A waterproof laying construction method based on a tunnel inverted arch trestle integration
Patent Information
- Application Number
- CN202410317977.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2026-10-30
- Estimated Expiration
- 2044-03-19
AI Technical Summary
[0004]1、现有的铁路隧道防水材料铺设装置一般只是用于将防水材料材输送到指定的位置处,还是需要人工手动进行铺设,工作效率较低,且施工环境恶劣,存在安全风险
[0018]本发明中拱形铺设台车的设置,用于保证过车净空,满足隧道内其他施工车辆的通行;通过运载小车铺设防水材料,无需人工在隧道恶劣的环境下作业,无安全风险,降低了人工成本。
Smart Images

Figure CN118008398B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel waterproofing construction technology, and in particular to a waterproofing construction method based on an integrated tunnel arch trestle. Background Technology
[0002] Railway tunnels are passageways specifically designed for train transport. When railways traverse mountainous areas, due to limited traction capacity and maximum gradient requirements (less than 24%), overcoming elevation obstacles is necessary. Excavating tunnels to cross mountains is a reasonable choice, as it shortens the track, reduces gradient, improves operating conditions, and increases traction capacity. Based on their location, they can be divided into three main categories: mountain tunnels, which pass under mountains or hills to shorten distances and avoid steep gradients; underwater tunnels, which pass under rivers or straits to cross waterways or straits; and urban tunnels, which pass under cities to accommodate railways passing through large cities. Waterproofing materials are required in railway tunnels, necessitating the use of railway tunnel waterproofing material laying devices.
[0003] The existing railway tunnel waterproofing material laying devices have the following defects:
[0004] 1. Existing railway tunnel waterproofing material laying devices are generally only used to transport waterproofing materials to designated locations, and manual laying is still required, resulting in low work efficiency, harsh construction environment, and safety risks.
[0005] 2. Existing railway tunnel waterproofing material laying devices occupy most of the tunnel area, preventing other construction vehicles from passing and affecting overall construction efficiency. Summary of the Invention
[0006] In view of this, the present invention provides a waterproof paving construction method based on an integrated tunnel arch trestle bridge to solve the problems mentioned in the background art.
[0007] To achieve the above objectives, the present invention provides the following technical solution:
[0008] A waterproof paving construction method based on an integrated tunnel arch trestle bridge includes the following steps:
[0009] S1: Move the trestle to the tunnel construction position. The arched track is located at the starting point of the construction section. Both transport trolleys are located at the starting and ending ends of the arched track. First, the clamping arm clamps the waterproof material rolled on the mandrel and presses the waterproof material onto the tunnel lining. Then, the welding arm welds the waterproof material onto the tunnel lining. After welding is completed, the active walking unit drives the arched track to move along the walking rails to the end of the construction section and repeats the above waterproof material laying process until the waterproof material laying of the tunnel lining at the same height of the entire construction section is completed.
[0010] S2: At this point, the arched track is at the end of the construction section. Both transport trolleys move towards the center of the arched track to continue laying waterproof material and ensure that it overlaps with the waterproof material laid in S1. After welding is completed, the active walking unit drives the arched track to move along the walking rail towards the starting point of the construction section and repeats the above waterproof material laying process to complete the waterproof material laying of the tunnel lining at the same height in the entire construction section.
[0011] S3: Repeat S1 and S2. After the waterproofing material is laid on the tunnel lining of the entire construction section, the arched track moves to the next construction section to lay the waterproofing material on the tunnel lining, ensuring that it overlaps longitudinally with the waterproofing material laid in the previous construction section. After the waterproofing material is laid on the tunnel lining at the construction position of the trestle, the trestle moves to the next construction position to lay the waterproofing material until the waterproofing material is laid on the entire tunnel lining.
[0012] Furthermore, when there is insufficient working space to lay the waterproof material to the center of the tunnel lining, one side of the transport trolley moves away from the center of the arched track to leave enough working space, while the other side of the transport trolley moves closer to the center of the arched track and completes the laying of the waterproof material at the center of the tunnel lining.
[0013] A waterproof paving construction method based on an integrated tunnel arch trestle bridge includes the following steps:
[0014] S1: Move the trestle to the tunnel construction location. The arched track is located at the starting point of the construction location. A transport trolley is located at the starting end of the arched track. First, the clamping arm clamps the waterproof material rolled on the mandrel and presses the waterproof material onto the tunnel lining. Then, the welding arm welds the waterproof material onto the tunnel lining. After welding is completed, the transport trolley moves to the end of the arched track and repeats the above waterproof material laying process until the waterproof material laying of the tunnel lining in the same longitudinal direction of the entire construction location is completed.
[0015] S2: At this time, the transport trolley is located at the end of the arched track. The active walking unit drives the arched track to move along the walking rails to the end of the construction position, continue to lay the waterproof material, and ensure that it overlaps longitudinally with the waterproof material laid in S1. After the welding is completed, the transport trolley moves to the beginning of the arched track and repeats the above waterproof material laying process until the waterproof material laying of the tunnel lining in the same longitudinal direction of the entire construction position is completed.
[0016] S3: Repeat S1 and S2 until the waterproofing material for the tunnel lining at the construction location of the trestle is completed. Then move the trestle to the next construction location to lay the waterproofing material until the waterproofing material for the entire tunnel lining is completed.
[0017] The beneficial effects of this invention are as follows:
[0018] The arched laying trolley in this invention is designed to ensure clearance for vehicles to pass through and to allow other construction vehicles to pass through the tunnel. By laying waterproof materials using the trolley, there is no need for manual labor in the harsh environment of the tunnel, eliminating safety risks and reducing labor costs. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of a waterproof paving structure based on an integrated tunnel arch bridge in this invention.
[0021] Figure 2 This is a side view of a waterproof paving structure based on an integrated tunnel arch bridge in this invention.
[0022] Figure 3 This is a side view of the arched laying trolley in this invention.
[0023] Figure 4 This is a schematic diagram of the structure of the transport vehicle in this invention.
[0024] Figure 5 This is a left view of the transport vehicle in this invention.
[0025] Figure 6 This is a right view of the transport vehicle in this invention.
[0026] Figure 7 This is a front view of the arched laying trolley installation platform in this invention.
[0027] Figure 8 This is a side view of the arched laying trolley installation platform in this invention.
[0028] Figure 9 This is a flowchart from a first-person perspective of a waterproof paving construction method based on an integrated tunnel arch bridge in Example 1.
[0029] Figure 10 This is a flowchart from a second perspective of a waterproof paving construction method based on an integrated tunnel arch bridge in Example 1.
[0030] Figure 11 This is a first-view schematic diagram of a waterproof paving construction method based on an integrated tunnel arch bridge in Example 2.
[0031] Figure 12 This is a schematic diagram from a second perspective of a waterproof paving construction method based on an integrated tunnel arch bridge in Example 2.
[0032] In the figure:
[0033] 1. Arched laying trolley; 11. Arched track; 12. Traveling beam; 13. Active traveling unit; 14. Passive traveling unit; 2. Transport trolley; 20. Wheel set; 21. Support frame; 22. Mounting slot; 23. Fixing frame; 24. Mandrel; 25. Waterproof material; 26. First rotating base; 27. Second rotating base; 28. Clamping arm; 29. Welding arm; 3. Second lining of tunnel; 4. First lining of tunnel; 5. Trestle; 51. Traveling rail; 6. Demountable work platform. Detailed Implementation
[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0035] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate for the embodiments of this application described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0036] In this application, the terms "upper," "lower," "left," "right," "front," "rear," "top," "bottom," "inner," "outer," "middle," "vertical," "horizontal," "lateral," and "longitudinal" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are primarily for the purpose of better describing this application and its embodiments, and are not intended to limit the indicated device, element, or component to having a specific orientation, or to be constructed and operated in a specific orientation.
[0037] Furthermore, in addition to indicating location or positional relationship, some of the aforementioned terms may also have other meanings. For example, the term "above" may also be used in some cases to indicate a certain dependency or connection relationship. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.
[0038] Furthermore, the terms "installation," "setup," "equipped with," "connection," "linking," and "socketing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral structure; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium, or an internal connection between two devices, components, or parts. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.
[0039] Example 1:
[0040] See appendix Figure 1-6 A waterproof paving structure based on an integrated tunnel arch trestle includes a trestle 5, on which an arched paving trolley 1 is slidably mounted. The inner side of the arched paving trolley 1 is used to accommodate the passage of other construction vehicles, and a transport trolley 2 is slidably connected to the outer side of the arched paving trolley 1. The transport trolley 2 is used to lay waterproof material on the tunnel lining 4, which is located outside the tunnel lining 3. In this embodiment, the arched paving trolley 1 is set to ensure clearance for vehicles to pass through and to allow other construction vehicles to pass through the tunnel. By laying waterproof material through the transport trolley 2, there is no need for manual labor in the harsh environment of the tunnel, eliminating safety risks and reducing labor costs.
[0041] The arched laying trolley 1 includes an arched track 11, with both ends of the arched track 11 slidably connected to the trestle 5 via a traveling mechanism. A transport trolley 2 is slidably connected to the arched track 11. In this embodiment, the transport trolley 2 is slidably connected to both the starting and ending ends of the arched track 11.
[0042] The walking mechanism includes a walking beam 12, which is fixedly installed at both ends of the arched track 11. An active walking unit 13 is fixedly installed at one end of the bottom surface of the walking beam 12, and a passive walking unit 14 is fixedly installed at the other end. Walking rails 51 are provided on both sides of the top surface of the trestle 5. The active walking unit 13 and the passive walking unit 14 are both adapted to the walking rails 51.
[0043] The transport trolley includes a support frame 21 and a wheel set 20 adapted to the arched track 11. The support frame 21 is slidably connected to the arched track 11 through the wheel set 20. The support frame 21 has an installation groove 22 on the side away from the arched track 11. A storage unit is provided on one side of the installation groove 22 and an installation unit is provided on the other side.
[0044] The storage unit includes a mandrel 24, which is mounted on one side of the mounting groove 22 via two fixing brackets 23. The mandrel 24 is rotatably connected between the two fixing brackets 23, and a waterproof material 25 is rolled onto the mandrel 24. In this embodiment, the mandrel 24 is perpendicular to the longitudinal direction of the tunnel.
[0045] The installation unit includes a first rotating base 26 and a second rotating base 27, which are sequentially fixedly disposed on the side of the mounting groove 22 away from the mandrel 24. A clamping arm 28 is fixedly connected to the driving end of the first rotating base 26 for clamping the waterproof material 25. A welding arm 29 is fixedly connected to the driving end of the second rotating base 27 for welding the waterproof material 25. In this embodiment, both the clamping arm 28 and the welding arm 29 can rotate 360°. The welding arm 29 welds the waterproof material 25 to the tunnel lining 4 using a hot-melt pad and inspects the quality of the welding between the waterproof material 25 and the hot-melt pad.
[0046] See appendix Figure 7-8 The transport trolley on the arched laying trolley 1 can be disassembled, and multiple detachable working platforms can be evenly installed on the arched laying trolley 1. Workers can stand on the detachable working platforms to complete the work of tying steel bars or the maintenance of the tunnel.
[0047] See appendix Figure 9-10 A waterproof paving construction method based on an integrated tunnel arch trestle bridge includes the following steps:
[0048] S1: Move the trestle 5 to the tunnel construction position. The arched track 11 is located at the starting point of the construction section. Both transport trolleys 2 are located at the starting and ending ends of the arched track 11. First, the clamping arm 28 clamps the waterproof material 25 rolled on the mandrel 24 and presses the waterproof material 25 onto the tunnel lining 4. Then, the welding arm 29 welds the waterproof material 25 onto the tunnel lining 4. After welding is completed, the active walking unit 13 drives the arched track 11 to move along the walking rail 51 to the end of the construction section and repeats the above waterproof material 25 laying process until the waterproof material 25 is laid on the tunnel lining 4 at the same height of the entire construction section. In this embodiment, the construction section is 12m long, the arched track 11 is 4m long along the tunnel depth direction, and the working range of the welding arm 29 and the clamping arm 28 is 4m. The arched track 11 needs to be moved at least 3 times from the starting point to the end point of the construction section. It can also be moved gradually during the work process as needed.
[0049] S2: At this time, the arched track 11 is located at the end of the construction section. Both transport trolleys 2 move towards the center of the arched track 11 to continue laying the waterproof material 25, and ensure that it overlaps with the waterproof material 25 laid in S1. In this embodiment, the waterproof material 25 is 4m wide and the circumferential overlap length is 125mm. After the welding is completed, the active walking unit 13 drives the arched track 11 to move along the walking rail 51 towards the starting point of the construction section, and repeats the above waterproof material 25 laying process to complete the laying of waterproof material 25 on the tunnel lining 4 at the same height in the entire construction section.
[0050] S3: Repeat S1 and S2. After the waterproof material 25 of the tunnel lining 4 is laid in the entire construction section, the arched track 11 moves to the next construction section to lay the waterproof material 25 of the tunnel lining 4, ensuring that it overlaps longitudinally with the waterproof material 25 laid in the previous construction section. After the waterproof material 25 of the tunnel lining 4 at the construction position of the trestle 5 is laid, the trestle 5 moves to the next construction position to lay the waterproof material 25 until the waterproof material 25 of the entire tunnel lining 4 is laid.
[0051] When there is insufficient working space to lay the waterproof material 25 to the center of the tunnel lining 4, one side of the transport trolley 2 moves away from the center of the arched track 11 to leave enough working space, while the other side of the transport trolley 2 moves closer to the center of the arched track 11 and completes the laying of the waterproof material 25 at the center of the tunnel lining 4.
[0052] In this embodiment, the waterproof material 25 includes geotextile and waterproof board. The geotextile is laid first, and then the waterproof board is laid.
[0053] Example 2:
[0054] See appendix Figure 11-12 A waterproof paving structure based on an integrated tunnel arch trestle includes a trestle 5, on which an arched paving trolley 1 is slidably mounted. The inner side of the arched paving trolley 1 is used to accommodate the passage of other construction vehicles, and a transport trolley 2 is slidably connected to the outer side of the arched paving trolley 1. The transport trolley 2 is used to lay waterproof material on the tunnel lining 4, which is located outside the tunnel lining 3. In this embodiment, the arched paving trolley 1 is set to ensure clearance for vehicles to pass through and to allow other construction vehicles to pass through the tunnel. By laying waterproof material through the transport trolley 2, there is no need for manual labor in the harsh environment of the tunnel, eliminating safety risks and reducing labor costs.
[0055] The arched laying trolley 1 includes an arched track 11, with both ends of the arched track 11 slidably connected to the trestle 5 via a traveling mechanism. A transport trolley 2 is slidably connected to the arched track 11. In this embodiment, only one transport trolley 2 is slidably connected to the arched track 11.
[0056] The walking mechanism includes a walking beam 12, which is fixedly installed at both ends of the arched track 11. An active walking unit 13 is fixedly installed at one end of the bottom surface of the walking beam 12, and a passive walking unit 14 is fixedly installed at the other end. Walking rails 51 are provided on both sides of the top surface of the trestle 5. The active walking unit 13 and the passive walking unit 14 are both adapted to the walking rails 51.
[0057] The transport trolley includes a support frame 21 and a wheel set 20 adapted to the arched track 11. The support frame 21 is slidably connected to the arched track 11 through the wheel set 20. The support frame 21 has an installation groove 22 on the side away from the arched track 11. A storage unit is provided on one side of the installation groove 22 and an installation unit is provided on the other side.
[0058] The storage unit includes a mandrel 24, which is mounted on one side of the mounting groove 22 via two fixing brackets 23. The mandrel 24 is rotatably connected between the two fixing brackets 23, and a waterproof material 25 is rolled onto the mandrel 24. In this embodiment, the mandrel 24 is parallel to the longitudinal direction of the tunnel.
[0059] The installation unit includes a first rotating base 26 and a second rotating base 27, which are sequentially fixedly disposed on the side of the mounting groove 22 away from the mandrel 24. A clamping arm 28 is fixedly connected to the driving end of the first rotating base 26 for clamping the waterproof material 25. A welding arm 29 is fixedly connected to the driving end of the second rotating base 27 for welding the waterproof material 25. In this embodiment, both the clamping arm 28 and the welding arm 29 can rotate 360°. The welding arm 29 welds the waterproof material 25 to the tunnel lining 4 using a hot-melt pad and inspects the quality of the welding between the waterproof material 25 and the hot-melt pad.
[0060] The transport trolley on the arched laying trolley 1 can be disassembled, and multiple detachable working platforms can be evenly installed on the arched laying trolley 1. Workers can stand on the detachable working platforms to complete the work of tying steel bars or the maintenance of the tunnel.
[0061] A waterproof paving construction method based on an integrated tunnel arch trestle bridge includes the following steps:
[0062] S1: Move the trestle 5 to the tunnel construction position. The arched track 11 is located at the starting point of the construction position. A transport trolley 2 is located at the starting end of the arched track 11. First, the clamping arm 28 clamps the waterproof material 25 rolled on the mandrel 24 and presses the waterproof material 25 onto the tunnel lining 4. Then, the welding arm 29 welds the waterproof material 25 onto the tunnel lining 4. After the welding is completed, the transport trolley 2 moves to the end of the arched track 11 and repeats the above waterproof material 25 laying process until the waterproof material 25 laying of the tunnel lining 4 in the same longitudinal direction of the entire construction position is completed.
[0063] S2: At this time, the transport trolley 2 is located at the end of the arched track 11. The active walking unit 13 drives the arched track 11 to move along the walking rail 51 to the end of the construction position, and continues to lay the waterproof material 25, ensuring that it overlaps longitudinally with the waterproof material 25 laid in S1. After the welding is completed, the transport trolley 2 moves to the beginning of the arched track 11 and repeats the above waterproof material 25 laying process until the waterproof material 25 laying of the tunnel lining 4 in the same longitudinal direction of the entire construction position is completed.
[0064] S3: Repeat S1 and S2 until the waterproofing material 25 of the tunnel lining 4 at the construction location of the trestle 5 is laid. Then move the trestle 5 to the next construction location to lay the waterproofing material 25 until the waterproofing material 25 of the entire tunnel lining 4 is laid.
[0065] In this embodiment, the waterproof material 25 includes geotextile and waterproof board. The geotextile is laid first, and then the waterproof board is laid.
[0066] During the installation of waterproof materials, this invention ensures sufficient clearance for other construction vehicles in the tunnel to pass through. The construction process is fully automated, allowing operators to control the process on-site via buttons or remotely. This improves the quality of tunnel waterproofing, eliminates the need for manual labor in the harsh tunnel environment, eliminates safety risks, reduces labor costs, and significantly accelerates the construction progress.
[0067] This invention is suitable for construction in tunnels where there is a lot of dust, noise, harmful gases, and high ventilation difficulty.
[0068] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A waterproof paving construction method based on an integrated tunnel arch trestle bridge, characterized in that, Includes the following steps: S1: Move the trestle (5) to the tunnel construction position. The arched track (11) is located at the starting point of the construction section. The two transport trolleys (2) are located at the starting end and the ending end of the arched track (11) respectively. First, the clamping arm (28) clamps the waterproof material (25) rolled on the mandrel (24) and presses the waterproof material (25) onto the tunnel lining (4). Then, the welding arm (29) welds the waterproof material (25) onto the tunnel lining (4). After the welding is completed, the active walking unit (13) drives the arched track (11) to move along the walking rail (51) to the end of the construction section and repeats the above waterproof material (25) laying process until the waterproof material (25) laying of the tunnel lining (4) at the same height of the entire construction section is completed. S2: At this time, the arched track (11) is located at the end of the construction section. Both transport trolleys (2) move towards the center of the arched track (11) to continue laying the waterproof material (25) and ensure that it overlaps with the waterproof material (25) laid in S1. After welding is completed, the active walking unit (13) drives the arched track (11) to move along the walking rail (51) towards the starting point of the construction section and repeats the above waterproof material (25) laying process to complete the laying of waterproof material (25) on the tunnel lining (4) at the same height in the entire construction section. S3: Repeat S1 and S2. After the waterproof material (25) of the tunnel lining (4) of the entire construction section is laid, the arched track (11) moves to the next construction section to lay the waterproof material (25) of the tunnel lining (4) and ensures that it overlaps longitudinally with the waterproof material (25) laid in the previous construction section. After the waterproof material (25) of the tunnel lining (4) at the construction position of the trestle (5) is laid, the trestle (5) moves to the next construction position to lay the waterproof material (25) until the waterproof material (25) of the entire tunnel lining (4) is laid.
2. A waterproof paving construction method based on an integrated tunnel arch trestle bridge according to claim 1, characterized in that, When there is insufficient working space to lay the waterproof material (25) to the center of the tunnel lining (4), one side of the transport trolley (2) moves away from the center of the arched track (11) to leave enough working space, while the other side of the transport trolley (2) moves close to the center of the arched track (11) and completes the laying of the waterproof material (25) at the center of the tunnel lining (4).
Citation Information
Patent Citations
Full-ring lining device of traffic tunnel and construction method
CN116771389A
Automatic waterproof plate laying machine for secondary lining operation
CN209604047U