A u-shaped tunneling machine and a method of construction thereof

The design of a fully enclosed structure and sealing components solved the construction problem of U-shaped tunnel boring machines in water-rich conditions, achieving sealing and stress balance of the tunnel boring machine, ensuring smooth construction and stable posture.

CN118008333BActive Publication Date: 2026-11-20CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410277774.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2026-11-20
Estimated Expiration
2044-03-12

AI Technical Summary

Technical Problem

When U-shaped tunnel boring machines are used in water-rich conditions, they are prone to problems such as insufficient foundation bearing capacity, tunnel boring machine sinking and rolling, foundation inability to support concrete pipe sections, groundwater seepage into equipment, and pressure asymmetry.

Method used

The shield adopts a fully enclosed structure, waterproof insert assembly, articulated sealing structure, sealing brush assembly, and auxiliary support assembly to prevent groundwater from entering the shield, balance groundwater and soil pressure, and ensure the shield machine's stress balance and attitude stability.

Benefits of technology

It achieves overall sealing and stress balance of the U-shaped shield machine under water-rich conditions, ensuring smooth construction, avoiding shield sinking and instability, and improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118008333B_ABST
    Figure CN118008333B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of U-shaped shield construction, in particular to a U-shaped shield machine and a construction method thereof, which solves the problem that the U-shaped shield machine cannot be constructed under water-rich conditions in the prior art. The shield machine comprises a front shield body, a middle shield body and a tail shield body, the front shield body is provided with a waterproof plug-in cutter assembly, the connection position of the middle shield body and the front shield body is provided with a hinged sealing structure, the tail shield body is provided with a sealing brush assembly, and the side edge of the middle shield body is provided with an auxiliary support assembly. The beneficial effects are that the waterproof plug-in cutter assembly blocks the underground water from entering the shield body from the front shield body position, the hinged sealing structure can seal the connection position of the middle shield body and the front shield body, and meanwhile does not affect the deflection of the front shield body, the sealing brush assembly cooperates with the outer wall of the prefabricated pipe joint to block the underground water from flowing into the shield body from the tail shield position, the overall sealing of the U-shaped shield machine is realized, and the smooth construction of the U-shaped shield machine under water-rich conditions is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of U-shaped shield tunneling technology, and in particular to a U-shaped shield tunneling machine and its construction method. Background Technology

[0002] A tunnel boring machine (TBM), also known as a shield tunneling machine, is a specialized engineering machine for tunnel excavation. Modern TBMs integrate optics, mechanics, electronics, hydraulics, sensing, and information technology, possessing functions such as excavation and cutting of soil, transporting excavated material, assembling tunnel lining, and measurement and guidance correction. They involve multiple disciplines including geology, civil engineering, mechanical engineering, mechanics, hydraulics, electrical engineering, control, and surveying. Furthermore, they require customized design and manufacturing based on different geological conditions, demanding extremely high reliability. TBMs are widely used in tunnel projects for subways, railways, highways, municipal works, and hydropower projects.

[0003] Currently, the construction of integrated utility tunnels in Chinese cities is progressing actively. These tunnels house municipal infrastructure pipelines such as electricity, communications, gas, and water supply and drainage, effectively utilizing underground space along urban roads. The construction of integrated utility tunnels typically involves first supporting the slope using slope protection or pile foundations, then erecting formwork and pouring concrete, followed by backfilling and compaction. This method is characterized by large excavation volumes, slow speed, complex procedures, high consumption of auxiliary support structures and formwork, and high costs.

[0004] Patent CN106593455A discloses a full-face tunneling self-propelled U-shaped shield machine, including a support shield body. The support shield body is equipped with several tunneling devices, which are movably connected to the support shield body. Wedge-shaped inserts are provided between the tunneling devices, and the wedge-shaped inserts are connected to the insert cylinders. The insert cylinders are connected to the support shield body. The tunneling device includes a drive device, which is connected to a chain cutting belt. The chain cutting belt is equipped with cutting tools and a scraper. The chain cutting belt works in conjunction with a muck conveyor belt, which works in conjunction with precast pipe sections.

[0005] When a U-shaped tunnel boring machine is excavating near a ditch, the soil near the ditch has a high water content and the soil is soft, which may cause the following problems: 1. Insufficient foundation bearing capacity can easily cause the tunnel boring machine to sink, and the shield body may even roll. 2. Insufficient bearing capacity of the foundation; the foundation cannot support the concrete pipe sections. 3. Water in the strata can seep into the moving parts of the equipment; 4. The tunnel boring machine is subjected to soil pressure on one side and water pressure from the ditch on the other side, which will result in an asymmetrical pressure situation, making the tunnel boring machine prone to rolling or lateral displacement. Summary of the Invention

[0006] This invention proposes a U-shaped tunnel boring machine and its construction method, which solves the problem that existing U-shaped tunnel boring machines cannot be used in water-rich conditions.

[0007] The technical solution of this invention is implemented as follows: A U-shaped tunnel boring machine includes a front shield, a middle shield, and a tail shield. The front shield is equipped with a waterproof cutting tool assembly. The connection between the middle shield and the front shield is equipped with a hinged sealing structure. The middle shield and the tail shield are integrally connected. The tail shield is equipped with a sealing brush assembly. The middle shield is equipped with an auxiliary support assembly on its side. The front shield adopts a fully enclosed structure. The waterproof insert assembly prevents groundwater from entering the shield from the front shield position. At the same time, the hinged sealing structure can seal the connection between the middle shield and the front shield without affecting the deflection of the front shield. The sealing brush assembly cooperates with the outer wall of the prefabricated pipe section to block groundwater from flowing into the shield from the tail shield position, achieving overall sealing of the U-shaped shield machine and ensuring that the U-shaped shield machine can carry out smooth construction in water-rich conditions. In addition, the auxiliary support assembly can provide support to one side of the middle shield, enabling the U-shaped shield machine to carry out construction under conditions of asymmetrical groundwater and soil pressure. It balances the asymmetrical groundwater and soil pressure, making the U-shaped shield machine stress balanced and the tunneling posture stable, allowing the U-shaped shield machine to excavate near ditches.

[0008] The waterproof insert assembly includes side inserts. A sealing baffle is provided on the front shield body. The side inserts are symmetrically arranged on the left and right sides of the sealing baffle in a stepped manner. A double sealing structure is provided between the front shield body and the side inserts. The sealing baffle seals the front shield body, and the double sealing structure seals the space between the side inserts and the front shield body. The double sealing structure and the sealing baffle work together to prevent groundwater and debris from entering the interior of the shield body.

[0009] The end of the side cutter is detachably equipped with an over-excavation block. By replacing the over-excavation block with one of different sizes, the over-excavation amount can be controlled, thereby adjusting the deflection of the U-shaped tunnel boring machine during its forward movement.

[0010] The lower part of the enclosed partition is provided with an inclined insert plate, which is integrally connected to the enclosed partition. Below the insert plate are at least two bottom cutters arranged side by side. The extension of the bottom cutters can adjust the over-excavation amount at the bottom when the shield advances, and the different extension lengths of the bottom cutters at different positions can control the forward attitude of the shield and prevent the U-shaped shield machine from rolling during the forward movement.

[0011] The bottom insert includes an inclined telescopic component located below the insert plate. A plug is connected to the lower end of the telescopic component, which can extend or retract the plug along the lower edge of the insert plate. The telescopic component is a telescopic hydraulic cylinder, which controls the extension length of the plug. Specifically, when the shield advances with the left side lower than the right, the right bottom insert extends longer than the left bottom insert; conversely, when the shield advances with the left side higher than the right, the right bottom insert extends shorter than the left bottom insert. This adjustment of the over-digging amount of the bottom inserts on both sides ensures the shield remains balanced and prevents it from rolling.

[0012] The sealing brush assembly includes at least two sets of shield tail brushes arranged side by side. The shield tail brushes are fixedly installed inside the tail shield body, and sealing grease is filled between adjacent sets of shield tail brushes. The shield tail brushes contact the outer wall of the precast pipe section. The sealing grease and shield tail brushes work together to seal the gap between the tail shield body and the precast pipe section, preventing groundwater from entering the shield body.

[0013] The tail shield is equipped with a slurry stop plate at its tail end. The slurry stop plate seals the gap between the soil and the tail shield, facilitating subsequent backfilling of the side joints.

[0014] The tail shield body is equipped with a base plate, on which at least two sets of tail brushes are installed. Sealing grease is filled between adjacent sets of tail brushes. Multiple telescopic support components are also installed on the base plate. These telescopic support components are jacks, which provide support for the precast pipe sections being hoisted, aligning them with the already installed precast pipe sections. This facilitates the connection of the precast pipe sections using bolts, ensuring the smooth hoisting of the precast pipe sections.

[0015] The auxiliary support assembly includes an auxiliary support frame, one end of which is connected to the side of the shield body, and the other end of which is equipped with an adjustment mechanism with support wheels. When one side of the U-shaped shield machine is a ditch, the auxiliary support frame can provide support for the U-shaped shield machine, balancing the forces on both sides of the shield body; the support wheels convert sliding friction into cutterhead friction, reducing the resistance to the shield body's advance.

[0016] The adjustment mechanism includes a horizontally movable sliding component and a vertically movable lifting component. The sliding component is slidably mounted on the auxiliary support frame and is connected to the auxiliary support frame via a horizontal hydraulic cylinder. The lifting component is slidably mounted on the sliding component and is connected to the sliding component via a vertical hydraulic cylinder. A support wheel is rotatably mounted on the lifting component. The horizontal and vertical hydraulic cylinders serve as the power source for the adjustment mechanism, adjusting the positions of the sliding component and the lifting component so that the auxiliary support structure can conform to the contour of the trench when the shield moves.

[0017] The support wheel is connected to the lifting component via a flexible suspension mechanism. The flexible suspension mechanism provides flexible support for the support wheel, ensuring the stability of the auxiliary support assembly's support for the shield body.

[0018] A material transport frame is installed above the middle and tail shields, and a muck discharge conveyor belt is mounted on the material transport frame. The muck inlet end of the muck discharge conveyor belt is located at the front shield position, and a material hopper for transporting the subgrade material is movably mounted on the material transport frame. When the excavator excavates the soil, the muck is transported out via the muck discharge conveyor belt to avoid muck accumulation; the material transport frame can move the material hopper to facilitate the transportation of the subgrade material.

[0019] The material hopper includes a material hopper body and a hinged door located at the bottom of the material hopper body. One side of the hinged door is hinged to the material hopper body, and the other side of the hinged door is detachably connected to the material hopper body through a dispensing mechanism.

[0020] The dispensing mechanism includes a pin movably mounted on the main body of the material hopper, and a pin hole on the hinged door, with the pin inserted into the pin hole. Pulling out the pin opens the hinged door, releasing the material and facilitating rapid material dumping, thus improving construction efficiency.

[0021] A construction method for the aforementioned U-shaped tunnel boring machine includes the following steps: S1, excavate the starting pit and receiving pit, lay the shield machine cushion layer in the starting pit, inspect the pit, install the U-shaped shield machine on the shield machine cushion layer, in the initial state of the U-shaped shield machine, the side cutter retracts, the jacking system on the middle shield body extends, and the extension length of the jacking system is greater than or equal to the sum of the widths of the two prefabricated pipe sections. S2, the side inserter extends forward to transport the prefabricated pipe section to the material transport frame below. The extension length of the side inserter is greater than or equal to the width of one prefabricated pipe section. The reference height for the installation of the prefabricated pipe section is adjusted at the tail shield position. S3, excavating the soil inside the side cutting tool, the excavated soil is transported to the muck truck by the muck discharge conveyor belt, the jacking system on the middle shield retracts, and two prefabricated pipe sections are spliced ​​in the tail shield. S4, Use a material bucket to transport the shield machine cushion material to the front of the bottom cutterhead, lay the shield machine cushion in front of the bottom cutterhead, the width of the shield machine cushion is greater than or equal to the width of one precast pipe section, and inspect the foundation pit; S5, the jacking system extends, and the jacking system pushes the U-shaped shield machine forward a distance equal to the width of a precast tunnel segment. The side cutter retracts, and at the same time, the side seams and top of the precast tunnel segment are backfilled. S6, the side inserter extends forward, and the extension length of the side inserter is greater than or equal to the width of a prefabricated pipe section; S7, excavates the soil inside the side cutting tool, and the excavated soil is transported to the muck truck via the muck conveyor belt. S8, Use a material bucket to transport the shield machine cushion material to the front of the bottom cutterhead, lay the shield machine cushion in front of the bottom cutterhead, the width of the shield machine cushion is greater than or equal to the width of one precast pipe section, and inspect the foundation pit; S9, the jacking system extends, and the jacking system pushes the U-shaped shield machine forward a distance equal to the width of a precast tunnel segment. The side cutter retracts, and at the same time, the side seams and top of the precast tunnel segment are backfilled. S10. Repeat steps S2 to S9 until the U-shaped tunnel boring machine reaches the receiving pit, and the construction is completed.

[0022] In step S2, a material hopper is used to transport the pipe section bedding material to the inside of the tail shield body. A paving device is then used to level the pipe section bedding, and the width of the bedding is greater than or equal to the sum of the widths of two precast pipe sections. The pipe section bedding includes a graded crushed stone layer and a coarse sand layer, with the coarse sand layer located above the graded crushed stone layer. Due to the size limitations of the paving device, the paving efficiency is high when the paving device paves the pipe section bedding within the range of the sum of the widths of two precast pipe sections.

[0023] In step S2, the telescopic support components on the bottom plate of the tail shield are adjusted so that the support height of each telescopic support component is equal. The telescopic support component is a jack. At this time, the tail shield has a U-shaped structure, and the jacks provide support for the prefabricated pipe sections to ensure accurate installation of the prefabricated pipe sections.

[0024] In S5 and S9, the horizontal status of the U-shaped tunnel boring machine (TBM) is detected, and the extension length of the bottom cutterheads is adjusted. When the extension length of the bottom cutterhead on the left side of the U-shaped TBM is greater than that on the right side, the TBM rolls to the left during its forward movement; when the extension length of the bottom cutterhead on the left side is less than that on the right side, the TBM rolls to the right during its forward movement; when the extension length of the bottom cutterhead on the left side is equal to that on the right side, the TBM moves horizontally during its forward movement, thus adjusting the forward attitude of the U-shaped TBM.

[0025] In steps S2 and S6, the lateral deviation of the U-shaped tunnel boring machine (TBM) is detected, and over-excavation blocks of different sizes are installed on the side cutters. Specifically, by replacing the over-excavation blocks with blocks of different lengths, the different over-excavation amounts on the left and right sides can control the U-shaped TBM to turn left or right, facilitating adjustments to the forward attitude of the TBM.

[0026] The beneficial effects of this invention are as follows: the front shield adopts a fully enclosed structure, and the waterproof insert assembly prevents groundwater from entering the shield from the front shield position. At the same time, the hinged sealing structure can seal the connection between the middle shield and the front shield without affecting the deflection of the front shield. The sealing brush assembly cooperates with the outer wall of the prefabricated pipe section to block groundwater from flowing into the shield from the tail shield position. All the sealing structures work together to achieve the overall sealing of the U-shaped shield machine, so that groundwater will not enter the shield of the U-shaped shield machine, ensuring that the U-shaped shield machine can carry out smooth construction in water-rich conditions.

[0027] The auxiliary support components can provide support to one side of the shield body, enabling the U-shaped shield machine to carry out construction under conditions of asymmetrical groundwater and soil pressure. By balancing the asymmetrical groundwater and soil pressure, the U-shaped shield machine is subjected to force balance and its tunneling posture is stable, allowing it to excavate near ditches.

[0028] During U-shaped shield tunneling, a shield machine pad is laid beneath the U-shaped shield machine. The shield machine pad provides good support, lifting the shield body and allowing it to move on the pad, preventing it from sinking and ensuring its stability. In addition, laying pipe section pads or installing jacks provides support for the installation of prefabricated pipe sections, ensuring the stability of the installation.

[0029] By installing over-excavation blocks of different sizes on the side cutters, the over-excavation amount of the side cutters can be adjusted, thereby controlling the left and right turns during the forward movement of the U-shaped shield machine. By adjusting the different extension lengths of the bottom cutters on both sides, the over-excavation amount of the bottom cutters can be adjusted, thereby controlling the left and right roll of the U-shaped shield machine during its forward movement, ensuring the stability of the U-shaped shield machine's forward posture. Attached Figure Description

[0030] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0031] Figure 1 This is a schematic diagram of the construction of a U-shaped tunnel boring machine according to the present invention; Figure 2 This is a top view of a U-shaped tunnel boring machine; Figure 3 This is a front view of a U-shaped tunnel boring machine; Figure 4 This is a schematic diagram of the blades inserted on both sides; Figure 5 for Figure 4 Enlarged view of section H in the middle; Figure 6 A 3D diagram illustrating the connection between the waterproof insert assembly and the front shield. Figure 7 This is a cross-sectional view of the bottom insert. Figure 8 This is a top-view cross-sectional view of the side inserter; Figure 9 for Figure 8 Enlarged view of point A in the middle; Figure 10 A schematic diagram of the tail shield body sealing; Figure 11 for Figure 10 Enlarged view of point B in the middle; Figure 12 This is a schematic diagram of the auxiliary support component structure; Figure 13 for Figure 12 Enlarged view of point C in the middle; Figure 14 for Figure 12 Enlarged view of point D; Figure 15 Top view of the auxiliary support components; Figure 16 for Figure 15 Enlarged view of point E in the middle; Figure 17 A schematic diagram of the material transport rack installation; Figure 18 This is a schematic diagram of the material hopper structure; Figure 19 This is a schematic diagram of a pin connection; Figure 20 This is a construction diagram for step S2; Figure 21 This is a construction diagram for step S3; Figure 22 This is a construction diagram for step S4; Figure 23 This is a construction diagram for step S5; Figure 24 This is a construction diagram for step S6; Figure 25 This is a construction diagram for step S7; Figure 26 This is a construction diagram for step S8; Figure 27 This is a construction diagram for step S9; Figure 28 This is a schematic diagram of Example 5; Figure 29 for Figure 28 Enlarged diagram at point F; Figure 30 for Figure 28 Enlarged diagram of point G in the middle; Figure 31 This is a schematic diagram of Example 7.

[0032] In the diagram: 1. Waterproof inserter assembly; 11. Side inserter; 111. Over-digging block; 12. Bottom inserter; 121. Telescopic component; 122. Plug; 2. Front shield body; 21. Enclosed partition; 22. Insert plate; 23. Sealing groove; 24. Sealing strip; 3. Middle shield body; 31. Hinge sealing structure; 32. Pushing system; 4. Tail shield body; 41. Tail shield brush; 42. Base plate; 43. Jack; 44. Anti-paddle plate; 5. Pre- 51. Shield machine bedding layer; 52. Pipe section bedding layer; 6. Auxiliary support assembly; 61. Auxiliary support frame; 62. Sliding component; 63. Lifting component; 64. Horizontal cylinder; 65. Vertical cylinder; 66. Flexible suspension mechanism; 67. Wheel and axle; 68. Support wheel; 8. Material transport frame; 81. Material hopper; 811. Material hopper body; 812. Hinged door; 813. Pin shaft; 82. Slag discharge belt conveyor; 9. Soil. Detailed Implementation

[0033] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0034] Example 1, as Figure 1 , Figure 2 , Figure 3 As shown, a U-shaped tunnel boring machine (TBM) includes a front shield 2, a middle shield 3, and a tail shield 4. The front shield 2 is equipped with a waterproof insert assembly 1. A hinged sealing structure 31 is provided at the connection point between the middle shield 3 and the front shield 2. The middle shield 3 and the tail shield 4 are integrally connected. A sealing brush assembly is provided on the tail shield 4. An auxiliary support assembly 6 is provided on the side of the middle shield 3. The waterproof insert assembly 1 prevents groundwater from entering the shield body from the front shield 2, ensuring the front shield 2's airtightness. The hinged sealing structure 31 ensures the airtightness at the connection point between the middle shield 3 and the front shield 2 without affecting the deflection of the front shield 2. The sealing brush assembly cooperates with the outer wall of the precast pipe section 5 to prevent groundwater from flowing into the shield body from the tail shield. The combined action of these sealing structures achieves overall sealing of the U-shaped TBM, ensuring smooth construction under water-rich conditions.

[0035] In addition, the auxiliary support component 6 can provide support to one side of the central shield body 3, enabling the U-shaped shield machine to carry out construction under conditions of asymmetrical groundwater and soil pressure, balancing the asymmetrical groundwater and soil pressure, balancing the forces on the U-shaped shield machine, stabilizing the tunneling posture, and enabling the U-shaped shield machine to carry out tunneling and excavation near ditches.

[0036] Example 2, based on Example 1, provides a U-shaped tunnel boring machine. The articulated sealing structure 31 includes multiple articulated hydraulic cylinders. The two ends of each cylinder are articulated to the front shield 2 and the middle shield 3, respectively. The side plate of the front shield 2 is located outside the side plate of the middle shield 3. Multiple sealing grooves are arranged side-by-side on the outer side of the side plate of the middle shield 3. Sealing rings and inflatable sealing elements are provided within these grooves. The sealing rings and inflatable sealing elements work together to seal the gap between the front shield 2 and the middle shield 3. Specifically, when the front shield 2 and the middle shield 3 move relative to each other, the articulated hydraulic cylinders extend and retract, while the inflatable sealing elements inflate or deflate, ensuring that the gap between the front shield 2 and the middle shield 3 remains sealed during relative movement.

[0037] Example 3, based on Example 1, a U-shaped tunnel boring machine, such as... Figure 4 , Figure 6 As shown, the waterproof insert assembly 1 includes side inserts 11, and a sealing partition 21 is provided on the front shield body 2. The side inserts 11 are symmetrically arranged on the left and right sides of the sealing partition 21 in a stepped arrangement. A double sealing structure is provided between the front shield body 2 and the side inserts 11. The sealing partition 21 seals the front shield body 2 to ensure the airtightness of the front shield body 2. At the same time, the double sealing structure seals the space between the side inserts 11 and the front shield body 2, ensuring the airtightness of the side inserts 11, thereby preventing groundwater from entering the front shield body 2.

[0038] Furthermore, such as Figure 5 As shown, the double sealing structure includes two sealing grooves 23, which are arranged side by side on the front shield body 2. The sealing grooves 23 are filled with sealing strips 24, which are in close contact with the side insert 11 to achieve a seal between the side insert 11 and the front shield body 2.

[0039] Furthermore, such as Figure 8 , Figure 9 As shown, the end of the side inserter 11 is detachably equipped with an over-digging block 111. The over-digging block 111 is connected to the front end of the side inserter 11 by a through-hole bolt. When it is necessary to adjust the over-digging amount of the side inserter 11, the bolt is removed, an over-digging block 111 of a different size is replaced, and the over-digging block 111 is fixed with bolts to ensure the installation stability of the over-digging block 111 on the side inserter 11.

[0040] Furthermore, such as Figure 7As shown, the lower part of the enclosed partition 21 is provided with an inclined insert plate 22, which is integrally connected to the enclosed partition 21. Below the insert plate 22 are at least two bottom inserts 12 arranged side-by-side. Each bottom insert 12 includes an inclined telescopic member 121 located below the insert plate 22. The lower end of the telescopic member 121 is connected to a plug 122, which can extend or retract the plug 122 along the lower edge of the insert plate 22. The telescopic member 121 is a telescopic hydraulic cylinder; its extension and retraction can move the plug 122, adjusting the length of the plug 122 extending beyond the insert plate 22, thereby adjusting the over-digging amount of the bottom insert 12. In this embodiment, there are two bottom inserts 12, which are arranged side by side on the underside of the insert plate 22. Specifically, when the shield advances with the left side lower than the right, the extension of the telescopic cylinder is adjusted so that the extension length of the bottom insert 12 on the right is greater than that on the left, thereby adjusting the over-excavation amount of the two bottom inserts 12. When the shield advances with the left side higher than the right, the extension of the telescopic cylinder is adjusted so that the extension length of the bottom insert 12 on the right is less than that on the left, thereby adjusting the over-excavation amount of the two bottom inserts 12. This ensures balance when the shield advances, prevents the shield from rolling, and ensures the safety of the U-shaped shield machine.

[0041] Example 4, based on Example 1 or Example 3, a U-shaped tunnel boring machine, such as... Figure 10 , Figure 11 As shown, the sealing brush assembly includes at least two sets of shield tail brushes 41 arranged side by side. The shield tail brushes 41 are fixedly installed inside the tail shield body 4, and sealing grease is filled between adjacent sets of shield tail brushes 41. The shield tail brushes 41 are elastic plates. In this embodiment, there are three sets of shield tail brushes 41. The shield tail brushes 41 are ordinary tail brushes, arc-shaped steel plate wire brushes, steel plate brushes, or integrated grout stop plate wire brushes. Sealing grease is provided between adjacent sets of shield tail brushes 41. The shield tail brushes 41 slide in contact with the outer wall of the precast pipe section 5 after installation. The sealing grease can seal the gap between the tail shield body 4 and the precast pipe section 5. When the U-shaped shield machine moves forward, the sealing grease moves on the outer wall of the precast pipe section 5 under the action of the shield tail brushes 41 to ensure the reliability of the seal, thereby preventing groundwater from entering the shield body from the gap between the tail shield body 4 and the precast pipe section 5, and ensuring the sealing performance of the U-shaped shield machine.

[0042] Furthermore, a slurry stop plate 44 is provided at the tail end of the tail shield body 4. The slurry stop plate 44 seals the gap between the soil and the tail shield body 4, facilitating the backfilling of the side joints of the precast pipe section 5. Specifically, during the backfilling of the side joints, the slurry stop plate 44 and the sealing brush assembly work together to seal the gap between the precast pipe section 5 and the soil 9, and fill the gap with soil or concrete to fix the precast pipe section 5.

[0043] In this embodiment, the tail shield body 4 includes two side plates, and the tail brush 41 is fixedly installed on the side plates. There is no bottom plate between the two side plates. When installing the precast pipe section 5, a pipe section pad 52 is laid on the ground between the two side plates, and the precast pipe section 5 is placed directly on the pipe section pad 52. There is no need to fill the bottom of the precast pipe section 5 with concrete afterward.

[0044] Example 5 differs from Example 4 in that it uses a U-shaped tunnel boring machine, such as... Figure 28 , Figure 29 , Figure 30 As shown, the tail shield body 4 is provided with a base plate 42, and at least two sets of tail brushes 41 are provided on the base plate 42. Sealing grease is filled between adjacent sets of tail brushes 41. Multiple telescopic support components are provided on the base plate 42. The telescopic support components are jacks 43. When installing the precast tunnel segment 5, the support height of the jacks 43 is adjusted. The jacks 43 provide temporary support for the precast tunnel segment 5, so that the precast tunnel segment 5 can be installed smoothly. After the U-shaped shield machine moves forward, concrete is filled into the bottom of the precast tunnel segment 5. After the concrete solidifies, it can provide stable support for the precast tunnel segment 5.

[0045] Example 6, based on Example 1, a U-shaped tunnel boring machine, such as... Figure 12 , Figure 15 As shown, the auxiliary support assembly 6 includes an auxiliary support frame 61. One end of the auxiliary support frame 61 is connected to the side of the central shield body 3, and the other end of the auxiliary support frame 61 is provided with an adjustment mechanism, on which a support wheel 68 is provided. When one side of the U-shaped shield machine is a ditch, the support wheel 68 contacts the side of the ditch, and the auxiliary support frame 61 provides support for the U-shaped shield machine with the side of the ditch as a fulcrum, so that the forces on both sides of the shield body are balanced; the support wheel 68 converts sliding friction into cutting edge friction, reducing the friction between the auxiliary support frame 61 and the ditch, and reducing the resistance to the advancement of the shield body.

[0046] Furthermore, such as Figure 13 , Figure 16 As shown, the adjustment mechanism includes a horizontally movable sliding member 62 and a vertically movable lifting member 63. The sliding member 62 is slidably mounted on the auxiliary support frame 61 and is connected to the auxiliary support frame 61 via a horizontal hydraulic cylinder 64. The lifting member 63 is slidably mounted on the sliding member 62 and is connected to the sliding member 62 via a vertical hydraulic cylinder 65. A support wheel 68 is rotatably mounted on the lifting member 63. The horizontal hydraulic cylinder 64 and the vertical hydraulic cylinder 65 serve as the power source for the adjustment mechanism, adjusting the positions of the sliding member 62 and the lifting member 63 so that the auxiliary support assembly 6 can conform to the contour of the ditch when the shield moves, thus enhancing the applicability of the auxiliary support assembly 6.

[0047] Furthermore, such as Figure 14As shown, the support wheel 68 is connected to the lifting component 63 via a flexible suspension mechanism 66. The flexible suspension mechanism 66 has a shock-absorbing function, enabling the support wheel 68 to provide stable support to the auxiliary support frame 61.

[0048] Example 7, based on Example 6, a U-shaped tunnel boring machine, such as... Figure 17 As shown, a material transport frame 8 is installed above the middle shield body 3 and the tail shield body 4. A slag discharge conveyor belt 82 is installed on the material transport frame 8, with the slag inlet end of the slag discharge conveyor belt 82 located at the front shield body 1. A material hopper 81 for transporting subgrade material is movably installed on the material transport frame 8. When the excavator excavates the soil 9, the slag is transported out through the slag discharge conveyor belt 82 to avoid slag accumulation; the material transport frame 8 can drive the material hopper 81 to move, facilitating the transportation of subgrade material.

[0049] Furthermore, the material transport frame 8 is placed on the installed precast pipe section 5. The lower end of the material transport frame 8 is equipped with rollers. When the U-shaped tunnel boring machine advances, the material transport frame 8 moves forward accordingly, facilitating the continuous use of the slag discharge conveyor 82 and the material hopper 81. Additionally, as... Figure 31 As shown, the material transport rack 8 has one long and one short leg, which can lower the center of gravity of the material transport rack 8, prevent the material transport rack 8 from tipping over, and ensure the safety of the material transport rack 8 in use.

[0050] Furthermore, such as Figure 18 As shown, the material hopper 81 includes a material hopper body 811 and a hinged door 812 disposed at the bottom of the material hopper body 811. One side of the hinged door 812 is hinged to the material hopper body 811, and the other side of the hinged door 812 is detachably connected to the material hopper body 811 via a dispensing mechanism. Figure 19 As shown, the spreading mechanism includes a pin 813 movably mounted on the material hopper body 811, and a pin hole on the hinged door 812, with the pin 813 inserted into the pin hole. After the material hopper 81 is filled with bedding material and moved to the designated position, the pin 813 is pulled out, separating it from the hinged door 812. Under the weight of the bedding material itself, the hinged door 812 is pushed open, and the bedding material falls into the bedding laying position.

[0051] Example 8, based on Example 7, provides a construction method for the aforementioned U-shaped tunnel boring machine, comprising the following steps: S1. Excavate the starting pit and receiving pit. Lay the shield machine cushion layer 51 in the starting pit. Inspect the pit. Install the U-shaped shield machine on the shield machine cushion layer 51. In the initial state of the U-shaped shield machine, the side cutter 11 is retracted and the jacking system 32 on the middle shield body 3 is extended. The extension length of the jacking system 32 is greater than or equal to the sum of the widths of the two prefabricated pipe sections 5. The shield machine cushion layer 51 can improve the support force at the bottom of the pit and ensure the stability of the U-shaped shield machine in the starting state.

[0052] S2, the side inserter 11 extends forward, transporting the precast pipe section 5 to below the material transport frame 8. The extension length of the side inserter 11 is greater than or equal to the width of one precast pipe section 5. The reference height for the installation of the precast pipe section 5 is adjusted at the tail shield body 4. Figure 20 As shown, the side inserter 11 can extend and adjust its reference height simultaneously, improving construction efficiency. In this embodiment, the material hopper 81 is used to transport the pipe section cushion layer 52 material to the inside of the tail shield 4, and the paving equipment is used to flatten the pipe section cushion layer 52. The width of the pipe section cushion layer 52 is greater than or equal to the sum of the widths of the two precast pipe sections 5. The pipe section cushion layer 52 includes a graded crushed stone layer and a coarse sand layer, with the coarse sand layer located above the graded crushed stone layer. Due to the size limitations of the paving equipment, the paving efficiency is high when the paving equipment paves the pipe section cushion layer within the range of the sum of the widths of the two precast pipe sections.

[0053] S3, excavating the soil inside the side cutting tool 11, the excavated soil is transported to the dump truck via the muck conveyor belt 82, the jacking system 32 on the middle shield retracts, and two precast pipe sections 5 are spliced ​​inside the tail shield 4; such as Figure 21 As shown, excavation and connection of precast pipe sections 5 are performed at the front shield 2 and tail shield 4 positions respectively, and the two can be carried out simultaneously to improve construction efficiency.

[0054] S4, use material hopper 81 to transport the shield machine cushion layer 51 material to the front of the bottom cutterhead 12, and lay the shield machine cushion layer 51 in front of the bottom cutterhead 12. The width of the shield machine cushion layer 51 is greater than or equal to the width of one precast pipe section 5. Excavation pit inspection; if... Figure 22 As shown, the shield machine cushion layer 51 includes a crushed stone layer. The material hopper 81 is loaded with crushed stone. The material transport frame 8 moves the material hopper 81 to the front of the bottom cutter 12, opens the hinged door 812 at the bottom of the material hopper 81, and allows the crushed stone to fall in front of the bottom cutter 12. Then the crushed stone is spread out, and the crushed stone provides support for the shield body.

[0055] S5, the jacking system 32 extends, pushing the U-shaped tunnel boring machine forward a distance equal to the width of a precast tunnel segment 5. The side cutter 11 retracts, and simultaneously, side seam backfilling and top backfilling are performed on the precast tunnel segment 5. Figure 23 As shown, the extension of the jacking system 32, the retraction of the side inserter 11, the backfilling of the side joints and the backfilling of the top do not affect each other and can be carried out simultaneously, improving construction efficiency. Furthermore, the backfilling of the side joints and the backfilling of the top only cover the width of one precast pipe section 5.

[0056] S6, the side inserter 11 extends forward, and the extended length of the side inserter 11 is greater than or equal to the width of a prefabricated pipe section 5; such as Figure 24 As shown, the side cutting tool 11 extends forward before excavating the soil. During the excavation process, the soil outside the side cutting tool 11 is prevented from collapsing into the inside of the side cutting tool 11.

[0057] S7, excavating the soil inside the side cutting tool 1, the excavated soil is transported to the dump truck via the muck conveyor belt 82; such as Figure 25 As shown.

[0058] S8, using material hopper 81 to transport the shield machine cushion layer 51 material to the front of the bottom cutterhead 12, and laying the shield machine cushion layer 51 in front of the bottom cutterhead 12. The width of the shield machine cushion layer 51 is greater than or equal to the width of one precast pipe section 5. Excavation pit inspection; if... Figure 26 As shown, the material hopper 81 is loaded with crushed stone. The material transport frame 8 moves the material hopper 81 to the front of the bottom insert 12, opens the hinged door 812 at the bottom of the material hopper 81, and lets the crushed stone fall in front of the bottom insert 12. Then the crushed stone is spread out and provides support for the shield.

[0059] S9, the jacking system 32 extends, pushing the U-shaped tunnel boring machine forward a distance equal to the width of a precast tunnel segment 5. The side cutter 11 retracts, simultaneously backfilling the side seams and top of the precast tunnel segment 5. Figure 27 As shown, the extension of the jacking system 32, the retraction of the side inserter 11, the backfilling of the side joints and the backfilling of the top do not affect each other and can be carried out simultaneously, improving construction efficiency. Furthermore, the backfilling of the side joints and the backfilling of the top only cover the width of one precast pipe section 5.

[0060] S10. Repeat steps S2 to S9 until the U-shaped tunnel boring machine reaches the receiving pit, and the construction is completed.

[0061] Example 9 differs from Example 8 in that, in S2, the telescopic support members on the bottom plate 42 of the tail shield body 4 are adjusted, and the support height of each telescopic support member is equal. In this example, the tail shield body 4 has a U-shaped structure, and three sets of tail shield brushes 41 are provided on both sides and the bottom of the tail shield body 4. Sealing grease is filled between two adjacent sets of tail shield brushes 41. The tail shield brushes 41 contact the side walls and bottom walls of the prefabricated pipe section 5 to achieve a seal between the prefabricated pipe section 5 and the tail shield body 4. The telescopic support member is a jack 43. The installation height of the prefabricated pipe section 5 can be adjusted by adjusting the telescopic length of the jack 43. During the installation of the prefabricated pipe section 5, the jack 43 provides temporary support for the prefabricated pipe section 5, which facilitates the assembly and connection between the prefabricated pipe sections.

[0062] Furthermore, in steps S5 and S9, the horizontal status of the U-shaped tunnel boring machine is detected, and the extension length of the bottom cutterhead 12 is adjusted. Specifically, the attitude of the U-shaped tunnel boring machine shield is determined by a level or laser guide. When the shield is higher on the left and lower on the right, the extension length of the bottom cutterhead 12 is adjusted so that the extension length of the left bottom cutterhead 12 is greater than that of the right bottom cutterhead 12. During the shield's forward movement, the shield rolls to the left to restore horizontality. When the shield is lower on the left and higher on the right, the extension length of the bottom cutterhead 12 is adjusted so that the extension length of the left bottom cutterhead 12 is less than that of the right bottom cutterhead 12. During the shield's forward movement, the shield rolls to the right to restore horizontality. This achieves the adjustment of the forward attitude of the U-shaped tunnel boring machine.

[0063] Furthermore, in steps S2 and S6, the degree of left-right deviation of the U-shaped tunnel boring machine is detected, and over-excavation blocks 111 of different sizes are installed on the side cutters 11. The forward direction of the shield is determined by a laser instrument, and the over-excavation blocks 111 of different sizes are switched on the side cutters 11 on the left and right sides, thereby adjusting the over-excavation amount of the side cutters 11. Different over-excavation amounts on the left and right sides can control the U-shaped tunnel boring machine to turn left or right, facilitating the adjustment of the forward attitude of the U-shaped tunnel boring machine.

[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A U-shaped tunnel boring machine, comprising a front shield (2), a middle shield (3), and a tail shield (4), characterized in that, The front shield (2) is provided with a waterproof insert knife assembly (1), the middle shield (3) and the front shield (2) are provided with a hinged sealing structure (31), the tail shield (4) is provided with a sealing brush assembly, and the middle shield (3) is provided with an auxiliary support assembly (6) on its side. The auxiliary support assembly (6) includes an auxiliary support frame (61), one end of which is connected to the side of the central shield body (3), and the other end of which is provided with an adjustment mechanism, and a support wheel (68) is provided on the adjustment mechanism. The adjustment mechanism includes a horizontally movable sliding member (62) and a vertically movable lifting member (63). The sliding member (62) is slidably mounted on the auxiliary support frame (61) and is connected to the auxiliary support frame (61) via a horizontal hydraulic cylinder (64). The lifting member (63) is slidably mounted on the sliding member (62) and is connected to the sliding member (62) via a vertical hydraulic cylinder (65). The support wheel (68) is rotatably mounted on the lifting member (63).

2. The U-shaped tunnel boring machine according to claim 1, characterized in that, The waterproof insert assembly (1) includes a side insert (11), a closed partition (21) is provided on the front shield (2), the side insert (11) is symmetrically arranged on the left and right sides of the closed partition (21), the side insert (11) is arranged in a stepped manner, and a double sealing structure is provided between the front shield (2) and the side insert (11).

3. The U-shaped tunnel boring machine according to claim 2, characterized in that, The end of the side inserter (11) is detachably provided with an over-digging block (111).

4. The U-shaped tunnel boring machine according to claim 3, characterized in that, The lower part of the closed partition (21) is provided with an inclined insert plate (22), which is integrally connected with the closed partition (21). At least two bottom inserts (12) are arranged side by side below the insert plate (22).

5. The U-shaped tunnel boring machine according to claim 4, characterized in that, The bottom insert (12) includes an inclined telescopic member (121) located below the insert plate (22). The lower end of the telescopic member (121) is connected to a plug (122). The telescopic member (121) can drive the plug (122) to extend or retract from the lower edge of the insert plate (22).

6. The U-shaped tunnel boring machine according to claim 5, characterized in that, The sealing brush assembly includes at least two sets of shield tail brushes (41) arranged side by side. The shield tail brushes (41) are fixedly installed inside the tail shield body (4), and sealing grease is filled between two adjacent sets of shield tail brushes (41).

7. The U-shaped tunnel boring machine according to claim 6, characterized in that, The tail shield body (4) is equipped with a slurry stop plate (44) at its tail end.

8. The U-shaped tunnel boring machine according to claim 7, characterized in that, The tail shield body (4) is provided with a base plate (42), and the base plate (42) is provided with at least two sets of tail shield brushes (41). The space between two adjacent sets of tail shield brushes (41) is filled with sealing grease, and the base plate (42) is provided with multiple telescopic support components.

9. The U-shaped tunnel boring machine according to claim 8, characterized in that, The support wheel (68) is connected to the lifting component (63) through a flexible suspension mechanism (66).

10. The U-shaped tunnel boring machine according to claim 9, characterized in that, Material transport frame (8) is provided above the middle shield body (3) and the tail shield body (4). A slag discharge belt conveyor (82) is provided on the material transport frame (8). The slag inlet end of the slag discharge belt conveyor (82) is located at the front shield body (2). A material hopper (81) for transporting cushion material is movably provided on the material transport frame (8).

11. The U-shaped tunnel boring machine according to claim 10, characterized in that, The material hopper (81) includes a material hopper body (811) and a hinged door (812) located at the bottom of the material hopper body (811). One side of the hinged door (812) is hinged to the material hopper body (811), and the other side of the hinged door (812) is detachably connected to the material hopper body (811) through a dispensing mechanism.

12. The U-shaped tunnel boring machine according to claim 11, characterized in that, The dispensing mechanism includes a pin (813) that is movably mounted on the main body (811) of the material hopper, and a pin hole on the hinged door (812), with the pin (813) inserted into the pin hole.

13. A construction method for a U-shaped tunnel boring machine as described in claim 12, characterized in that, Includes the following steps: S1, excavate the starting pit and receiving pit, lay the shield machine cushion layer (51) in the starting pit, install the U-shaped shield machine on the shield machine cushion layer (51), when the U-shaped shield machine is in the initial state, the side cutter (11) is retracted, the jacking system (32) on the middle shield body (3) extends, and the extension length of the jacking system (32) is greater than or equal to the sum of the widths of the two prefabricated pipe sections (5); S2, the side inserter (11) extends forward to transport the prefabricated pipe section (5) to the material transport frame (8). The extension length of the side inserter (11) is greater than or equal to the width of one prefabricated pipe section (5). The reference height for the installation of the prefabricated pipe section (5) is adjusted at the position of the tail shield body (4). S3, excavate the soil inside the side insert cutter (11), and transport the excavated soil to the muck truck via the muck conveyor belt (82). The jacking system (32) on the middle shield body retracts and splices two prefabricated pipe sections (5) inside the tail shield body (4). S4, use the material bucket (81) to transport the shield machine cushion layer (51) material to the front of the bottom cutter (12), and lay the shield machine cushion layer (51) in front of the bottom cutter (12). The width of the shield machine cushion layer (51) is greater than or equal to the width of a prefabricated pipe section (5). S5, the jacking system (32) extends, the jacking system (32) pushes the U-shaped shield machine forward a distance equal to the width of a precast tunnel section (5), the side cutter (11) retracts, and at the same time, the side seam backfilling and top backfilling are carried out on the precast tunnel section (5); S6, the side inserter (11) extends forward, and the extension length of the side inserter (11) is greater than or equal to the width of a prefabricated pipe section (5); S7, excavate the soil inside the side cutting tool (11), and transport the excavated soil to the muck truck via the muck conveyor belt (82); S8, use the material bucket (81) to transport the shield machine cushion layer (51) material to the front of the bottom cutter (12), lay the shield machine cushion layer (51) in front of the bottom cutter (12), the width of the shield machine cushion layer (51) is greater than or equal to the width of a precast pipe section (5), and inspect the foundation pit. S9, the jacking system (32) extends, the jacking system (32) pushes the U-shaped shield machine forward a distance equal to the width of a precast tunnel section (5), the side cutter (11) retracts, and at the same time, the side seam backfilling and top backfilling are carried out on the precast tunnel section (5); S10. Repeat steps S2 to S9 until the U-shaped tunnel boring machine reaches the receiving pit, and the construction is completed.

14. The construction method of the U-shaped shield tunneling machine according to claim 13, characterized in that, In S2, the material of the pipe section cushion layer (52) is transported to the inside of the tail shield body (4) using a material hopper (81), and the pipe section cushion layer (52) is flattened using a paving equipment. The width of the pipe section cushion layer (52) is greater than or equal to the sum of the widths of the two precast pipe sections (5).

15. The construction method of the U-shaped shield tunneling machine according to claim 14, characterized in that, The pipe section bedding layer (52) includes a graded crushed stone layer and a coarse sand layer, with the coarse sand layer located above the graded crushed stone layer.

16. The construction method of the U-shaped shield tunneling machine according to claim 13, characterized in that, In S2, the telescopic support members on the bottom plate (42) of the tail shield body (4) are adjusted so that the support height of each telescopic support member is equal.

17. The construction method of the U-shaped shield tunneling machine according to any one of claims 13 to 16, characterized in that, In S5 and S9, the horizontal status of the U-shaped shield machine is detected, and the extension length of the bottom cutter (12) is adjusted.

18. The construction method of the U-shaped shield tunneling machine according to any one of claims 13 to 16, characterized in that, In S2 and S6, the degree of left and right offset of the U-shaped shield machine is detected, and over-excavation blocks (111) of different sizes are installed on the side cutter (11).

Citation Information

Patent Citations

  • Full section tunneling self-propelled type U-shaped shield tunneling machine

    CN106593455A

  • Tail shield of shield tunneling machine

    CN105114084A

  • Supporting and retaining device for open excavation construction of comprehensive pipe gallery and construction method thereof

    CN106049532A

  • Full -face tunnel boring machine constructs machine from walking U -shaped shield

    CN206530336U

  • Waterproof open cut piping lane equipment suitable for weak stratum of rich water

    CN208486292U