Karst geology cast-in-place pile hole-forming construction device and method

By using reinforcing cage components during the jet grouting pile drilling process, combined with high-pressure jet grouting to form a skeleton structure, the problem of insufficient bending resistance of jet grouting piles in karst areas has been solved, thus improving the strength and safety of jet grouting piles.

CN118007629BActive Publication Date: 2026-11-20CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410310939.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2026-11-20
Estimated Expiration
2044-03-19

AI Technical Summary

Technical Problem

When constructing jet grouting piles in karst areas, existing high-pressure jet grouting has weak bending resistance, and existing reinforcement measures have limited effectiveness in rock caves, failing to effectively guarantee the quality of pile hole formation and construction safety.

Method used

A construction device for drilling grouting piles in karst geological conditions is adopted, including a jet grouting machine body, drill rod and nozzle. The bending strength of the jet grouting pile is enhanced by reinforcing structural components. The reinforcing cage is composed of connecting rings, deflection bars, torsion springs and reinforcing bars. The skeleton structure is formed by high-pressure jet grouting, and the performance of the jet grouting pile is enhanced after the cement grout solidifies.

Benefits of technology

It effectively enhances the bending strength and structural strength of jet grouting piles, improves the overall performance of jet grouting piles, and ensures the quality of pile hole formation and construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118007629B_ABST
    Figure CN118007629B_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of underground building construction equipment, and particularly relates to a construction device and method for hole forming of a karst geology cast-in-place pile, which comprises a rotary jet machine main body, a drill rod and a spray head, the drill rod is installed on the rotary jet machine main body, and the spray head is detachably and fixedly installed at the end of the drill rod; further comprising a reinforcing structure assembly, the reinforcing structure assembly is used for reinforcing the bending strength of the rotary jet pile column; a positioning and installing assembly is used for installing a reinforcement cage in a karst cave in cooperation with the drill rod, and the reinforcement cage is used as the reinforcing structure assembly in the application, the deformation capacity of the reinforcement cage is utilized in the rotary jet pile construction process, the reinforcement cage is conveyed to the inside of the karst cave through the lead hole formed on the ground, and the shape of the reinforcement cage is restored to form a skeleton structure in the karst cave, then the rotary jeted cement slurry is combined with the skeleton structure, and the bending strength, structural strength and other performances of the finally manufactured rotary jet pile are enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of underground construction equipment, specifically a construction device and method for drilling grouting piles in karst geological conditions. Background Technology

[0002] With the acceleration of infrastructure construction, the development of the national economy, the continuous advancement of urbanization, the expanding scale of infrastructure construction, the increasing scarcity of land available for construction, the growing number of high-rise buildings, and the increasing intensity of underground space development, the construction environment is becoming increasingly complex, placing higher demands on the foundation engineering industry. The growing contradictions between human habitation, transportation, and the environment have led to a shift in land development from surface to underground space. The demand for underground space has spurred the development of deep foundation pit engineering. In these complex geological or deep foundation pit environments, cast-in-place concrete piles have been widely used in buildings, bridges, and highways. Given China's vast territory and diverse geological conditions, encountering karst caves is common during the construction of cast-in-place concrete piles. If karst caves are not properly treated, the quality of pile drilling cannot be guaranteed, and collapses may occur during the process, posing safety hazards.

[0003] For the treatment of karst caves, various construction schemes have been adopted, such as steel casing, grouting and filling reinforcement, and concrete backfilling. However, while these methods are feasible, they are time-consuming, costly, and complex. Under the guidance of the national policy of developing new construction technologies, a number of innovative construction methods have emerged. High-pressure jet grouting dual-liquid grouting technology for karst cave reinforcement has officially come into view. This method mainly involves injecting cement grout into the karst cave using a high-pressure grouting machine to achieve filling and reinforcement. Based on the actual situation of the project, the high-pressure jet grouting dual-liquid grouting technology was used to reinforce the karst cave, ensuring the quality of the bored pile hole formation, reducing the risk of hole collapse, and achieving significant social and economic benefits after implementation.

[0004] However, in practical applications, it has been found that jet grouting piles formed solely by high-pressure jet grouting have weak bending resistance due to their relatively simple composition and lack of structural framework. Related technologies often employ reinforcing bars to enhance the bending strength of jet grouting piles, such as the quadruple-tube high-pressure jet grouting pile construction method published in Chinese Patent No. 2019105226187. This method enhances the bending resistance of the jet grouting pile by installing reinforcing bars in the center. However, in karst areas, where the jet grouting pile is partially located within a cave, the reinforcing bars in the center provide insufficient bending resistance. Therefore, this invention proposes a construction device and method for drilling grouting piles in karst geological conditions to address the aforementioned technical problems.

[0005] The information disclosed in this background section is intended only to enhance the understanding of the overall background of the present invention and should not be construed as an admission or in any way implying that the information constitutes prior art known to those skilled in the art. Summary of the Invention

[0006] To overcome the shortcomings of existing technologies and solve the aforementioned technical problems, this invention proposes a construction device and method for drilling grout piles in karst geological conditions.

[0007] The technical solution adopted by the present invention to solve its technical problem is: a construction device for drilling grouting piles in karst geological conditions, comprising a jet grouting machine body, a drill rod and a nozzle, wherein the drill rod is installed on the jet grouting machine body and the nozzle is detachably fixedly installed at the end of the drill rod;

[0008] It also includes a reinforcing structural component, which is mounted on the drill pipe and is used to enhance the bending strength of the jet grouting pile;

[0009] The reinforcing structure component includes a reinforcing cage, which is initially detachably installed at the end of the drill rod. After the jet grouting pile is formed, the reinforcing cage is located inside the jet grouting pile.

[0010] The rib cage consists of a connecting ring, a deflection rib, a torsion spring, and reinforcing ribs;

[0011] The two connecting rings are symmetrically designed, and the connecting rings are provided with evenly distributed deflection grooves on one side close to each other. The deflection ribs are rotatably installed in the deflection grooves, and the two corresponding deflection ribs are close to each other and are hinged together with reinforcing ribs.

[0012] A torsion spring is fixedly installed inside the deflection groove, and the other end of the torsion spring is fixedly connected to the deflection rib. In the initial state, the rib cage is a cylindrical frame structure.

[0013] A positioning and installation component is mounted on the drill pipe and is used to cooperate with the drill pipe to install the reinforcing cage in the karst cave.

[0014] Preferably, both the deflection ribs and the reinforcing ribs are sheet-like structures, and the length directions of both the deflection ribs and the reinforcing ribs are arranged along the diameter direction of the connecting ring.

[0015] Preferably, the rib cages are designed in multiples, with an assembly groove on the lower connecting ring and an assembly component fixedly installed on the upper connecting ring. Adjacent rib cages are detachably and fixedly connected through the assembly groove and the assembly component.

[0016] Preferably, the deflecting ribs on two adjacent reinforcing cages are staggered. In the initial state, the deflecting ribs are perpendicular to the reinforcing ribs, and the length of the reinforcing ribs is greater than the distance between the two connecting rings.

[0017] Preferably, the positioning and mounting assembly includes a mounting ring, which is fixedly mounted below the nozzle.

[0018] The mounting ring has a positioning hole, and the connecting ring has a mating hole corresponding to the mounting ring. In the initial state, the positioning hole is equipped with a positioning pin, and the positioning pin has a fracture groove.

[0019] The diameters of the nozzle and drill rod are both smaller than the inner diameter of the connecting ring. The deflection rib is designed with an inclined surface facing one side of the connecting ring. In the conveying state, the deflection rib extends into the inner cavity of the connecting ring and is located on the movement path of the nozzle.

[0020] Preferably, the positioning and mounting assembly further includes a core rod, the bottom of which is fixedly mounted with a mounting plate, and the mounting plate is threadedly connected to the lowest assembly slot;

[0021] The nozzle and drill rod are both provided with through grooves. The through grooves are designed to be coaxial with the connecting ring, and the core rod extends into the through grooves.

[0022] Preferably, the nozzle has at least an upper spray hole, a lower spray hole, an oblique spray hole, and a straight spray hole. The upper spray hole, lower spray hole, oblique spray hole, and straight spray hole are evenly distributed on the nozzle. When the nozzle is in a vertical direction, the upper spray hole sprays obliquely upward, the lower spray hole sprays obliquely downward, the straight spray hole sprays along the diameter of the nozzle, and the oblique spray hole does not spray along the diameter of the nozzle.

[0023] Preferably, the upper spray hole, lower spray hole, oblique spray hole and straight spray hole are all conical holes, and their diameter gradually decreases as the distance from the outside world decreases.

[0024] A construction method for drilling grouting piles in karst geological conditions, the method comprising the following steps:

[0025] S1: Based on the exploration report, measure and locate the areas where karst caves exist, and level the site to be constructed;

[0026] S2: The down-the-hole hammer drill is in place and drilling operations begin at the designated location. A pilot hole is opened on the ground. After the pilot hole is opened, the cave is measured again, and the drill rod and nozzle are pushed into the cave. High-pressure airflow is used to refine the cave.

[0027] S3: The jet grouting machine is in place. After the jet grouting machine is in place, a test spray is carried out to check the parameters of the grouting machine, such as the grouting volume, grouting pressure, and lifting rotation speed. Necessary adjustments are made to ensure that the grouting machine's grouting supply system, mixing system, pressure system, etc. are all operating normally.

[0028] S4: Determine the jet grouting parameters based on the test spraying results, then connect the drill rod, mounting ring and nozzle, and connect multiple rib cages in sequence through the positioning and mounting components. With the cooperation of the jet grouting machine body and the drill rod, the rib cages are transported into the karst cave, and the pushing pressure is used to make the rib cages unfold in the karst cave.

[0029] S5: Continuously increase the pushing pressure to separate the drill rod, nozzle and the unfolded rib cage. Then, with the cooperation of the main body of the jet grouting machine, the drill rod and nozzle, high-pressure jet grouting operation is carried out in the karst cave.

[0030] S6: After the high-pressure jet grouting operation is completed, the pipe is pulled out and the equipment is cleaned. After the karst cave treatment is completed, the engineering pile construction is carried out.

[0031] The beneficial effects of this invention are as follows:

[0032] 1. The present invention discloses a construction device and method for drilling grouting piles in karst geological conditions. By using a reinforcing cage as a reinforcing structural component, during the jet grouting pile construction process, the deformation capacity of the reinforcing cage is utilized to transport it into the karst cave through a pilot hole opened on the ground. Inside the karst cave, the reinforcing cage completes its shape restoration to form a skeleton structure. Subsequently, the rotating jet grouting material is combined with the skeleton structure, thereby enhancing the bending strength, structural strength, and other properties of the final jet grouting pile.

[0033] 2. The construction device and method for drilling grouting piles in karst geological conditions as described in this invention misaligns the reinforcing bars of two adjacent reinforcing cages. Since the reinforcing cage is initially a cylindrical structure, the distance between the two connecting rings is the height of the cylindrical structure. Therefore, when the length of the reinforcing bar is greater than the distance between the two connecting rings, it means that the length of the reinforcing bar is greater than the height of the cylindrical structure. As a result, the reinforcing bar protrudes from the bottom surface of the cylindrical structure. When the upper and lower reinforcing cages are combined, there is partial overlap between the misaligned reinforcing bars, which further enhances the overall strength of the multiple reinforcing cages and thus effectively improves the performance of the jet grouting pile. Attached Figure Description

[0034] The invention will now be further described with reference to the accompanying drawings.

[0035] Figure 1 This is a partial perspective view of the construction device for drilling grouting piles in karst geological conditions according to the present invention;

[0036] Figure 2 This is a three-dimensional view of the reinforcing cage in the construction device for drilling grouting piles in karst geological conditions according to the present invention.

[0037] Figure 3 This is a partial cross-sectional view of the reinforcing cage in the construction device for drilling grouting piles in karst geological conditions according to the present invention.

[0038] Figure 4 yes Figure 3Enlarged view of a portion of point A in the middle;

[0039] Figure 5 This is a partial sectional view of the nozzle;

[0040] Figure 6 This is an assembly diagram of the connecting ring and the mounting ring;

[0041] Figure 7 It is a three-dimensional assembly view of the drill pipe, drill bit, and mounting ring;

[0042] Figure 8 This is a schematic diagram showing the connection between the core rod, drill rod, drill bit, and mounting ring;

[0043] Figure 9 This is a flowchart of the construction method for drilling grouting piles in karst geological conditions according to the present invention;

[0044] In the diagram: 1. Drill rod; 11. Nozzle; 2. Rib cage; 21. Connecting ring; 22. Deflection rib; 23. Torsion spring; 24. Reinforcing rib; 25. Deflection groove; 26. Assembly groove; 27. Assembly component; 3. Mounting ring; 31. Positioning pin; 32. Positioning hole; 33. Butt joint hole; 34. Fracture groove; 4. Core rod; 41. Mounting plate; 42. Through groove; 5. Upper spray hole; 51. Lower spray hole; 52. Angled spray hole; 53. Straight spray hole. Detailed Implementation

[0045] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with specific embodiments.

[0046] like Figures 1 to 9 As shown, the construction device for drilling grouting piles in karst geological conditions according to the present invention includes a jet grouting machine body, a drill rod 1 and a nozzle 11. The drill rod 1 is installed on the jet grouting machine body, and the nozzle 11 is detachably fixedly installed at the end of the drill rod 1.

[0047] It also includes a reinforcing structural component, which is mounted on the drill pipe 1 and is used to enhance the bending strength of the jet grouting pile.

[0048] The reinforcing structure component includes a reinforcing cage 2. In the initial state, the reinforcing cage 2 is detachably installed at the end of the drill rod 1. After the jet grouting pile is formed, the reinforcing cage 2 is located inside the jet grouting pile.

[0049] The rib cage 2 is composed of a connecting ring 21, a deflection rib 22, a torsion spring 23, and a reinforcing rib 24;

[0050] The two connecting rings 21 are symmetrically designed, and the connecting rings 21 are provided with evenly distributed deflection grooves 25 on one side close to each other. The deflection ribs 22 are rotatably installed in the deflection grooves 25, and the two corresponding deflection ribs 22 are close to each other on one side and are hinged together with reinforcing ribs 24.

[0051] A torsion spring 23 is fixedly installed in the deflection groove 25, and the other end of the torsion spring 23 is fixedly connected to the deflection rib 22. In the initial state, the rib cage 2 is a cylindrical frame structure.

[0052] A positioning and installation component is installed on the drill rod 1. The positioning and installation component is used to cooperate with the drill rod 1 to install the reinforcing cage 2 in the karst cave.

[0053] When constructing bored piles in karst geological areas, high-pressure jet grouting is used to inject cement slurry into the ground to form jet grouting piles. This effectively improves the construction environment and facilitates subsequent engineering pile construction. When using high-pressure jet grouting piles to improve karst geology, in order to enhance the performance of the jet grouting piles formed by high-pressure jet grouting and increase their bending resistance, a reinforcement structure is usually used for modification. In this invention, in order to enhance the improvement effect on the jet grouting piles, a reinforcement structure component is set up in combination with the jet grouting machine body, drill rod 1 and nozzle 11, which effectively enhances the modification effect on the jet grouting piles.

[0054] Specifically, when treating karst caves in karst areas, the first step is to perform pilot hole drilling in a pre-selected area according to the construction drawings. Then, jet grouting can be carried out. First, the main body of the jet grouting machine is assembled with drill rod 1 and nozzle 11, and then it is adjusted. After adjustment, the reinforcing structure component is installed on drill rod 1 using a positioning and installation assembly. Driven by drill rod 1, it is pushed into the karst cave through the pre-drilled pilot hole. Since the reinforcing structure component is a rib cage 2, and the rib cage 2 consists of a connecting ring 21, deflection rib 22, torsion spring 23, and reinforcing rib 24, the initial state... Under the force of the torsion spring 23, the rib cage 2 forms a cylindrical frame structure. Two connecting rings 21 are located at the center of the upper and lower bottom surfaces of the cylindrical structure, while deflection ribs 22 are evenly distributed on the two bottom surfaces. Reinforcing ribs 24, hinged to the deflection ribs 22, are evenly distributed on the curved surface of the cylindrical structure. After the rib cage 2 is installed on the assembly of the drill rod 1 and nozzle 11 using the positioning and mounting components, the operator manually presses the deflection ribs 22, causing them to gradually rotate. This eventually leads to a gradual decrease in the diameter of the rib cage 2. 2. After the diameter is slightly smaller than the diameter of the pilot hole, insert the end of the reinforcing cage 2 away from the drill rod 1 into the pilot hole. Under the pushing action of the drill rod 1, it is gradually pushed into the cave through the pilot hole. As the pushing distance increases, the reinforcing cage 2 gradually extends into the cave. At this point, it is no longer limited by external factors such as the diameter of the pilot hole. Under the elastic action of the torsion spring 23, the reinforcing cage 2 has a tendency to return to its original shape. At the same time, combined with the pushing force of the drill rod 1 on the reinforcing cage 2 and the supporting effect of the bottom of the cave on the bottom of the reinforcing cage 2, the reinforcing cage 2 returns to a cylindrical frame structure. At this time, continue to push the drill rod 1 to position and install. Under the action of the components, the drill rod 1, nozzle 11 and reinforcement cage 2 are disconnected. After the nozzle 11 on the drill rod 1 is pushed to the bottom of the karst cave, the cement slurry is transported into the nozzle 11 by the main body of the jet grouting machine and sprayed into the karst cave through the nozzle 11. During the spraying process, the drill rod 1 drives the nozzle 11 to rotate and lift, and gradually form a jet grouting pile. During the formation of the jet grouting pile, the cement slurry combines with the reinforcement cage 2. The reinforcement cage 2 is used to modify the finally solidified jet grouting pile, so that the reinforcement cage 2 serves as the skeleton structure of the jet grouting pile, thereby enhancing the performance of the jet grouting pile.

[0055] This invention uses a reinforcing cage 2 as a reinforcing structural component. During the construction of jet grouting piles, the deformation capacity of the reinforcing cage 2 is utilized to transport it into the interior of a karst cave through a pilot hole opened on the ground. Inside the karst cave, the reinforcing cage 2 completes its shape restoration to form a skeleton structure. Subsequently, the rotating jet grouting material is combined with the skeleton structure, thereby enhancing the bending strength, structural strength, and other properties of the final jet grouting pile.

[0056] In a preferred embodiment of the present invention, both the deflection rib 22 and the reinforcing rib 24 are sheet-like structures;

[0057] To minimize the impact of substances within the karst cave on the shape restoration of the reinforcing cage 2 during installation, pre-treatment of the karst cave can be performed before installation, based on the detected and measured parameters and actual conditions. This pre-treatment involves adjustments to the karst cave. Specifically, in this embodiment, to ensure a closer fit between the reinforcing cage 2 and the karst cave, before installation, workers extend the drill rod 1 and nozzle 11 into the karst cave and use high-pressure airflow to reshape the cave, thereby removing any soil blocks and rock layers that may be present within the cave. After cutting and breaking, the reinforcing cage 2 is lowered into the karst cave. When the reinforcing cage 2 is unfolded, since the deflecting ribs 22 and the reinforcing ribs 24 move outward from the axis of the connecting ring 21, the deflecting ribs 22 and the reinforcing ribs 24 are made of sheet-like structures. This reduces the probability of the deflecting ribs 22 and the reinforcing ribs 24 being blocked by surrounding soil, stones and other objects during the outward expansion process. Under the external force applied by the drill rod 1, the extension of the deflecting ribs 22 and the reinforcing ribs 24 into the surrounding soil layer is enhanced.

[0058] As a preferred embodiment of the present invention, the rib cage 2 is designed in multiple ways. An assembly groove 26 is provided on the lower connecting ring 21, and an assembly component 27 is fixedly installed on the upper connecting ring 21. Two adjacent rib cages 2 are detachably and fixedly connected by the assembly groove 26 and the assembly component 27.

[0059] Due to the change in construction location, the volume and size of the karst caves that need improvement vary. Therefore, by using multiple reinforcing cages 2, in actual operation, the karst cave to be treated is first detected and measured. Then, based on the measured data, an appropriate number of reinforcing cages 2 are selected and connected. During connection, two adjacent reinforcing cages 2 are detachably fixedly connected through the assembly groove 26 and assembly component 27 on the connecting ring 21. Specifically, in this invention, the assembly groove 26 and assembly component 27 can be a combination of threaded grooves and hollow threaded pipes, or other connection methods adjusted by manual operation. They are only used to connect two adjacent reinforcing cages 2. After multiple reinforcing cages 2 are connected in sequence, they are connected to the drill rod 1 and nozzle 11 through the positioning and installation components. Then, multiple reinforcing cages 2 are pushed into the karst cave, allowing the reinforcing cages 2 to unfold one by one in the karst cave. With the high-pressure rotary jetting of cement slurry, a jet grouting pile is finally formed to improve the karst cave.

[0060] In a preferred embodiment of the present invention, the deflection ribs 22 on two adjacent reinforcing cages 2 are staggered. In the initial state, the deflection ribs 22 are perpendicular to the reinforcing ribs 24, and the length of the reinforcing ribs 24 is greater than the distance between the two connecting rings 21.

[0061] When actually connecting two adjacent reinforcing cages 2, the deflection ribs 22 of the two reinforcing cages 2 are misaligned. Therefore, after the reinforcing cages 2 are unfolded, the positions of the reinforcing ribs 24 of the two adjacent reinforcing cages 2 are misaligned. At the same time, since the reinforcing cage 2 is a cylindrical structure in the initial state, the distance between the two connecting rings 21 is the height of the cylindrical structure. Therefore, when the length of the reinforcing rib 24 is greater than the distance between the two connecting rings 21, that is, when the length of the reinforcing rib 24 is greater than the height of the cylindrical structure, the reinforcing rib 24 protrudes from the bottom surface of the cylindrical structure. When the two reinforcing cages 2 are combined, there is a partial overlap between the misaligned reinforcing ribs 24, which further enhances the overall strength of the multiple reinforcing cages 2, thereby effectively improving the performance of the jet grouting pile.

[0062] In a preferred embodiment of the present invention, the positioning and mounting assembly includes a mounting ring 3, which is fixed below the mounting nozzle 11;

[0063] The mounting ring 3 has a positioning pin 31, and the connecting ring 21 has a docking hole 33 at the mounting ring 3. In the initial state, the positioning pin 31 is installed in the positioning hole 32, and the positioning pin 31 has a fracture groove 34.

[0064] The diameters of the nozzle 11 and the drill rod 1 are both smaller than the inner diameter of the connecting ring 21. The deflection rib 22 is designed with an inclined surface facing the connecting ring 21. In the conveying state, the deflection rib 22 extends into the inner cavity of the connecting ring 21, and the deflection rib 22 is located on the movement path of the nozzle 11.

[0065] The positioning and installation assembly is used to connect the reinforcing cage 2 with the drill rod 1 and the nozzle 11. During installation, the mounting ring 3 is installed below the nozzle 11, preferably via a threaded connection. The drill rod 1, mounting ring 3, and nozzle 11 all have the same diameter. The assembly of the drill rod 1, mounting ring 3, and nozzle 11 is then inserted into the connecting ring 21 on the reinforcing cage 2. Once the mating hole 33 on the connecting ring 21 aligns with the positioning hole 32 on the mounting ring 3, the operator inserts the positioning pin 31 into the positioning hole 32, thus connecting the reinforcing cage 2 with the mounting ring 3. The reinforcing cage 2 is then transported into the karst cave via the drill rod 1. At this time, the operator continues to... After the bottom of the reinforcing cage 2 reaches the bottom of the karst cave, it gradually unfolds under the support of the karst cave and the thrust of the drill rod 1. When the reinforcing cage 2 is fully unfolded, pressure is applied to the positioning pin 31. Since the positioning pin 31 has a fracture groove 34, when the pressure exceeds the working pressure of the positioning pin 31, the positioning pin 31 breaks neatly with the assistance of the fracture groove 34, causing the installation ring 3 to separate from the reinforcing cage 2. At this time, the worker pushes the push rod, which causes the drill rod 1 to drive the nozzle 11 to move up and down inside the reinforcing cage 2, so that cement slurry can be sprayed into the karst cave through the drill rod 1 and the nozzle 11.

[0066] In a preferred embodiment of the present invention, the positioning and mounting assembly further includes a core rod 4, and a mounting plate 41 is fixedly mounted on the bottom of the core rod 4. The mounting plate 41 is threadedly connected to the lowermost assembly groove 26.

[0067] Through groove 42, both the nozzle 11 and the drill rod 1 are provided with through groove 42, the through groove 42 is coaxial with the connecting ring 21, and the core rod 4 extends into the through groove 42;

[0068] The core rod 4 and the through groove 42 serve two purposes. First, when the reinforcing cage 2 is combined with the drill rod 1, the core rod 4 is inserted into the through groove 42, thereby positioning the connecting ring 21 and the mounting ring 3. This facilitates the guiding of the lifting and lowering movement of the drill rod 1 and the nozzle 11 within the reinforcing cage 2, enhancing the stability of the drill rod 1 and the nozzle 11 during the high-pressure jet grouting process. Second, since the core rod 4 extends into the through groove 42, its length is greater than the combined height of multiple reinforcing cages 2. After the reinforcing cage 2 is installed inside the karst cave, part of the core rod 4 extends into the pilot hole, further enhancing the strength of the jet grouting pile after it is formed. At the same time, since the reinforcing cage 2 and the core rod 4 together form a structure that is smaller at the top and larger at the bottom, combined with the structural shape of the karst cave and the pilot hole, the tensile and pull-out resistance of the jet grouting pile is enhanced.

[0069] In a preferred embodiment of the present invention, the nozzle 11 is provided with at least an upper spray hole 5, a lower spray hole 51, an oblique spray hole 52, and a straight spray hole 53. The upper spray hole 5, the lower spray hole 51, the oblique spray hole 52, and the straight spray hole 53 are evenly distributed on the nozzle 11. When the nozzle 11 is in a vertical direction, the upper spray hole 5 sprays obliquely upward, the lower spray hole 51 sprays obliquely downward, the straight spray hole 53 sprays along the diameter of the nozzle 11, and the oblique spray hole 52 does not spray along the diameter of the nozzle 11.

[0070] Due to the presence of the reinforcing cage 2, the nozzle 11 provides some obstruction to the cement slurry during the high-pressure jet grouting process. By adjusting the nozzle holes on the nozzle 11, at least an upper nozzle 5, a lower nozzle 51, an oblique nozzle 52, and a straight nozzle 53 are present on the nozzle 11, thereby diversifying the spraying path of the cement slurry and effectively reducing the obstruction of the reinforcing cage 2 to the cement slurry. Through the multi-angle spraying of cement slurry, the final jet grouting pile structure is compact.

[0071] In a preferred embodiment of the present invention, the upper spray hole 5, the lower spray hole 51, the oblique spray hole 52 and the straight spray hole 53 are all conical holes, and their diameters gradually decrease as the distance from the outside world decreases.

[0072] The conical orifice design reduces the clogging of the nozzle 11 by external soil during the raising and lowering process. On the other hand, it enhances the impact force of the cement slurry sprayed by the nozzle 11 by adjusting the pressure of the main body of the rotary jet grouting machine during the spraying process.

[0073] A construction method for drilling grouting piles in karst geological conditions, the method comprising the following steps:

[0074] S1: Based on the exploration report, measure and locate the areas where karst caves exist, and level the site to be constructed;

[0075] S2: The down-the-hole hammer drill is in place and drilling operations begin at the designated location. A pilot hole is opened on the ground. After the pilot hole is opened, the cave is measured again, and the drill rod 1 and nozzle 11 are pushed into the cave. The high-pressure airflow is used to repair the cave.

[0076] S3: The jet grouting machine is in place. After the jet grouting machine is in place, a test spray is carried out to check the parameters of the grouting machine, such as the grouting volume, grouting pressure, and lifting rotation speed. Necessary adjustments are made to ensure that the grouting machine's grouting supply system, mixing system, pressure system, etc. are all operating normally.

[0077] S4: Determine the jet grouting parameters based on the test spraying results, then connect the drill rod 1, the mounting ring 3 and the nozzle 11, and connect multiple reinforcing cages 2 in sequence through the positioning and mounting components. With the cooperation of the jet grouting machine body and the drill rod 1, the reinforcing cages 2 are transported into the karst cave, and the pushing pressure is used to make the reinforcing cages 2 unfold in the karst cave.

[0078] S5: Continuously increase the pushing pressure to separate the drill rod 1, nozzle 11 from the unfolded rib cage 2. Then, with the cooperation of the main body of the jet grouting machine, drill rod 1, and nozzle 11, high-pressure jet grouting operation is carried out in the karst cave.

[0079] S6: After the high-pressure jet grouting operation is completed, the pipe is pulled out and the equipment is cleaned. After the karst cave treatment is completed, the engineering pile construction is carried out.

[0080] Specifically, when the site is leveled, the construction axis and the parts that need to be jet grouted are measured and marked according to the construction drawings, coordinate grid points and preliminary exploration reports. The hole positions are determined on the construction axis and assigned pile numbers, hole numbers and serial numbers. The deviation between the drilling position and the center of the pile shall not exceed 50mm.

[0081] Based on the previously measured locations, the down-the-hole drill rig is positioned for pilot hole drilling. Obstacles and weeds are cleared, and the construction site is ensured to be flat and stable to provide a safe operating environment. The foundation on which the down-the-hole hammer drill rig is placed is ensured to be stable and level, and anchor bolts are installed for fixation. A level or other measuring tools are used to adjust the horizontal position of the down-the-hole hammer drill rig, keeping the drill rod perpendicular to the ground and ensuring the machine body is level to guarantee drilling accuracy and effectiveness. Pilot hole drilling, as one of the steps in forming karst piles, helps improve grouting efficiency. When drilling in layers, due to improper operation or some layers being relatively loose, the borehole opening may be filled with soil, rocks, debris, or other impurities. These impurities can affect the smoothness and uniformity of high-pressure jet grouting, and may also cause blockage or overflow of the grouting pipe, thus affecting the stability of the foundation. Therefore, the presence of pilot holes ensures that the grouting process does not encounter obstacles such as stones or hardened materials in the soil, making the construction of high-pressure jet grouting piles smoother and the reinforcement effect better.

[0082] In this embodiment, the spraying is performed in the following order:

[0083] (1) Equipment and material selection: Cement-water glass mixed grout is used for grouting. P.O42.5 ordinary Portland cement is used with a water-cement ratio of 0.5. Water glass with a modulus of 2.4 to 3.4 and a concentration of 30 to 45 Baume is used. The water glass admixture ratio is 15%. The initial setting time of the grout is controlled at 30 to 60 minutes.

[0084] (2) Test spraying: Conduct ground test spraying to check the operation of mechanical equipment and pipelines, and adjust the spraying direction and placement angle to determine the spraying parameters;

[0085] (3) Jetting grouting: After the test spraying meets the requirements, jet grouting operation shall be carried out. After the nozzle is lowered to the design depth, in-situ spraying shall be carried out according to the specified parameters. The spraying operation can only be started after the grout returns to the orifice and the situation is normal. The spraying operation shall be carried out continuously from top to bottom, and the lifting speed shall be controlled at 5 to 10 cm / min. If the spraying pipeline needs to be disassembled in the middle, the overlapping section shall be re-sprayed. The re-spraying length shall not be less than 0.2 m, and the following matters shall be noted.

[0086] Before construction, prepare drainage ditches and mud pits. During construction, waste slurry should be introduced into or discharged into the mud pit. After sedimentation and solidification, it should be transported to an off-site location for storage or disposal. This can effectively handle the slurry and keep the construction site clean.

[0087] Before jet grouting, inspect the high-pressure equipment and pipeline system. The pressure and flow rate must meet the design requirements. There must be no foreign matter in the grouting pipe, and the sealing rings of the grouting pipe joints must be in good condition. This can ensure the normal operation of the high-pressure equipment and avoid problems during the grouting process.

[0088] Records should be kept for each borehole, including the actual location, depth, underground obstacles within each borehole, and grouting volume. This allows for timely monitoring of the construction progress and provides a basis for subsequent quality monitoring.

[0089] Once the drill rod has penetrated the soil and the nozzle has reached the design elevation, grouting can begin according to the determined construction parameters. During grouting, the predetermined injection pressure should be reached first, and once the flow rate is normal, the grouting pipe should be gradually raised, and grouting should proceed from bottom to top in a rotary motion. This ensures uniform filling and reinforcement of the grout.

[0090] Each time the jet grouting is performed, the grout should be sprayed first, and then the equipment should be rotated and lifted to prevent the grout pipe from twisting and breaking. This ensures the safety of the construction and prevents equipment damage.

[0091] When preparing cement grout, the water-cement ratio should be strictly controlled according to the design and should not be changed arbitrarily. During the spraying process, cement grout sedimentation should be prevented to avoid reducing its concentration. The mixing time after each addition should not be less than 3 minutes. The grout should be poured into the aggregate hopper before grouting. Cement grout should be mixed and used immediately to ensure stable quality and reliable construction results.

[0092] When abnormal situations such as sudden drop, rise or large amount of grout leakage occur during high-pressure jet grouting, the cause should be identified and measures should be taken in a timely manner. This can quickly solve the problem and avoid further affecting the construction progress and quality.

[0093] If the grout or air supply is interrupted, immediately lower the nozzle to 0.3 meters below the point of interruption, and raise it again after the supply is restored. This will maintain the continuity and stability of the grouting process.

[0094] When the pile is raised to a depth of 1.0 meter below the design pile top, the lifting speed is slowed down to the design elevation. This ensures that the grouting meets the design requirements and avoids unexpected situations during construction.

[0095] After the grouting operation is completed, the slurry that has emerged is poured back into the hole until it stops sinking. This makes full use of the slurry, reduces waste, and improves the grouting effect.

[0096] When performing jet grouting, it is necessary to strictly follow the relevant specifications and operating requirements to ensure construction quality and project safety. At the same time, construction personnel should have relevant technical experience and professional knowledge to cope with various construction situations and handle problems in a timely manner.

[0097] (4) Waste mud treatment: During the jet grouting process, a lot of waste mud is generated. It is strictly forbidden to discharge it directly into the municipal stormwater and sewage pipes. In order to ensure the cleanliness of the site and the requirements of safe and civilized construction, a mud pit is set up on site. After solidification, it is transported to a designated location for treatment.

[0098] (5) Equipment cleaning: After the high-pressure jet grouting is completed, the grouting pipe should be pulled out quickly and the grouting pump and pump pipe should be cleaned immediately to prevent the slurry from solidifying and blocking the pump pipe, causing the pressure in the pipe to increase suddenly and cause an accident when the grouting is repeated. If a malfunction occurs during construction, the pressure must be released before the connection interface can be removed. The connection interface must not be removed under high pressure. After cleaning, move the jet grouting machine to the next karst cave for treatment.

[0099] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction device for drilling grouting piles in karst geological conditions, comprising a jet grouting machine body, a drill rod (1) and a nozzle (11), wherein the drill rod (1) is mounted on the jet grouting machine body and the nozzle (11) is detachably fixedly mounted on the end of the drill rod (1); Its features are: It also includes a reinforcing structural component, which is mounted on the drill pipe (1) and is used to enhance the bending strength of the jet grouting pile; The reinforcing structure component includes a reinforcing cage (2). In the initial state, the reinforcing cage (2) is detachably installed at the end of the drill rod (1). After the jet grouting pile is formed, the reinforcing cage (2) is located inside the jet grouting pile. The rib cage (2) is composed of a connecting ring (21), a deflection rib (22), a torsion spring (23), and a reinforcing rib (24); The two connecting rings (21) are symmetrically designed, and the connecting rings (21) are provided with evenly distributed deflection grooves (25) on one side close to each other. The deflection ribs (22) are rotatably installed in the deflection grooves (25), and the two corresponding deflection ribs (22) are close to each other on one side and are hinged together with reinforcing ribs (24). A torsion spring (23) is fixedly installed in the deflection groove (25), and the other end of the torsion spring (23) is fixedly connected to the deflection rib (22). In the initial state, the rib cage (2) is a cylindrical frame structure. A positioning and installation assembly is installed on the drill rod (1). The positioning and installation assembly is used to cooperate with the drill rod (1) to install the reinforcing cage (2) in the karst cave. The deflection rib (22) and the reinforcing rib (24) are both sheet-like structures, and the length direction of the deflection rib (22) and the reinforcing rib (24) are both arranged along the diameter direction of the connecting ring (21); The rib cage (2) is designed in multiples. An assembly groove (26) is provided on the lower connecting ring (21), and an assembly component (27) is fixedly installed on the upper connecting ring (21). Two adjacent rib cages (2) are detachably and fixedly connected through the assembly groove (26) and the assembly component (27). The positioning and mounting assembly includes a mounting ring (3), which is fixedly mounted below the nozzle (11). The positioning pin (31) has a positioning hole (32) on the mounting ring (3), and the connecting ring (21) has a docking hole (33) at the location corresponding to the mounting ring (3). In the initial state, the positioning pin (31) is installed in the positioning hole (32), and the positioning pin (31) has a fracture groove (34). The diameters of the nozzle (11) and drill rod (1) are both smaller than the inner diameter of the connecting ring (21). The deflection rib (22) is designed with an inclined surface facing the connecting ring (21). In the conveying state, the deflection rib (22) extends into the inner cavity of the connecting ring (21), and the deflection rib (22) is located on the movement path of the nozzle (11). The positioning and mounting assembly also includes a core rod (4), and a mounting plate (41) is fixedly mounted on the bottom of the core rod (4). The mounting plate (41) is threadedly connected to the lowest assembly slot (26). Through groove (42), both the nozzle (11) and the drill rod (1) are provided with through groove (42), the through groove (42) and the connecting ring (21) are designed coaxially, and the core rod (4) extends into the through groove (42).

2. The construction device for drilling grouting piles in karst geological conditions according to claim 1, characterized in that: The deflection ribs (22) on the two adjacent rib cages (2) are designed to be staggered. In the initial state, the deflection ribs (22) are perpendicular to the reinforcing ribs (24), and the length of the reinforcing ribs (24) is greater than the distance between the two connecting rings (21).

3. The construction device for drilling grouting piles in karst geological conditions according to claim 2, characterized in that: The nozzle (11) is provided with at least an upper spray hole (5), a lower spray hole (51), an oblique spray hole (52) and a straight spray hole (53). The upper spray hole (5), lower spray hole (51), oblique spray hole (52) and straight spray hole (53) are evenly distributed on the nozzle (11). When the nozzle (11) is in the vertical direction, the upper spray hole (5) sprays obliquely upward, the lower spray hole (51) sprays obliquely downward, the straight spray hole (53) sprays along the diameter of the nozzle (11), and the oblique spray hole (52) does not spray along the diameter of the nozzle (11).

4. The construction device for drilling grouting piles in karst geological conditions according to claim 3, characterized in that: The upper spray hole (5), lower spray hole (51), oblique spray hole (52) and straight spray hole (53) are all conical holes, and their diameter gradually decreases as the distance from the outside world decreases.

5. A construction method for drilling grouting piles in karst geological conditions, characterized in that: This method is applicable to the construction device for drilling grouting piles in karst geological conditions as described in claim 4, and the method includes the following steps: S1: Based on the exploration report, measure and locate the areas where karst caves exist, and level the site to be constructed; S2: The down-the-hole hammer drill is in place and drilling operations begin at the designated location. A pilot hole is opened on the ground. After the pilot hole is opened, the cave is measured again, and the drill rod (1) and nozzle (11) are pushed into the cave. The cave is repaired using high-pressure airflow. S3: The rotary grouting machine is in place. After the rotary grouting machine is in place, a test spray is carried out to check the grouting volume, grouting pressure, and rotation speed of the grouting machine. Necessary adjustments are made to ensure that the grouting machine's grouting supply system, mixing system, and pressure system are all operating normally. S4: Determine the jet grouting parameters based on the test spraying results, then connect the drill rod (1), the mounting ring (3) and the nozzle (11), and connect multiple rib cages (2) in sequence through the positioning and installation components. With the cooperation of the jet grouting machine body and the drill rod (1), the rib cages (2) are transported to the karst cave, and the pushing pressure is used to make the rib cages (2) unfold in the karst cave. S5: Continuously increase the pushing pressure to separate the drill rod (1), nozzle (11) from the unfolded rib cage (2), and then, with the cooperation of the main body of the rotary jetting machine, the drill rod (1), and the nozzle (11), high-pressure rotary jetting operation is carried out in the karst cave. S6: After the high-pressure jet grouting operation is completed, the pipe is pulled out and the equipment is cleaned. After the karst cave treatment is completed, the engineering pile construction is carried out.

Citation Information

Patent Citations

  • Cast-in-situ bored pile structure in karst area

    CN216515545U

  • Method for erection of bored pile with soil-cement broadenings in weak soils zone and device for its implementation (versions)

    RU2725363C1