High-speed railway foundation large deformation post-subgrade partition grading layered disease remediation method
By combining high-density surface wave method and ground-penetrating radar method for zoned, graded and layered treatment, and by adopting methods such as vertical seepage barriers and grouting reinforcement, the problems of untimely detection and incomplete treatment of subgrade defects in high-speed railways have been solved, and the smoothness and safety of the track have been improved.
Patent Information
- Application Number
- CN202410183361.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-02-19
AI Technical Summary
Existing technologies for detecting and treating subgrade defects in high-speed railways, especially cavities and sinkholes caused by soil erosion, suffer from problems such as untimely detection, limited remediation measures, significant disruption to operating lines during construction, and a lack of specificity and effectiveness.
High-density surface wave method and ground-penetrating radar method are used to detect the compaction and shear wave velocity of the roadbed. The roadbed is treated in different zones, grades and layers. Different construction techniques such as vertical seepage barriers and grouting reinforcement are used to treat sections with different degrees of damage. NB-IoT communication is combined with real-time sensor monitoring.
It has enabled the accurate identification and effective treatment of roadbed defects in high-speed railways, maintained the smoothness and safety of the track, and reduced interference with operating lines.
Smart Images

Figure CN118029354B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of high-speed railways, specifically relating to a method for treating subgrade defects in high-speed railways after large deformation of the subgrade. Background Technology
[0002] Despite the rapid development of my country's high-speed railway industry, the understanding of roadbed structural defects remains insufficient. In particular, regarding defects such as roadbed cavities and sinkholes caused by soil erosion, existing detection and monitoring technologies are not keeping pace with the speed of defect development, often resulting in significant damage by the time defects are discovered. Therefore, effective emergency remediation measures are urgently needed.
[0003] Defects in the subgrade of road and bridge transition sections in soft soil areas, such as cavities and sinkholes, pose a serious threat to the safety of high-speed trains. Currently, there is insufficient understanding of the formation and development mechanisms of these defects, and a lack of targeted comprehensive remediation solutions. Conventional cement compaction grouting, as an emergency measure, has limited effectiveness and cannot fundamentally solve the problem.
[0004] High-speed railway subgrade improvement work faces significant challenges, including tight deadlines, limited construction space, and interference control with operating lines. In particular, when conducting foundation construction near operating railway lines, various complex conditions must be considered, such as under high-voltage lines, inside tunnels, and under bridges and culverts. Summary of the Invention
[0005] The purpose of this invention is to address the shortcomings of the prior art by providing a method for treating roadbed defects in a zonal, tiered, and layered manner after large deformation of the high-speed railway foundation. This method effectively treats roadbed defects of different degrees by precisely dividing, grading, and layering the roadbed, thereby maintaining the smoothness and safety of the track.
[0006] The objective of this invention is achieved through the following technical solutions: A method for treating subgrade defects in high-speed railways after large deformation, characterized by the following steps: (S1) Use high-density surface wave method and ground-penetrating radar method to detect the density and shear wave velocity on the top of the embankment; based on the data from the dynamic inspection vehicle, identify the diseased sections of the roadbed and classify the diseased sections; The diseased areas are divided into disease-free areas with good geological conditions, disease-free areas with poor geological conditions, areas with general diseases, and areas with severe diseases. (S2) Divide the roadbed into passive and active zones; The passive zone is defined as the area that indirectly affects the stability of the roadbed, and the active zone is defined as the roadbed area that directly affects the smoothness of the ballastless track surface. The passive zone includes the slope toe influence zone and the area outside the railway boundary, and the active zone includes the roadbed slope area, the subgrade surface layer, the subgrade bottom layer A area, the subgrade bottom layer B area, and the original foundation area. (S3) For the disease-free and geologically sound sections, no treatment is required; for the disease-free and geologically poor sections, the passive zone of the section is treated; for the generally diseased sections, both the passive zone and the active zone of the section are treated; for the severely diseased sections, both the passive zone and the active zone are treated. (S4) When processing the passive area, one or both of the two construction processes are used, namely the first construction process and the second construction process; when processing the active area, one or more of the three construction processes are used, namely the third construction process, the fourth construction process and the fifth construction process. The first construction process involves adding a vertical seepage barrier wall between the slope toe influence area and the railway boundary area; the second construction process involves grouting reinforcement of the slope toe influence area; the third construction process involves grouting reinforcement of the roadbed slope area and the original foundation area; the fourth construction process involves grouting reinforcement of the subgrade surface layer and the subgrade bottom layer A area using polyurethane material; and the fifth construction process involves grouting reinforcement of the subgrade bottom layer B area. (S5) Monitor the diseased areas.
[0007] In step S1, the method for identifying the defective sections of the roadbed is as follows: Ground-penetrating radar (GPR) probes along the extension direction of the high-speed railway subgrade to obtain loose areas on the subgrade. A wave velocity reflection method is used to conduct detailed exploration of these loose areas. This wave velocity reflection method includes at least ten wave velocity detectors and a data processor. The wave velocity detectors are arranged sequentially along a straight line on the subgrade support plate of the loose area, with a spacing of more than 100 cm between adjacent detectors. A shock wave is generated by hammering the subgrade support plate in the loose area. The wave velocity detectors receive the shock wave and upload the reception time to the data processor. The data processor calculates the shear wave velocity in the area where each wave velocity detector is located, identifying areas with a shear wave velocity less than 150 m / s as defective areas.
[0008] In step S1, the method for classifying the diseased areas is as follows: Unfavorable geological sections refer to sections where the following soil layers exist within 0-10m below the roadbed: ① silty sand layer, the soil characteristics of which are: dark gray or grayish-black, loose and saturated; ② gravelly sand layer, the soil characteristics of which are: dark gray or grayish-black, slightly dense and saturated; Favorable geological sections refer to sections where the above soil layers do not exist within 0-10m below the roadbed. Areas where ground-penetrating radar (GPR) detection results show looseness, voids, or wave velocities of 100-150 m / s are designated as general diseased areas; areas where GPR detection results show looseness, voids, and wave velocities less than 100 m / s are designated as severely diseased areas; other areas where no of the above characteristics are detected are designated as disease-free areas.
[0009] In steps S3 and S4, the processing methods for different zones of different diseased areas are as follows: For the affected but geologically unfavorable areas, the second construction method is used to treat the passive zone of the area. For the general diseased area, the passive zone of the area is treated using the second construction process, and the active zone of the area is treated using one or two of the third, fourth and fifth construction processes. For the severely damaged areas, the passive zone of the area is treated using the first and second construction techniques, and the active zone of the area is treated using the third, fourth, and fifth construction techniques.
[0010] In the first construction process, a vertical seepage barrier wall is added between the roadbed slope toe line and the drainage system, and the vertical seepage barrier wall is composed of high-pressure jet grouting piles.
[0011] In the second, third, and fifth construction processes, cement grouting is performed using a skip-hole grouting method.
[0012] In the fourth construction process, polyurethane material is injected using a skip-hole grouting method.
[0013] The advantages of this invention are: by precisely dividing, classifying, and layering the roadbed, it can effectively treat roadbed defects of different degrees, thereby maintaining the smoothness and safety of the track. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the process of the present invention; Figure 2 This is a schematic diagram of the process for zoning and treating diseased areas according to the present invention; Figure 3 This is a schematic diagram showing the zoning of diseased areas according to the present invention; Figure 4 This is a construction schematic diagram of the diseased area zoning treatment according to the present invention. Detailed Implementation
[0015] The features and other related features of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments, so as to facilitate understanding by those skilled in the art: like Figure 1-4 As shown in the figure, the markings represent: 1. Railway boundary outer area, 2. Slope toe influence area, 3. Subgrade slope area, 4. Subgrade surface layer, 5. Subgrade bottom layer A area, 6. Subgrade bottom layer B area, 7. Original foundation area, 8. High-pressure jet grouting pile, 9. Stress relief hole, 10. First grouting body, 11. Second grouting body, 12. Grouting reinforcement area, 13. Third grouting body.
[0016] Example: Figure 1-4 As shown, this embodiment specifically relates to a method for treating subgrade defects in a high-speed railway after large deformation, which includes the following steps: (S1) Identification and classification of diseased sections: The density and shear wave velocity of the top of the embankment are detected using the high-density surface wave method and ground-penetrating radar method; based on the data from the dynamic inspection vehicle, the diseased sections of the roadbed are identified and classified.
[0017] The method for identifying defective sections of the roadbed is as follows: Ground-penetrating radar (GPR) probes along the direction of the high-speed railway embankment to obtain loose areas on the embankment.
[0018] The loose area is probed in detail using a wave velocity reflection method device, which includes at least ten wave velocity detectors and a data processor.
[0019] Wave velocity detectors are arranged sequentially along a straight line on the roadbed support plate in the loose area, with a spacing of more than 100cm between adjacent wave velocity detectors.
[0020] Shock waves are generated by hammering the roadbed support plate in the voided area. A wave velocity detector receives the shock waves and uploads the reception time to the data processor.
[0021] The data processor calculates the shear wave velocity in the area where each wave velocity detector is located, and identifies areas with a shear wave velocity less than 150 m / s as areas with defects.
[0022] The method for classifying diseased areas is as follows: Unfavorable geological sections refer to sections where the following soil layers exist within 0-10m below the roadbed: ① silty sand layer (alQ4), the soil characteristics of which are: dark gray or grayish-black, loose and saturated; ② gravelly sand layer (alQ4), the soil characteristics of which are: dark gray or grayish-black, slightly dense and saturated; Favorable geological sections refer to sections where the above soil layers do not exist within 0-10m below the roadbed. Ground-penetrating radar (GPR) detection results showed that areas were loose, hollow, or had wave velocities of 100-150 m / s, which were classified as areas with general disease; GPR detection results showed that areas were loose, hollow, and had wave velocities of less than 100 m / s, which were classified as areas with severe disease; other areas where no of the above characteristics were detected were classified as disease-free areas.
[0023] In summary, diseased areas are categorized into disease-free areas with good geological conditions, disease-free areas with poor geological conditions, areas with moderate disease conditions, and areas with severe disease conditions.
[0024] (S2) Define the zone: Divide the roadbed into passive zone and active zone.
[0025] The passive zone is defined as the area that indirectly affects the stability of the roadbed, while the active zone is defined as the roadbed area that directly affects the smoothness of the ballastless track surface. The passive zone includes the slope toe influence zone 2 and the railway boundary zone 1. Although these areas do not directly affect the track surface, their stability has a potential impact on the overall safety of the roadbed. The active zone includes the roadbed slope zone 3, the subgrade surface layer 4, the subgrade bottom layer A zone 5, the subgrade bottom layer B zone 6, and the original foundation zone 7. These areas are directly affected by foundation deformation and have a significant impact on the track geometry and smoothness.
[0026] (S3) Graded treatment: For disease-free areas with good geology, the treatment level is four, and no treatment is required for these areas; for disease-free areas with poor geology, the treatment level is three, and the passive area of these areas is treated; for areas with general disease, the treatment level is two, and both the passive and active areas of these areas are treated; for areas with severe disease, the treatment level is one, and both the passive and active areas are treated.
[0027] (S4) Layered treatment: When treating the passive area, one or both of the two construction techniques are used, namely the first construction technique and the second construction technique; when treating the active area, one or more of the three construction techniques are used, namely the third construction technique, the fourth construction technique and the fifth construction technique.
[0028] The first construction process involves adding a vertical seepage barrier wall between the slope toe influence zone 2 and the railway boundary zone 1; the second construction process involves grouting reinforcement of the slope toe influence zone 2; the third construction process involves grouting reinforcement of the roadbed slope zone 3 and the original foundation zone 7; the fourth construction process involves grouting reinforcement of the subgrade surface layer 4 and the subgrade bottom layer A zone 5 using polyurethane materials; and the fifth construction process involves grouting reinforcement of the subgrade bottom layer B zone 6.
[0029] The treatment methods for different zones in different diseased areas are as follows: For areas without defects but with poor geological conditions, the second construction technique is used to treat the passive zone of the area; for areas with general defects, the second construction technique is used to treat the passive zone of the area, and one or two of the third, fourth, and fifth construction techniques are used to treat the active zone of the area; for areas with severe defects, the first and second construction techniques are used to treat the passive zone of the area, and the third, fourth, and fifth construction techniques are used to treat the active zone of the area.
[0030] The first construction method ①: A vertical seepage barrier is added between the slope toe influence zone 2 and the railway boundary zone 1, that is, between the roadbed slope toe line and the drainage system. The vertical seepage barrier is composed of high-pressure jet grouting piles 8.
[0031] Among them, the construction of vertical seepage barriers can be carried out in a clearance of as low as 4 meters, which is particularly suitable for areas with limited height, such as under high-voltage lines, ensuring the feasibility and safety of construction.
[0032] The parameters for high-pressure jet grouting piles are as follows: Jet grouting pressure: The pressure during jet grouting of the pile body is controlled within 20MPa to ensure construction quality and structural stability.
[0033] Pile diameter and overlap: The pile diameter is set at 50cm, and the overlap width between piles is 20cm to form a stable and continuous seepage-proof wall.
[0034] Pile depth: The depth ranges from 5 to 30 meters to meet different geological conditions and structural requirements.
[0035] Stress relief holes 9: These are located at the toe of the vertical seepage barrier wall and the roadbed slope. The depth of each hole is half the depth of the vertical seepage barrier wall, the diameter is 20cm, and the spacing is 50-100cm. The holes are filled with sand and gravel to assist in the uniform distribution and release of stress.
[0036] Vertical seepage barrier length setting: Each seepage barrier unit is 25 meters long, and multiple units can be spliced together continuously as needed to form a longer protective structure.
[0037] The second construction technique ②: Grouting reinforcement technology is used in the slope toe influence zone 2 to form the first grouting body 10.
[0038] The grouting system includes five rows of holes at the toe of each 25m slope. The three rows closest to the culvert have a vertical grouting depth of 10m, while the other rows have a vertical grouting depth of 7m. The holes are arranged in a square pattern with a 1m spacing. The grouting pipes are inserted sequentially from the toe of the roadbed slope outwards at angles ranging from 65° to 90°.
[0039] The grouting pipe is made of φ48mm galvanized steel pipe. The last pipe (1m long) has φ10mm small holes drilled at 20cm intervals on the pipe wall for grout to flow out. A wedge-shaped tip is added to the end of the grouting pipe to facilitate pipe insertion.
[0040] Intermittent grouting is used to prevent grout from overflowing from the grouting holes and to ensure the compactness of the grout.
[0041] Cement grouting uses 42.5 grade ordinary Portland cement, with a water-cement ratio of 1:1 (by weight), and is mixed evenly using a grout mixer. To accelerate the setting speed of the grout after grouting, an appropriate amount of accelerator (water glass) is added during grout mixing. The grouting pressure is within 0.15 MPa.
[0042] When the grouting pressure is raised to 0.15MPa, the grouting absorption rate per meter is <2L / min. After stabilizing the pressure for 15 minutes, the grouting can be terminated.
[0043] The third construction technique ③: The same grouting process as the slope toe influence zone 2 is used to reinforce the roadbed slope area 3 and the original foundation area 7 to form a second grouting body 11, the bottom of which extends to the bottom surface of the original foundation area 7.
[0044] Among them, the inclined holes on the slope: grouting pipes are installed on the roadbed slope of 25m on both sides of the culvert, with a total of 2 rows of inclined holes. The angles between the grouting inclined holes and the horizontal plane are 45° and 65°, the spacing along the line is 1.5m, the spacing perpendicular to the line is 1m, and the length of the inclined holes is 5.5m and 3.7m.
[0045] Vertical grouting holes on slopes: Grouting pipes are installed on the roadbed slopes on both sides of the culvert for 25m each, with one row of inclined holes. The vertical grouting holes are spaced 1.5m apart along the road and are 2.8m long.
[0046] The grouting pipe is made of φ48mm galvanized steel pipe. The last pipe (1m long) has φ10mm small holes drilled at 20cm intervals on the pipe wall for grout to flow out. A wedge-shaped tip is added to the end of the grouting pipe to facilitate pipe insertion.
[0047] Intermittent grouting is used to prevent grout from overflowing from the grouting holes and to ensure the compactness of the grout.
[0048] Cement grouting uses 42.5 grade ordinary Portland cement, with a water-cement ratio of 1:1 (by weight), and is mixed evenly using a grout mixer. To accelerate the setting speed of the grout after grouting, an appropriate amount of accelerator (water glass) is added during grout mixing. The grouting pressure is within 0.15 MPa.
[0049] When the grouting pressure is raised to 0.15MPa, the grouting absorption rate per meter is <2L / min. After stabilizing the pressure for 15 minutes, the grouting can be terminated.
[0050] The fourth construction technique ④: Polyurethane grouting is used to reinforce the surface layer 4 and the bottom layer A area 5 of the subgrade to form a grouting reinforcement zone 12.
[0051] Among them, the shoulder sealing layer drilling: along the shoulder sealing layer of the road, 50cm away from the edge of the base plate, vertical holes are drilled in the direction of the road, with a hole diameter of 16-25mm. A total of 3 rows of grouting holes are arranged, with a spacing of 2m along the road and a spacing of 0.5m perpendicular to the road. The hole depths from the perpendicular to the road outward are 1.5m, 2.5m, and 1.5m respectively.
[0052] Intermittent grouting is used to prevent grout from overflowing from the grouting holes and to ensure the compactness of the grout.
[0053] Insert the grouting pipe into the grouting hole, and use quick-drying sealant to install the grouting pipe at the hole location. The grouting pipe should be inserted to the bottom of the hole, with more than 15cm protruding outside, for connecting the grouting gun.
[0054] Electronic levels were used to measure data in the grouting area. There were no fewer than six measuring points on each track slab, and they were evenly distributed on both sides of the track. Special attention was paid to monitoring the data on both sides of the expansion joint.
[0055] During the grouting process, continuously observe whether grout is gushing out from adjacent or opposite grouting nozzles. If cross-grouting occurs, stop grouting and seal the nozzle, then switch to another hole for grouting until the nozzle is completely full, and then end the grouting process.
[0056] High-pressure foaming grouting equipment should be used for construction, and the pressure must be kept constant and continuous during the grouting process. The grouting pressure should be sufficient to ensure that the modified two-component polyurethane material reacts fully, and the pressure at the grout outlet should be controlled within 0.15 MPa.
[0057] The fifth construction technique ⑤: The same grouting process as the slope toe influence zone 2 is used to reinforce the bottom layer B area 6 of the foundation bed to form a third grouting body 13, the bottom of which extends to the bottom surface of the bottom layer B area 6 of the foundation bed.
[0058] Grouting is carried out on the sealing layers on both sides of the base plate using perforated pipes. The grouting inclined holes are at an angle of 70° to the horizontal plane, inclined towards the center of the track, spaced 1.5m apart along the track, and are 3.2m long.
[0059] The grouting pipe is made of φ48mm galvanized steel pipe. The last pipe (1m long) has φ10mm small holes drilled at 20cm intervals on the pipe wall for grout to flow out. A wedge-shaped tip is added to the end of the grouting pipe to facilitate pipe insertion.
[0060] Intermittent grouting is used to prevent grout from overflowing from the grouting holes and to ensure the compactness of the grout.
[0061] Cement grouting uses 42.5 grade ordinary Portland cement, with a water-cement ratio of 1:1 (by weight), and is mixed evenly using a grout mixer. To accelerate the setting speed of the grout after grouting, an appropriate amount of accelerator (water glass) is added during grout mixing. The grouting pressure is within 0.15 MPa.
[0062] When the grouting pressure is raised to 0.15MPa, the grouting absorption rate per meter is <2L / min. After stabilizing the pressure for 15 minutes, the grouting can be terminated.
[0063] (S5) Post-treatment monitoring: Monitor the affected areas.
[0064] After the treatment of the defects, continuous monitoring of the affected areas is required. By using real-time sensors and measuring robots based on NB-IoT communication, it is possible to monitor the subgrade settlement, slope deformation, and deformation of structures such as underpasses and overpasses in the transition section between roads and bridges in real time. Data analysis and risk assessment are then conducted through a cloud platform to provide effective protection for the safe operation of high-speed rail.
[0065] Monitoring point layout: Layout of roadbed collapse monitoring points based on NB-IoT communication real-time sensors: Detection points are set up on the sealing layer every 5~10m within the reinforcement range.
[0066] Monitoring points for the measurement robot prism: A monitoring point is set up every 5-10m along the line at the base plate, sealing layer, slope, and slope foot.
[0067] The beneficial effects of this embodiment are: by precisely dividing, classifying and layering the roadbed, it is possible to effectively treat roadbed defects of different degrees, so as to maintain the smoothness and safety of the track.
[0068] Although the above embodiments have described the concept and embodiments of the present invention in detail with reference to the accompanying drawings, those skilled in the art will recognize that various improvements and modifications can still be made to the present invention without departing from the scope of the claims, and therefore will not be elaborated here.
Claims
1. A method for treating subgrade defects in a graded and layered manner after large deformation of high-speed railway subgrade, characterized in that... The method includes the following steps: (S1) Use high-density surface wave method and ground-penetrating radar method to detect the density and shear wave velocity on the top of the embankment; based on the data from the dynamic inspection vehicle, identify the diseased sections of the roadbed and classify the diseased sections; The diseased areas are divided into disease-free areas with good geological conditions, disease-free areas with poor geological conditions, areas with general diseases, and areas with severe diseases. In step S1, the method for classifying the diseased areas is as follows: Unfavorable geological sections refer to sections where the following soil layers exist within 0-10m below the roadbed: ① silty sand layer, the soil characteristics of which are: dark gray or grayish-black, loose and saturated; ② gravelly sand layer, the soil characteristics of which are: dark gray or grayish-black, slightly dense and saturated; Favorable geological sections refer to sections where the aforementioned silty sand layer and gravelly sand layer do not exist within 0-10m below the roadbed. Ground-penetrating radar (GPR) detection results showed that areas with loose texture, voids, and wave velocities of 100-150 m / s were designated as general disease areas; GPR detection results showed that areas with loose texture, voids, and wave velocities of less than 100 m / s were designated as severe disease areas; areas where no characteristics of general or severe disease areas were detected were designated as disease-free areas. (S2) Divide the roadbed into passive and active zones; The passive zone is defined as the area that indirectly affects the stability of the roadbed, and the active zone is defined as the roadbed area that directly affects the smoothness of the ballastless track surface. The passive zone includes the slope toe influence zone and the area outside the railway boundary, and the active zone includes the roadbed slope area, the subgrade surface layer, the subgrade bottom layer A area, the subgrade bottom layer B area, and the original foundation area. (S3) For the disease-free and geologically sound sections, no treatment is required; for the disease-free and geologically poor sections, the passive zone of the section is treated; for the generally diseased sections, both the passive zone and the active zone of the section are treated; for the severely diseased sections, both the passive zone and the active zone are treated. (S4) When processing the passive area, one or both of the two construction processes are used, namely the first construction process and the second construction process; when processing the active area, one or more of the three construction processes are used, namely the third construction process, the fourth construction process and the fifth construction process. The first construction process involves adding a vertical seepage barrier wall between the slope toe influence area and the railway boundary area; the second construction process involves grouting reinforcement of the slope toe influence area; the third construction process involves grouting reinforcement of the roadbed slope area and the original foundation area; the fourth construction process involves grouting reinforcement of the subgrade surface layer and the subgrade bottom layer A area using polyurethane material; and the fifth construction process involves grouting reinforcement of the subgrade bottom layer B area. (S5) Monitor the diseased areas.
2. The method for treating subgrade defects in high-speed railways after large deformation, as described in claim 1, is characterized in that... In step S1, the method for identifying the defective sections of the roadbed is as follows: Ground-penetrating radar (GPR) probes along the extension direction of the high-speed railway subgrade to obtain loose areas on the subgrade. A wave velocity reflection method is used to conduct detailed exploration of these loose areas. This wave velocity reflection method includes at least ten wave velocity detectors and a data processor. The wave velocity detectors are arranged sequentially along a straight line on the subgrade support plate of the loose area, with a spacing of more than 100 cm between adjacent detectors. A shock wave is generated by hammering the subgrade support plate in the loose area. The wave velocity detectors receive the shock wave and upload the reception time to the data processor. The data processor calculates the shear wave velocity in the area where each wave velocity detector is located, identifying areas with a shear wave velocity less than 150 m / s as defective areas.
3. The method for treating subgrade defects in high-speed railways after large deformation, as described in claim 1, is characterized in that... In steps S3 and S4, the processing methods for different zones of different diseased areas are as follows: For the affected but geologically unfavorable areas, the second construction method is used to treat the passive zone of the area. For the general diseased area, the passive zone of the area is treated using the second construction process, and the active zone of the area is treated using one or two of the third, fourth and fifth construction processes. For the severely damaged areas, the passive zone of the area is treated using the first and second construction techniques, and the active zone of the area is treated using the third, fourth, and fifth construction techniques.
4. The method for treating subgrade defects in high-speed railways after large deformation, as described in claim 3, is characterized in that... In the second, third, and fifth construction processes, cement grouting is performed using a skip-hole grouting method.
5. The method for treating subgrade defects in high-speed railways after large deformation, as described in claim 3, is characterized in that... In the fourth construction process, polyurethane material is injected using a skip-hole grouting method.