuth can effectively suppress its corrosive effects on materials.

[0004] Oxygen control testing of liquid lead-bismuth alloys conducted domestically and internationally mainly employs two methods. One method involves direct oxygen control within the test chamber. The drawbacks include the need for repeated oxygen control for each test, resulting in lengthy testing times. Prolonged immersion of the sample in the liquid lead-bismuth alloy can lead to pre-corrosion, affecting test accuracy, and frequent opening of the chamber can easily cause oxidation of the liquid lead-bismuth alloy. The other method incorporates a liquid lead-bismuth alloy storage tank. After oxygen control is completed in the storage tank, liquid lead-bismuth is introduced into the test chamber via high-pressure inert gas pressurization or a lead-bismuth shielded pump. However, high-pressure inert gas pressurization is highly dangerous, and the introduction of inert gas can affect the accuracy and stability of oxygen control; while using a lead-bismuth shielded pump is complex to operate and expensive. Therefore, a high-safety, low-cost, and highly efficient oxygen-controlled liquid lead-bismuth environmental fatigue testing system is needed. Summary of the Invention

[0005] The purpose of this invention is to provide a horizontal fatigue testing system and method for an oxygen-controlled liquid lead-bismuth environment. The introduction of a horizontal test unit greatly reduces the amount of liquid lead-bismuth used. The principle of communicating vessels is used to balance the gas pressure in the test unit and the liquid storage unit, and the liquid lead-bismuth content in the test unit is controlled by raising and lowering the float. This invention cleverly avoids the dangers introduced by using high-pressure gas pressurization and the high cost and operational complexity brought about by using lead-bismuth shielded pumps. It has the advantages of simple structure, small amount of lead-bismuth used, high safety performance, and strong operability.

[0006] To achieve the above-mentioned objectives, the present invention is implemented through the following technical solution:

[0007] According to one aspect of the present invention, a horizontal fatigue testing system for an oxygen-controlled liquid lead-bismuth environment is provided, comprising a testing unit, a testing loading unit, a liquid storage unit, and a communication unit;

[0008] The test unit includes a test chamber heating furnace, a test chamber, and a test oxygen sensor; the test chamber heating furnace is located outside the test chamber to heat it; the test chamber and the sample inside it are both horizontally arranged, and the test chamber is connected to a horizontally arranged clamp; the test oxygen sensor is installed on the top cover of the test chamber, and its probe extends into the interior of the test chamber for real-time measurement of the oxygen content inside the test chamber;

[0009] The test loading unit is connected to the test chamber and is used to provide the loading force required for the test;

[0010] The liquid storage tank unit includes a liquid storage tank heater, a liquid storage tank cavity, a float, a float lifting motor, a liquid oxygen sensor, an inlet pipe, an outlet pipe, a thermocouple, a lower level gauge, a shut-off valve, and a shut-off valve. The liquid storage tank heater is located outside the liquid storage tank cavity to heat it. The liquid storage tank cavity is used to store liquid lead-bismuth alloy, and the bottom surface of the liquid storage tank cavity is lower than the bottom surface of the test chamber. The float lifting motor is fixed to the upper cover of the liquid storage tank cavity and is connected to the float, enabling control of the float's lifting and lowering. The liquid oxygen sensor is fixed to the upper cover of the liquid storage tank cavity for real-time measurement of the oxygen content within the liquid storage tank cavity. The inlet pipe is fixed to the liquid storage tank. The upper cover of the cavity is used to connect the vacuum pump and the reducing mixed gas and high-purity argon gas required to be introduced into the liquid storage tank cavity; the gas outlet pipe is fixed to the upper cover of the liquid storage tank cavity and is connected to a one-way valve to maintain a positive pressure environment during oxygen control; the thermocouple is fixed to the upper cover of the liquid storage tank cavity to control the temperature of the liquid lead-bismuth in the liquid storage tank cavity; the lower liquid level gauge is fixed to the upper cover of the liquid storage tank cavity to cooperate with the float to control the initial liquid lead-bismuth level in the liquid storage tank cavity; the shut-off valve is fixed to the upper cover of the liquid storage tank cavity to cooperate with the float to control the liquid lead-bismuth level in the test chamber; the shut-off valve is installed at the bottom of the liquid storage tank cavity to discharge the liquid lead-bismuth in the liquid storage tank cavity;

[0011] The communication unit includes a liquid lead-bismuth communication subunit and a gas communication subunit; the liquid lead-bismuth communication subunit includes a liquid lead-bismuth inlet / outlet pipeline and a liquid lead-bismuth pipeline shut-off valve; one end of the liquid lead-bismuth inlet / outlet pipeline is connected to the bottom of the test chamber and the other end is connected to the side wall of the storage tank cavity; and the connection end of the liquid lead-bismuth inlet / outlet pipeline to the test chamber is higher than the connection end of the liquid lead-bismuth inlet / outlet pipeline to the storage tank cavity; the liquid lead-bismuth inlet / outlet pipeline is equipped with a liquid lead-bismuth pipeline shut-off valve; the gas communication subunit includes a gas communication pipeline and a gas phase pipeline shut-off valve; one end of the gas communication pipeline is connected to the test chamber through the top cover of the test chamber and the other end is connected to the storage tank cavity through the top cover of the storage tank cavity; the gas communication pipeline is equipped with a gas phase pipeline shut-off valve.

[0012] Furthermore, the test chamber heating furnace is placed on the first operating table; the liquid storage tank heating furnace is placed on the second operating table, and the second operating table is equipped with a fixing frame that restricts the movement of the liquid storage tank heating furnace.

[0013] Furthermore, the float includes a cylinder and a ball screw, the ball screw including a central screw, balls, a ball return mechanism, and a nut; the upper end of the central screw is connected to the output shaft of the float lifting motor via a coupling, and the lower end is a free end inside the cylinder; the central screw is connected to the nut via the balls, and the nut is fixedly connected to the center of the top surface of the cylinder; thus, the rotational motion of the central screw driven by the float lifting motor can be converted into linear motion of the cylinder along the central screw driven by the nut.

[0014] Furthermore, both the lower level gauge and the shut-off valve are contact level gauges. The probe of the lower level gauge is below level A, and the probe of the shut-off valve is below level B. Level A is the initial liquid level in the storage tank cavity, and level B is the liquid level in the storage tank cavity when the liquid level in the test chamber does not exceed the sample.

[0015] Furthermore, the shut-off valve is connected to a flange located at the bottom of the liquid storage tank cavity via a flange.

[0016] Furthermore, the liquid lead-bismuth inlet and outlet pipelines are heated by wrapping a ceramic heating strip around their outer side, and can be heated to the target temperature.

[0017] According to another aspect of the present invention, a test method for a horizontal fatigue test system based on the above-described oxygen-controlled liquid lead-bismuth environment is provided, comprising the following steps:

[0018] (1) The sample is clamped in the test chamber by a fixture, the liquid lead-bismuth pipeline shut-off valve and the gas phase pipeline shut-off valve are opened, and the test chamber and the liquid storage tank are evacuated through the gas inlet pipe; then high-purity argon gas is continuously introduced through the gas inlet pipe, and the evacuation operation is performed again. The above gas washing operation is repeated multiple times until the oxygen concentration error in the test chamber and the liquid storage tank reaches the requirement.

[0019] (2) Turn on the heating furnace of the storage tank and heat the lead-bismuth inside to a liquid state. The liquid lead-bismuth level reaches the height of the lower level gauge. Maintain the temperature to the required test temperature and keep it warm. Introduce hydrogen-argon mixture through the inlet pipe. After the gas exits through the one-way valve of the outlet pipe, continuously observe the reading of the storage oxygen sensor. After the oxygen concentration drops to the required test concentration, heat the liquid lead-bismuth inlet and outlet pipes and the test chamber to the test temperature. Then, drive the float to descend through the float lifting motor so that the liquid lead-bismuth level reaches the height of the shut-off valve. At this time, the liquid level in the test chamber is above the sample. Continuously observe the test oxygen sensor. Start the test when the error between its reading and the storage oxygen sensor is lower than the set value.

[0020] (3) After the test is completed, the float is driven to rise by the float lifting motor, and the liquid lead-bismuth in the test chamber flows back into the storage tank and reaches the height of the lower level gauge; the liquid lead-bismuth pipeline shut-off valve and the gas phase pipeline shut-off valve are closed, and the heating of the test chamber and the liquid lead-bismuth inlet and outlet pipelines is stopped. After the test chamber cools down to room temperature, the sample removal operation is performed; at this time, a sealed structure is formed in the storage tank, which can keep the oxygen concentration in the storage tank continuously stable.

[0021] The beneficial effects of this invention are:

[0022] (i) The present invention adopts a horizontal test unit, that is, the test chamber, the sample and the fixture are all installed horizontally, which greatly reduces the amount of lead and bismuth used, and also reduces the amount of lead and bismuth in the storage tank, and increases the oxygen control rate.

[0023] (ii) The present invention connects the test chamber and the storage tank chamber through a connecting pipeline, so that the air pressure of the two chambers is balanced. Therefore, the float can be used to lift and lower to realize the entry and exit of lead and bismuth, avoiding the use of high-pressure gas to pressurize, simplifying the structure and improving the safety of the device.

[0024] (III) The present invention uses a motor to drive the screw to rotate to realize the raising and lowering of the float. The lowering of the float presses the lead and bismuth into the test chamber, avoiding the use of a lead and bismuth shielded pump, reducing the cost of the device and the complexity of operation. Furthermore, by adjusting the raising and lowering of the float, the liquid level of lead and bismuth in the test chamber can be adjusted in real time, which can achieve precise control of the liquid level. Attached Figure Description

[0025] Figure 1 This is a three-dimensional structural diagram of the horizontal fatigue testing system provided in an embodiment of the present invention;

[0026] Figure 2 This is a half-sectional view of the horizontal fatigue testing system provided in an embodiment of the present invention;

[0027] Figure 3 This is a top view of the horizontal fatigue testing system provided in an embodiment of the present invention.

[0028] In the above diagram: 1: Test loading unit; 2: Test chamber heating furnace; 3: Test chamber; 4: Gas connection pipeline; 5: Test oxygen sensor; 6: Liquid lead-bismuth inlet and outlet pipeline; 7: Liquid lead-bismuth pipeline shut-off valve; 8: Gas phase pipeline shut-off valve; 9: Storage tank heating furnace; 10: Storage tank cavity; 11: Float; 12: Storage oxygen sensor; 13: Float lifting motor; 14: Air inlet pipe; 15: Thermocouple; 16: Lower liquid level gauge; 17: Shut-off valve; 18: Shut-off valve; 19: Air outlet pipe. Detailed Implementation

[0029] To further understand the content, features, and effects of this invention, the following embodiments are provided, and detailed descriptions are given below in conjunction with the accompanying drawings:

[0030] like Figures 1-3 As shown, this embodiment provides a horizontal fatigue testing system in an oxygen-controlled liquid lead-bismuth environment, which mainly includes a test loading unit 1, a test unit, a liquid storage unit, and a communication unit.

[0031] The test loading unit 1 is placed on the first operating table and is used to connect with the test chamber 3 of the test unit to provide the loading force required for the test.

[0032] The test unit includes at least a test chamber heating furnace 2, a test chamber 3, and a test oxygen sensor 5.

[0033] The test chamber heating furnace 2 is placed on the first operating table and set outside the test chamber 3 to heat the test chamber 3 and provide the temperature required for the test.

[0034] The test chamber 3 is used to connect the test loading unit 1, the fixture, and the test oxygen sensor 5. The test chamber 3, fixture, specimen, and test loading unit 1 (including the motor, motor mounting components, output shaft, bellows, etc.) are all horizontally positioned. In a vertical chamber, the liquid level needs to completely submerge the specimen, while in the horizontal test chamber 3, the liquid level only needs to submerge the gauge length of the specimen, which is much lower than the liquid level in the vertical chamber. Therefore, using a horizontal test chamber 3 saves on lead and bismuth usage and also facilitates the mounting of the extensometer, making strain measurement easier.

[0035] The test chamber 3 is equipped with a top cover. The test oxygen sensor 5 is fixedly installed on the top cover of the test chamber 3 and extends into the interior of the test chamber 3 to measure the oxygen content inside the test chamber 3 in real time.

[0036] The liquid storage tank unit includes at least a liquid storage tank heater 9, a liquid storage tank cavity 10, a float 11, a float lifting motor 13, a liquid storage oxygen sensor 12, an air inlet pipe 14, an air outlet pipe 19, a thermocouple 15, a lower liquid level gauge 16, a shut-off valve 18, and a shut-off valve 17.

[0037] The liquid storage tank heater 9 is placed on a second operating platform, which is also equipped with a fixing frame to restrict the movement of the liquid storage tank heater 9. The liquid storage tank heater 9 is used to heat the liquid storage tank cavity 10 to melt solid lead bismuth.

[0038] The liquid storage tank cavity 10 is placed inside the liquid storage tank heating furnace for storing liquid lead-bismuth alloy and fixing related equipment. The top of the liquid storage tank cavity 10 is a cover, and the bottom is welded with a flange. The side wall of the liquid storage tank cavity 10 has an opening for connecting the liquid lead-bismuth inlet and outlet pipeline 6; the position of this opening must be lower than the bottom surface of the test chamber 3, preferably 70-90 mm lower than the bottom surface of the test chamber 3.

[0039] The bottom surface of the storage tank cavity 10 should be lower than the bottom surface of the test chamber 3, so that the lead and bismuth can flow back to the storage tank cavity 10 from the test chamber 3 by gravity due to the height difference and the lead and bismuth itself. Preferably, the bottom surface of the storage tank cavity 10 is 210-230 mm lower than the bottom surface of the test chamber 3.

[0040] The float lifting motor 13 is fixed to the upper cover of the liquid storage tank cavity 10 by bolts and is used to control the lifting and lowering of the float 11.

[0041] The float 11 includes a cylinder and a ball screw. The cylinder is a cylinder with a cavity formed by a top surface, bottom surface, and side walls. The ball screw includes a central screw, balls, a ball return mechanism, and a nut. The upper end of the central screw is connected to the output shaft of the float lifting motor 13 via a coupling, while the lower end is a free end inside the cylinder. The central screw is connected to the nut via the balls. The rotational motion of the central screw driven by the float lifting motor 13 can be converted into linear motion of the nut along the central screw, moving it upwards or downwards. The nut is fixedly connected to the center of the top surface of the cylinder, enabling the cylinder to move linearly along the central screw.

[0042] The liquid oxygen sensor 12 is bolted to the top cover of the liquid storage tank cavity 10 via a CF flange and is used to measure the oxygen content inside the liquid storage tank cavity 10 in real time.

[0043] The inlet pipe 14 is welded to the top cover of the liquid storage tank cavity 10 and is used to connect the vacuum pump and the reducing mixed gas and high-purity argon gas required to be introduced into the liquid storage tank cavity 10.

[0044] The vent pipe 19 is welded to the top cover of the liquid storage tank cavity 10. The vent pipe 19 is connected to a one-way valve to maintain a positive pressure environment of 0.1 MPa in the liquid storage tank during oxygen control.

[0045] Thermocouple 15 is fixed to the top cover of liquid storage tank cavity 10 via KF flange, and is used to precisely control the temperature of liquid lead bismuth inside liquid storage tank cavity 10 with an error of ±1℃.

[0046] The lower level gauge 16 is fixed to the upper cover of the storage tank cavity 10 via a CF flange, and is used in conjunction with the float 11 to control the initial lead-bismuth liquid level in the storage tank cavity 10.

[0047] The shut-off valve 18 is fixed to the upper cover of the liquid storage tank cavity 10 via a CF flange, and is used in conjunction with the float 11 to control the lead-bismuth liquid in the test chamber 3.

[0048] Both the lower level gauge 16 and the shut-off valve 18 are contact level gauges, capable of displaying the level reading when in contact with liquid lead-bismuth. The probe of the lower level gauge 16 should be below level A, and the probe of the shut-off valve 18 should be below level B.

[0049] Liquid level A refers to the initial liquid level height in the storage tank cavity 10. At this initial liquid level height (when the float 11 is in the rising state), liquid lead-bismuth will not enter the liquid lead-bismuth inlet / outlet pipe 6 and the test chamber 3.

[0050] Liquid level B refers to the liquid level in the storage tank cavity 10 when the liquid level in the test chamber 3 does not exceed the sample (the float 11 is in the descending state); at this time, the liquid level in the test chamber 3 is the same as the liquid level in the storage tank cavity 10. Liquid level B can be calculated from the location of the sample.

[0051] The liquid level A can be calculated from the liquid level B. The volume of liquid lead-bismuth in the storage tank cavity 10 corresponding to liquid level A is the sum of the volumes of the three parts of liquid lead-bismuth. The volumes of the three parts of liquid lead-bismuth are the volume of liquid lead-bismuth in the test chamber 3, the volume of liquid lead-bismuth in the liquid lead-bismuth inlet and outlet pipe 6, and the volume of liquid lead-bismuth in the storage tank cavity 10 corresponding to liquid level B minus the volume occupied by the float 11 below liquid level B.

[0052] The shut-off valve 17 is connected to the flange at the bottom of the liquid storage tank cavity 10 via a flange, and is used to discharge liquid lead-bismuth from the liquid storage tank cavity 10.

[0053] The connecting unit includes at least a liquid lead-bismuth connecting subunit and a gas connecting subunit.

[0054] The liquid lead-bismuth inlet / outlet pipe 6 includes a liquid lead-bismuth inlet / outlet pipe 6 and a liquid lead-bismuth pipe shut-off valve 7. One end of the liquid lead-bismuth inlet / outlet pipe 6 is welded to the bottom of the side wall of the test chamber 3, and the other end is welded to an opening in the side wall of the storage tank cavity 10. The connection end of the liquid lead-bismuth inlet / outlet pipe 6 to the test chamber 3 should be higher than the connection end to the storage tank cavity 10. The connection of the liquid lead-bismuth inlet / outlet pipe 6 to the bottom of the side wall of the test chamber 3 allows all the lead-bismuth in the test chamber 3 to flow back into the storage tank cavity 10, avoiding any impact on the final oxygen control effect. Furthermore, the liquid lead-bismuth inlet / outlet pipe 6 is heated by wrapping a ceramic heating strip around the outside of the pipe, and can be heated to the target temperature.

[0055] The liquid lead-bismuth inlet and outlet pipeline 6 is connected to the liquid lead-bismuth pipeline shut-off valve 7 via a flange. Before the test, opening the liquid lead-bismuth pipeline shut-off valve 7 allows liquid lead-bismuth from the storage tank to enter the test chamber 3. After the test, closing the liquid lead-bismuth shut-off valve 7 prevents oxygen from entering the storage tank 10 when the test chamber 3 is opened to take the sample, thus affecting oxygen control.

[0056] The gas connection subunit includes a gas connection pipeline 4 and a gas phase pipeline shut-off valve 8.

[0057] The gas-connecting pipeline 4 has a flange at each end, which is bolted to the flange on the top cover of the test chamber 3 and the flange on the top cover of the liquid storage tank 10, respectively. The gas-connecting pipeline 4 is connected to the gas phase pipeline shut-off valve 8 through a flange in the middle. Before the test, opening the gas phase pipeline shut-off valve 8 can maintain the same atmosphere in the test chamber 3 and the liquid storage tank 10, which facilitates the entry of liquid lead-bismuth into the test chamber. After the test, closing the gas phase pipeline shut-off valve 8 can prevent oxygen from entering the top of the liquid storage tank 10 when the test chamber 3 is opened to take the sample, thus affecting the oxygen control efficiency.

[0058] The test method based on the above-mentioned horizontal fatigue test system in an oxygen-controlled liquid lead-bismuth environment is as follows:

[0059] 1. The sample is clamped in the test chamber 3 using a fixture. The test chamber 3 is connected to the liquid storage tank 10 through a connecting unit to form a loop. The liquid lead-bismuth pipeline shut-off valve 7 and the gas phase pipeline shut-off valve 8 are opened. A vacuum operation is performed on the loop formed by the two chambers through the air inlet pipe 14 at the top of the liquid storage tank 10, and the vacuum level is 10. -3 Below Pa. Then, high-purity argon gas is continuously introduced through the inlet pipe 14 for 30 minutes, followed by vacuuming. The above gas washing operation is repeated 5 times until the oxygen concentration error in the liquid storage tank cavity 10 and the test chamber 3 is within 0.5%.

[0060] 2. Select a solid lead bismuth ingot based on the volume of liquid lead bismuth required to reach liquid level A. Place the cleaned solid lead bismuth ingot, after removing surface oxides, into the bottom of the storage tank cavity 10. Turn on the storage tank heating furnace 9 to heat the lead bismuth to a liquid state. The liquid lead bismuth level should reach the height of the lower liquid level gauge 16 (i.e., liquid level A). Maintain the temperature to the required test temperature for two hours. Once the temperature error is less than ±1℃, introduce a hydrogen-argon mixture containing 5% H2 through the inlet pipe 14. After the gas exits through the one-way valve of the outlet pipe 19, continuously observe the reading of the storage liquid oxygen sensor 12 until the oxygen concentration decreases to the required test concentration and the concentration error is within 0.5%. The liquid lead-bismuth inlet and outlet pipes 6 and the test chamber 3 are heated to the test temperature. Then, the float 11 is driven to descend by the float lifting motor 13 so that the liquid lead-bismuth level reaches the height of the shut-off valve 18 (i.e., liquid level B). At this time, the liquid level in the test chamber 3 does not exceed the sample. The test oxygen sensor 5 is continuously observed. The test begins when the error between its reading and the liquid oxygen sensor 12 is less than 5%.

[0061] 3. After the test is completed, the float 11 is raised by the float lifting motor 13, and the liquid lead-bismuth in the test chamber 3 flows back into the storage tank chamber 10, reaching level A. The liquid lead-bismuth pipeline shut-off valve 7 and the gas phase pipeline shut-off valve 8 are closed, stopping the heating of the test chamber 3 and the liquid lead-bismuth inlet / outlet pipeline 6. The sample is removed after the test chamber 3 cools to room temperature. At this time, a sealed structure is formed inside the storage tank chamber 10, maintaining a stable oxygen concentration. Before conducting the test again, the sample must be clamped at room temperature, and the test chamber 3 and the liquid lead-bismuth inlet / outlet pipeline 6 must be heated to the target temperature. The liquid lead-bismuth pipeline shut-off valve 7 and the gas phase pipeline shut-off valve 8 are opened, ensuring that the oxygen concentration error between the test chamber 3 and the storage tank chamber 10 is less than 0.5%. The above test operation can be repeated.

[0062] Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many specific modifications under the guidance of the present invention without departing from the spirit of the invention and the scope of protection of the claims, and these modifications all fall within the scope of protection of the present invention.

Claims

1. A horizontal fatigue testing system for an oxygen-controlled liquid lead-bismuth environment, characterized in that, It includes a test unit, a test loading unit, a liquid storage unit, and a communication unit; The test unit includes a test chamber heating furnace, a test chamber, and a test oxygen sensor; the test chamber heating furnace is located outside the test chamber to heat it; the test chamber and the sample inside it are both horizontally arranged, and the test chamber is connected to a horizontally arranged clamp; the test oxygen sensor is installed on the top cover of the test chamber, and its probe extends into the interior of the test chamber for real-time measurement of the oxygen content inside the test chamber; The test loading unit is connected to the test chamber and is used to provide the loading force required for the test; The liquid storage unit includes a liquid storage tank heater, a liquid storage tank cavity, a float, a float lifting motor, a liquid oxygen sensor, an inlet pipe, an outlet pipe, a thermocouple, a lower level gauge, a shut-off valve, and a shut-off valve. The liquid storage tank heater is located outside the liquid storage tank cavity to heat it. The liquid storage tank cavity is used to store liquid lead-bismuth alloy, and the bottom surface of the liquid storage tank cavity is lower than the bottom surface of the test chamber. The float lifting motor is fixed to the upper cover of the liquid storage tank cavity and is connected to the float, enabling control of the float's lifting and lowering. The liquid oxygen sensor is fixed to the upper cover of the liquid storage tank cavity for real-time measurement of the liquid storage tank cavity's oxygen levels. The internal oxygen content; the inlet pipe is fixed to the upper cover of the liquid storage tank cavity and is used to connect the vacuum device and the reducing mixed gas and high-purity argon gas required to be introduced into the liquid storage tank cavity; the outlet pipe is fixed to the upper cover of the liquid storage tank cavity and is connected to a one-way valve to maintain a positive pressure environment during oxygen control; the thermocouple is fixed to the upper cover of the liquid storage tank cavity and is used to control the temperature of the liquid lead and bismuth in the liquid storage tank cavity; the lower liquid level gauge is fixed to the upper cover of the liquid storage tank cavity and is used to cooperate with the float to control the initial lead and bismuth liquid level in the liquid storage tank cavity; the shut-off valve is fixed to the upper cover of the liquid storage tank cavity and is used to cooperate with the float to control the lead and bismuth liquid level in the test chamber; The shut-off valve is installed at the bottom of the liquid storage tank cavity and is used to discharge liquid lead-bismuth from the liquid storage tank cavity; The pontoon includes a cylinder and a ball screw. The ball screw includes a central screw, balls, a ball return mechanism, and a nut. The upper end of the central screw is connected to the output shaft of the pontoon lifting motor via a coupling, and the lower end is a free end inside the cylinder. The central screw is connected to the nut via the balls, and the nut is fixedly connected to the center of the top surface of the cylinder. Thus, the rotational motion of the central screw driven by the pontoon lifting motor can be converted into linear motion of the cylinder along the central screw driven by the nut. Both the lower liquid level gauge and the shut-off valve are contact type liquid level gauges. The probe of the lower liquid level gauge is below liquid level A, and the probe of the shut-off valve is below liquid level B. Liquid level A is the initial liquid level height in the storage tank cavity, and liquid level B is the liquid level height in the storage tank cavity when the liquid level in the test chamber does not exceed the sample. The communication unit includes a liquid lead-bismuth communication subunit and a gas communication subunit; the liquid lead-bismuth communication subunit includes a liquid lead-bismuth inlet / outlet pipeline and a liquid lead-bismuth pipeline shut-off valve; one end of the liquid lead-bismuth inlet / outlet pipeline is connected to the bottom of the test chamber and the other end is connected to the side wall of the storage tank cavity; and the connection end of the liquid lead-bismuth inlet / outlet pipeline to the test chamber is higher than the connection end of the liquid lead-bismuth inlet / outlet pipeline to the storage tank cavity; the liquid lead-bismuth inlet / outlet pipeline is equipped with a liquid lead-bismuth pipeline shut-off valve; the gas communication subunit includes a gas communication pipeline and a gas phase pipeline shut-off valve; one end of the gas communication pipeline is connected to the test chamber through the top cover of the test chamber and the other end is connected to the storage tank cavity through the top cover of the storage tank cavity; the gas communication pipeline is equipped with a gas phase pipeline shut-off valve.

2. The horizontal fatigue testing system for an oxygen-controlled liquid lead-bismuth environment according to claim 1, characterized in that, The test chamber heating furnace is placed on the first operating table; the liquid storage tank heating furnace is placed on the second operating table, and the second operating table is equipped with a fixing frame that restricts the movement of the liquid storage tank heating furnace.

3. The horizontal fatigue testing system for an oxygen-controlled liquid lead-bismuth environment according to claim 1, characterized in that, The shut-off valve is connected to the flange located at the bottom of the liquid storage tank cavity via a flange.

4. The horizontal fatigue testing system for an oxygen-controlled liquid lead-bismuth environment according to claim 1, characterized in that, The liquid lead-bismuth inlet and outlet pipelines are heated by wrapping ceramic heating tape around their outer side, and can be heated to the target temperature.

5. A test method based on the horizontal fatigue testing system in an oxygen-controlled liquid lead-bismuth environment as described in any one of claims 1-4, characterized in that, The process includes the following: (1) The sample is clamped in the test chamber by a fixture, the liquid lead-bismuth pipeline shut-off valve and the gas phase pipeline shut-off valve are opened, and the test chamber and the liquid storage tank are evacuated through the gas inlet pipe; then high-purity argon gas is continuously introduced through the gas inlet pipe, and the evacuation operation is performed again. The above gas washing operation is repeated multiple times until the oxygen concentration error in the test chamber and the liquid storage tank reaches the requirement. (2) Turn on the heating furnace of the storage tank and heat the lead-bismuth inside to liquid state. The liquid lead-bismuth level reaches the height of the lower level gauge. Maintain the temperature to the required test temperature and keep it warm. Introduce hydrogen-argon mixture through the inlet pipe. After the gas comes out of the one-way valve of the outlet pipe, continuously observe the reading of the storage oxygen sensor. After the oxygen concentration drops to the required test concentration, heat the liquid lead-bismuth inlet and outlet pipes and the test chamber to the test temperature. Then, drive the float to descend through the float lifting motor so that the liquid lead-bismuth level reaches the height of the shut-off valve. At this time, the liquid level in the test chamber is above the sample. Continuously observe the test oxygen sensor. Start the test when the error between its reading and the storage oxygen sensor is lower than the set value. (3) After the test is completed, the float is driven to rise by the float lifting motor, and the liquid lead-bismuth in the test chamber flows back into the storage tank and reaches the height of the lower level gauge; the liquid lead-bismuth pipeline shut-off valve and the gas phase pipeline shut-off valve are closed, and the heating of the test chamber and the liquid lead-bismuth inlet and outlet pipeline is stopped. After the test chamber cools down to room temperature, the sample removal operation is carried out; at this time, a sealed structure is formed in the storage tank, which can keep the oxygen concentration in the storage tank continuously stable.

Citation Information

Patent Citations

  • In-situ mechanical testing device used in lead-bismuth environment

    CN113029751A

  • Corrosion test apparatus

    WO2022154634A1