Convergence value parameter prediction and early warning method and device for assisting intelligent decision of tunnel support

By constructing a time series prediction model based on spatiotemporal deep learning, and combining it with a safety factor and evaluation function, the problems of low prediction accuracy and inadequate anomaly detection in tunnel support are solved. This achieves high-precision prediction of tunnel support parameters and safety assessment, and assists in intelligent decision-making for tunnel support.

CN118013430BActive Publication Date: 2026-11-20SOUTHWEST JIAOTONG UNIV +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410098075.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2026-11-20
Estimated Expiration
2044-01-24

AI Technical Summary

Technical Problem

Existing time series prediction methods for tunnel support suffer from low prediction accuracy, weak robustness, poor adaptability, and uncompromising anomaly detection methods that are either too simplistic or lack rigor.

Method used

A time series prediction model based on spatiotemporal sequence deep learning is constructed, which includes a window normalization module, an embedding layer module, a destationary module, a variational inference module, and an anti-normalization module. The safety of the tunnel support structure is determined by combining the safety factor and the evaluation function.

Benefits of technology

It improves the accuracy and robustness of tunnel support parameter prediction, effectively adjusts support schemes, and assists in intelligent decision-making for tunnel support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118013430B_ABST
    Figure CN118013430B_ABST
Patent Text Reader

Abstract

The present application relates to the convergence value parameter prediction early warning method and device for assisting tunnel support intelligent decision-making, comprising: obtaining the environmental parameters, support parameters and historical data of monitored parameters in a predetermined time period of the tunnel; constructing training samples according to the historical data; constructing a time series prediction model and inputting the training samples into the constructed time series prediction model for training; inputting the data to be predicted into the trained time series prediction model to obtain the convergence value; calculating all safety factors; calculating the evaluation function value according to the safety factor, and adjusting the decision scheme according to the evaluation function value. The convergence value parameter prediction early warning method for assisting tunnel support intelligent decision-making has good applicability, can effectively solve the problems of low convergence value precision of predicted related parameters and incomplete safety determination of support structure in actual tunnel support, thereby effectively assisting the intelligent decision-making process of tunnel support.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method and device for predicting and warning convergence parameters for intelligent decision-making in tunnel support, belonging to the field of time series prediction and time series anomaly detection technology. Background Technology

[0002] Tunnel support refers to the various engineering techniques and measures adopted during tunnel construction, such as rock strata reinforcement and tunnel lining, to ensure the stability and safety of the tunnel structure. During tunnel excavation, the underground soil and rock undergo enormous mechanical deformation and pressure, which may lead to soil collapse, tunnel structural instability, and other potential dangers. Therefore, to ensure the safety of construction personnel and protect the integrity of the tunnel, it is necessary to monitor certain important parameters manually or using sensors. When the values ​​of the monitored parameters are in an unsafe state, timely response and handling are required. Taking surface displacement monitoring and rock mass stress monitoring as examples, surface displacement monitoring refers to measuring changes in surface settlement and displacement during tunnel construction to assess surface deformation and protect surrounding buildings and underground pipelines. Rock mass stress monitoring refers to monitoring rock mass stress during tunnel excavation to prevent damage or even collapse due to enormous stress, and then taking reinforcement and support measures to ensure the safety of tunnel construction. These monitoring results are crucial for rock mass stability, tunnel support scheme decisions, and the safety of tunnel construction.

[0003] Generally, the change curves of tunnel construction monitoring parameters show an initial upward or downward trend after tunnel excavation, then gradually slow down and eventually stabilize, forming a convergence curve. Therefore, parameter prediction can be viewed as a time series prediction problem. The final predicted convergence value is an important indicator for judging the safety of the tunnel support structure, belonging to the field of anomaly detection. Over the years, many scholars have conducted extensive and in-depth research on sequence parameter prediction. Early time series prediction models were represented by ARIMA, which can fit each sequence separately. However, it is inefficient when processing large-scale time series and cannot share similar patterns between different sequences. With the successful application of deep learning models in natural language processing, computer vision, and other fields, it has also been gradually introduced into solving the problem of time series prediction. The paper "Salinas D, Flunkert V, Gasthaus J, et al. DeepAR: Probabilistic forecasting with autoregressive recurrent networks[J].2017" uses classic recurrent neural networks (RNNs) for time series prediction, predicting the value at a future time each time. However, as the sequence length increases, RNN-type models suffer from problems such as error accumulation and gradient explosion. The paper "Wu N, Green B, Ben X, et al. Deep transformer models for time series forecasting: The influenza prevalence case[J]. 2020" successfully transferred the Transformer model, used in natural language processing, to time series scenarios for the first time. Transformer-type models, due to their parallel computing and long-range dependency modeling capabilities, have been widely discussed and improved. The paper "Liu Y, Wu H, Wang J, et al. Non-stationary transformers: Exploring the stationarity in time series forecasting[J]. 2022" addresses the large amount of non-stationary time series data in the real world by improving the Transformer's attention mechanism, integrating non-stationary information into the model, and improving the model's time series modeling ability and prediction performance. However, due to the different geological environments between different tunnels, the data distribution of monitoring parameters varies, and existing time series prediction methods may suffer from low prediction accuracy, weak robustness, and poor adaptability.

[0004] In the field of time series anomaly detection, due to the scarcity of outliers in real-world scenarios and the difficulty in obtaining labels, deep learning-based time series anomaly detection models primarily employ unsupervised methods. The paper "SuY, Zhao Y, Niu C, et al. Robust anomaly detection for multivariate time series through stochastic recurrent neural network[C].2019" proposes the OmniAnomaly model, which uses a recurrent neural network to capture the temporal dependencies between multiple variables and a variational autoencoder (VAE) to generate reconstruction probabilities. In the anomaly detection stage, the model uses a method based on Peaks-Over-Threshold (POT) theory to automatically set thresholds and detect outliers in the time series. The paper "Xu J, Wu H, Wang J, et al. Anomaly transformer: Time series anomaly detection with association discrepancy[J].2021" improves the transformer structure, proposing two types of associations in time series data and using the calculation of association differences to assist in anomaly detection. However, in actual tunnel support processes, relying solely on thresholds to determine anomalies is neither rigorous nor intuitive, and a more systematic anomaly detection method is needed. Summary of the Invention

[0005] In order to overcome the shortcomings of the existing technology, the present invention aims to provide a method and device for predicting and warning convergence parameters to assist intelligent decision-making in tunnel support.

[0006] The technical solution provided by this invention to solve the above-mentioned technical problems is: a traffic flow prediction method based on spatiotemporal sequence deep learning, comprising:

[0007] S1. Obtain historical data of tunnel environmental parameters, support parameters, and parameters monitored within a predetermined time period;

[0008] S2. Based on historical data, determine the parameters that need to be trained and construct training samples;

[0009] S3. Construct a time series prediction model and input the training samples into the constructed time series prediction model for training;

[0010] The time series prediction model includes a window normalization module, an embedding layer module, a destableization module, a variational inference module, and an inverse normalization module.

[0011] S4. Input the data to be predicted into the trained time series prediction model to obtain the convergence curve and convergence value of the parameters;

[0012] S5. Calculate all safety factors by predicting the convergence values ​​of the parameters. If any safety factor is less than 1 or greater than 8, it indicates that the current support scheme is unreasonable and the support parameters need to be adjusted. If all safety factors are between 1 and 8, it indicates that the current support scheme is safe, and then proceed to the next step.

[0013] S6. Calculate the evaluation function value based on the safety factor, and adjust the decision-making scheme based on the evaluation function value.

[0014] A further technical solution is that, in step S2, a sliding window process is applied to the historical data to fully utilize the contextual information in the data. The processing method is as follows:

[0015] W t ={x t-w+1 ,x t-w+2 ,…,x t}

[0016] In the formula: W t Let w represent the t-th window, and w represent the window size.

[0017] A further technical solution is that the window normalization module normalizes the time series in the time dimension to eliminate scale differences between different variables in multivariate time series data.

[0018] The embedding layer module includes a position encoding unit and a label embedding unit; the position encoding unit provides the model with information about the relative position in the sequence, and the label embedding unit uses a one-dimensional convolution operation to convert each data point of the input sequence into a fixed-dimensional embedding vector, which is aligned with the dimension of the position-encoded vector.

[0019] The de-stabilization module includes a de-stabilization attention layer, a residual connection layer, a layer normalization layer, and a fully connected layer. The de-stabilization attention layer employs an improved attention mechanism, using window-normalized input and statistics to approximate the attention map of the original input before normalization. The residual connection layer alleviates the problems of gradient vanishing and information loss during training, improving the training effect and model performance. The layer normalization layer provides normalization processing for the input at each layer, reducing the distribution differences between inputs at different layers and improving the robustness of the model. The fully connected layer is used for dimensionality transformation to better model the input data and extract useful features.

[0020] The variational inference module is used to impose rule constraints on the hidden layer (space) of the model to alleviate the overfitting problem. It includes an inference network and a generator network. The inference network is used to perform variational inference on the input to generate the probability distribution of the latent variables. The generator network restores an approximate probability distribution of the input based on the probability distribution of the latent variables.

[0021] The denormalization module is used in conjunction with the window normalization module to restore the normalized data to the reconstructed value of the unnormalized original input.

[0022] A further technical solution is that the normalization formula of the window normalization module is as follows:

[0023]

[0024]

[0025]

[0026] In the formula: x i μ represents the i-th data within the window. x This represents the mean of the data points within the window. x' represents the variance of the data points within the window. i This represents the normalized data.

[0027] A further technical solution is that the calculation formula for the de-stabilized attention layer is:

[0028]

[0029]

[0030]

[0031] In the formula: Q and K represent the query matrix and key matrix in the attention mechanism, Q' and K' represent the normalized query matrix and key matrix, and μ Q μ K d represents the mean of Q and K over time. model Indicates the dimension of the model.

[0032] A further technical solution is that the calculation formula of the inverse normalization module is:

[0033] O = σ x ⊙(O'+μ x )

[0034] In the formula: O' represents the output after the variational inference module; O represents the predicted value, which is the final output of the model; σ x μ xThis is expressed as the standard deviation and mean of the original input.

[0035] A further technical solution is that the safety factor in step S5 includes a displacement safety factor and three support structure safety factors.

[0036] A further technical solution is that the calculation formula in step S5 is:

[0037]

[0038] In the formula: U L U represents the ultimate displacement, determined by the surrounding rock grade and burial depth in the current environment, and is a known value; p This represents the average of the three predicted displacement convergence values; K1 is the displacement safety factor.

[0039]

[0040] In the formula: σ L This represents the ultimate stress of the steel arch frame, which is generally a constant value; σ p The predicted stress of the steel arch frame cannot be directly obtained. It is necessary to determine the cross-sectional area of ​​the steel arch frame by the type of steel arch frame used in the support scheme, and then divide the predicted axial force convergence value of the steel arch frame by the cross-sectional area of ​​the steel arch frame; K2 is the safety factor of the second support structure.

[0041]

[0042] In the formula: f c This represents the ultimate compressive strength of the shotcrete, which is determined by the initial support grade used in the support scheme and is a constant value. K3 is the convergence value of the minimum principal stress at the crown predicted by the model; K3 is the safety factor of the third support structure.

[0043]

[0044] In the formula: f h The compressive strength limit of concrete is determined by the secondary lining grade used in the support scheme and is a constant value; d is the secondary lining thickness in the support scheme; N1-N5 are the axial force convergence values ​​in five directions predicted by the model; K4 is the safety factor of the fourth support structure.

[0045] A further technical solution is that the calculation formula for the evaluation function is:

[0046]

[0047]

[0048] Where: K i γ represents the i-th safety factor. iThis represents the corresponding safety factor K. i The value of the evaluation function is given by γ, where γ represents all calculated γ values. i Sum.

[0049] A convergence parameter prediction and early warning device for assisting intelligent decision-making in tunnel support includes:

[0050] The data acquisition module is configured to collect historical data of environmental parameters, support parameters, and parameters monitored within a predetermined time period in the tunnel.

[0051] The sample determination module is configured to determine the training samples for the time series prediction model based on historical data of parameters monitored within a predetermined time period.

[0052] The model training module is configured to input the processed training samples into the constructed time series prediction model for training.

[0053] The model inference module is configured to input the data to be predicted into the trained model for inference, and obtain the convergence curve and convergence value of the parameters.

[0054] The anomaly detection module is configured to further calculate the convergence value of the parameters obtained in the model inference to obtain the safety factor and determine whether the tunnel support structure is safe.

[0055] The auxiliary decision-making module is configured to integrate all safety factors and adjust the relevant parameters in the original support decision-making scheme to assist in intelligent decision-making for tunnel support.

[0056] The present invention has the following beneficial effects:

[0057] First, a de-stationary attention mechanism was used to predict the relevant parameters of the tunnel in order to solve the problem that the ability of the model to establish time-dependent relationships is weakened due to the transition of the data to a stable state after normalization.

[0058] Second, in order to prevent the model from overfitting when predicting the relevant parameters of the tunnel, a variational inference module is used to constrain the hidden layer (space) of the model by rules.

[0059] Third, when detecting anomalies in convergence values ​​of tunnel-related parameters, an innovative method is proposed to determine the safety of tunnel support structures using different safety factors and evaluation functions;

[0060] Fourth, the convergence parameter prediction and early warning method for assisting intelligent decision-making in tunnel support proposed in this invention has high applicability. It can predict the convergence values ​​of relevant parameters in actual tunnel support, and adjust the support scheme through safety factor and evaluation function to assist intelligent decision-making in tunnel support. Attached Figure Description

[0061] Figure 1 This is a flowchart illustrating the overall invention method;

[0062] Figure 2 This is the model design architecture diagram of this method;

[0063] Figure 3 This is an explanatory diagram of the TCNx module in the model;

[0064] Figure 4 This is a diagram explaining the principle of the GRN module;

[0065] Figure 5 This is a diagram illustrating the multi-head attention mechanism;

[0066] Figure 6 This is a schematic diagram of the device. Detailed Implementation

[0067] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0068] The present invention provides a traffic flow prediction method based on spatiotemporal sequence deep learning, comprising:

[0069] Step S1: Obtain historical data of tunnel environmental parameters, support parameters, and parameters monitored within a predetermined time period;

[0070] Environmental parameters, such as surrounding rock grade, elastic modulus, Poisson's ratio, cohesion, and ground stress, are obtained through geological exploration and sensor monitoring.

[0071] Support parameters are obtained based on environmental parameters, such as reinforced concrete support parameters, anchor bolt support parameters, steel arch support parameters, and shotcrete support parameters.

[0072] Monitoring key indicators, such as formation displacement, axial force, and stress, through methods such as manual monitoring and sensors can be viewed as time-series data, as shown below:

[0073] X = {x1, x2, ..., x} t}

[0074] Where, x t ∈R m , representing the values ​​of m parameters monitored at timestamp t.

[0075] Step S2: Based on historical data, determine the parameters that need to be trained and construct training samples.

[0076] To obtain more local information and better model temporal dependencies, the data is transformed into a sliding window, as shown below:

[0077] W t ={x t-w+1 ,x t-w+2 ,…,x t}

[0078] Among them, W t Let w represent the t-th window, and w represent the window size.

[0079] Step S3: Construct a time series prediction model and input the training samples into the constructed time series prediction model for training;

[0080] like Figure 2 As shown, the time series prediction model includes a window normalization module, an embedding layer module, a destableization module, a variational inference module, and an inverse normalization module;

[0081] The window normalization module normalizes time series data along the time dimension, eliminating scale differences between variables in multivariate time series data, and making model training and optimization more stable. The normalization method is as follows:

[0082]

[0083]

[0084]

[0085] Where, x i μ represents the i-th data within the window. x This represents the mean of the data points within the window. x' represents the variance of the data points within the window. i This represents the normalized data.

[0086] The embedding layer module contains positional encoding units and labeled embedding units. Since the self-attention mechanism cannot capture the order information of elements in a sequence, positional encoding units are used to provide the model with information about the relative positions within the sequence, as shown in the following formula:

[0087]

[0088]

[0089] Where d model The dimension of the model is represented by , i represents the position of the time step, and pos is used to generate the position code.

[0090] The labeled embedding unit uses a one-dimensional convolution operation to convert each data point of the input sequence into a fixed-dimensional embedding vector, which is aligned with the dimension of the position-encoded vector. This operation is denoted as TE.

[0091] The total embedding is represented by the sum of the position-encoded result and the tag-embedded result, as shown below:

[0092] I = PE(W) + TE(W)

[0093] Where I represents the embedded input.

[0094] The de-stabilization module includes a de-stabilization attention layer, a residual connection layer, a layer normalization layer, and a fully connected layer. Since window normalization is used in step S3, the time-series data may become too stable, weakening the model's ability to model time-series dependencies and affecting model performance. Therefore, a de-stabilization attention layer is designed to approximate the attention map of the original input before normalization using the window-normalized input and the statistics stored during normalization.

[0095] The original attention score is calculated as follows:

[0096]

[0097] Where Q, K, and V represent the query matrix, key matrix, and value matrix, respectively. To prevent the inner product from becoming too large, they are divided by... As scaling factors, the gradient is prevented from becoming too small during backpropagation. These three matrices are derived from the learnable weight matrix, as shown below.

[0098] Q = W q I

[0099] K = W k I

[0100] V = W v I

[0101] Among them, W q W k W v These are weight matrices, which are initially randomly assigned values ​​and updated as the model is trained.

[0102] Under the assumption of linearity in the time dimension based on the fully connected layer, the inputs Q and K are calculated to satisfy the following equation:

[0103]

[0104]

[0105] Where, μ Q ,μK σ represents the mean of Q and K over the time dimension. x Let be the standard deviation of the original input. Substituting this into the formula for calculating attention, we can approximately satisfy the following equation:

[0106]

[0107] Will Kμ Q Defined as destationarization factors τ and Δ, these are applied to the attention map obtained from the normalized input data. A multilayer perceptron (MLP) is used to adaptively learn these two parameters, allowing the model to internally convey non-stationary information from the time-series data.

[0108] Residual connection layers are used to alleviate the problems of gradient vanishing and information loss during training, thereby improving the training effect and model performance.

[0109] Layer normalization layers can provide normalization processing for the input of each layer, reduce the distribution differences of inputs at different layers, and improve the robustness of the model;

[0110] Fully connected layers are used to perform dimensionality transformations, better model the input data, and extract useful features.

[0111] The variational inference module contains an inference network and a generative network, such as Figure 3 As shown. For many time series prediction models, the goal during training is to minimize errors as much as possible, but there are no rule constraints on the hidden layers; at the same time, due to the limited amount of data on tunnel-related parameters monitored in reality, the model may overfit. Therefore, a variational inference module was designed after the de-stabilization module to address the above problems.

[0112] Inference networks are used to perform variational inference on the input, mapping it to the latent space and generating the probability distribution of the latent variables, as shown in the following formula:

[0113]

[0114] Where, q φ (z|x) represents the posterior probability distribution of the latent variables learned by the inference network given the input x, where μ and σ are... 2 This represents the mean and variance of the inference network output. It is generally defined as a Gaussian distribution.

[0115] The generator network receives latent variables as input and maps them back to the data space to reconstruct the original input data, as shown in the following formula:

[0116]

[0117] Where, p θ (x'|z) represents the data distribution learned by the generative network given the latent variable z.

[0118] During model training, we assume that the latent variables follow a prior distribution (usually Gaussian) to constrain the hidden layers of the model. We aim to capture the latent structure of the data through these latent variables, which requires their distribution to approximate the prior distribution. KL divergence can be used to measure the deviation between the latent variable distribution and the prior distribution, thus yielding the KL divergence loss term, as shown below:

[0119]

[0120] in, The KL divergence loss term represents the model, p(z) is the prior distribution of the latent variables, and q(z|x) is the learned posterior probability distribution of the latent variables.

[0121] The denormalization module corresponds to the window normalization module in step S3, restoring the normalized data to its original, unnormalized state. The calculation method is as follows:

[0122] O = σ x ⊙(O'+μ x )

[0123] In the formula: O' represents the output after the variational inference module; O represents the predicted value, which is the final output of the model; σ x μ x This is expressed as the standard deviation and mean of the original input.

[0124] The reconstruction loss function of the model is derived from the predicted reconstructed values ​​and the true values, as shown below:

[0125]

[0126] Where w represents the window size and W represents the actual value. The reconstruction loss term of the model is represented by the mean squared error.

[0127] Combining the KL divergence loss term and the reconstruction loss term of the integrated model, the final loss function is shown below:

[0128]

[0129] in, This represents the loss function of the model.

[0130] Step S4: Input the data to be predicted into the trained time series prediction model to obtain the convergence curve and convergence value of the parameters;

[0131] As shown in Table 1, the dataset used in this embodiment was generated by professional simulation software. There are more than 900 sets of test data, including 10 parameters such as arch bottom displacement, arch bottom axial force, steel arch frame axial force, and minimum principal stress at the arch top.

[0132] Serial Number Parameter name unit 1 Arch base displacement m (meter) 2 Crown displacement m (meter) 3 arch displacement m (meter) 4 Arching axial force N (Newton) 5 Axial force of arched shoulder N (Newton) 6 Axial force at the top of the arch N (Newton) 7 Axial force at arch foot N (Newton) 8 Axial force at the bottom of the arch N (Newton) 9 Axial force of steel arch frame N (Newton) 10 Minimum principal stress of the dome Pascal

[0133] like Figure 4 As shown, the fitting curves of the convergence values ​​of the arch shoulder axial force predicted by the model and the actual values ​​are shown, and the fitting accuracy can reach 85%.

[0134] Step S5: By using the convergence value of the predicted parameters, the safety factor is further obtained, which is used to measure whether the tunnel support structure is safe.

[0135] In this embodiment, after the convergence value is predicted by the model, four safety factors can be further obtained, including one displacement safety factor and three support structure safety factors, denoted as K1, K2, K3 and K4 respectively, which are used to comprehensively judge the safety of the support structure.

[0136] K1 is calculated using the three convergent displacement values ​​predicted by the model, as follows:

[0137]

[0138] Among them U L U represents the ultimate displacement, determined by the surrounding rock grade and burial depth in the current environment, and is a known value; p This represents the average of the three predicted displacement convergence values.

[0139] K2 is calculated using the stress convergence value of the steel arch frame predicted by the model. The calculation method is as follows:

[0140]

[0141] Where, σ L This represents the ultimate stress of the steel arch frame, which is generally a constant value; σ p The predicted stress of the steel arch frame cannot be obtained directly. It is necessary to determine the cross-sectional area of ​​the steel arch frame by the type of steel arch frame used in the support scheme, and then divide the predicted axial force convergence value of the steel arch frame by the cross-sectional area of ​​the steel arch frame.

[0142] K3 is calculated using the convergence value of the minimum principal stress at the crown predicted by the model. The calculation method is as follows:

[0143]

[0144] Among them, f c This represents the ultimate compressive strength of the shotcrete, which is determined by the initial support grade used in the support scheme and is a constant value. This is the convergence value of the minimum principal stress at the crown predicted by the model.

[0145] K4 is calculated using the convergence values ​​of axial forces in five directions (crown, shoulder, waist, foot, and base) predicted by the model. The calculation method is as follows:

[0146]

[0147] Among them, f h The compressive strength limit of the concrete is determined by the secondary lining grade used in the support scheme and is a constant value; d is the secondary lining thickness in the support scheme; N1-N5 are the axial force convergence values ​​in five directions predicted by the model.

[0148] The calculated safety factors K1-K4 can be used to preliminarily assess the safety of the tunnel support structure. If any safety factor is less than 1 or greater than 8, it indicates that the current support scheme is unreasonable and the support parameters need to be adjusted. If all safety factors are between 1 and 8, it indicates that the current support scheme is safe, and then proceed to the next step.

[0149] Step S6: By combining different safety factors, the safety of the support structure is judged through an evaluation function, and the decision-making scheme is adjusted accordingly.

[0150] After calculating all safety factors, an evaluation method based on the overall safety factor of the tunnel support system can be constructed to analyze the safety performance of the support scheme. The evaluation function is shown below:

[0151]

[0152]

[0153] Among them, K i γ represents the i-th safety factor. i This represents the corresponding safety factor K. i The value of the evaluation function is given by γ, where γ represents all calculated γ values. i Sum.

[0154] The evaluation function shows that it reaches its maximum value when the safety factor is 1.5. When the safety factor is less than 1, the evaluation function is negative, indicating that the support scheme is unsafe and the relevant support scheme parameters need to be adjusted. When the safety factor is greater than 8, the evaluation function is also less than 0, indicating that too much support material has been used, resulting in waste, and the support scheme also needs to be adjusted.

[0155] like Figure 5The diagram shows the flowchart for detecting convergence value anomalies. First, after predicting the convergence values ​​of the parameters using the model, all safety factors are calculated. If any safety factor is less than 1 or greater than 8, the calculated evaluation function will be negative, indicating that the current support scheme is unreasonable and requires adjustment of support parameters (such as anchor bolts, steel arches, etc.). If all safety factors are between 1 and 8, it indicates that the current support scheme is safe. The safety factors are then substituted into the evaluation function for summation to obtain γ. The larger γ is, the safer the scheme. When multiple decision schemes exist, the magnitude of γ can be used to evaluate and rank the schemes, achieving the effect of assisting intelligent decision-making in tunnel support.

[0156] Based on the same concept, and corresponding to the methods in the above embodiments, the present invention also provides a convergence value parameter prediction and early warning device for assisting intelligent decision-making in tunnel support, such as... Figure 6 As shown, it includes the following modules:

[0157] The data acquisition module 101 is configured to collect historical data of environmental parameters, support parameters, and parameters monitored within a predetermined time period of the tunnel.

[0158] The sample determination module 102 is configured to determine the training samples for the time series prediction model based on historical data of parameters monitored within a predetermined time period.

[0159] The model training module 103 is configured to input the processed training samples into the constructed time series prediction model for training.

[0160] The model inference module 104 is configured to input the data to be predicted into the trained model for inference, and obtain the convergence curve and convergence value of the parameters.

[0161] The anomaly detection module 105 is configured to further calculate the convergence value of the parameters obtained in the model inference to obtain the safety factor and determine whether the tunnel support structure is safe.

[0162] The auxiliary decision-making module 106 is configured to integrate all safety factors and adjust the relevant parameters in the original support decision-making scheme to assist in intelligent decision-making for tunnel support.

[0163] In summary, the convergence parameter prediction and early warning method for assisting intelligent decision-making in tunnel support proposed in this invention has good applicability and can effectively solve the problems of low accuracy of convergence value prediction of relevant parameters and incomplete judgment of support structure safety in actual tunnel support, thereby effectively assisting the intelligent decision-making process of tunnel support.

[0164] The above description is not intended to limit the present invention in any way. Although the present invention has been disclosed through the above embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some changes or modifications to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the present invention shall still fall within the scope of the present invention.

Claims

1. A method for predicting and warning convergence parameters in intelligent decision-making for tunnel support, characterized in that, include: S1. Obtain historical data of tunnel environmental parameters, support parameters, and parameters monitored within a predetermined time period; S2. Based on historical data, determine the parameters that need to be trained and construct training samples; S3. Construct a time series prediction model and input the training samples into the constructed time series prediction model for training; The time series prediction model includes a window normalization module, an embedding layer module, a destableization module, a variational inference module, and an inverse normalization module. The window normalization module normalizes the time series in the time dimension, eliminating scale differences between different variables in multivariate time series data; The embedding layer module includes a position encoding unit and a label embedding unit; the position encoding unit provides the model with information about the relative position in the sequence, and the label embedding unit uses a one-dimensional convolution operation to convert each data point of the input sequence into a fixed-dimensional embedding vector, which is aligned with the dimension of the position-encoded vector. The de-stabilization module includes a de-stabilization attention layer, a residual connection layer, a layer normalization layer, and a fully connected layer. The de-stabilization attention layer adopts an improved attention mechanism, using the input and statistics after window normalization to approximate the attention map of the original input before normalization. The residual connection layer is used to alleviate the problems of gradient vanishing and information loss during training, thereby improving the training effect and model performance; the layer normalization layer can provide normalization processing for the input of each layer, reduce the distribution difference of inputs at different layers, and improve the robustness of the model; the fully connected layer is used to perform dimensionality transformation, better model the input data and extract useful features. The variational inference module is used to impose rule constraints on the hidden layers of the model to alleviate the overfitting problem. It includes an inference network and a generator network. The inference network is used to perform variational inference on the input to generate the probability distribution of the latent variables. The generator network restores an approximate probability distribution of the input based on the probability distribution of the latent variables. The inverse normalization module is used in conjunction with the window normalization module to restore the normalized data to the reconstructed value of the unnormalized original input. S4. Input the data to be predicted into the trained time series prediction model to obtain the convergence curve and convergence value of the parameters; S5. Calculate all safety factors by predicting the convergence value of the parameters. If there is a safety factor less than 1 or greater than 8, it means that the current support scheme is unreasonable and the support parameters need to be adjusted. If all safety factors are between 1 and 8, it indicates that the current support scheme is safe, and then proceed to the next step; S6. Calculate the evaluation function value based on the safety factor, and adjust the decision-making scheme based on the evaluation function value.

2. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 1, characterized in that, In step S2, the historical data is processed using a sliding window method to fully utilize the contextual information in the data. The processing method is as follows: In the formula: Indicates the first One window, Indicates the window size.

3. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 2, characterized in that, The normalization formula of the window normalization module is as follows: In the formula: Indicates the first in the window Data points, This represents the mean of the data points within the window. This represents the variance of the data points within the window. This represents the normalized data points.

4. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 3, characterized in that, The calculation formula for the destabilizing attention layer is as follows: In the formula: , This represents the query matrix and key matrix in the attention mechanism. , This represents the normalized query matrix and key matrix. , express , The mean over time. Indicates the dimension of the model.

5. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 4, characterized in that, The calculation formula for the inverse normalization module is as follows: In the formula: This represents the output after passing through the variational inference module; This represents the predicted value, which is the final output of the model. , This is expressed as the standard deviation and mean of the original input.

6. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 5, characterized in that, The safety factor in step S5 includes a displacement safety factor and three support structure safety factors.

7. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 6, characterized in that, The calculation formula in step S5 is: In the formula: This represents the ultimate displacement, determined by the surrounding rock grade and burial depth in the current environment, and is a known value; This represents the average of the three predicted displacement convergence values; For displacement safety factor; In the formula: This indicates the ultimate stress of the steel arch frame; The predicted stress of the steel arch frame; The safety factor for the second support structure; In the formula: This indicates the ultimate compressive strength of shotcrete; The convergence value of the minimum principal stress at the crown predicted by the model; The safety factor for the third support structure; In the formula: This represents the ultimate compressive strength of concrete, which is determined by the secondary lining grade used in the support scheme and is a constant value. The thickness of the secondary lining in the support scheme; These are the convergence values ​​of axial force in the five directions predicted by the model; K 4 represents the safety factor for the fourth support structure.

8. The convergence parameter prediction and early warning method for intelligent decision-making in auxiliary tunnel support according to claim 7, characterized in that, The formula for calculating the evaluation function is: In the formula: Indicates the first A safety factor, Indicates the corresponding safety factor The value of the evaluation function under the following conditions Represents all calculated Sum.

9. A convergence parameter prediction and early warning device for assisting intelligent decision-making in tunnel support, characterized in that, The device is used for prediction of convergence value parameters in the intelligent decision-making method for auxiliary tunnel support as described in claim 8, including: The data acquisition module is configured to collect historical data of environmental parameters, support parameters, and parameters monitored within a predetermined time period in the tunnel. The sample determination module is configured to determine the training samples for the time series prediction model based on historical data of parameters monitored within a predetermined time period. The model training module is configured to input the processed training samples into the constructed time series prediction model for training. The model inference module is configured to input the data to be predicted into the trained model for inference, and obtain the convergence curve and convergence value of the parameters. The anomaly detection module is configured to further calculate the convergence value of the parameters obtained in the model inference to obtain the safety factor and determine whether the tunnel support structure is safe. The auxiliary decision-making module is configured to integrate all safety factors and adjust the relevant parameters in the original support decision-making scheme to assist in intelligent decision-making for tunnel support.

Citation Information

Patent Citations

  • Intelligent supporting decision-making method for unfavorable geological section of TBM tunnel

    CN115758515A

  • Tunneling equipment parameter prediction method for assisting safety risk decision

    CN116167516A