Pipe rack foundation and method of installing same

CN117947816BActive Publication Date: 2026-10-20CHINA NAT CHEM ENG THIRD CONSTR
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410028346.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2026-10-20
Estimated Expiration
2044-01-09

AI Technical Summary

Technical Problem

[0003]本发明的目的在于提供一种管廊架基础及其安装方法,以解决上述背景技术中提出的现有管廊架基础施工方法需要分段施工,步骤程序繁多,时间周期长,施工效率低,材料倒运量大,成本高等问题

Benefits of technology

[0018]与现有技术相比,本发明的有益效果是:本申请中采取后台集中制作管廊架基础,效率高、成本低,并且后台集中制作基础,便于管理,有利于提高基础质量,有效避免蜂窝麻面等质量通病,实现提质增效的目的,同时,进行后台基础集中制作,不受工期影响;且本申请也适用于独立设备基础类等独立基础的施工,特别是装置内需待框架结构完成后方可施工独立设备基础进行,对进度、工期影响很大。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117947816B_ABST
    Figure CN117947816B_ABST
Patent Text Reader

Abstract

The application discloses a pipe gallery frame foundation and a mounting method thereof in the technical field of building engineering, and comprises a bearing platform and a column body above the bearing platform. A steel bar batten is arranged in the interior of the bearing platform and the column body, and a foundation bolt extending to the outside of the top of the column body is arranged on the steel bar batten. A plurality of groups of first pre-buried grouting sleeves and second pre-buried grouting sleeves are arranged on the bearing platform, the bottom end of the second pre-buried grouting sleeve extends to the bottom center of the bearing platform, and a hoisting sleeve is arranged on the column body. In the application, the pipe gallery frame foundation is produced in the backstage, high efficiency and low cost are achieved, the foundation is produced in the backstage, management is facilitated, the quality of the foundation is improved, common quality defects such as honeycomb and pitted surface are effectively avoided, the purpose of improving quality and increasing efficiency is achieved, and the production of the foundation in the backstage is not affected by the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building engineering technology, specifically to a pipe rack foundation and its installation method. Background Technology

[0002] The external pipe racks of petrochemical, coal chemical and other engineering projects are laid out throughout the plant. The pipe racks have large spans and wide areas, and their foundations are scattered and involve many procedures. The existing pipe rack foundation construction methods require segmented construction, with many steps and procedures, long time cycle, low construction efficiency, large material transportation volume, and high cost. In addition, due to cross-operations and site restrictions, the pipe racks can only be constructed in batches. Especially around the equipment, only a few foundations are left at the end, and the construction still needs to be reorganized and carried out according to the procedure. Summary of the Invention

[0003] The purpose of this invention is to provide a pipe rack foundation and its installation method, so as to solve the problems of existing pipe rack foundation construction methods mentioned in the background art, which require segmented construction, have many steps and procedures, long time cycle, low construction efficiency, large material transportation volume and high cost.

[0004] To achieve the above objectives, the present invention provides the following technical solution: a pipe rack foundation, comprising: a foundation and a column located above the foundation;

[0005] The foundation and the inside of the column are provided with steel reinforcement keel, and the steel reinforcement keel is provided with anchor bolts for extending to the outer side of the top of the column;

[0006] The pier is provided with several sets of first pre-embedded grouting sleeves and second pre-embedded grouting sleeves. The bottom end of the second pre-embedded grouting sleeve extends to the bottom center of the pier. The column is provided with a hoisting sleeve.

[0007] Preferably, the hoisting sleeve is arc-shaped and is horizontally mounted on the column.

[0008] Preferably, the first pre-embedded grouting sleeve is arranged vertically, and several groups of the first pre-embedded grouting sleeves are distributed in a rectangular shape on the bearing platform.

[0009] As a preferred embodiment, a method for installing a pipe rack foundation includes the following steps:

[0010] S1: Excavate the foundation pit, set a cushion layer on the base of the foundation pit, and set alignment shims on the cushion layer;

[0011] S2: After passing the fixing device through the hoisting sleeve, hang it on the hook of the hoisting device, and the hoisting device will hoist the pipe rack foundation to the top of the alignment pad;

[0012] S3: Grouting material is injected into the gap between the bottom of the pipe rack foundation and the cushion layer through the first and second pre-embedded grouting sleeves to fill the gap;

[0013] S4: Backfill the foundation pit.

[0014] Preferably, the fixing device includes a pull rope and a balance beam installed on the pull rope. The pull rope is provided with two mounting parts, each of which is provided with a limiting part. The two limiting parts are respectively inserted into both ends of the lifting sleeve.

[0015] Preferably, the limiting member includes a plug installed on the mounting member, an expansion member is provided on the side wall of the plug, an airflow channel for communicating with the expansion member is provided inside the plug, and an air port for communicating with the airflow channel is provided on the mounting member.

[0016] Preferably, the pull rope is provided with several sets of guides located inside the hoisting sleeve.

[0017] Preferably, the guide includes a sphere, the outer wall of which is provided with an installation groove, a limiting block and an elastic element connected to the limiting block are slidably provided in the installation groove, and the sphere is provided with a through hole for communicating with the installation groove and with the airflow channel.

[0018] Compared with the prior art, the beneficial effects of the present invention are as follows: The present application adopts centralized fabrication of pipe rack foundations in the background, which is efficient and low-cost. Furthermore, centralized fabrication of foundations in the background facilitates management, helps improve foundation quality, effectively avoids common quality defects such as honeycomb and pitting, and achieves the goal of improving quality and efficiency. At the same time, centralized fabrication of foundations in the background is not affected by the construction period. Moreover, the present application is also applicable to the construction of independent foundations such as independent equipment foundations, especially since the construction of independent equipment foundations within the device can only be carried out after the frame structure is completed, which has a great impact on the progress and construction period. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the foundation structure of the pipe rack of the present invention;

[0020] Figure 2 This is a schematic diagram of the pipe rack foundation structure from below according to the present invention;

[0021] Figure 3 This is a schematic diagram of the connection structure between the fixing device of the present invention and the pipe rack foundation;

[0022] Figure 4 This is a schematic diagram of the guide component structure of the present invention;

[0023] Figure 5 This is a schematic diagram of the limiting component structure of the present invention.

[0024] In the diagram: 1. Foundation; 2. Column; 3. Reinforcing steel joists; 4. Anchor bolts; 5. Lifting sleeve; 6. First pre-embedded grouting sleeve; 7. Second pre-embedded grouting sleeve; 8. Subbase; 9. Base; 10. Alignment shims; 11. Tie rope; 12. Balance beam; 13. Installation component; 14. Limiting component; 141. Insert block; 142. Expansion component; 143. Airflow channel; 15. Guide component; 151. Sphere; 152. Installation groove; 153. Through hole; 154. Limiting block. Detailed Implementation

[0025] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] Example 1

[0027] Please see Figure 1 and Figure 2 A pipe rack foundation includes: a foundation 1 and a column 2, with the column 2 located on top of the foundation 1; the foundation 1 and the column 2 are provided with steel reinforcement 3 inside, and anchor bolts 4 are provided on the steel reinforcement 3, with the top of the anchor bolts 4 extending to the outer side of the top of the column 2; the foundation 1 is provided with several sets of first pre-embedded grouting sleeves 6 and second pre-embedded grouting sleeves 7, with the bottom end of the second pre-embedded grouting sleeves 7 extending to the bottom center of the foundation 1; and the column 2 is provided with a hoisting sleeve 5.

[0028] It should be noted that you should refer to [link / reference]. Figure 1 and Figure 2 The hoisting sleeve 5 is arc-shaped and is horizontally set on the column 2; the first pre-embedded grouting sleeve 6 is set vertically, and several groups of the first pre-embedded grouting sleeve 6 are distributed in a rectangular shape on the foundation 1.

[0029] The construction method and specific steps for the pipe rack foundation are as follows:

[0030] First, customize templates for batch construction and level the prefabrication site for the pipe gallery foundation;

[0031] Second, install anchor bolts 4 on the steel keel 3, and install the first pre-embedded grouting sleeve 6 and the second pre-embedded grouting sleeve 7 at the position of the foundation 1 of the steel keel 3. Then, install the lifting sleeve 5 at the column 2 position of the steel keel 3, and fill the inside of the lifting sleeve 5 with fine sand or sawdust (to prevent the lifting sleeve 5 from deforming due to concrete pouring and vibration).

[0032] Third, set up custom templates at 3 locations of the steel reinforcement keel, and then cast the concrete to form the pipe rack foundation;

[0033] Fourth, after the concrete has hardened, remove the formwork and take out the filler (fine sand or sawdust) inside the hoisting sleeve 5.

[0034] Step 5: Apply asphalt to the surface of the pipe rack foundation for corrosion protection.

[0035] A method for installing a pipe rack foundation, the specific steps of which are as follows:

[0036] Step 1: Excavate the foundation pit, set a cushion layer 8 on the base 9 of the foundation pit, and set leveling shims 10 on the cushion layer 8 (e.g., Figure 1 (as shown);

[0037] The second step is to pass the fixing device through the lifting sleeve 5 and hang it on the hook of the lifting device (the lifting device refers to a crane or other lifting equipment). The lifting device will then lift the pipe rack foundation above the leveling shims 10 (e.g., Figure 3 (as shown);

[0038] The third step involves injecting grout into the gap between the bottom of the pipe rack foundation and the pad 8 through the first pre-embedded grouting sleeve 6 and the second pre-embedded grouting sleeve 7 to form a grouting layer. The gap between the bottom of the pipe rack foundation and the pad 8 is then filled (e.g., ...). Figure 1 (as shown);

[0039] The fourth step is to backfill the foundation pit.

[0040] Please see Figure 3 The fixing device includes a pull rope 11 and a balance beam 12. The balance beam 12 is installed on the pull rope 11 (the balance beam 12 and the pull rope 11 are detachably connected, so that the balance beam 12 can be removed from the pull rope 11). The pull rope 11 is provided with two mounting parts 13, and each of the two mounting parts 13 is provided with a limiting part 14. The two limiting parts 14 are respectively inserted into the two ends of the lifting sleeve 5. The mounting parts 13 and the limiting parts 14 are slidably sleeved on the outer wall of the pull rope 11, so that the mounting parts 13 and the limiting parts 14 can slide on the outer wall of the pull rope 11 to change their positions.

[0041] Please refer to Figure 5 The limiting member 14 includes a plug 141, which is installed on the mounting member 13. An expansion member 142 (made of rubber, such as an airbag) is provided on the side wall of the plug 141. An airflow channel 143 is provided inside the plug 141, which is connected to the expansion member 142. An air port is provided on the mounting member 13, which is connected to the airflow channel 143.

[0042] The method of using the fixing device is as follows: one end of the pull rope 11 is passed through the lifting sleeve 5 and connected to the other end of the pull rope 11. The connection points of the two ends of the pull rope 11 are moved above the pipe rack foundation. Then, the balance beam 12 is installed on the pull rope 11 and supported on both sides of the pull rope 11 (the balance beam 12 is above the pipe rack foundation). The connection points of the pull rope 11 are then hooked onto the hook of the lifting device. Then, the installation component 13 is moved and the two limiting components 14 are inserted into the two ends of the lifting sleeve 5 respectively. Air is injected into the airflow channel 143 through the air port. After the expansion component 142 is inflated and contacts the inner wall of the lifting sleeve 5, the air injection is stopped. Then, the pipe rack foundation is lifted using the lifting device.

[0043] It should be noted that a valve is installed at the air inlet to control the opening and closing of the air inlet. During the inflation process, an inflation device, such as an air pump, can be used. When it is necessary to remove the fixing device from the pipe rack foundation, the valve is opened to release the gas inside the expansion member 142, reducing its volume. Then, the pull rope 11 is removed from the hook of the device, the connection at both ends of the pull rope 11 is disconnected, and the balance beam 12 is removed from the pull rope 11. Then, the pull rope 11 is pulled to pull the pull rope 11 out of the hoisting sleeve 5.

[0044] It should also be noted that when the limiting component 14 is inserted into the hoisting sleeve 5, the mounting component 13 contacts the side wall of the pipe rack foundation; the mounting component 13 and the limiting component 14 restrict the pipe rack foundation so that it will not move during the hoisting process, thus ensuring the stability of the pipe rack foundation hoisting.

[0045] In this embodiment, as a further optimization, please refer to... Figure 3 The pull rope 11 is provided with several sets of guide members 15, which are located inside the hoisting sleeve 5. The guide members 15 are spherical, and the pull rope 11 can move easily inside the hoisting sleeve 5 by contacting the inner wall of the hoisting sleeve 5 with the guide members 15.

[0046] In this embodiment, as a further optimization, please refer to... Figure 4The guide component 15 includes a sphere 151. A mounting groove 152 is formed on the outer wall of the sphere 151. A limiting block 154 (made of rubber, which blocks the mounting groove 152 to prevent gas from leaking out of the through hole 153) slides within the mounting groove 152. An elastic element (spring) is installed between the mounting groove 152 and the limiting block 154. A through hole 153 is formed on the sphere 151, communicating with both the mounting groove 152 and the airflow channel 143. When air is injected into the airflow channel 143, some gas will pass through. The through hole 153 enters the installation groove 152, increasing the internal air pressure. This pushes the limiting block 154 to move outward from the installation groove 152, making it contact the inner wall of the lifting sleeve 5. This increases the friction between the guide 15 and the inner wall of the lifting sleeve 5, reducing the probability of the pipe rack foundation moving during the lifting process. When the gas inside the expansion member 142 is discharged, the gas inside the through hole 153 is also discharged, reducing the internal air pressure of the through hole 153. Under the action of the elastic member, the limiting block 154 moves into the installation groove 152 and does not contact the inner wall of the lifting sleeve 5.

[0047] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A method for installing a pipe rack foundation, characterized in that: Includes the following steps: S1: Excavate the foundation pit, set a cushion layer (8) on the base (9) of the foundation pit, and set a leveling shim (10) on the cushion layer (8). S2: After passing the fixing device through the hoisting sleeve (5), hang it on the hook of the hoisting device, and the hoisting device will hoist the pipe rack foundation to the top of the alignment pad (10); S3: Grouting material is injected into the gap between the bottom of the pipe rack foundation and the cushion layer (8) through the first pre-embedded grouting sleeve (6) and the second pre-embedded grouting sleeve (7) to fill the gap; S4: Backfill the foundation pit; The pipe rack foundation includes: a foundation (1) and a column (2) located above the foundation (1); The foundation (1) and the column (2) are provided with steel reinforcement keel (3), and the steel reinforcement keel (3) is provided with anchor bolts (4) for extending to the outer side of the top of the column (2). The foundation (1) is provided with several sets of first pre-embedded grouting sleeves (6) and second pre-embedded grouting sleeves (7). The first pre-embedded grouting sleeves (6) are set vertically, and the bottom end of the second pre-embedded grouting sleeves (7) extends to the bottom center of the foundation (1). The column (2) is provided with a hoisting sleeve (5). The fixing device includes a pull rope (11) and a balance beam (12) installed on the pull rope (11). The pull rope (11) is provided with two mounting parts (13), and each of the two mounting parts (13) is provided with a limiting part (14). The two limiting parts (14) are respectively inserted into the two ends of the hoisting sleeve (5). The limiting member (14) includes a plug (141) mounted on the mounting member (13), an expansion member (142) is provided on the side wall of the plug (141), an airflow channel (143) for communicating with the expansion member (142) is provided in the plug (141), and an air port for communicating with the airflow channel (143) is provided on the mounting member (13). The pull rope (11) is provided with several sets of guides (15) inside the hoisting sleeve (5); The guide member (15) includes a sphere (151), an installation groove (152) is provided on the outer wall of the sphere (151), a limiting block (154) and an elastic member connected to the limiting block (154) are slidably provided in the installation groove (152), and a through hole (153) is provided on the sphere (151) for communicating with the installation groove (152) and the airflow channel (143).

2. The installation method of a pipe rack foundation according to claim 1, characterized in that: The hoisting sleeve (5) is arc-shaped and is horizontally set on the column (2).

3. The installation method of a pipe rack foundation according to claim 1, characterized in that: Several groups of the first pre-embedded grouting sleeves (6) are distributed in a rectangular shape on the foundation (1).

Citation Information

Patent Citations

  • Independent foundation pouring process

    CN109457718A

  • Lightweight composite material electric pole

    CN215803599U