Highly inclined broken ore body high sublevel subsequent filling mining method and stope structure
By dividing the steeply inclined fractured ore body into intermediate sections and optimizing the stope structure and mining methods, the problems of stope collapse and safety hazards were solved, efficient mining operations were achieved, loss rate and dilution rate were reduced, and stope recovery rate and mine benefits were improved.
Patent Information
- Application Number
- CN202410376840.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-03-29
AI Technical Summary
Under steeply inclined and fractured ore body conditions, the collapse of the first-stage stope in the existing technology is severe, which makes it impossible to arrange the mining and cutting work in the second-stage stope normally. This results in high loss and dilution rates, increased safety hazards, and reduced resource recovery rate and production capacity.
The high-segment subsequent backfilling mining method is adopted. By dividing the intermediate sections in the steeply inclined vein, the stope structure and mining method are determined. Stope boundary control holes, grouting holes and long anchor cables are arranged along the ore body boundary to optimize the mining sequence and stope structure, reduce the impact of blasting on the second-stage stope, avoid the need for pre-reserved pillars, and adopt a bottom-up or top-down mining method.
It reduced the loss rate and dilution rate of the mining area, increased the recovery rate of the mining area, reduced safety hazards, and optimized mining efficiency and the benefits of mining enterprises.
Smart Images

Figure CN117967314B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mining engineering technology, specifically relating to a high-level sub-section subsequent backfilling mining method and stope structure for steeply inclined fractured ore bodies. Background Technology
[0002] Mining methods for steeply dipping, thick ore bodies currently often employ a two-step high-level sublevel subsequent backfilling method. During the first-step stope mining, the explosive stress waves and blast gases generated by medium-deep hole blasting damage the second-step pillar stopes, especially when the ore body is relatively fragmented and the RQD value is low. This leads to large-scale collapses of the second-step stopes, surrounding rock, and reserved pillars. During the first-step mining, the recovered ore volume significantly exceeds the designed ore volume, resulting in severe stope dilution. Furthermore, during the mining of adjacent second-step stopes, it is impossible to properly arrange mining operations in collapsed sections. In severely collapsed sections, the entire section may become unminable, leading to a significant increase in stope loss rate.
[0003] Meanwhile, due to the collapse of the second-stage stope, the backfill slurry from the first-stage stope flows into the second-stage stope. Since the collapse situation in the second-stage stope cannot be known when designing the medium-deep holes, the medium-deep holes are often placed within the backfill material. During blasting in these medium-deep holes, the backfill material is often blown down along with the backfill, significantly increasing the stope's dilution rate and even making normal mining impossible. If a mixture of backfill and gravel, especially large pieces of gravel, is encountered during the second-stage stope's cutting operations, it will create even greater safety hazards, and the cost of roadway support will also increase accordingly.
[0004] The above problems have led to a significant increase in ore loss and dilution rates in mines, increasingly prominent safety issues, an increase in useless projects, a significant decrease in resource recovery rates and production capacity, a significant increase in costs, and have affected the sustainable development of mining enterprises. Summary of the Invention
[0005] The purpose of this invention is to solve the problems existing in the prior art mentioned above, and to provide a high-level sub-section subsequent backfilling mining method and stope structure for steeply inclined fractured ore bodies. This solution aims to solve the problems of severe collapse of the first-stage stope under fractured ore body conditions, which makes it impossible to arrange mining and cutting works normally in the second-stage stope, resulting in excessive loss rate and dilution rate, as well as safety hazards caused by the excavation of roadways in the second-stage stope.
[0006] One of the objectives of this invention is to provide a high-level subdivision subsequent backfilling mining method for steeply inclined fractured ore bodies, comprising the following steps: Step 1: Divide the steeply inclined ore vein into several intermediate sections and determine the mining method; Step 2: Determine the mining width of the first-stage stope and the second-stage stope within the mining section. Each section includes the upper sub-section, the lower sub-section, and the bottom structure from top to bottom. Step 3: Excavate the mining trench from the first-stage mining area and the adjacent second-stage mining area along the direction perpendicular to the ore body. At the same time, in the mining trench of the second-stage mining area, excavate the ore extraction path at a certain angle to the centerline of the roadway towards the mining trench of the first-stage mining area, forming the trench-type bottom structure and ore extraction path of the high-section mining area. Step 4: Excavate two lower segment drilling tunnels perpendicular to the ore body strike direction along the lower segment boundary of the first-step stope, and excavate two upper segment drilling tunnels perpendicular to the ore body strike direction along the upper segment boundary of the first-step stope; these will serve as construction sites for medium-deep holes and stope boundary control holes; excavate a further lower segment cutting level tunnel within the lower segment drilling tunnels of the stope, and excavate a further upper segment cutting level tunnel within the upper segment drilling tunnels of the stope; finally, excavate the stope cutting riser within the lower and upper segment cutting level tunnels of the first-step stope to complete the preparation and cutting operations; Step 5: Implement ventilation in the mining area to ensure airflow passes through the working face of the mining area; Step 6: When the ore body is broken and the RQD value is lower than a certain value, construct stope boundary control holes in the lower segmented drilling access road and the upper segmented drilling access road of the stope. The distance between two adjacent stope boundary control holes is 0.3-2m to reduce the impact of the first-step stope blasting on the second-step stope. Step 7: Construct slotting holes and medium-deep holes into the mining area within the segmented cutting tunnels of Step 1, the segmented drilling access roadways of the stope, the segmented cutting tunnels of Step 1, and the segmented drilling access roadways of the stope. Step 8: Carry out mining operations in the first-step stope; within the stope area, charge explosives in a stepped manner from top to bottom and blast in stages according to the design, and extract ore from the bottom structure through the ore extraction entrance and the stope trench; Step 9: Perform pressurized backfilling operation on the first-step mining area; Step 10: Carry out the mining operation in the second-step stope; after the strength of the filling body in the first-step stope meets the requirements, carry out the mining operation in the second-step stope using the single-path mining method; Step 11: Fill the two-step mining area with filler material; Step 12: Repeat steps 3 through 11 to complete one segment of the mining operation; Step Thirteen: Repeat Steps Two through Twelve to complete the mining operations for each intermediate section.
[0007] As a preferred option, in step one, the mining method is as follows: mining is carried out from bottom to top, first mining the lower middle section, and then mining the adjacent upper middle section. No top pillar is left at the top of each middle section mining area.
[0008] As a preferred embodiment, the following steps are also included between steps seven and eight: constructing a filling and connecting roadway for the lower stope at the location of the adjacent upper middle section stope trench in the corresponding construction stope; after step thirteen, the step of excavating the upper middle section stope trench is also included, and the step of excavating the stope trench is as follows: after the first step stope filling body in the filling and connecting roadway has reached a certain strength, the stope trench is excavated at the corresponding location of the filling and connecting roadway.
[0009] As a preferred option, in step one, the mining method is as follows: mining is carried out from top to bottom, first mining the upper middle section, and then mining the adjacent lower middle section, with a top pillar reserved at the top of each middle section mining area.
[0010] As a preferred embodiment, the following steps are also provided between steps seven and eight: in the adjacent upper middle section of the stope trench, construct a top column filling hole and a top column venting hole for the top column; wherein the top column filling hole is used to fill the stope void after mining is completed with slurry, and the top column venting hole is used to vent the stope void outward.
[0011] As a preferred embodiment, in step six, when the RQD value is <40%, relatively dense stope boundary control holes are constructed in the lower segmental drilling access road and the upper segmental drilling access road of the stope, respectively, with a spacing of 0.5-1m between two adjacent stope boundary control holes. At the same time, grouting holes are constructed on one side of the second-step stope of the lower segmental drilling access road and the upper segmental drilling access road of the stope, and cement grout is injected into the grouting holes under high pressure, or long anchor cables are constructed on one side of the second-step stope of the lower segmental drilling access road and the upper segmental drilling access road of the stope.
[0012] The second objective of this invention is to provide a stope structure for a high-section subsequent backfilling mining method for steeply inclined fractured ore bodies. The stope is divided into sections every 55-65m along the ore body height from top to bottom. Each section includes an upper section, a lower section, and a bottom trench from top to bottom. First-stage and second-stage stopes are arranged at intervals along the ore body strike direction. In the upper and lower sections of the first-stage stope, two parallel stope drilling entrances are arranged perpendicular to the ore body strike direction. In the upper and lower sections of the second-stage stope, a... In the pillar stope, both the first-stage and second-stage stopes have cutting ramps and external transport ramps arranged in their upper and lower sections. The cutting ramps are located at the first end of the corresponding drilling ramp, and the external transport ramps are located at the second end of the corresponding drilling ramp. The upper and lower cutting ramps and the bottom trench are connected by a cutting riser within the bottom structure. Both the first-stage and second-stage stopes have stope trenches arranged along the direction perpendicular to the ore body. The stope trenches in the first-stage stope are connected to the stope trenches in the second-stage stope by the ore extraction ramp.
[0013] As a preferred option, a top column of a certain thickness is reserved at the top of each middle section. The top column is provided with a top column filling hole and a top column venting hole. The two ends of the top column filling hole and the top column venting hole are respectively connected to the filling connecting road and the stope void.
[0014] As a preferred embodiment, the width of the first-step mining area is smaller than the width of the second-step mining area.
[0015] As a preferred embodiment, the length direction of the mining trench is arranged perpendicular to the strike of the ore body, and the length direction of the ore extraction route is not perpendicular to the strike of the ore body.
[0016] Compared with the prior art, the present invention has at least the following beneficial effects: Firstly, this scheme provides a stope structure with a reasonable layout. By arranging two access routes along the ore body boundary in segments (or layers) within the first-stage stope, and constructing relatively dense stope boundary control holes along the stope boundary along these access routes, the impact of explosive stress waves and explosive gases generated by deep-hole blasting in the first-stage stope on the second-stage stope is reduced. When the ore body is particularly fractured and the effect of dense stope boundary control holes is limited, grouting holes can be constructed on one side of the second-stage stope along the two drilling access routes. High-pressure injection of cement grout can then reinforce the fractured ore body, or long anchor cables can be constructed to reinforce the fractured ore body. This scheme, by eliminating the need for roof pillars, provides structural conditions for direct construction work on the backfill of the lower middle-level stope during the upper middle-level mining operations, further reducing the stope loss rate. With reserved roof pillars, it provides structural conditions for construction operations using a downward mining method.
[0017] Secondly, this scheme optimizes the mining method. By combining it with the specific stope structure mentioned above, and in conjunction with the selected mining method, it allows for upward or downward mining. When no pillars are left, upward mining from bottom to top in the intermediate sections can improve the stope recovery rate. This mining operation method can solve the problems of high ore loss rate in the stope due to the inability to mine the pillar ore body after the subsequent backfilling mining in high-section reserved pillars, and the serious collapse of the first-stage stope under fractured ore body conditions, which makes it impossible to arrange the mining and cutting work in the second-stage stope, resulting in excessive loss rate and dilution rate. It also prevents the safety hazards caused by the excavation of the second-stage stope roadways. When pillars are left, downward mining from top to bottom in each intermediate section, while strengthening the boundary control of the first-stage stope, improves the stability of the second-stage stope, thereby reducing the loss rate and dilution rate of both the first-stage and second-stage stopes, reducing useless works in the second-stage stope, and improving the efficiency of the mining enterprise. Attached Figure Description
[0018] Figure 1 Design a front view for the subsequent backfilling mining method in Example 1; Figure 2In Example 1 Figure 1 Sectional view at point III-III; Figure 3 This is a diagram showing the layout of deep holes in the mining area during one step of Example 1; Figure 4 This is a cross-sectional view of the blasting and ore-falling at the second-middle section, first step of Example 1; Figure 5 This is a diagram illustrating the combined effect of stress waves and explosive gases generated by medium-deep hole blasting on the control hole at the stope boundary in Example 1. Figure 6 This is a schematic diagram of pressurized backfilling in the second section, first step of the stope in Example 1; Figure 7 This is a front view of the two-step mining and cutting process in the second section of Example 1; Figure 8 This is a structural diagram of the goaf after filling in Example 1; Figure 9 Design a front view for the subsequent backfilling mining method in Example 2; Figure 10 In Example 2 Figure 9 Sectional view at point III-III; Figure 11 This is a diagram showing the layout of deep holes in the mining area during one step of Example 2; Figure 12 This is a cross-sectional view of the blasting and ore-falling at the second-middle section, first step of Example 2; Figure 13 This is a diagram illustrating the combined effect of stress waves and explosive gases generated by medium-deep hole blasting on the control hole at the stope boundary in Example 2. Figure 14 This is a schematic diagram of pressurized backfilling in the second section, first step of the stope in Example 2; Figure 15 This is a structural diagram of the goaf after filling in Example 2; Figure 16 for Figure 1 , Figure 9 Cross-sectional view at point II; Figure 17 for Figure 1 , Figure 9 Sectional view at point II-II; Figure 18 for Figure 7 Drawings of the two-step mining operation of the subsequent backfilling mining method at location IV-IV.
[0019] Marked in the diagram: 1. Filling body of the third intermediate stope; 2. Trench-type bottom structure; 3. Stope trench; 4. Ore extraction access road; 5. Lower sub-section drilling access road of the stope; 6. Lower sub-section drilling access road of the pillar stope; 7. Upper sub-section drilling access road of the stope; 8. Upper sub-section drilling access road of the pillar stope; 9. Stope cutting shaft; 10. Stope boundary control hole; 11. Grouting hole; 12. Filling connecting roadway; 13. Ore body of the first intermediate stope; 14. External transport roadway of the first-stage bottom structure; 15. Cutting roadway of the first-stage bottom structure; 16. Stope boundary; 19. Ventilation tent; 20. Lower sub-section of the first-stage stope. 21. Second side drilling approach; 23. First step lower segment external transport tunnel; 24. First step lower segment first side drilling approach; 25. First step lower segment cutting tunnel; 26. Bottom structure medium-deep hole; 27. Lower segment boundary control hole; 28. First step upper segment external transport tunnel; 29. First step upper segment first side drilling approach; 30. Upper segment stope boundary control hole; 31. Filling retaining wall; 32. First middle segment external transport tunnel; 33. First middle segment surrounding rock; 34. First step upper segment cutting tunnel; 35. Grooving hole; 36. Lower segment positive row medium-deep hole; 37. Upper segment positive row medium-deep hole 37. Deep boreholes arranged in a figure-eight pattern; 38. Borehole head mud for deep boreholes; 39. Granular ammonium nitrate explosive; 40. Reflected stress wave; 41. Boundary control boreholes provide a free surface for reflecting blasting stress waves; 42. Stress wave generated by blasting; 43. Explosive gas; 44. Ore produced after blasting; 45. Stope void; 46. Filling retaining wall in trench; 47. Filling retaining wall of lower section drilling access; 48. Filling retaining wall of upper section drilling access; 49. Filling slurry; 50. Filling pipe; 51. Two-step trench bottom structure; 52. Two-step stope boundary reinforcement zone; 53. Two-step... 54. Upper section cutting level roadway; 55. Pillar stope cutting shaft; 56. First-stage stope backfill body; 57. Second-stage stope backfill body; 58. First-stage stope ore access road; 59. First-stage stope trench; 60. First-stage stope trench-type bottom structure; 61. Top pillar; 62. Top pillar backfill hole; 63. Top pillar vent hole; 100. First-stage stope; 200. Second-stage stope; 300. Third-stage stope; 201. Upper section; 202. Lower section; 203. Bottom structure; 204. First-stage stope; 205. Second-stage stope; 206. Top pillar. Detailed Implementation
[0020] The present invention will be specifically described below through exemplary embodiments.
[0021] It should be noted that, unless otherwise defined, the technical or scientific terms used herein should have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms "a," "an," or "the," and similar words used in the specification and claims of this patent application do not express a limitation of quantity, but rather indicate the presence of at least one. Terms such as "comprising" or "including" indicate that the elements or objects preceding "comprising" encompass the elements or objects listed following "comprising" or "including" and their equivalents, but do not exclude other elements or objects having the same function.
[0022] Example 1 As shown in the figure, the mining area structure of this scheme is as follows: it is divided into several equal-distance sections from top to bottom, such as... Figure 1 The middle section, from top to bottom, includes a first middle section 100, a second middle section 200, and a third middle section 300, etc. Specifically, the first middle section 100, the second middle section 200, and the third middle section 300 are all 55-65m long; preferably 60m. Taking the second middle section 200 as an example, the stope structure within each middle section is as follows: during mining operations, no top pillar is left at the top of each middle section, thereby reducing the ore loss rate during mining operations. The second middle section 200, from top to bottom along the height direction of the stope, includes an upper section 201, a lower section 202, and a bottom structure 203. The upper section 201 is 24m high, the lower section 202 is 23m high, and the bottom structure 203 is 13m high, totaling 60m. The second middle section 200, laterally along the direction B of the stope, includes alternating first-step stopes 204 and second-step stopes 205.
[0023] The following is a detailed description of each part of the second section 200: The bottom structures 203 of the first-stage stope 204 and the second-stage stope 205 are respectively equipped with stope trenches 3. The excavation directions of the stope trenches 3 of the first-stage stope 204 and the second-stage stope 205 are parallel, and the stope trenches 3 of the first-stage stope 204 and the second-stage stope 205 are set along the C direction perpendicular to the strike of the ore body. An ore-exit access road is provided between the stope trenches 3 of the first-stage stope 204 and the second-stage stope 205 to connect them. 4. It should be noted that the excavation direction of the ore exit roadway 4 is inclined at a certain angle to the length direction of the stope trench 3. Preferably, the inclination angle is 50°. In the first-step stope 204, a first-step bottom structure cutting level 15 is provided at one end of the bottom trench 3, and a first-step bottom structure external transport level 14 is provided at the other end of the stope trench 3 in the first-step stope 204. The length directions of both the first-step bottom structure cutting level 15 and the first-step bottom structure external transport level 14 are along... Figure 1 The ore body is set in direction B, and is perpendicular to the excavation direction C of the mining trench 3.
[0024] In the first-stage stope 204, the lower section 202 includes a lower section drilling approach 5 for the stope. The lower section drilling approach 5 includes a first-side drilling approach 23 and a second-side drilling approach 20 located at the boundary between the first and second-stage stopes 204 and 205. The first-side drilling approach 23 and the second-side drilling approach 20 are parallel to each other and separated by the ore body. Both the first-side drilling approach 23 and the second-side drilling approach 20 are along... Figure 10 Arranged in the C direction, where the C direction is... Figure 9 The strike of the ore body is perpendicular to direction B, such as... Figure 17 As shown, a first-stage sub-section external transport tunnel 21 is provided at the first end of the same side of the first-stage sub-section drilling access road 23 and the second-stage sub-section drilling access road 20. A first-stage stope sub-section cutting tunnel 24 is provided at the second end of the same side of the first-stage sub-section drilling access road 23 and the second-stage sub-section drilling access road 20. Both the first-stage sub-section drilling access road 23 and the second-stage sub-section drilling access road 20 are located close to both sides of the first-stage stope 204. It should be noted that ventilation tents 19 are set up on the inner side of the boundary to avoid airflow short-circuiting. Ventilation tents 19 are set up in the middle of the openings of two drilling access roads in the same segment and the same stope, so that the airflow passes through the working face of the stope and avoids airflow short-circuiting. For example, the ventilation tent 19 of the lower segment of the first step stope is located inside the external transport roadway 21 of the lower segment of the first step stope, and is arranged between the same side port of the first side boundary drilling access road 23 and the second side boundary drilling access road 20 of the lower segment of the first step.
[0025] In the first-stage stope 204, the upper section 201 and the lower section 202 have similar or identical internal structures. The upper section 201 of the first-stage stope 204 is equipped with a drilling access road 7 along the C direction. This drilling access road 7 includes a first side boundary drilling access road 28 and a second side boundary drilling access road (not shown in the figure). The first side boundary drilling access road 28 and the second side boundary drilling access road are arranged in parallel. The two sections are separated by the ore body. At the first end of the same side of the first-side drilling access road 28 and the second-side drilling access road of the first-side section, there is a first-side external transport tunnel 27. At the second end of the same side of the first-side drilling access road 28 and the second-side drilling access road of the first-side section, there is a first-side cutting tunnel 33. It should be noted that in order to avoid airflow short circuit, a ventilation net (not shown in the figure) is installed in the first-side external transport tunnel 27 of the first-side stope.
[0026] In the two-step stope 205, the lower section 202 includes a pillar stope lower section drilling access 6, which is arranged along the C direction and connected with... Figure 1 The B direction is perpendicular to the length of the lower segment drilling access 6 of the pillar stope, and the length of the lower segment drilling access 5 of the stope is parallel to the length of the lower segment drilling access 5 of the stope. The upper segment 201 includes the upper segment drilling access 8 of the pillar stope, which is arranged along the C direction.
[0027] A filling connecting roadway 12 for the second section 200 is arranged at the location of the trench 3 in the first section 100. The filling connecting roadway 12 is arranged along direction C. At one end of the filling connecting roadway 12, a mid-section external haulage roadway 31 is set, which is set along the strike direction B of the ore body and is perpendicular to the filling connecting roadway 12. A filling retaining wall 30 is set in the safety area inside the filling connecting roadway 12. The filling retaining wall 30 isolates the first section external haulage roadway 31 from the stope void 45. The upper part of the filling retaining wall 30 has a filling opening and an observation port. Specifically, the filling retaining wall 30 is located in the surrounding rock area, as shown in the first section surrounding rock area 32 in the figure.
[0028] This plan also includes a stope cutting shaft 9 and a pillar cutting shaft 54. The lengths of the stope cutting shaft 9 and the pillar cutting shaft 54 are arranged along the H direction of the stope, which is perpendicular to the strike B of the ore body. The stope cutting shaft 9 connects sequentially from bottom to top to the bottom structure cutting level 15 of the first step, the lower segment cutting level 24 of the first step, and the upper segment cutting level 33 of the first step, and extends upwards directly to the filling connecting roadway 12 of the first step stope 204. The pillar cutting shaft 54 connects sequentially from bottom to top to the bottom structure cutting level 2 of the second step, the lower segment cutting level 2 of the second step, and the upper segment cutting level 53 of the second step, and extends upwards directly to the filling connecting roadway 12 of the second step stope 205.
[0029] In this scheme, as shown in the figure, deep holes 25 are constructed upwards from the top of the inner wall of the stope trench 3 for blasting the ore body. In the stope, deep holes 35 are constructed upwards from the top of the inner wall of the lower segmented drilling access 5 for the first-step stope 204. In the stope, deep holes 36 are constructed upwards from the top of the inner wall of the upper segmented drilling access 7 for the first-step stope 204. The cross-section of the upper end face of the deep holes 36 is basically distributed in a figure-eight shape, specifically: the bottom position of the upper deep holes is arranged with a higher center and lower sides, thus forming a high-center, low-side top space of the goaf after blasting in the upper segmented stope, which facilitates the connection of the filling slurry on both sides. The top of the goaf 45 forms a structure that slopes downwards from the middle to both sides, thus forming a top of the goaf that slopes downwards from the middle to both sides after blasting of the ore body.
[0030] In this embodiment, stope boundary control holes 10 are provided in the lower segment drilling access road 5 and the upper segment drilling access road 7 of the stope, thereby effectively reducing the impact of the explosive stress wave and explosive gas generated by the upward fan-shaped deep hole blasting in the first-stage stope on the second-stage stope 205. The upward fan-shaped deep holes in the first-stage stope include bottom structural deep holes 25, lower segment positive row deep holes 35, and upper segment positive row deep holes 36. The lower segment positive row deep holes 35 and the upper segment positive row deep holes 36 are distributed in a fan shape, spreading from bottom to top. As a more preferred embodiment, grouting holes 11 or long anchor cables can also be constructed on the side of the drilling access road near the second-stage stope 205, thereby arranging a second-stage stope reinforcement zone 52 on both sides of the second-stage stope 205.
[0031] like Figure 6 As shown, in this scheme, after the ore body of the first-step stope 204 is blasted, the collapsed ore 44 is transported out from the stope exit, and a stope void 45 is formed above the first-step stope 204.
[0032] After the mining operation in the first-step stope 204 is completed, slurry is filled into the stope void 45 of the first-step stope 204. The filling slurry forms a three-layer sandwich structure, in which the upper layer slurry, middle layer slurry and lower layer slurry solidify, and the strength of the upper layer slurry and lower layer slurry is greater than that of the middle layer slurry. After the mining operation in the second-step stope 205 is completed, slurry is filled into the stope void 45 of the second-step stope 205. The filling slurry 59 of the stope void of the second-step stope 205 has a single-layer structure, that is, it is made of the same raw material ratio.
[0033] This invention provides a method for mining steeply inclined fractured ore bodies by upward segmentation without leaving a pillar followed by backfilling, comprising the following steps: Step 1, determination of intermediate sections and mining sequence: Divide the steeply inclined ore body into several intermediate sections from top to bottom. During mining, mine in an upward manner from bottom to top. For example, divide the steeply inclined ore body into intermediate sections every 60m, mine the lower intermediate sections first, and then mine the adjacent upper intermediate sections. Figure 1 As shown, the ore body is divided into three sections: Section 1 (100), Section 2 (200), and Section 3 (300). Section 3 (300) will be mined first, followed by Section 2 (200), and then Section 1 (100) will be mined.
[0034] Step 2, Determining the Stope Structure: Determine the mining width of the first-step stope 204 and the second-step stope 205, and at the same time, the lower part of the corresponding middle section of each stope adopts a trench-type bottom structure 2; In this plan, each intermediate stope adopts a high-segment layout without roof pillars. For example, if the stope height is 60m, the bottom structure is 13m, the lower segment is 23m, and the upper segment is 24m, without roof pillars. The length is 20m, the width of the first-step stope is 11m, and the width of the second-step stope is 12m; the stope length is equal to the ore body thickness. The widths of the first-step stope 204 and the second-step stope 205 are determined based on factors such as rock properties. Generally, to save on cement consumption for backfilling in the first-step stope, the width of the first-step mining 204 is slightly smaller than the width of the second-step mining 205. The lower part adopts a trench-type bottom structure 2, which is the aforementioned bottom structure 203, and an ore access road 4 is provided. Figure 1 As shown.
[0035] Step 3: Trench and Ore Exit Road Excavation Steps: From the vertical centerline of the bottom structure 2 of the first-stage stope 204 and its adjacent second-stage stope 205, excavate the stop trench 3 of the first-stage stope 204 and the second-stage stope 205 along the direction perpendicular to the ore body strike. At the same time, within the stop trench 3, at a certain angle to the roadway centerline, excavate the ore exit road 4 from the stop trench 3 of the second-stage stope 205 toward the stop trench 3 of the first-stage stope 204, forming the trench-type bottom structure 2 and the ore exit road 4 of the high-segment stope.
[0036] In step three, all the trenches 3 in the mining area adopt a "three-center arch" roadway structure, with dimensions of 3.5m × 3.5m. The angle along the length of trench 3 forms a 50° angle with the length of the ore access road 4. The ore access road 4 also adopts a "three-center arch" roadway structure, with dimensions of 3.5m × 3.5m. For example... Figure 16 As shown.
[0037] Step 4, Layout of Dual-Entry Mining and Cutting Roadways: When the ore body is fractured and the RQD value is <40%, two lower segment drilling roads 5 are excavated in the lower section 202 along the boundary of the first-step stope 204 perpendicular to the strike of the ore body. These roads will serve as the construction sites for upward fan-shaped medium-deep holes, stope boundary control holes, and grouting holes. Two upper segment drilling roads 7 are excavated in the upper section 201 along the boundary of the first-step stope 204 perpendicular to the strike of the ore body. A further step lower segment cutting level roadway 24 is excavated at one end of the upper segment drilling roadway 5, and a further step upper segment cutting level roadway 33 is excavated at one end of the upper segment drilling roadway 7. Finally, cutting risers 9 are excavated in the lower segment cutting level roadway 24 and the upper segment cutting level roadway 33 of the first-step stope to complete the mining preparation and cutting operations.
[0038] In this step, the stope cutting shaft 9 connects, from top to bottom, the filling connecting roadway 21, the first-stage upper segment cutting level 33, the first-stage lower segment cutting level 24, and the first-stage bottom structure cutting level 15. If the rock conditions in the lower segment stope are relatively good and no collapse has occurred, and only the upper segment stope collapses, affecting the second-stage stope 205, then a double access route can be arranged only in the upper segment of the first-stage stope 204, while a double access route is not necessary for the lower segment.
[0039] In the dual-entry roadway layout, both the lower segment drilling roadway 5 and the upper segment drilling roadway 7 of the stope adopt a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m. The lower segment, upper segment, and bottom structure cutting level roadways all adopt a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m. Finally, the stope cutting shaft 9 is excavated within the cutting level roadway. When manual construction is used, the stope cutting shaft 9 adopts a rectangular structure with dimensions of 3.0 × 1.5m; when mechanical construction is used, it adopts a circular shape with a diameter of 1.4m. This completes the preparation and cutting operations. Figure 2 and 16 As shown.
[0040] Step 5, Ventilation in the mining area: A ventilation curtain 19 is installed in the transport roadway between two parallel drilling routes in the same section and mining area to allow airflow to pass through the working face of the mining area and avoid airflow short-circuiting caused by direct passage through the transport roadway.
[0041] Specifically, a ventilation duct 19 is installed in the external transport roadway 21 of the first-step stope. The ventilation duct 19 is located between the ports of the second side boundary drilling access road 20 and the second side boundary drilling access road 23 of the lower section of the first-step stope, with the purpose of guiding the airflow through the stope working face. A ventilation duct 19 is also installed in the upper section of the first-step stope 204, with a similar installation location and principle as the lower section, which will not be repeated here. It should be noted that the ventilation duct 19 can be installed as needed, and is not limited to the above-mentioned location, with the purpose of preventing short-circuiting of the stope airflow.
[0042] Step 6, Stope Boundary Control Hole Step: When the ore body is broken and the RQD value is <40%, in order to reduce the impact of the explosive stress wave and explosive gas generated by the upward fan-shaped deep hole blasting in the first-step stope 204 on the second-step stope 205, stope boundary control holes 10 are constructed in the lower segment drilling access 5 and the upper segment drilling access 7 respectively.
[0043] The spacing of the stope boundary control holes 10 is 0.5m-1.0m. Their main function is, based on the blasting rock-breaking mechanism and compensation space theory, to provide a free surface for the reflection of stress waves from the medium-deep hole blasting in the first-stage stope 204, reducing the impact of the explosive stress waves and explosive gases generated by the medium-deep hole blasting in the first-stage stope on the second-stage stope 205; to utilize the tensile and compressive concentration effect of the stope boundary control holes 10 to provide space for further expansion of the broken rock; and to effectively reduce the rate of large ore blocks falling from the stope, improving production efficiency. Specifically, the upper segment stope boundary control holes 29 and the lower segment boundary control holes 26 are constructed near the boundary of the second-stage stope 205 in the upper and lower segment drilling routes of the first-stage stope 204. When the ore body is particularly fractured and the effect of dense stope boundary control holes is small, grouting holes 11 are constructed on one side of the two-step stope 205, which is the lower segmented rock drilling access 5 and the upper segmented rock drilling access 7 of the stope. Cement slurry is injected into the grouting holes 11 under high pressure to reinforce the fractured ore body, or long anchor cables are constructed to reinforce the fractured ore body, thereby forming a two-step stope reinforcement zone 52.
[0044] In step six, see Figure 2 and 3 Boundary control holes 10 have a diameter of 90mm, lower segment boundary control holes 26 have a length of 20m, and upper segment stope boundary control holes 29 have a length of 21m. When the ore body is particularly fractured and the effect of dense stope boundary control holes is limited, grouting holes 11 can also be constructed on the side of the drilling approach of the first-step stope 204 near the second-step stope 205. Grouting holes 11 have a diameter of 90mm, lower segment 202 have a length of 22m, and upper segment 201 have a length of 23m. Cement grout is injected under high pressure (grouting pressure: 11.5mPa) to reinforce the fractured ore body, or long anchor cables can be constructed to reinforce the fractured ore body. The long anchor cables have a diameter of 29mm, a hole diameter of 38mm, an anchoring length of 22m in lower segment 202, and an anchoring length of 23m in upper segment 201.
[0045] Step 7, Construction of Upward Medium-Deep Holes: In the first step, the horizontal tunnel 24 is cut in sections, the rock drilling access road 5 is cut in sections below the stope, the horizontal tunnel 33 is cut in sections above the stope, the rock drilling access road 7 is cut in sections above the stope, and the slotting hole 34 and the upward fan-shaped medium-deep hole are constructed in the stope trench 3, without leaving a top pillar. In this step, slotting holes and upward fan-shaped medium-deep holes are constructed into the cutting tunnels and drilling access roads of the lower section 202 and the upper section 201, respectively, without leaving any roof pillars. The upward fan-shaped medium-deep holes include bottom structural medium-deep holes 25, lower section main row medium-deep holes 35, and upper section main row medium-deep holes 36; simultaneously, to ensure proper filling and roof connection, the bottom of the upper section medium-deep holes is arranged in a figure-eight shape, such as... Figure 3Position 37 is shown in the diagram. The grooved hole 34 has a diameter of 90mm, with the lower segment grooved hole having a length of 19.5m and the upper segment grooved hole having a length of 20.5m, spaced 1.0m apart and with a row spacing of 1.5m. The upward-facing fan-shaped deep holes have a diameter of 90mm, arranged symmetrically on both sides, with a hole bottom distance of 2.8m and a row spacing of 2.6m.
[0046] Step 8: Construction of the backfilling connecting road: Construct the backfilling connecting road 12 of the lower stope at the location of the trench 3 of the adjacent upper middle section of the corresponding construction stope; In this step, a filling connecting roadway 12 for the lower stope is constructed at the location of the adjacent upper-middle stope trench 3. Its dimensions should be smaller than the trench dimensions to allow for a certain amount of safety margin for the later widening and sizing of the upper-middle stope trench 3. The filling connecting roadway 12 adopts a "three-center arch" roadway structure with dimensions of 3.0m × 3.0m.
[0047] It should be noted that the filling connecting roadway 12 and the stope trench 3 are actually located in the same roadway. The reason for the different names is that the filling connecting roadway 12 is only used for filling the lower middle section of two adjacent middle sections, while the stope trench 3 is used for ore extraction from the upper middle section of the two adjacent middle sections. In this plan, the lower middle section of the two adjacent middle sections needs to be mined first, followed by the upper middle section. During blasting operations in the lower middle section, the rock mass may become loose, and there may be a situation where the filling does not meet the roof during filling. From a safety perspective, after filling, the loose rock mass should be brushed away, leaving a fresh rock surface, before support is installed, which is more conducive to safety. Of course, the filling connecting roadway 12 in the lower middle section and the upper stope trench 3 can also be constructed to the same size and then supported, as long as the safety of operations in the upper stope trench is guaranteed.
[0048] Step Nine, Blasting Mining: Within the stope area, explosives are charged and blasted in stages from top to bottom in a stepped manner according to the design; ore is extracted from the bottom structure 2 through the ore extraction entrance 4 and the stope trench 3; in this scheme, a loader is used to extract ore from the ore extraction entrance 4 and the stope trench 3 in the trench-type bottom structure 2, and the ore is loaded onto trucks at the horizontal roadway 14 outside the vein of the bottom structure in the first step.
[0049] like Figure 5 As shown, after the granular ammonium nitrate explosive 39 arranged in the deep holes 36 of the upper section is detonated, it will emit a stress wave 42 generated by the blast towards the second-stage stope 205. The boundary control holes provide a free reflective surface 41 for the blast stress wave, which reflects the stress wave 42, thus forming a reflected stress wave 40 that returns to the first-stage stope 204. In this way, the free reflective surface formed by the boundary control holes protects the second-stage stope 205 and reduces its impact.
[0050] Step 10, First-Step Stope Backfilling: After the first-step stope is completed, construct a backfilling retaining wall 30 in the safe area of the backfilling connecting roadway 12 adjacent to the previous intermediate stope. A backfilling opening and observation port should be provided at the top of the backfilling retaining wall 30. To ensure a good backfilling connection with the roof, the empty area inside the backfilling retaining wall 30 should be completely filled. Then, use a high-mixture backfilling grout for backfilling, such as a 1:1:5 mixture of cement, crushed stone, and tailings with a mass concentration of 70%, to fill the stope void 45.
[0051] In step ten, the filling retaining wall 30 is a 24mm wall with double-sided plastering. Both the filling opening and the observation opening are located on the upper part of the filling retaining wall 30, with a diameter of 250mm. A trench filling retaining wall 46 is installed within the stope trench 3; a drilling access filling retaining wall 47 is installed in the lower segmented drilling access 5 of the stope, and an upper segmented drilling access filling retaining wall 48 is installed in the upper segmented drilling access 7 of the stope. This seals off all access passages, creating a relatively enclosed space in the stope void.
[0052] This step is a pressurized backfilling step in the stope. To reduce segregation caused by the backfill slurry falling from a height, pressurized backfilling is used. The backfill pipe 50 is placed into the backfill hole and extends to the bottom of the stope void 45. At the beginning of backfilling, the opening of the backfill pipe 50 is buried in the backfill slurry to a depth of about 4.0m. Then, the backfill pipe is pulled out 3.0m, leaving 1.0m of the backfill pipe 50 in the backfill slurry 49. Backfilling continues until the backfill height is about 3.0m. Then, the backfill pipe 50 is pulled out 3.0m again, leaving 1.0m of the backfill pipe 50 in the backfill slurry 49. This process is repeated until the backfill slurry 49 fills the stope void 45.
[0053] Step 11 and Step 2 mining steps: After the strength of the backfill body 55 in the Step 1 stope meets the requirements, the design and mining of the Step 2 stope 205 will proceed, using a method of alternating between one or three stopes. In this step, after the strength of the backfill body 55 in the Step 1 stope meets the requirements, the design and mining of the Step 2 stope 205 will proceed normally using the high-segment single-entry subsequent backfilling mining method. The purpose of this design is: after the stope is mined and backfilled, in order to ensure the stability of adjacent stopes and that the backfill body has sufficient strength, another stope will be mined at intervals of one (or three) stopes.
[0054] In this step, the specific mining steps of the second-stage stope 205 are as follows: A drilling approach is arranged along the centerline of the second-stage stope 205 in each section, including the upper section drilling approach 8 and the lower section drilling approach 6 of the pillar stope in the second-stage stope 205. The upper section drilling approach 8 and the lower section drilling approach 6 are arranged perpendicular to the strike of the ore body. Figure 18As shown, a two-step upper segmented cutting horizontal tunnel 53 and a two-step upper segmented external transport horizontal tunnel 27 are respectively arranged at both ends of the segmented drilling approach 8 in the pillar stope. A two-step lower segmented cutting horizontal tunnel and a two-step lower segmented external transport horizontal tunnel are respectively arranged at both ends of the segmented drilling approach 6 in the pillar stope. The two-step upper segmented cutting horizontal tunnel 53, the two-step lower segmented cutting horizontal tunnel, the two-step upper segmented external transport horizontal tunnel 27, and the two-step lower segmented external transport horizontal tunnel are arranged along the direction perpendicular to the strike B of the ore body. A pillar stope cutting shaft 54 is set in the two-step upper segmented cutting horizontal tunnel 53 and the two-step lower segmented cutting horizontal tunnel. Complete the preparation and cutting operations for the second-stage stope 205; the pillar stope cutting shaft 54 connects from top to bottom the filling connecting roadway 12, the upper segmented cutting level roadway 53, the lower segmented cutting level roadway, and the bottom trench 3 of the second-stage stope; construct slotting holes and upward fan-shaped medium-deep holes into the stope interior within the lower segmented cutting level roadway, the lower segmented drilling access roadway 6, the upper segmented cutting level roadway, and the upper segmented drilling access roadway 8 of the second-stage stope 205, without leaving any top pillars; blast ore from top to bottom as needed, and use a loader to load ore at the bottom structure, coordinating with ore trucks to transport the ore. It should be noted that, if... Figure 3 As shown, the deep boreholes in the stope are arranged in a figure-eight shape at the top of the upper section, as described in step seven. The design and construction of the filling connecting roadway 12 are as described in step eight. The second step involves the construction of slotting holes and deep boreholes within stope 205: slotting holes and upward-facing fan-shaped deep boreholes are constructed in the cutting level roadways and drilling access roads of the lower and upper sections, respectively, without leaving any roof pillars. Simultaneously, to ensure proper roof support during filling, the bottom of the upper section deep boreholes is arranged in a figure-eight shape. The slotting holes have a diameter of 90mm, the lower section slotting holes are 19.5m long, and the upper section slotting holes 34 are 20.5m long, spaced 1.0m apart, with a row spacing of 1.5m. The upward-facing fan-shaped deep boreholes have a diameter of 90mm, are arranged symmetrically on both sides, with a bottom distance of 2.8m and a row spacing of 2.6m.
[0055] Step 12, Step 2 backfilling: After the second step stope 205 is completed, a backfilling retaining wall 30 is built in the safe area of the backfilling connecting roadway 12 of the adjacent upper middle stope, and a backfilling opening is left at the top of the backfilling retaining wall 30. In this step, after the second-step mining of stope 205 is completed, backfilling will be carried out according to the backfilling method described in step ten above, which will not be repeated here. The key difference is that a "sandwich-core" backfilling ratio is used in the design of the backfilling mix, detailed as follows: To ensure the subsequent mining of the "peach-shaped" pillars at the bottom, the lower part of stope 45 needs to be backfilled with a high-ratio backfill material (such as a 1:1:5 mixture of cement, crushed stone, and tailings, with a mass concentration of 70%); while to reduce cement consumption, the backfilling mix in the middle of stope 45 should use a low-ratio backfill material. The filling slurry (such as a mixture of cement, crushed stone, and tailings with a mass concentration of 68% in a ratio of 1:1:20) is used for filling; finally, in order to ensure that the floor of the upper intermediate stope has a certain strength during mining operations, the upper part of the stope void 45 should still be filled with a high-ratio filling material (such as a mixture of cement, crushed stone, and tailings with a mass concentration of 70% in a ratio of 1:1:5) to form the two-step stope filling body 56.
[0056] Step Thirteen: Construction steps for each mining area in the same segment: Repeat steps three to twelve in sequence to complete the mining operation of one segment; Step Fourteen: Excavation of the Cutting Trench at the Bottom of the Upper Intermediate Stope: Excavation of the Cutting Trench 3 of the Bottom Structure 2 of the Upper Intermediate Stope: When excavating the Cutting Trench 3 of the Bottom Structure 2 of the Upper Intermediate Stope, excavation should be carried out after the filling material in the connecting tunnel 12 has reached a certain strength. The enlargement size of the Cutting Trench 3 should be slightly larger than the size of the connecting tunnel 12, as shown in the figure. Due to the impact of blasting disturbance in the lower ore body, if the rock mass is relatively broken during tunneling, roadway support should be carried out first before tunneling operations. Complete the mining operations of this upper section according to steps two through thirteen.
[0057] In existing technologies, the mining sequence adopts a top-down, downward mining approach, meaning the upper middle section is mined first, followed by the lower middle section. During mining, a pillar is left at the top of the stope to provide a safe working area in the upper middle section and to prevent the impact of blast stress waves and explosive gases from deep-hole blasting in the lower stope on the filling material in the upper middle section, which could lead to the collapse of the filling material and mixing with the blasted ore in the lower stope, resulting in an increased dilution rate in the lower stope. However, this method of reserving pillars results in a high ore loss rate because the pillar ore cannot be mined. Recovering the pillars as residual ore, on the other hand, faces safety hazards due to secondary disturbance of the rock mass caused by blasting, increased support costs, and further dilution losses.
[0058] Compared with existing technologies, this embodiment 1 is an embodiment of a method for mining steeply inclined fractured ore bodies with a double-entry approach without a top pillar and subsequent backfilling. In this embodiment, the method of mining from bottom to top between intermediate levels is used, without reserving a top pillar. During the mining operation of the upper intermediate level, construction work is carried out directly on the backfill body of the lower intermediate level stope, further reducing the stope loss rate. At the same time, utilizing the theory of explosive stress waves and explosive gases, two approaches are arranged along the ore body boundary in the first-step stope in sections (or layers). Relatively dense stope boundary control holes are constructed at the location of the approach along the stope boundary to reduce the impact of explosive stress waves and explosive gases generated by deep-hole blasting in the first-step stope on the second-step stope 205. When the ore body is particularly fractured and the effect of dense stope boundary control holes 10 is small, grouting holes 11 can also be constructed on the side of the drilling approach close to the second-step stope 205 to reinforce the fractured ore body by injecting cement grout under high pressure, or long anchor cables can be constructed to reinforce the fractured ore body. The above mining methods can solve the problems of high ore loss rate in the stope due to the inability to recover the ore body when reserving the top pillar in high-section pre-filling mining, as well as the serious collapse of the first-stage stope 204 under the condition of fractured ore body, which makes it impossible to arrange the mining and cutting work in the second-stage stope 205 normally, resulting in excessive loss rate and dilution rate, and safety hazards caused by the tunneling of the second-stage stope 205. By not reserving the top pillar, the recovery rate of the stope is improved, the boundary control of the first-stage stope 204 is strengthened, the stability of the second-stage stope 205 is improved, and thus the loss rate and dilution rate of the first-stage stope 204 and the second-stage stope 205 are reduced, the useless works in the second-stage stope 205 are reduced, and the efficiency of the mining enterprise is improved.
[0059] Example 2 The stope structure of this scheme is as follows: It is divided into several intermediate sections at equal intervals from top to bottom, as shown in the figure. From top to bottom, these include a first intermediate section 100, a second intermediate section 200, etc. Specifically, the first and second intermediate sections are both 55-65m long; preferably 60m. Taking the second intermediate section as an example, the stope structure within each section is as follows: During mining operations, a top pillar 206 is reserved at the top of each intermediate section. The second intermediate section 200, from top to bottom along the height direction of the stope, includes the top pillar 206, an upper section 201, a lower section 202, and a bottom structure 203. For example, if the stope height is 60m, the top pillar 206 is reserved for 6m, the bottom structure 203 is 13m long, the lower section 202 is 20m long, and the upper section is 21m long. The second intermediate section 200, along the strike of the ore body, includes a first-step stope 204 and a second-step stope 205, which are spaced apart.
[0060] The following is a detailed description of each part of the second section 200: The bottom structure 203 has two mining areas, the first-stage stope 204 and the second-stage stope 205, each equipped with a stope trench 3. The trenches 3 of the first-stage stope 204 and the second-stage stope 205 are arranged in parallel directions, perpendicular to the strike of the ore body. An ore extraction access road 4 is provided between the two mining areas 204 and 205 to connect them. It should be noted that the length of the ore extraction access road 4... The directions are inclined at a certain angle to the length direction of the mining trench 3. Preferably, the inclination angle is 50°. One end of the mining trench 3 of the first-step mining 204 is provided with a first-step bottom structure cutting horizontal tunnel 15, and the other end of the mining trench 3 of the first-step mining 204 is provided with a first-step external transport horizontal tunnel 14. The length directions of the first-step bottom structure cutting horizontal tunnel 15 and the first-step external transport horizontal tunnel 14 are both set along the strike direction of the ore body and are perpendicular to the arrangement direction of the mining trench 3.
[0061] In this scheme, the lower section 202 of the first-step stope 204 is equipped with a stope lower section drilling access road 5. The stope lower section drilling access road 5 includes a first-side drilling access road 23 and a second-side drilling access road 20. The first-side drilling access road 23 and the second-side drilling access road 20 are parallel to each other and separated by the ore body. Both are excavated in a direction perpendicular to the strike of the ore body. A first-step lower section vein is set at the first end of the same side of the first-side drilling access road 23 and the second-side drilling access road 20. The external transport level 21 has a first-step lower segment cutting level 24 at its second end on the same side. It should be noted that a ventilation duct 19 is installed within the first-step lower segment external transport level 21. The ventilation duct 19 is located inside the first-step stope lower segment external transport level 21 between the same-side ports of the first-side drilling access 23 and the second-side drilling access 20 of the lower segment. The purpose of the ventilation duct 19 is to guide the airflow through the stope face, preventing the airflow from directly passing through the channel provided by the ventilation duct 19 and causing a short circuit. The second-step stope 205 has a pillar stope lower segment drilling access 6 arranged in the lower segment 202, which is arranged perpendicular to the strike of the ore body.
[0062] The upper section 201 and lower section 202 of one-step stope 204 have the same or similar internal structures. The upper section 201 of the first-step stope 204 contains a stope upper section drilling access road 7. This road includes a first-side drilling access road 28 and a second-side drilling access road. The first-side drilling access road 28 and the second-side boundary drilling access road (not shown in the figure) are arranged in parallel and separated by the ore body. The first-side drilling access road 28 and the upper section... The first end of the second side drilling approach is provided with an upper segment external transport tunnel 27. The second end of the first side boundary drilling approach 28 of the upper segment and the second side boundary drilling approach of the lower segment is provided with a first step upper segment cutting tunnel 33. A temporary ventilation tent (not shown in the figure) is provided in the upper segment external transport tunnel 27 of the first step stope. The upper segment 201 of the second step stope 205 is provided with a pillar stop upper segment drilling approach 8, which is arranged along the direction perpendicular to the strike of the ore body.
[0063] In this design, a vent hole 62 and a filling hole 61 are provided on the top column 206. The filling hole 61 is used for the passage of the filling pipe 50, and the vent hole 62 is used to connect the filling operation area with the stope void 45. Preferably, the length directions of the filling hole 61 and the vent hole 62 are not parallel to the thickness direction (H direction) of the top column 204.
[0064] This plan also includes a stope cutting shaft 9 and a pillar cutting shaft 54. The stope cutting shaft 9 connects sequentially from bottom to top to the first-stage bottom structure cutting level 15, the first-stage lower segment cutting level 24, and the first-stage upper segment cutting level 33, and extends upwards directly to the roof pillar 206. The pillar cutting shaft 54 connects sequentially from bottom to top to the second-stage bottom structure cutting level 2, the second-stage lower segment cutting level 2, and the second-stage upper segment cutting level 53, and extends upwards directly to the roof pillar 206 of the second-stage stope 205.
[0065] In this plan, such as Figure 5 As shown, in this scheme, the top of the inner wall of the mining trench 3 is used to construct the deep holes 25 in the bottom structure of the mining area for blasting and filling the ore body. The top of the inner wall of the lower segmented drilling access 5 in the stope is used to construct the lower segmented row of deep holes 35 in the forward row. The top of the inner wall of the upper segmented drilling access 7 in the stope is used to construct the upper segmented row of deep holes 36 in the forward row. The deep holes 25 in the bottom structure of the first-step mining area, the lower segmented row of deep holes 35, and the upper segmented row of deep holes 36 are all distributed in a fan shape.
[0066] In this embodiment, stope boundary control holes 10 are provided near the boundary of the second-stage stope 205 within the lower segmented drilling access road 5 and the upper segmented drilling access road 7 of the stope. This effectively reduces the impact of the explosive stress wave and explosive gas generated by the upward fan-shaped deep-hole blasting in the first-stage stope on the second-stage stope 205. As a more preferred embodiment, grouting holes 11 or long anchor cables can also be constructed on the side of the drilling access road near the second-stage stope 205, thereby forming a second-stage stope reinforcement zone 52 on both sides of the second-stage stope 205.
[0067] As shown in the figure, after the ore body of the first-step stope 204 in this scheme is blasted, the resulting collapsed ore is transported out through stope exit 4, forming a stope void 45 above the first-step stope 204. After the mining operation of the first-step stope 204 is completed, slurry is filled into the stope void 45 of the first-step stope 204. The filling slurry 49 forms a three-layer sandwich structure, in which the upper layer slurry, middle layer slurry, and lower layer slurry solidify, and the strength of the upper layer slurry and the lower layer slurry is greater than that of the middle layer slurry. After the mining operation of the second-step stope 205 is completed, slurry is filled into the void of the second-step stope 205. The filling slurry 49 of the second-step stope void has a single-layer structure, that is, it is made of the same raw material ratio.
[0068] This embodiment 2 also provides a method for mining steeply inclined fractured ore bodies with pre-reserved pillars in high-level sub-sections followed by backfilling, including the following steps: Step 1, determination of intermediate section division and mining sequence: Divide the steeply inclined ore body into several intermediate sections from top to bottom. During mining, mine in a downward manner from top to bottom. The stope height adopts a high-level sub-section arrangement. For example, divide the steeply inclined ore body into an intermediate section of 100m every 60m. First mine the upper intermediate section, then mine the adjacent lower intermediate section. Figure 1 As shown, the ore body is divided into sections 100 and 200, etc. Section 100 is mined first, followed by section 200.
[0069] Step Two: Determining the Stope Structure: The mining widths of the first-stage stope 204 and the second-stage stope 205 are determined. Simultaneously, the lower section of each stope adopts a trench-type bottom structure 2, which is the aforementioned bottom structure 203. An ore exit route 4 is also provided. The roof pillar 206 is reserved at 6m, the bottom structure 203 at 13m, the lower section 201 at 20m, and the upper section 202 at 21m. The stope length is 20m. The width of the first-stage stope 204 is determined to be 11m based on rock properties and roof pillar thickness, and is 12m in total.
[0070] Step 3: Trench and Ore Exit Path: From the bottom structure centerline of both the first-stage stope 204 and the adjacent second-stage stope 205, trenches 3 are excavated perpendicular to the ore body strike. Simultaneously, within the trench 3 of the second-stage stope 205, an ore exit path 4 is excavated at a certain angle to the roadway centerline towards the trench 3 of the first-stage stope, forming the trench-type bottom structure 2 and the ore exit path 4 of the high-level stope. It should be noted that, preferably, the length direction of the ore exit path 4 is not perpendicular to the length direction of the roadway centerline, but forms a 50° angle. All trenches 3 adopt a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m. The ore exit path 4 also adopts a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m.
[0071] Step 4, Layout of Dual-Entry Mining and Cutting Roadways: With the ore body fractured and RQD value < 40%, two lower segment drilling roads 5 are excavated within the lower section 202, perpendicular to the ore body strike direction and along the boundary of the first-step stope 204. These will serve as construction sites for projects such as upward fan-shaped medium-deep holes, stope boundary control holes 10, and grouting holes 11. Two upper segment drilling roads 7 are excavated within the upper section 201, perpendicular to the ore body strike and along the boundary of the first-step stope 204. A further step down segment cutting level roadway 24 is excavated at one end of each upper segment drilling roadway 5, and a further step up segment cutting level roadway 33 is excavated at one end of each upper segment drilling roadway 7. Finally, a stope cutting riser 9 is excavated within the lower segment cutting level roadway 24 and the upper segment cutting level roadway 33 of the first-step stope, completing the preparation and cutting operations. The stope cutting shaft 9 connects sequentially from bottom to top to the first-stage bottom structure cutting level 15, the first-stage lower segment cutting level 24, and the first-stage upper segment cutting level 33, reaching the roof pillar 206. If the rock conditions in the lower segment stope are relatively good and no collapse has occurred, but a collapse occurs only in the upper segment stope, affecting the second-stage stope 205, then a double-entry roadway can be arranged only in the upper segment of the first-stage stope 204, while the lower segment does not need a double-entry roadway. In the double-entry roadway layout, both the lower and upper segment drilling roadways adopt a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m. The lower, upper, and bottom structure cutting level roadways all adopt a "three-center arch" roadway structure with dimensions of 3.5m × 3.5m. When manual construction is used, the cutting shaft 9 in the stope is a rectangular structure with dimensions of 3.0 × 1.5 m; when mechanical construction is used, it is circular with a diameter of 1.4 m. This completes the preparation and cutting operations.
[0072] Step 5, Ventilation in the mining area: A ventilation curtain 19 is installed in the transport roadway between two parallel drilling routes in the same section and mining area to allow airflow to pass through the working face of the mining area and avoid airflow short-circuiting caused by direct passage through the transport roadway.
[0073] Specifically, a ventilation tent 19 is installed in the external transport level 21 of the first-step stope, located between the ports of the second side boundary drilling access 20 and the second side boundary drilling access 23 of the lower section of the first-step stope. A ventilation tent 19 is also installed in the upper section 201 of the first-step stope 204, with a similar location and principle as the lower section, which will not be elaborated here. It should be noted that the ventilation tent 19 can be installed as needed, and is not limited to the locations described above.
[0074] Step Six: Stope Boundary Control Hole Construction: In the case of ore body fracture and RQD value < 40%, in order to reduce the impact of the explosive stress wave and explosive gas generated by the upward fan-shaped deep hole blasting in the first-step stope 204 on the second-step stope 205, stope boundary control holes 10 are constructed in the lower segmented drilling access 5 and the upper segmented drilling access 7 of the stope. The spacing of the stope boundary control holes 10 is 0.5m-1.0m. Its main function is, based on the blasting rock-breaking mechanism and the compensation space theory, to provide a free surface for the reflection of stress waves from the medium-deep hole blasting in the first-stage stope 204, reducing the impact of the explosive stress waves and explosive gases generated by the medium-deep hole blasting in the first-stage stope 204 on the second-stage stope 205; to utilize the tensile and compressive concentration effect of the stope boundary control holes 10 to provide space for the further expansion of the fractured rock; and to effectively reduce the rate of large blocks of ore falling in the stope, thereby improving production efficiency. Specifically, upper segment stope boundary control holes 29 and lower segment boundary control holes 26 are constructed on the side of the upper and lower segment drilling accesses of the first-stage stope 204 near the second-stage stope 205. When the ore body is particularly fractured and the effect of the dense stope boundary control holes 10 is small, grouting holes can also be constructed on the side of the drilling accesses of the first-stage stope 204 near the second-stage stope 205, and cement grout can be injected under high pressure to reinforce the fractured ore body, or long anchor cables can be constructed to reinforce the fractured ore body, thereby forming the second-stage stope reinforcement zone 52.
[0075] In step six, the diameter of boundary control hole 10 is 90mm, the length of lower segment boundary control hole 29 is 20m, and the length of upper segment boundary control hole 26 is 21m. When the ore body is particularly fractured and the effect of dense stope boundary control holes is small, grouting holes are constructed on the side of the drilling approach of the first-step stope 204 near the second-step stope 205. The diameter of boundary grouting hole 11 is 90mm, the length of boundary grouting hole 11 in lower segment 202 is 22m, and the length of boundary grouting hole 11 in upper segment 201 is 23m. Cement grout is injected under high pressure at a pressure of 11.5mPa to reinforce the fractured ore body, or long anchor cables are constructed to reinforce the fractured ore body. The diameter of the long anchor cable is 29mm, the hole diameter is 38mm, the anchoring length in lower segment 202 is 22m, and the anchoring length in upper segment 201 is 23m.
[0076] Step 7, Construction of Upward Medium-Deep Holes: Construct grooved holes 34 and upward fan-shaped medium-deep holes into the mining area within the segmented cutting roadway 24 of Step 1, the segmented rock drilling access roadway 5 of the mining area, the segmented cutting roadway 33 of Step 1, and the segmented rock drilling access roadway 7 of the mining area. At the same time, construct medium-deep holes in the mining trench and reserve a top pillar 206. In this step, slotting holes and upward-facing fan-shaped medium-deep holes are constructed into the cutting tunnels and drilling access roads of the lower and upper sections, respectively. The upward-facing fan-shaped medium-deep holes include the lower section's main row of medium-deep holes 35 and the upper section's main row of medium-deep holes 36; among them, slotting hole 34 has a diameter of 90mm, a length of 19.5m in the lower section, a length of 20.5m in the upper section, a spacing of 1.0m, and a row spacing of 1.5m. The lower section's main row of medium-deep holes 35, the upper section's main row of medium-deep holes 36, and the bottom structure medium-deep hole 25 are all upward-facing fan-shaped medium-deep holes: 90mm in diameter, symmetrically arranged left and right, with a hole bottom distance of 2.8m and a row spacing of 2.6m.
[0077] Step 8, blasting and mining: Within the mining area, explosives are charged and blasted in stages from top to bottom according to the design; ore is extracted from the ore extraction entrance 4 and the mining trench 3 in the trench-type bottom structure 2; in this scheme, a loader is used to extract ore from the ore extraction entrance 4 and the mining trench 3 in the trench-type bottom structure 2, and the ore is loaded onto trucks at the horizontal roadway 14 outside the vein of the first step bottom structure.
[0078] like Figure 13 As shown, after the granular ammonium nitrate explosive 39 arranged in the deep holes 36 of the upper section is detonated, it will emit a stress wave 42 generated by the blast towards the second-stage stope 205. The boundary control holes provide a free reflective surface 41 for the blast stress wave, which reflects the stress wave 42, thus forming a reflected stress wave 40 that returns to the first-stage stope 204. In this way, the free reflective surface formed by the boundary control holes protects the second-stage stope 205 and reduces its impact.
[0079] Step Nine, Step One Stope Backfilling Step: After the first step stope 204 is completed, high-ratio backfill slurry is used for backfilling, such as a mixture of cement, crushed stone, and tailings with a ratio of 1:1:6 and a mass concentration of 70% to fill the stope void 45. To reduce segregation caused by the filling slurry 49 falling from a height, pressurized filling is adopted during filling. That is, the filling pipe 50 is inserted into the filling hole 61 of the top column 206 and extends to the bottom of the stope void 45. At the beginning of filling, the pipe opening of the filling pipe 50 is buried in the filling slurry to a depth of about 4.0m. Then the filling pipe 50 is pulled out 3.0m, leaving 1.0m of the filling pipe in the filling slurry 49. Filling continues. After filling to a height of about 3.0m, the filling pipe 50 is pulled out 3.0m again, leaving 1.0m of the filling pipe 50 in the filling slurry 49. This process is repeated until the filling slurry 49 fills the stope void 45.
[0080] Step 10 and Step 2 Mining Steps: Step 10 Mining Steps: After the strength of the backfill body 55 in the Step 1 mining area meets the requirements, the design and mining of Step 2 Mining Area 205 will proceed, using a method of alternating between one or three mining areas. In this step, a "one-stop-mining-at-a-time" or "three-stop-mining-at-a-time" method is generally used. After the strength of the backfill body 55 in the Step 1 mining area meets the requirements, the design and mining of Step 2 Mining Area 205 will proceed normally using the high-segment single-entry subsequent backfilling mining method. The purpose of this design is: after mining and backfilling the current mining area, to ensure the stability of adjacent mining areas and sufficient strength of the backfill body, another mining area will be mined at intervals of one (or three) mining areas.
[0081] In this step, the specific mining steps of the second-stage stope 205 are as follows: A drilling approach is arranged along the centerline of the second-stage stope 205 in each section, including the upper section drilling approach 8 and the lower section drilling approach 6 of the pillar stope 205. The upper section drilling approach 8 and the lower section drilling approach 6 are arranged perpendicular to the strike of the ore body. At both ends of the upper section drilling approach 8, the second-stage upper section cutting horizontal tunnel 53 and the second-stage upper section external transport horizontal tunnel 27 are respectively arranged. At both ends of the lower section drilling approach 6, the second-stage lower section cutting horizontal tunnel and the second-stage lower section external transport horizontal tunnel are respectively arranged. The second-stage upper section cutting horizontal tunnel 53, the second-stage lower section cutting horizontal tunnel, the second-stage upper section external transport horizontal tunnel 27, and the second-stage lower section... The external transport tunnels are arranged along the strike direction of the ore body. Pillar cutting shafts 54 are installed within the upper and lower segmented cutting tunnels of the second-stage mining area 205 to complete the preparation and cutting operations. The pillar cutting shaft 54 connects the upper and lower segmented cutting tunnels of the second-stage mining area 53, the lower segmented cutting tunnel, and the bottom trench cutting tunnel from top to bottom. In the lower segmented cutting tunnel, the lower segmented drilling access road, the upper segmented cutting tunnel, and the upper segmented drilling access road of the second-stage mining area 205, slotting holes and upward-facing fan-shaped medium-deep holes are constructed into the mining area, reserving a top pillar 206. Ore is blasted from top to bottom as needed, and a loader is used to load ore at the bottom structure, with ore transported using ore-carrying equipment. The setting of the cutting tunnels in the second-stage mining area 205 can also be referenced. Figure 18 The grooved holes have a diameter of 90mm, the lower segment grooved holes are 19.5m long, the upper segment grooved holes 34 are 20.5m long, spaced 1.0m apart, and the row spacing is 1.5m. The upward fan-shaped deep holes have a diameter of 90mm, are arranged symmetrically on the left and right, with a hole bottom distance of 2.8m and a row spacing of 2.6m.
[0082] Step 11: After the mining is completed, use a low-ratio backfill slurry for backfilling, such as a mixture of cement, crushed stone, and tailings with a ratio of 1:1:20 and a mass concentration of 70% for backfilling.
[0083] In this step, after the second-step mining is completed, the filling is carried out in accordance with the filling method and principle of step nine above. The only difference is that the first-step mining area 204 has two access routes while the second-step mining area 205 has a single access route. It is necessary to block each access route according to the structural settings, which will not be elaborated here. It is important to note that the filling mix design employs a "sandwich-core" filling ratio, detailed as follows: To ensure the subsequent mining of the "peach-shaped" pillars at the bottom, the lower part of stope 45 requires high-ratio filling material (e.g., a mixture of cement, crushed stone, and tailings at a ratio of 1:1:6, with a mass concentration of 70%). To reduce cement consumption, the middle part of stope 45 should use low-ratio filling slurry (e.g., a mixture of cement, crushed stone, and tailings at a ratio of 1:1:20, with a mass concentration of 68%). Finally, to ensure sufficient strength of the floor during mining operations in the upper section of the stope, the upper part of stope 45 should still use high-ratio filling material (e.g., a mixture of cement, crushed stone, and tailings at a ratio of 1:1:6, with a mass concentration of 70%), forming a two-step stope filling body.
[0084] Step 12: Construction steps for each mining area in the same segment: Repeat steps 3 to 11 in sequence to complete the mining operation of one segment.
[0085] Step 13: Adopt a top-down, downward mining method; repeat steps 2 to 12 to complete the mining operations in each section.
[0086] Example 2 presents a scheme for a dual-path pre-supported top pillar mining method for a steeply inclined, fractured ore body with downward high-level subdivisions and subsequent backfilling. This scheme utilizes the theories of explosive stress waves and explosive gases to arrange two paths along the ore body boundary in the first-stage stope, segmented (or layered). A relatively dense network of stope boundary control holes is constructed along the stope boundary along these paths to reduce the impact of explosive stress waves and explosive gases generated by deep-hole blasting in the first-stage stope on the second-stage stope. When the ore body is particularly fractured and the effect of dense stope boundary control holes is limited, grouting holes can be constructed on one side of the second-stage stope along the two drilling paths. High-pressure injection of cement grout can then reinforce the fractured ore body, or long anchor cables can be constructed to reinforce the fractured ore body. The above mining methods can solve the problems of severe collapse of the first-stage stope when using the high-level sublevel backfilling mining method under fractured ore body conditions, which makes it impossible to properly arrange mining and cutting works in the second-stage stope 205, resulting in excessive loss and dilution rates. The methods can also reduce the safety hazards of roadway excavation in the second-stage stope 205, strengthen the boundary control of the first-stage stope 204, improve the stability of the second-stage stope 205, thereby reducing the dilution rate of the first-stage stope 204 and the loss and dilution rates of the second-stage stope 205, reducing useless works in the second-stage stope 205, and improving the efficiency of mining enterprises.
[0087] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.
Claims
1. A mining method for rapidly inclined, fractured ore bodies that proceeds upwards to higher sections without leaving pillars and subsequently backfilling, characterized by: Includes the following steps: Step 1: Divide the steeply inclined vein into several intermediate sections and determine the mining method. The mining method is as follows: mining is carried out from bottom to top and from top to top. First, mine the lower intermediate section, and then mine the adjacent upper intermediate section. No roof pillar is left at the top of each intermediate section stop. Step 2: Determine the mining width of the first-stage stope and the second-stage stope within the mining section. Each section includes the upper sub-section, the lower sub-section, and the bottom structure from top to bottom. Step 3: Excavate the mining trench from the first-stage mining area and the adjacent second-stage mining area along the direction perpendicular to the ore body. At the same time, in the mining trench of the second-stage mining area, excavate the ore extraction path at a certain angle to the centerline of the roadway towards the mining trench of the first-stage mining area, forming the trench-type bottom structure and ore extraction path of the high-section mining area. Step 4: Excavate two lower segment drilling tunnels perpendicular to the ore body strike direction along the lower segment boundary of the first-step stope, and excavate two upper segment drilling tunnels perpendicular to the ore body strike direction along the upper segment boundary of the first-step stope; these will serve as construction sites for medium-deep holes and stope boundary control holes; excavate a further lower segment cutting level tunnel within the lower segment drilling tunnels of the stope, and excavate a further upper segment cutting level tunnel within the upper segment drilling tunnels of the stope; finally, excavate the stope cutting riser within the lower and upper segment cutting level tunnels of the first-step stope to complete the preparation and cutting operations; Step 5: Implement ventilation in the mining area to ensure airflow passes through the working face of the mining area; Step Six: When the ore body is fractured and the RQD value is <40%, construct relatively dense stope boundary control holes in the lower and upper segmented drilling access roads of the stope, respectively. The spacing between two adjacent stope boundary control holes should be 0.5-1m. At the same time, construct grouting holes on one side of the second-stage stope of the lower and upper segmented drilling access roads of the stope. Cement grout is injected into the grouting holes under high pressure, or long anchor cables are constructed on one side of the second-stage stope of the lower and upper segmented drilling access roads of the stope to reduce the impact of the first-stage stope blasting on the second-stage stope. Step 7: Construct slotting holes and medium-deep holes into the mining area within the segmented cutting tunnels of Step 1, the segmented drilling access roadways of the stope, the segmented cutting tunnels of Step 1, and the segmented drilling access roadways of the stope. Step 8: Carry out mining operations in the first-step stope; within the stope area, charge explosives in a stepped manner from top to bottom and blast in stages according to the design, and extract ore from the bottom structure through the ore extraction entrance and the stope trench; Step 9: Perform pressurized backfilling operation on the first-step mining area; Step 10: Conduct mining operations in the second-step mining area; After the strength of the filling body in the first-stage stope meets the requirements, the second-stage stope is mined using a single-path mining method. Step 11: Fill the two-step mining area with filler material; Step 12: Repeat steps 3 through 11 to complete one segment of the mining operation; Step 13: Repeat steps 2 to 12 to complete the mining operations for each intermediate section. The steps between steps seven and eight include the following: constructing a filling and connecting tunnel for the lower mining area at the location of the trench adjacent to the upper middle section of the corresponding mining area. After step thirteen, the next step is to excavate the mining trench in the next middle section. The mining trench excavation steps are as follows: after the first step of the mining filling body in the filling and connecting road has reached a certain strength, the mining trench is excavated at the corresponding position of the filling and connecting road.
2. A stope structure employing the method of mining steeply inclined fractured ore bodies with upward sub-sections without pillars followed by backfilling, as described in claim 1, characterized in that: The ore body is divided into sections every 55-65m from top to bottom along its height. Each section's stope, from top to bottom, includes an upper section, a lower section, and a bottom trench. First-stage and second-stage stopes are arranged at intervals along the strike of the ore body. In the upper and lower sections of the first-stage stope, two parallel stope drilling passes are arranged perpendicular to the strike of the ore body. In the upper and lower sections of the second-stage stope, one pillar stope drilling pass is arranged perpendicular to the strike of the ore body. Within the step-by-step stope, both the upper and lower sections are equipped with cutting ramps and external transport ramps. The cutting ramps are located at the first end of the corresponding drilling approach, and the external transport ramps are located at the second end of the corresponding drilling approach. The upper and lower section cutting ramps and the bottom trench are connected through the cutting riser and are located within the bottom structure. Both the first-step and second-step stopes are equipped with stop trenches along the direction perpendicular to the ore body strike. The stop trenches of the first-step stope are connected to the stop trenches of the second-step stope through the ore exit approach.
3. A stope structure employing the method of mining steeply inclined fractured ore bodies with upward sub-sections without pillars followed by backfilling, as described in claim 1, characterized in that: The width of the first-step mining area is less than the width of the second-step mining area.
4. A stope structure employing the method of mining steeply inclined fractured ore bodies with upward sub-sections without pillars followed by backfilling, as described in claim 1, characterized in that: The length of the mining trench is arranged perpendicular to the strike of the ore body, and the length of the ore access road is not perpendicular to the strike of the ore body.
5. A mining method for pre-reserved pillars and subsequent backfilling in steeply inclined fractured ore bodies, characterized by: Step 1: Divide the steeply inclined vein into several intermediate sections and determine the mining method. The mining method is as follows: mining is carried out from top to bottom. First, the upper intermediate section is mined, and then the adjacent lower intermediate section is mined. A roof pillar is reserved at the top of each intermediate section stop. Step 2: Determine the mining width of the first-stage stope and the second-stage stope within the mining section. Each section includes the upper sub-section, the lower sub-section, and the bottom structure from top to bottom. Step 3: Excavate the mining trench from the first-stage mining area and the adjacent second-stage mining area along the direction perpendicular to the ore body. At the same time, in the mining trench of the second-stage mining area, excavate the ore extraction path at a certain angle to the centerline of the roadway towards the mining trench of the first-stage mining area, forming the trench-type bottom structure and ore extraction path of the high-section mining area. Step 4: Excavate two lower segment drilling tunnels perpendicular to the ore body strike direction along the lower segment boundary of the first-step stope, and excavate two upper segment drilling tunnels perpendicular to the ore body strike direction along the upper segment boundary of the first-step stope; these will serve as construction sites for medium-deep holes and stope boundary control holes; excavate a further lower segment cutting level tunnel within the lower segment drilling tunnels of the stope, and excavate a further upper segment cutting level tunnel within the upper segment drilling tunnels of the stope; finally, excavate the stope cutting riser within the lower and upper segment cutting level tunnels of the first-step stope to complete the preparation and cutting operations; Step 5: Implement ventilation in the mining area to ensure airflow passes through the working face of the mining area; Step Six: When the ore body is fractured and the RQD value is <40%, construct relatively dense stope boundary control holes in the lower and upper segmented drilling access roads of the stope, respectively. The spacing between two adjacent stope boundary control holes should be 0.5-1m. At the same time, construct grouting holes on one side of the second-stage stope of the lower and upper segmented drilling access roads of the stope. Cement grout is injected into the grouting holes under high pressure, or long anchor cables are constructed on one side of the second-stage stope of the lower and upper segmented drilling access roads of the stope to reduce the impact of the first-stage stope blasting on the second-stage stope. Step 7: Construct slotting holes and medium-deep holes into the mining area within the segmented cutting tunnels of Step 1, the segmented drilling access roadways of the stope, the segmented cutting tunnels of Step 1, and the segmented drilling access roadways of the stope. Step 8: Carry out mining operations in the first-step stope; within the stope area, charge explosives in a stepped manner from top to bottom and blast in stages according to the design, and extract ore from the bottom structure through the ore extraction entrance and the stope trench; Step 9: Perform pressurized backfilling operation on the first-step mining area; Step 10: Conduct mining operations in the second-step mining area; After the strength of the filling body in the first-stage stope meets the requirements, the second-stage stope is mined using a single-path mining method. Step 11: Fill the two-step mining area with filler material; Step 12: Repeat steps 3 through 11 to complete one segment of the mining operation; Step 13: Repeat steps 2 to 12 to complete the mining operations for each intermediate section. Between steps seven and eight, the following steps are also included: in the adjacent upper middle section of the mining trench, constructing a top column filling hole and a top column venting hole for the top column; wherein the top column filling hole is used to fill the mining void after mining is completed with slurry, and the top column venting hole is used to vent air from the mining void.
6. A stope structure employing the pre-reserved roof pillar and subsequent backfilling mining method for steeply inclined fractured ore bodies as described in claim 5, characterized in that: The ore body is divided into sections every 55-65m from top to bottom along its height. Each section's stope includes an upper section, a lower section, and a bottom trench. First-stage and second-stage stopes are arranged at intervals along the strike of the ore body. In the upper and lower sections of the first-stage stope, two parallel stope drilling access roads are arranged perpendicular to the strike of the ore body. In the upper and lower sections of the second-stage stope, one pillar stope drilling access road is arranged perpendicular to the strike of the ore body. Within both the first and second-stage stopes, cutting adits and external transport adits are arranged in the upper and lower sections. The tunnel is located at the first end of the corresponding drilling approach, and the external transport tunnel is located at the second end of the corresponding drilling approach. The upper segmented cutting tunnel, the lower segmented cutting tunnel, and the bottom trench are connected through the cutting riser and are located within the bottom structure. Both the first-stage stope and the second-stage stope have stope trenches arranged along the direction perpendicular to the ore body. The stope trenches of the first-stage stope are connected to the stope trenches of the second-stage stope through the ore exit approach. A certain thickness of top pillar is reserved at the top of each intermediate section. The top pillar is equipped with a top pillar filling hole and a top pillar vent hole. The two ends of the top pillar filling hole and the top pillar vent hole are respectively connected to the filling connecting roadway and the stope void.
7. A stope structure employing the pre-reserved roof pillar and subsequent backfilling mining method for steeply inclined fractured ore bodies as described in claim 5, characterized in that: The width of the first-step mining area is less than the width of the second-step mining area.
8. A stope structure employing the pre-reserved roof pillar and subsequent backfilling mining method for steeply inclined fractured ore bodies as described in claim 5, characterized in that: The length of the mining trench is arranged perpendicular to the strike of the ore body, and the length of the ore access road is not perpendicular to the strike of the ore body.
Citation Information
Patent Citations
Open-stope subsequent filling mining method suitable for gently inclined medium-thick ore bodies
CN110644996A