A method for pre-controlling regional fracturing of a steeply inclined coal seam rock burst ground horizontal well
By using microseismic monitoring to determine the target fracturing layer in steeply inclined coal seam mining, and then deploying fracturing wells and perforating operations on the surface, the problem of small control range in traditional underground pre-fracturing was solved. This enabled effective pre-fracturing control of the roof of steeply inclined coal seams, reduced mine pressure, and improved mine safety.
Patent Information
- Application Number
- CN202410248972.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-03-05
AI Technical Summary
In steeply inclined coal seam mining, traditional underground roof pre-fracturing control technology has a limited scope, making it difficult to effectively control rockbursts and lacking reliable technical means.
By using microseismic monitoring to determine the rock stratum with the highest energy release during fracture, the target stratum for fracturing is identified. Fracturing wells are then drilled downwards from the surface and drilled into the horizontal section of the fracturing well along the strike of the steeply dipping coal seam. Perforation operations are then carried out, and fracturing fluid is pumped in using a surface high-pressure pump to perform the fracturing process.
It enables extensive and reliable pre-splitting control of the roof of steeply inclined coal seams, reduces the mine pressure intensity during the mining process, and improves the safety of the mining area.
Smart Images

Figure CN117988847B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal seam mining technology, and in particular to a method for pre-controlling fracturing in a horizontal well on the surface during rockburst in a steeply inclined coal seam. Background Technology
[0002] The manifestation of mining pressure in the stope is closely related to the characteristics of roof fracture. Especially in the case of mining steeply inclined coal seams with hard roofs, the fracture patterns of overlying strata and the manifestation of mining pressure are complex. The complex fracture structure of the hard roof has a direct impact on the manifestation of mining pressure in the stope. Therefore, according to the requirements of mining pressure control in the stope, pre-fracture control of the hard roof is an effective technical means to efficiently control mining pressure in the stope and reduce the degree of rockburst hazards.
[0003] Traditional roof fracturing control technologies include borehole blasting and hydraulic fracturing, but their control range is limited to within 50m due to underground environmental conditions, resulting in a relatively small area. Currently, rockburst control in steeply inclined coal seam mining is challenging and lacks reliable technical means. Summary of the Invention
[0004] In order to overcome the shortcomings of the prior art, the purpose of this invention is to provide a method for pre-control of fracturing in a horizontal well on the surface where a steeply inclined coal seam is subject to rockburst.
[0005] To achieve the above objectives, the present invention provides the following solution:
[0006] A method for pre-controlling fracturing in a horizontal well at the surface during rockburst in a steeply inclined coal seam includes:
[0007] During the mining of steeply inclined coal seams, the energy released by overburden fracturing during the working face mining of the steeply inclined coal seam is monitored by microseismic monitoring equipment, and the rock layer with the highest fracturing energy is identified as the target layer for fracturing.
[0008] Drilling begins from the ground downwards, with vertical fracturing well sections arranged. After reaching the target fracturing layer, horizontal fracturing well sections are drilled and arranged along the strike of the steeply dipping coal seam. The drilling and arrangement direction of the horizontal fracturing well sections is opposite to the advancing direction of the working face.
[0009] Perforation operations are performed in the horizontal section of the fractured well, along the dip direction of the target fractured layer.
[0010] A ground-based high-pressure pump is used to pump fracturing fluid into the target fracturing layer to complete the fracturing process.
[0011] Preferably, the vertical elevation distances between the horizontal section of the fracturing well and the planned mining level of the steeply dipping coal seam are Z2 and Z1, respectively.
[0012] Preferably, the normal distances between the horizontal section of the fractured well and the upper and lower planes of the target fractured layer are D2 and D1, respectively, wherein...
[0013] According to specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0014] This invention provides a method for pre-controlling fracturing in a horizontal well area of a steeply inclined coal seam prone to rockburst. The method includes: during the mining of a steeply inclined coal seam, monitoring the energy released by overlying rock fracturing during the working face extraction process using microseismic monitoring equipment, and identifying the stratum with the highest energy release as the target fracturing layer; drilling downwards from the surface and arranging vertical fracturing well sections; after reaching the target fracturing layer, drilling along the strike of the steeply inclined coal seam and arranging horizontal fracturing well sections; the drilling and arrangement direction of the horizontal fracturing well sections is opposite to the working face advancement direction; performing perforation operations in the horizontal fracturing well sections, perforating along the dip direction of the target fracturing layer; and using a surface high-pressure pump to pump fracturing fluid into the target fracturing layer to complete the fracturing process. This invention is reasonable and reliable, and has broad application prospects for pre-fracturing control of the roof of steeply inclined coal seams. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 A flowchart of the method provided in an embodiment of the present invention;
[0017] Figure 2 This is a schematic diagram of the arrangement of horizontal fracturing wells on the surface provided in an embodiment of the present invention;
[0018] Figure 3 A cross-sectional view of the layout of horizontal fracturing wells provided for an embodiment of the present invention.
[0019] Explanation of reference numerals in the attached figures:
[0020] 1-Vertical section of the fractured well, 2-Horizontal section of the fractured well, 3-Target fractured layer, 4-Steeply inclined coal seam. Detailed Implementation
[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0022] The purpose of this invention is to provide a method for pre-control of fracturing in a horizontal well on the surface during rockburst in steeply inclined coal seams. This invention is reasonable and reliable, and has broad application prospects for pre-fracturing control of the roof of steeply inclined coal seams.
[0023] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0024] Figure 1 The method flowchart provided in the embodiments of the present invention is as follows: Figure 1 As shown, this invention provides a method for pre-controlling fracturing in a horizontal well on the surface during rockburst in a steeply inclined coal seam, comprising:
[0025] Step 100: During the mining of steeply inclined coal seams, the energy released by overburden fracturing during the working face mining of the steeply inclined coal seam is monitored by microseismic monitoring equipment, and the rock layer with the highest fracturing energy is identified as the target layer for fracturing.
[0026] Step 200: Drill downwards from the ground and arrange vertical sections of the fracturing well. After reaching the target fracturing layer, drill along the strike of the steeply dipping coal seam and arrange horizontal sections of the fracturing well. The drilling and arrangement direction of the horizontal sections of the fracturing well is opposite to the advancing direction of the working face.
[0027] Step 300: Perform perforation operation in the horizontal section of the fractured well, perforating along the dip direction of the target fractured layer;
[0028] Step 400: Use a ground high-pressure pump to pump fracturing fluid into the target fracturing layer to complete the fracturing process.
[0029] This invention addresses the current technical bottleneck of lacking regional fracturing to weaken steeply inclined coal seams due to rockbursts during mining in areas with hard roofs, and provides a new surface horizontal well fracturing technology.
[0030] The main steps of this embodiment are as follows:
[0031] a. During the mining of steeply inclined coal seam 4, the energy released by overlying rock fracturing during the mining process is monitored by microseismic monitoring equipment, and the rock layer with the highest fracturing energy is selected as the target layer 3 for fracturing.
[0032] b. Let b and a be the upper and lower elevations of the proposed mining level for the steeply inclined coal seam 4, and let α be the dip angle of coal seam 4.
[0033] c. Drill downwards from the ground and arrange vertical section 1 of the fracturing well. After reaching the target fracturing layer 3, drill along the strike of coal seam 4 and arrange horizontal section 2 of the fracturing well. The drilling and arrangement direction of horizontal section 2 of the fracturing well is opposite to the working face advance direction. The length of vertical section 1 of the fracturing well is L1, and the length of horizontal section 2 of the fracturing well is L2.
[0034] d. The vertical elevation distances between the horizontal section 2 of the fractured well and the planned production level are Z2 and Z1, respectively. The distance between the vertical elevations of the planned production level is Z.
[0035] e. The normal distances between the horizontal section 2 of the fractured well and the upper and lower planes of the target fracture layer 3 are D2 and D1, respectively. The thickness of the target fracture layer is D.
[0036] f. Perform perforation in the horizontal section 2 of the fractured well, perforating along the dip direction of the target fractured layer 3 at a phase of 180°;
[0037] g. Use a ground high-pressure pump to pump fracturing fluid into the target layer 3 to complete the fracturing process.
[0038] like Figure 2 The diagram shows the horizontal well layout of the surface horizontal well regional fracturing pre-control technology for steeply inclined coal seam rockburst according to the present invention. Figure 3 This is a cross-sectional view of the horizontal well layout. The specific technical steps are as follows:
[0039] a. During the mining of steeply inclined coal seam 4, the energy released by overlying rock fracturing during coal mining is monitored by microseismic monitoring equipment, and the rock layer with the highest fracturing energy is selected as the target layer 3 for fracturing.
[0040] b. The upper and lower elevations of the proposed mining level for the steeply inclined coal seam 4 are +802m and +756m, and the dip angle of coal seam 4 is 60°.
[0041] c. Drill downwards from the ground and arrange vertical section 1 of the fracturing well. After reaching the target fracturing layer 3, drill along the strike of coal seam 4 and arrange horizontal section 2 of the fracturing well. The drilling and arrangement direction of horizontal section 2 of the fracturing well is opposite to the working face advance direction. Vertical section 1 of the fracturing well is 197m long and horizontal section 2 is 227m long.
[0042] d. The vertical elevation distances between the horizontal section 2 of the fractured well and the planned production level are 35.3m and 17.7m, respectively;
[0043] e. The normal distances between the horizontal section 2 of the fractured well and the upper and lower surfaces of the target fracture layer 3 are 22.1m and 10.9m, respectively;
[0044] f. Perform perforation in the horizontal section 2 of the fractured well, perforating along the dip direction of the target fractured layer 3 at a phase of 180°;
[0045] g. Use a ground high-pressure pump to pump fracturing fluid into the target layer 3 to complete the fracturing process.
[0046] Mine pressure monitoring showed that the mine pressure intensity during the mining process was significantly reduced after surface fracturing, verifying the correctness of the layout and parameters of the surface fracturing horizontal wells in steeply inclined coal seams. The above-mentioned layout method and parameters for surface fracturing horizontal wells are of great significance for efficiently controlling hard roofs, mitigating mine pressure dynamic hazards in the mining area, and ensuring the safe and efficient mining of coal seams in steeply inclined coal seams with hard roofs.
[0047] The beneficial effects of this invention are as follows:
[0048] 1) The selection of the fracturing layer takes into account the energy released by rock strata fracture and is monitored by microseismic equipment to ensure the rationality and reliability of the selection of the fracturing layer;
[0049] 2) Taking into full account the spatial characteristics of steeply inclined coal seams and the fracturing features of overlying strata, a suitable arrangement and parameters for surface fracturing horizontal wells were selected to meet the control requirements of the hard roof of steeply inclined coal seams.
[0050] 3) This technology has a simple horizontal well layout, strong applicability, and can be widely used for roof control of steeply inclined coal seams, with broad application prospects.
[0051] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
[0052] This document uses specific examples to illustrate the principles and implementation methods of the present invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of the present invention. Furthermore, those skilled in the art will recognize that, based on the ideas of the present invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of the present invention.
Claims
1. A method for pre-controlling fracturing in a horizontal well at the surface during rockburst in a steeply inclined coal seam, characterized in that, include: During the mining of steeply inclined coal seams, the energy released by overburden fracturing during the working face mining of the steeply inclined coal seam is monitored by microseismic monitoring equipment, and the rock layer with the highest fracturing energy is identified as the target layer for fracturing. Drilling begins from the ground downwards, with vertical fracturing well sections arranged. After reaching the target fracturing layer, horizontal fracturing well sections are drilled and arranged along the strike of the steeply dipping coal seam. The drilling and arrangement direction of the horizontal fracturing well sections is opposite to the advancing direction of the working face. Perforation operations are performed in the horizontal section of the fractured well, along the dip direction of the target fractured layer. A ground-based high-pressure pump is used to pump fracturing fluid into the target fracturing layer to complete the fracturing process.
2. The pre-control method for regional fracturing in a horizontal well at the surface during rockburst in a steeply inclined coal seam according to claim 1, characterized in that, The vertical elevation distances between the horizontal section of the fractured well and the planned mining level of the steeply dipping coal seam are Z2 and Z1, respectively.
3. The pre-control method for regional fracturing in a horizontal well at the surface during rockburst in a steeply inclined coal seam according to claim 1, characterized in that, The normal distances between the horizontal section of the fractured well and the upper and lower planes of the target fractured layer are D2 and D1, respectively.
Citation Information
Patent Citations
Roof and gas cooperative-control method based on hard roof ground fracturing
CN110067592A
Coal mine steeply-inclined coal seam large-section open-off cut pitching rock burst prevention and control method
CN112012742A