A central radiating stope configuration and mining method
By adopting a central radial stope structure and mining method, the problems of long exposure time of the stope sidewalls, uneven blasting block size, and unstable bottom ore extraction structure were solved. This achieved the effects of flat stope sidewalls, uniform blasting block size, and high stability of the ore extraction structure, thereby reducing engineering costs.
Patent Information
- Application Number
- CN202410258831.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-03-07
AI Technical Summary
Existing technologies for mining thick and large ore bodies in metal mines suffer from problems such as premature exposure of the sidewalls of the stope, uneven blasting block size, and unstable bottom ore extraction structure.
The central radial stope structure is adopted. By constructing roadways and connecting roadways at the bottom and top of the stope, combined with large-diameter deep-hole blasting and backfilling, the sidewall exposure time of the stope is short, the blasted block size is uniform, and the bottom ore extraction structure is highly stable.
Shorten the exposure time of the sidewalls in the stope, achieve uniform blasting block size, improve the stability and safety of the ore loading route, and reduce the engineering cost of the ore extraction structure.
Smart Images

Figure CN118008306B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mining technology, and more particularly to a central radial stope structure and mining method. Background Technology
[0002] Currently, in the mining of medium to steeply dipping, thick ore bodies and horizontal to gently dipping, thick ore bodies in metal mines, the staged open-cut mining method is the main approach. This method mainly involves ore extraction from the center to both sides, from one side to the other, or from bottom to top in a step-down manner. All of these ore extraction methods suffer from the following drawbacks: premature exposure of the stope sidewalls leading to varying degrees of sidewall collapse; and non-compression blasting resulting in excessively large and uneven blasting blocks. At the same time, the ore extraction structure at the bottom of the trench mainly uses a herring-type loading path. When mining the second-stage stope, it is necessary to back-excavate the ore extraction roadway and loading path within the first-stage backfill, which involves a large amount of engineering work and poor stability of the loading path.
[0003] In summary, current open-cut mining technologies cannot achieve the effects of short exposure time of the stope sidewalls, uniform blasting block size, and high stability of the bottom ore extraction structure.
[0004] Therefore, it is of great significance to develop a central radial stope structure and mining method. Summary of the Invention
[0005] The objective of this invention is to overcome the shortcomings of the prior art and provide a central radial stope structure and mining method that can shorten the exposure time of the stope sidewalls, make the blasted blocks more uniform, and improve the stability of the bottom ore extraction structure.
[0006] The objective of this invention is achieved through the following technical solution:
[0007] A central radial stope structure and mining method addresses the shortcomings of long sidewall exposure time, uneven blasting block size, and poor stability of bottom ore extraction structure. The method divides the stope along the ore body strike, first recovering the stope and then the pillars. Specific technological steps and conditions include:
[0008] A. Construct a cross-vein transport roadway (2) at the bottom of the mining area to connect the external transport roadway (1) of the upper and lower plates. Construct an internal transport roadway (3) at the ore-rock interface of the upper and lower plates respectively. Construct a loading roadway (4) in the cross-vein transport roadway (2) and internal transport roadway (3) at the bottom of each mining area to reach the center of the mining area.
[0009] B. Construct an external connecting roadway (5) from the external transport roadway (1) on the upper and lower plates of the mining area to reach the ore body. Construct a top-cutting rock drilling roadway (6) on the top of the mining area. The top-cutting rock drilling roadways (6) are connected by a top-cutting connecting roadway (7). Construct a cutting riser (8) in the center of the top of the mining area to connect with the ore loading roadway (4) at the bottom of the mining area.
[0010] C. Construct large-diameter deep holes (10) parallel to the bottom in the square-shaped top-cutting rock drilling tunnel (6), with the cutting well (8) as the free face, and blast in stages from the center of the mining area outward. The blasted ore (11) is transported out from the loading roadway (4) by a loader.
[0011] D. After the ore is extracted from the first-step stope, the goaf is filled with a high-strength backfill body (12);
[0012] E. Repeat step AC to return to the mining area. After the mining area is fully mined, use low-ratio filling material (12) to fill the goaf.
[0013] Compared with the prior art, the present invention has the following advantages or effects:
[0014] (1) Because the central radial stage ore cutting is adopted, the exposure time of the stope sidewalls can be shortened and the blasting block size can be made uniform. After the stope is finished, the stope sidewalls are flat and low-loss ore cutting can be achieved.
[0015] (2) At the same time, since it is a central radial stage ore falling, the ore is squeezed and blasted during blasting, so the blasted block size is more uniform and the proportion of large blocks is lower.
[0016] (3) In addition, since there is no need to excavate the ore roadway and loading route in the filling body, the stability and safety of the loading route are greatly improved, while the excavation cost of the ore structure is greatly reduced. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of a stope based on a central radial stope structure and mining method.
[0018] Figure 2 for Figure 1 A schematic diagram of the bottom ore extraction structure of the shown mining area.
[0019] Figure 3 for Figure 1 The diagram shows the layout of the roof cutting project in the shown mining area.
[0020] Figure 4 for Figure 1 The diagram shows a side view of the mining area to be mined.
[0021] Figure 5 for Figure 1 The diagram shown is a side view of the mining area during the recovery process.
[0022] Figure 6 for Figure 1 The diagram shows a large-diameter deep-hole drilling and blasting layout for cutting the top layer.
[0023] The symbols in the attached diagram represent:
[0024] 1. drift outside orebody 2. transverse drift 3. drift inside orebody 4. ore loading crosscut 5. connection drift outside orebody 6. roof-slicing drilling drift 7. roof-slicing connection drift 8. cut raise 9. barrier pillar 10. large-diameter longhole 11. caved ore 12. backfill
[0025] The present invention will be described in further detail below with reference to the accompanying drawings. Detailed Description of the Embodiments
[0026] As shown in Figures 1-6 , the invention discloses a central radial stope structure and a mining method. Aiming at the disadvantages of long exposure time of stope sidewalls, uneven blasting fragmentation, and poor stability of bottom ore drawing structures, the stope is divided along the orebody strike, and the ore room is mined first, followed by the ore pillar. The method specifically includes the following process steps and conditions:
[0027] A. Construct a transverse haulage drift (2) at the bottom of the stope to connect the drifts outside the orebody (1) on the hanging wall and footwall. Construct drifts inside the orebody (3) at the junction of ore and rock on the hanging wall and footwall, respectively. Construct ore loading crosscuts (4) in the transverse haulage drift (2) and the drift inside the orebody (3) at the bottom of each stope to reach the center of the stope;
[0028] B. Construct a connection drift outside the orebody (5) from the drifts outside the orebody (1) on the hanging wall and footwall at the top of the stope, respectively, to reach the orebody. Construct roof-slicing drilling drifts (6) at the top of the stope, which are connected to each other via roof-slicing connection drifts (7). Construct a cut raise (8) at the center of the stope top to connect with the ore loading crosscut (4) at the bottom of the stope;
[0029] C. Construct downward parallel large-diameter longholes (10) in the square-shaped roof-slicing drilling drifts (6). Using the cut raise (8) as a free surface, conduct staged blasting outward from the center of the stope. The blasted ore (11) is transported out from the ore loading crosscut (4) via a scraper;
[0030] D. After the first-step stope finishes ore drawing, fill the goaf with a high-strength backfill (12);
[0031] E. Repeat steps A-C to mine the next stope. After the stope is mined, fill the goaf with a low-proportion backfill (12).
[0032] The process of the present invention may further be:
[0033] The ore drawing structure at the bottom of the stope adopts a "field" shaped layout, with the ore loading crosscuts (4) arranged in a "cross" pattern, and the center of the "cross" is funnel-shaped.
[0034] Construct connection drifts (5) diagonally at the top of the stope to reach the stope.
[0035] The top cutting and rock drilling tunnel (6) of the mining area is square and arranged in a grid-radial pattern from the center of the mining area to the surrounding area.
[0036] The pillars (9) left at the top of the mining area are arranged in a grid-radial pattern.
[0037] The top of the mining area has large-diameter deep holes (10) arranged vertically downwards, and all the large-diameter deep holes (10) are parallel to each other.
[0038] The large-diameter deep holes (10) at the top of the mining area are arranged in a grid-radial pattern from the cutting well (8) to the outside of the mining area.
[0039] The large-diameter deep hole (10) should be blasted in one go, forming a whole square.
[0040] Example
[0041] A mining company's metal mine, primarily producing gold and copper, plans to mine an ore body at an elevation of -300m to -360m. The ore body has a strike length of 200-300m, an average thickness of 30-60m, and a dip angle of 80°-90°, constituting a steeply dipping, extremely thick, and largely stable ore body. Addressing the challenges of traditional staged open-cut mining methods, such as premature exposure of the sidewalls leading to varying degrees of collapse, excessively large and uneven blasting blocks due to non-compression blasting, and the large workload and poor stability of loading routes in the first-stage backfill during second-stage mining, this invention employs a large-diameter deep-hole central radial staged ore extraction and radial ore extraction technology. This achieves shorter sidewall exposure time, more uniform blasting block size, and higher stability of the bottom ore extraction structure. This provides a new approach for the widespread application of large-diameter deep-hole mining methods in moderately to steeply dipping, thick ore bodies, as well as horizontal to gently dipping, thick ore bodies.
[0042] As described above, the present invention can be well implemented. The above embodiments are only the best implementations of the present invention, but the implementation of the present invention is not limited to the above embodiments. Other changes, modifications, substitutions, combinations, and simplifications made without departing from the spirit and principle of the present invention should be considered equivalent substitutions and are all included within the protection scope of the present invention.
Claims
1. A mining method for a central radial stope, addressing the shortcomings of long sidewall exposure time, uneven blasting block size, and poor stability of the bottom ore extraction structure, characterized in that... Stopes are divided along the ore body strike, with room stoping first followed by pillar stoping, specifically including the following process steps and conditions: A. Construct a cross-cut haulage drift (2) at the stope bottom to connect the footwall and hanging wall outside-ore haulage drifts (1), construct inside-ore haulage drifts (3) at the footwall and hanging wall ore-rock boundaries respectively, and construct ore loading ramps (4) in the cross-cut haulage drift (2) and inside-ore haulage drift (3) at each stope bottom to reach the center of the stope; B. Construct an outside-ore connection drift (5) from the footwall and hanging wall outside-ore haulage drifts (1) at the stope top respectively to reach the ore body, construct a top-slicing drilling drift (6) at the stope top, the top-slicing drilling drifts (6) are connected by top-slicing connection drifts (7), and construct a cutting raise (8) in the center of the stope top to connect with the ore loading ramp (4) at the stope bottom; C. Construct downward parallel large-diameter deep holes (10) in the square-shaped top-slicing drilling drift (6), use the cutting raise (8) as a free face, conduct staged blasting from the center of the stope outward, and the blasted ore (11) is transported out from the ore loading ramp (4) by a scraper; D. After the first-step stope is completely drawn out, fill the goaf with a high-strength backfill (12); E. Repeat steps A-C to return to the stoping stope, and fill the goaf with a low-ratio backfill (12) after the stope is completely stoped; The top-slicing drilling drifts (6) at the stope top are square, arranged in a grid-radial pattern from the center of the stope to the surrounding area; the strip pillars (9) reserved at the stope top are arranged in a grid-radial pattern; the large-diameter deep holes (10) at the stope top are arranged in a grid-radial pattern from the cutting raise (8) to the outside of the stope.
2. The method according to claim 1, characterized in that: The ore drawing structure at the stope bottom adopts a "field"-shaped layout, the ore loading ramps (4) are distributed in a "cross" shape, and the center of the "cross" is funnel-shaped.
3. The method according to claim 1, characterized in that: Connection drifts (5) are constructed diagonally at the stope top to reach the stope.
4. The method according to claim 1, characterized in that: Large-diameter deep holes (10) are drilled vertically downward at the stope top, and all large-diameter deep holes (10) are parallel to each other.
5. The method according to claim 1 or 4, characterized in that: The large-diameter deep holes (10) shall be blasted in a whole grid and whole hole at one time.
Citation Information
Patent Citations
Approach open stope subsequent filling mining method for gently inclined medium-thick ore body
CN109339783A
Skip-mining type wangeviry stope branch roadway filling and coal mining method
US20160305245A1