A method for microwave-assisted pre-splitting of deep metal mine roadway slotting blasting
By employing microwave-assisted pre-splitting blasting in deep metal mine roadways, and optimizing the cut hole layout using microwave radiation pre-splitting and sequential delayed detonation networks, the problems of low efficiency and high safety risks in deep roadway excavation were solved, achieving efficient and safe blasting results.
Patent Information
- Application Number
- CN202410201732.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-02-23
AI Technical Summary
Deep metal mine tunnel excavation faces challenges such as high block ratio, high explosive consumption, low excavation efficiency, and frequent dynamic disasters. Especially in high ground stress environments, traditional drill-and-blast methods are inefficient and pose high safety risks, making it difficult to achieve efficient and safe tunnel excavation.
The method of slotting blasting in deep metal mine roadways using microwave-assisted pre-splitting involves arranging slotting holes in the direction of the minimum principal stress of the initial in-situ stress field at the roadway excavation face, utilizing microwave radiation to pre-split the rock mass at the bottom of the holes, and combining this with a sequential delayed detonation network to optimize the layout of the slotting hole network and the amount of explosive charge, thereby controlling the blast load disturbance and dynamic hazards.
It improved blasting efficiency, reduced explosive consumption per unit, decreased the rate of large blocks and the risk of dynamic disasters, enhanced the construction safety and efficiency of tunnel excavation, and simplified the on-site testing process.
Smart Images

Figure CN118031743B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of deep metal mine tunnel excavation technology, and particularly relates to a microwave-assisted pre-splitting method for deep metal mine tunnel slotting and blasting. Background Technology
[0002] As a crucial raw material for my country's modern industrial development, metallic mineral resources play a vital role in the country's economic construction. With the increasing depletion of shallow metal mine resources, deep mining has become an inevitable trend in metallic mineral resource development. my country currently has 16 underground metallic mines with mining depths reaching or exceeding 1,000 meters. The current mining depth of metallic mines is decreasing at a rate of approximately 10–30 meters per year. In the future, it is projected that one-third of my country's metallic mines will reach a mining depth of 1,000 meters.
[0003] Currently, most deep metal mine roadway excavation employs the drill-and-blast method, which generally suffers from problems such as a high proportion of large blocks, high explosive consumption per unit, and low excavation efficiency. Furthermore, the strong disturbance during the drill-and-blast process means that deep roadway excavation operations, often characterized by high altitude, high humidity, and high temperature, frequently face dynamic hazards such as rock bursts, spalling, and collapses. Traditional drill-and-blast construction in deep mine roadways has encountered technical bottlenecks, resulting in low construction efficiency, poor blasting effects, and high safety risks. This seriously affects the efficient and safe construction of deep metal mine roadways and further restricts the exploitation and utilization of deep metal mineral resources.
[0004] Cut-and-blast blasting is a crucial step in deep metal mine tunnel excavation, and its quality directly determines the overall quality of the drilling and blasting operation. Furthermore, as the initial blasting stage, cut-and-blast blasting experiences the greatest clamping effect during detonation. Besides the vibration disturbance caused by the explosive explosion, the intense vibration disturbance induced by the transient unloading of the high-stress excavation face at deep depths is also a major source of deep dynamic hazards. Therefore, developing an efficient and safe cut-and-blast blasting technology for deep metal mine tunnels is of significant practical and social importance in overcoming the current bottlenecks in deep drilling and blasting technology. Summary of the Invention
[0005] This application aims to at least solve one of the technical problems existing in the prior art. Therefore, one objective of this invention is to provide a microwave-assisted pre-splitting method for deep metal mine roadway slotting blasting. This method, when used for deep metal mine roadway slotting blasting construction, can ensure both the efficiency and effectiveness of the slotting blasting construction, while simultaneously controlling dynamic hazards caused by deep tunneling disturbances.
[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:
[0007] A microwave-assisted pre-splitting method for slotting blasting in deep metal mine roadways includes the following steps:
[0008] Step 1: Determine the direction of the minimum principal stress in the initial in-situ stress field at the tunnel excavation face.
[0009] Step 2: Determine the void parameters
[0010] Step 3: Determine the location and parameters of the first slot hole.
[0011] The first slotted hole is arranged along the direction of minimum principal stress through the center of the empty hole. All slotted holes have the same diameter, and the distance between the empty hole and the first slotted hole is calculated and determined according to the following formula:
[0012]
[0013] In the formula, s1 is the distance between the empty hole and the first slotted hole, mm; r is the radius of the first slotted hole, mm; R is the radius of the empty hole, mm; h1 is the charge coefficient of the first slotted hole;
[0014] All cut holes have the same depth. The depth of each cut hole is the sum of the theoretical cycle advance of blasting excavation and the over-depth, i.e.:
[0015] l=L+△l (7)
[0016] In the formula, l is the depth of the slotted hole, in meters; Δl is the extra depth.
[0017] The charge amount for the first slot hole is calculated and determined according to the following formula:
[0018] Q1=πr 2 lh1ρ e (8)
[0019] In the formula, Q1 is the charge amount in the first slot, in kg; ρ e Density of explosive, kg / m³ 3 .
[0020] Step 4: Perform microwave radiation pre-cracking on the bottom of the hollow hole and the first slotted hole.
[0021] Step 5: Test detonation of the first slot hole to preliminarily determine the location and parameters of the second slot hole.
[0022] Test-detonate the first slot hole and observe the crack distribution around the blast hole on the excavation surface after detonation. The main direction of crack propagation is the direction of the maximum principal stress on the excavation surface after temporary excavation of the first slot hole. The vertical direction is the direction of the minimum principal stress on the excavation surface after temporary excavation of the first slot hole. Arrange the second slot hole through the center of the first slot hole along the direction of the minimum principal stress of the first temporary excavation surface or at an angle of no more than 30°. The distance between the second slot hole and the first slot hole is calculated and determined according to the following formula:
[0023] s2=k1s1 (9)
[0024] In the formula, s2 is the distance between the second slotted hole and the first slotted hole, in meters; k1 is the distance coefficient between the second slotted hole and the first slotted hole.
[0025] The charge amount for the second slotted hole is calculated and determined according to the following formula:
[0026] Q2=πr 2 lh2ρ e (10)
[0027] In the formula, Q2 is the charge amount in the second slot, in kg; h2 is the charge coefficient in the second slot, and h2
[0028] Step 6: Using the same method as Step 4 and Step 5, preliminarily determine the location and parameters of all remaining slot holes;
[0029] Step 7: Determine the final hole mesh layout and parameters;
[0030] Step 8: Determine the initiation network for the cut-and-blast blasting.
[0031] The slotting blasting method employs a hole-by-hole delayed detonation network.
[0032] Specifically, in step 7, based on the cut hole closed-loop arrangement standard and by observing the cut blasting effect during the test blasting process, the preliminary determined cut hole mesh arrangement and parameters are verified to meet the closed-loop arrangement standard.
[0033] If satisfied, proceed to the next step; if not satisfied, repeat steps 3 to 6, and adjust the hole layout and parameters such as the position of each slot hole, the charge coefficient, and the microwave radiation at the bottom of the hole until satisfied, and then proceed to the next step.
[0034] Among them, the distance between the nth slotted hole and the (n-1th slotted hole) is similar to the distance between the nth slotted hole and the 1st slotted hole, where n is the number of slotted holes.
[0035] Specifically, in step 8, the holes are detonated sequentially according to the determined hole numbers. The detonation micro-delay time for the second hole after the first hole is detonated is 25-50ms, and the detonation micro-delay time for the remaining holes is 25ms.
[0036] Specifically, in step 6, when determining the location of the remaining slot holes, the overall slot hole layout is flexibly adjusted within a 30° angle range along the minimum principal stress to ensure that a closed loop of slot holes is finally formed.
[0037] Microwave radiation pre-cracking and test detonation are performed on the bottom of the (i-1)th cut hole to determine the location and parameters of the i-th cut hole. The distance between the i-th cut hole and the (i-1)th cut hole is calculated and determined according to the following formula:
[0038] s i =k i-1 s i-1 (11)
[0039] In the formula, s i The distance between the i-th slotted hole and the (i-1)-th slotted hole is in meters (m); s i-1 Let k be the distance between the (i-1)th and (i-2)th slotted holes, in meters (m); i-1 The spacing coefficient between the i-th slot and the (i-1)-th slot is denoted by 1 to 1.3, where i = 3, 4, ..., n, and n is the number of slots.
[0040] The charge amount in the i-th slot is calculated and determined according to the following formula:
[0041] Q i =πr 2 lh i ρ e (12)
[0042] In the formula, Q i The charge amount in the i-th slot is kg; h i h is the charge coefficient for the i-th slot. i The value of h is related to the stress level and the clamping conditions of the borehole, ranging from 0.7 to 0.9. Furthermore, the charge coefficient for the subsequently detonated slotted hole is smaller than that for the previously detonated slotted hole, i.e., h... i <h i-1 .
[0043] Specifically, the diameter of the slotted hole is 40-80mm, the value of Δl is 0.2-0.4m, the value of k1 is 1.5-2, the values of h1 and h2 are both 0.7-0.9, and the value of K is 1.60-1.85.
[0044] Specifically, step 4 involves installing a microwave generator into the bottom of both the empty hole and the first slotted hole to perform microwave radiation pre-splitting on the rock mass at the bottom of the hole. The operating frequency of the microwave generator inside the hole is 2-3 GHz, the power is 2-6 kW, and the microwave action time is 1-5 min. After the microwave radiation pre-splitting is completed, the borehole is flushed and the rock cuttings inside the hole are cleaned.
[0045] Specifically, the process of step 2 is as follows:
[0046] To effectively control the explosive load and transient unloading disturbance intensity caused by slotting blasting, the tunnel excavation adopts microwave-assisted pre-splitting barrel-shaped straight-hole slotting blasting technology with hollow holes, and the charging method adopts radial coupling charging.
[0047] Based on the blasting excavation cycle advance and the available rock drilling equipment, a large-diameter hole is arranged at the center of the working face to provide a free face for the first cut blasting hole. The diameter of a single large-diameter hole is calculated and determined according to the following formula:
[0048] De = (3.2L) 2 (4)
[0049] In the formula, D e D is the diameter of the large borehole, mm; L is the theoretical cycle advance of blasting excavation, m; when the calculated value based on formula (4) is inconsistent with the borehole diameter specification of the rock drilling equipment, D e Take a borehole diameter specification close to this calculated value. For ordinary rock drilling equipment, D e The depth of the hollow hole is 70-150mm, and the depth of the hollow hole is 0.1-0.2m greater than the depth of the slotted hole.
[0050] Specifically, if D e When the diameter is greater than 150mm, multiple small-diameter holes can be used instead. These small-diameter holes are arranged symmetrically along the centerline of the working face. The diameter of the small-diameter holes is calculated and determined according to the following formula:
[0051]
[0052] In the formula, d e d is the diameter of the small-diameter cavities, in mm; N1 is the number of small-diameter cavities; when the calculated value based on formula (5) is inconsistent with the drilling diameter specification of the rock drilling equipment, d e Choose a borehole diameter specification that is close to the calculated value.
[0053] Specifically, in step 1, the magnitude and direction of the principal stress field of the initial geostress field at the roadway excavation face are directly determined by the borehole geostress field test of the roadway; if there is no borehole geostress field test data for the roadway, it is further calculated and determined by the borehole geostress field test data of deep metal mines.
[0054] Specifically, the calculation process for the magnitude and direction of the principal stress field of the initial in-situ stress field at the tunnel excavation face is as follows:
[0055] First, based on the borehole stress field test data of the underground mining area, a univariate linear principal stress field model of the mining area was regressed:
[0056] σ H =a1H+b1 (1)
[0057] σ h =a2H+b2 (2)
[0058] σ v =a3H+b3 (3)
[0059] In the formula, σ H The maximum horizontal principal stress is σ, MPa; h The minimum horizontal principal stress is given in MPa; σ v is the vertical principal stress, MPa; H is the burial depth, m.
[0060] Then, substituting the burial depth at the tunnel excavation face into equations (1), (2), and (3), the σ at the tunnel excavation face is calculated respectively. H σ h and σ v ;
[0061] Finally, the direction of the minimum principal stress of the initial in-situ stress field at the tunnel excavation face is determined based on numerical inversion methods or focal mechanism solutions.
[0062] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0063] (1) The microwave radiation deteriorates (pre-cracks) the bottom of the slotted hole, reduces the clamping effect of the rock mass at the bottom of the hole, improves the stress state at the bottom of the slotted area, increases the slotting depth and the volume of the slotted cavity, prolongs the driving and expansion time of the explosive gas at the bottom of the slotted hole and inside the hole, thereby forming a complete slotted cavity and fully breaking the ore and rock, reducing the large block ratio and improving the blasting effect.
[0064] (2) When determining parameters such as the mesh size of the slotted holes, the amount of explosive per hole, the detonation sequence and the micro-delay time, the deterioration state of the deep ore and rock after microwave pre-splitting and the induction effect of the high stress in the deep ore on the propagation of the explosive crack were fully considered. This reduced the single consumption of explosives, controlled the blast load disturbance of the roadway excavation face, improved the energy utilization rate of explosives, and at the same time improved the utilization rate of the blast holes and the blasting efficiency.
[0065] (3) By setting up empty holes and arranging slotted holes in the direction of minimum principal stress, the direction of main crack propagation can be guided, the initial stress value of the excavation face and the single unloading area can be reduced, thereby controlling the dynamic unloading disturbance of high ground stress at the roadway excavation face; the optimized design of the slotted hole charge amount dynamically changing with the stress level and the clamping conditions of the blast hole reduces the risk of deep dynamic disasters to the greatest extent, and further saves the amount of explosives and improves the blasting effect.
[0066] (4) The steps are clear and the operation is strong. The blasting scheme can be determined by just a few test explosions, which overcomes the disadvantages of long time and high cost of general on-site monitoring and testing. Attached Figure Description
[0067] Figure 1 This is a schematic flowchart of the method of the present invention;
[0068] Figure 2 This is a schematic diagram of the initial hole mesh arrangement for the slotting holes in an embodiment.
[0069] Figure 3 This is a schematic diagram of the final hole mesh arrangement for the slotted holes in an embodiment. Detailed Implementation
[0070] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0071] See Figure 1 A microwave-assisted pre-splitting method for slotting blasting in deep metal mine roadways includes the following steps:
[0072] Step 1: Determine the direction of the minimum principal stress in the initial in-situ stress field of the tunnel excavation face.
[0073] The magnitude and direction of the principal stress field of the initial in-situ stress field at the tunnel excavation face are generally determined directly through in-situ borehole stress testing of the tunnel; if there is no in-situ borehole stress testing data for the tunnel, it can be further calculated and determined through in-situ borehole stress testing data from deep metal mines.
[0074] The specific method for determining the latter is as follows.
[0075] First, based on the borehole stress field test data of the underground mining area, a univariate linear principal stress field model of the mining area was regressed:
[0076] σ H =a1H+b1 (1)
[0077] σ h =a2H+b2 (2)
[0078] σ v =a3H+b3 (3)
[0079] In the formula, σ H The maximum horizontal principal stress is σ, MPa; h The minimum horizontal principal stress is given in MPa; σ v is the vertical principal stress, MPa; H is the burial depth, m.
[0080] Then, substituting the burial depth at the tunnel excavation face into equations (1), (2), and (3), the σ at the tunnel excavation face is calculated respectively. H σ h and σ v .
[0081] Finally, the direction of the minimum principal stress of the initial in-situ stress field at the tunnel excavation face is determined based on numerical inversion methods or focal mechanism solutions.
[0082] Step 2: Determine the pore parameters.
[0083] To effectively control the explosive load and transient unloading disturbance intensity caused by slotting blasting, the tunnel excavation adopts microwave-assisted pre-splitting barrel-shaped straight-hole slotting blasting technology with hollow holes, and the charging method adopts radial coupling charging.
[0084] The borehole diameter is selected based on the blasting excavation cycle advance and the available rock drilling equipment. Generally, a large-diameter borehole is placed at the center of the face to provide a free face for the first cut blast hole. The diameter of a single large-diameter borehole is calculated using the following formula:
[0085] D e = (3.2L) 2 (4)
[0086] In the formula, D e D is the diameter of the large-diameter borehole, mm; L is the theoretical cycle advance of blasting excavation, m; when the calculated value based on formula (4) is inconsistent with the borehole diameter specification of the rock drilling equipment, D e Choose a borehole diameter specification that is close to the calculated value.
[0087] For general rock drilling equipment, D e Generally, 70-150mm is used. If D e When the diameter is greater than 150mm, multiple small-diameter holes can be used instead, arranged symmetrically along the centerline of the working face. The diameter of the small holes is calculated and determined according to the following formula:
[0088]
[0089] In the formula, d e d is the diameter of the small-diameter cavities, in mm; N1 is the number of small-diameter cavities; when the calculated value based on formula (5) is inconsistent with the drilling diameter specification of the rock drilling equipment, d e Choose a borehole diameter specification that is close to the calculated value.
[0090] The depth of the hollow hole is generally slightly greater than the depth of the slotted hole, and it is recommended that the difference between the two be 0.1 to 0.2 m.
[0091] Step 3: Determine the location and parameters of the first slot hole.
[0092] The first slotted hole is arranged along the direction of minimum principal stress through the center of the hollow hole. All slotted holes have the same diameter, and the diameter of each slotted hole (including the first slotted hole) is generally 40-80 mm. The distance between the hollow hole and the first slotted hole is calculated and determined according to the following formula:
[0093]
[0094] In the formula, s1 is the distance between the empty hole and the first slotting hole, mm; r is the radius of the first slotting hole, mm; R is the radius of the empty hole, mm; h1 is the charging coefficient of the first slotting hole (the ratio of the charging length to the hole depth), which is generally taken as 0.7 to 0.9 for deep slotting holes; K is the rock fragmentation coefficient, which is generally taken as 1.60 to 1.85 for hard rock.
[0095] All cut holes have the same depth. The depth of each cut hole (including the first cut hole) is the sum of the theoretical cycle advance of blasting excavation and the over-depth, i.e.:
[0096] l=L+△l (7)
[0097] In the formula, l is the depth of the slotted hole, in meters; Δl is the extra depth, which is generally taken as 0.2 to 0.4 meters.
[0098] The charge amount for the first slot hole is calculated and determined according to the following formula:
[0099] Q1=πr 2 lh1ρ e (8)
[0100] In the formula, Q1 is the charge amount in the first slot, in kg; ρ e Density of explosive, kg / m³ 3 .
[0101] Step 4: Perform microwave radiation pre-cracking on the bottom of the empty hole and the first slot hole.
[0102] Microwave generators were installed at the bottom of both the empty borehole and the first slotted borehole to perform microwave pre-fracture on the rock mass at the bottom of the borehole. Existing in-hole microwave generators typically operate at frequencies of 2–3 GHz, with power ranging from 2–6 kW, and microwave action times of 1–5 minutes. After microwave pre-fracture, the borehole was flushed, and rock cuttings were removed.
[0103] Microwave radiation deteriorates (pre-fractures) the bottom of the cut hole, reducing the clamping effect of the rock mass at the bottom of the hole, improving the stress state at the bottom of the hole in the slot area, increasing the cutting depth and the volume of the cutting cavity, and prolonging the driving and expansion time of the explosive gas at the bottom of the cut hole and inside the hole, thereby forming a complete slot cavity and fully breaking up the ore and rock, reducing the proportion of large pieces, and improving the blasting effect.
[0104] Step 5: Test detonation of the first slot hole to preliminarily determine the location and parameters of the second slot hole.
[0105] Test-detonate the first slot hole and observe the crack distribution around the blast hole on the excavation surface after detonation. The main direction of crack propagation is the direction of the maximum principal stress on the excavation surface after the temporary excavation of the first slot hole. For ease of description, the excavation surface after the temporary excavation of the first slot hole is defined as the first temporary excavation surface, where the vertical direction is the direction of the minimum principal stress on the first temporary excavation surface. Arrange the second slot hole through the center of the first slot hole along the direction of the minimum principal stress (same barrel shape) on the first temporary excavation surface, or at an angle of no more than 30° (i.e., the angle between the center of the first slot hole and the direction of the minimum principal stress on the first temporary excavation surface is no more than 30 degrees). The distance between the second slot hole and the first slot hole is calculated and determined according to the following formula:
[0106] s2=k1s1 (9)
[0107] In the formula, s2 is the distance between the second slot and the first slot, in meters; k1 is the distance coefficient between the second slot and the first slot, which is generally taken as 1.5 to 2.
[0108] The charge amount for the second slotted hole is calculated and determined according to the following formula:
[0109] Q2=πr 2 lh2ρ e (10)
[0110] In the formula, Q2 is the charge amount in the second slot, in kg; h2 is the charge coefficient in the second slot, generally taken as 0.7 to 0.9, and h2
[0111] Step 6: Initially determine the location and parameters of all remaining slots.
[0112] Similarly, microwave radiation pre-splitting and trial detonation are performed on the bottom of the (i-1)th (i = 3, 4, ..., n, where n is the number of cut holes, generally 4 to 7) cut holes to determine the location and parameters of the i-th cut hole. Specifically, the (i-1)th cut hole is trial-detonated, and the distribution of cracks around the blast holes on the excavation surface after detonation is observed. The main direction of crack propagation is the direction of the maximum principal stress on the excavation surface after the temporary excavation of the (i-1)th cut hole. The distance between the i-th cut hole and the (i-1)th cut hole is calculated and determined according to the following formula:
[0113] s i =k i-1 s i-1 (11)
[0114] In the formula, s i The distance between the i-th slotted hole and the (i-1)-th slotted hole is in meters (m); s i-1 Let k be the distance between the (i-1)th and (i-2)th slotted holes, in meters (m); i-1 The distance coefficient between the i-th slot and the (i-1)-th slot is generally taken as 1 to 1.3, but for simplicity, it can also be uniformly taken as 1.
[0115] The charge amount for the i-th (i = 3, 4, ..., n) slot is determined by the following formula:
[0116] Q i =πr 2 lh i ρ e (12)
[0117] In the formula, Q i The charge amount in the i-th slot is kg; h i h is the charge coefficient for the i-th slot. i The value of h is related to the stress level and the clamping conditions of the borehole, and is generally taken as 0.7 to 0.9. Furthermore, the charge coefficient for the later-detonated slotted hole is smaller than that for the earlier-detonated slotted hole, i.e., h... i <h i-1 .
[0118] Based on this method, the locations and parameters of all remaining cut holes can be preliminarily determined. It can also be seen that by using the direction of minimum principal stress to determine the location of each cut hole, as the stress level and the clamping conditions of the borehole gradually improve, the charge per borehole subsequently decreases. This effectively optimizes the charge amount in the cut holes while controlling the risk of dynamic hazards and the blasting effect.
[0119] Step 7: Determine the final hole mesh layout and parameters.
[0120] It is particularly important to note that, except for strictly following the direction of minimum principal stress when determining the position of the first slotted hole, the positions of the remaining slotted holes can be flexibly adjusted within a 30° angle range along the direction of minimum principal stress (the same spiral) according to the overall slotted hole arrangement, to ensure that a closed-loop arrangement of slotted holes is finally formed. The spacing between the nth and (n-1th)th slotted holes is similar to the spacing between the nth and the first slotted hole, where n is the number of slotted holes.
[0121] Based on the closed-loop arrangement standard for cut holes and by observing the cut blasting effect during the test blasting process, verify whether the preliminarily determined cut hole mesh arrangement and parameters meet the closed-loop arrangement standard and that the cut blasting effect is good. If they meet the standard, proceed to the next step; if not, repeat steps 3 to 6, adjusting the hole mesh arrangement and parameters such as the position of each cut hole, charge coefficient, and bottom microwave radiation within the recommended range until they meet the standard, and then proceed to the next step.
[0122] Step 8: Determine the initiation network for slotting blasting.
[0123] To minimize the impact of blasting loads and excavation disturbances induced by transient unloading during cut blasting, a sequential delayed detonation network is employed. The cut holes are detonated sequentially according to the determined hole numbers, i.e., holes 1, 2, ..., n are detonated in order.
[0124] Considering the differences in free face conditions and excavation disturbance characteristics of different cut holes, and also considering the blasting effect of cut holes, the initiation micro-delay time of the second cut hole after the first cut hole is 25-50ms, and the initiation micro-delay time of the remaining subsequent cut holes is 25ms.
[0125] In determining parameters such as the slot hole mesh, single-hole charge, detonation sequence, and micro-delay time, this application fully considers the deterioration state of deep ore and rock after microwave pre-splitting and the inducing effect of high deep stress on the propagation of blast cracks. This reduces the unit consumption of explosives, controls the blast load disturbance at the roadway excavation face, and improves the energy utilization rate of explosives. At the same time, it enhances the utilization rate of blast holes and blasting efficiency. By setting empty holes and arranging slot holes in the direction of minimum principal stress, the direction of main crack propagation can be guided, reducing the initial stress value and single unloading area at the excavation face, thereby controlling the dynamic unloading disturbance of high ground stress at the roadway excavation face. The optimized design, which dynamically changes the charge of the slot holes as the stress level and the clamping conditions of the blast holes change, minimizes the risk of deep dynamic disasters and further saves explosives and improves the blasting effect.
[0126] Example
[0127] A microwave-assisted pre-splitting method for slotting blasting in deep metal mine roadways includes the following steps:
[0128] Step 1: Determine the direction of the minimum principal stress in the initial in-situ stress field of the tunnel excavation face.
[0129] A deep metal mine tunnel was constructed using the drill-and-blast method. The average burial depth of the excavated tunnel section was 1050m. The tunnel is predominantly composed of metamorphic diorite with a saturated uniaxial compressive strength of approximately 60MPa. Based on the results of on-site borehole stress tests, the minimum principal stress at the tunnel excavation face was 16MPa, and the angle between the direction of the minimum principal stress and the vertical direction was 13°.
[0130] Step 2: Determine the pore parameters.
[0131] The tunnel excavation adopts microwave-assisted pre-splitting barrel-shaped straight-hole slotting and hole-by-hole blasting technology, and the charging method adopts radial coupling charging.
[0132] Taking the blasting excavation cycle advance L as 3.5m, substituting it into formula (4), we obtain the calculated value of the diameter of a single large blast hole: D e =125.44mm. Considering the available rock drilling equipment, it is determined that a large (diameter) hole should be placed at the center of the working face. The diameter is taken as: D. e =125mm.
[0133] The depth of the hollow hole is 3.9m (the depth of the slotted hole is 3.8m, which is 0.1m greater than the depth of the slotted hole).
[0134] Step 3: Determine the location and parameters of the first slot hole.
[0135] The first slotted hole is arranged along the direction of minimum principal stress through the center of the hollow hole, and the diameter of all slotted holes is 45mm. Substituting r=45 / 2=22.5mm, R=125 / 2=62.5mm, h1=0.85, K=1.75 into formula (6), the distance between the hollow hole and the first slotted hole is obtained: s1=295mm.
[0136] According to formula (7), the depth of the slot is 3.8m (0.3m for extra-deep Δl).
[0137] The explosive used is No. 2 rock emulsion explosive, with an explosive density of: ρ e =1200kg / m 3 Given r = 0.0225m, l = 3.8m, h1 = 0.85, and ρ... e =1200kg / m 3 Substituting into formula (8), we get the charge amount for the first slotted hole: Q1 = 6.16 kg.
[0138] Step 4: Perform microwave radiation pre-cracking on the bottom of the empty hole and the first slot hole.
[0139] Microwave generators were installed at the bottom of both the empty borehole and the first slotted borehole to perform microwave pre-splitting on the rock mass at the bottom of the borehole. The existing in-hole microwave generator operated at a frequency of 2.5 GHz, a power of 3 kW, and a microwave treatment time of 2 minutes. After the microwave pre-splitting was completed, the borehole was flushed and the rock cuttings inside were removed.
[0140] Step 5: Test detonation of the first slot hole to preliminarily determine the location and parameters of the second slot hole.
[0141] The first slot hole was detonated for trial detonation. The distribution of cracks around the blast hole on the excavation surface after detonation was observed. The main direction of crack propagation is the direction of the maximum principal stress of the first temporary excavation surface, and the vertical direction is the direction of the minimum principal stress of the first temporary excavation surface. The second slot hole was arranged through the center of the first slot hole along the direction of the minimum principal stress (same barrel shape) of the first temporary excavation surface at a 6° angle. Taking k1 = 1.8, and substituting into formula (9), the distance between the second slot hole and the first slot hole was obtained: s2 = 531 mm.
[0142] Given r = 0.0225m, l = 3.8m, h² = 0.82, and ρ... e =1200kg / m 3 Substituting into formula (10), we get the charge amount for the second slot: Q2 = 5.95 kg.
[0143] Step 6: Initially determine the location and parameters of all remaining slots.
[0144] Similarly, microwave pre-cracking and test detonation were performed on the bottom of the second cut hole to determine the location and parameters of the third cut hole: (See location details below). Figure 2 s3 = 550mm, Q3 = 5.8kg.
[0145] Microwave pre-splitting and test detonation were performed on the bottom of the third cut hole to determine the location and parameters of the fourth cut hole: (Location details are provided in the original text.) Figure 2 , s4=560mm, Q4=5.51kg.
[0146] Microwave pre-cracking and test detonation were performed on the bottom of the fourth cut hole to determine the location and parameters of the fifth cut hole: (Location details are provided in the original text.) Figure 2 , s5=590mm, Q5=5.29kg.
[0147] At this point, the locations and parameters of all cut holes have been preliminarily determined. A schematic diagram of the initial cut hole network layout can be found here. Figure 2 .
[0148] Step 7: Determine the final hole mesh layout and parameters.
[0149] Based on the closed-loop arrangement standard for cut holes and observing the cut blasting effect during the test explosion, the preliminary determined cut hole mesh arrangement and parameters were verified to ensure they met the closed-loop arrangement standard and achieved a good cut blasting effect. The inspection revealed that the distance between the 5th cut hole and the 1st cut hole was 664mm, significantly different from s5 (590mm), thus failing to meet the closed-loop arrangement standard. Furthermore, the cut blasting effect was found to be less than ideal. Therefore, steps 3 through 6 were repeated, adjusting the position of each cut hole, the charge coefficient, and the microwave radiation at the bottom of the hole within the recommended range until the conditions were met. A schematic diagram of the final cut hole mesh arrangement meeting the conditions is provided below. Figure 3 The relevant design parameters are as follows: the diameter of the hollow hole is 125mm, the depth of the hollow hole is 3.9m, the diameter of the slotted hole is 45mm, the depth of the slotted hole is 3.8m, the microwave radiation working frequency of the bottom of the hollow hole and the slotted hole is 2.5GHz, the power is 2.5kW, the action time is 2min, s1=472mm, Q1=5.95kg, s2=490mm, Q2=5.73kg, s3=520mm, Q3=5.51kg, s4=525mm, Q4=5.37kg, s5=520mm, Q5=5.15kg.
[0150] Step 8: Determine the initiation network for slotting blasting.
[0151] The slotting blasting adopts a sequential delay initiation network. After the first slotting hole is detonated, the initiation micro-delay time of the second slotting hole is 50ms, and the initiation micro-delay time of the remaining subsequent slotting holes is 25ms.
[0152] This application fully considers the deterioration state of deep ore and rock after microwave pre-splitting and the inducing effect of high stress in the deep environment on the propagation of explosive cracks. The optimized design, which dynamically changes the charge amount in the slotting hole as the stress level and the clamping conditions of the blast hole change, minimizes the risk of deep dynamic disasters, reduces the unit consumption of explosives, saves the amount of explosives, improves the utilization rate of the blast hole and the blasting efficiency, and improves the blasting effect. Moreover, the slotting blasting scheme can be determined through only a few test blasts, overcoming the problems of long time and high cost of general field monitoring and testing. It has the advantages of clear steps and strong operability.
[0153] The above embodiments are merely illustrative examples to clearly illustrate the present invention and are not intended to limit the implementation. Those skilled in the art will recognize that other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all embodiments here. However, obvious variations or modifications derived therefrom are still within the scope of protection of this invention.
Claims
1. A microwave-assisted pre-splitting method for slotting blasting in deep metal mine roadways, characterized in that, Includes the following steps: Step 1: Determine the direction of the minimum principal stress in the initial in-situ stress field at the tunnel excavation face. Step 2: Determine the void parameters Step 3: Determine the location and parameters of the first slot hole. The first slotted hole is arranged along the direction of minimum principal stress through the center of the empty hole. All slotted holes have the same diameter, and the distance between the empty hole and the first slotted hole is calculated and determined according to the following formula: (6); In the formula, The distance between the empty hole and the first slotted hole is in mm; The radius of the first slotted hole is in mm; The radius of the hole is in mm; The charge coefficient for the first slot hole; The rock fragmentation coefficient; All cut holes have the same depth. The depth of each cut hole is the sum of the theoretical cycle advance of blasting excavation and the over-depth, i.e.: (7); In the formula, The depth of the cut hole is in meters (m). For ultra-deep; The theoretical cycle advance for blasting excavation is in meters (m). The charge amount for the first slot hole is calculated and determined according to the following formula: (8); In the formula, The charge amount for the first slot is in kg; Density of explosive, kg / m³ 3 ; Step 4: Perform microwave radiation pre-cracking on the bottom of the hollow hole and the first slotted hole. Step 5: Test detonation of the first slot hole to preliminarily determine the location and parameters of the second slot hole. The first cut hole is tried to be initiated, and the crack distribution around the hole on the excavation surface after initiation is observed. The main direction of crack propagation is the maximum principal stress direction of the first cut hole after temporary excavation, and the perpendicular direction is the minimum principal stress direction of the first cut hole after temporary excavation. The second cut hole is arranged in the direction of the included angle, and the interval between the second cut hole and the first cut hole is calculated and determined according to the following formula: o The second cut hole is arranged in the direction of the included angle, and the interval between the second cut hole and the first cut hole is calculated and determined according to the following formula: (9); In the formula, The distance between the second slotted hole and the first slotted hole is in meters (m). The spacing coefficient between the second slotted hole and the first slotted hole; The charge amount for the second slotted hole is calculated and determined according to the following formula: (10); In the formula, The charge amount for the second slot is in kg; The charge coefficient for the second slot hole is... ; Step 6: Using the same method as Step 4 and Step 5, preliminarily determine the location and parameters of all remaining slot holes; Step 7: Determine the final hole mesh layout and parameters; Step 8: Determine the initiation network for the cut-and-blast blasting. The slotting blasting method employs a hole-by-hole delayed detonation network; In step 6, when determining the locations of the remaining cut holes, the overall cut hole layout is based on the minimum principal stress at 30°C. o The angle can be flexibly adjusted within the included range to ensure that a closed loop arrangement of the slotted holes is finally formed; Microwave radiation pre-cracking and test detonation are performed on the bottom of the (i-1)th cut hole to determine the location and parameters of the i-th cut hole. The distance between the i-th cut hole and the (i-1)th cut hole is calculated and determined according to the following formula: (11); In the formula, Let be the distance between the i-th slotted hole and the (i-1)-th slotted hole, in meters. Let be the distance between the (i-1)th and (i-2)th slotted holes, in meters. The spacing coefficient between the i-th slotted hole and the (i-1)-th slotted hole is denoted by a value of 1 to 1.3, where i = 3, 4, ..., n, and n is the number of slotted holes. The charge amount in the i-th slot is calculated and determined according to the following formula: (12); In the formula, The charge amount in the i-th slot is in kg; Let i be the charge coefficient for the i-th slot. The value of is related to the stress level and the clamping conditions of the borehole, ranging from 0.7 to 0.
9. Furthermore, the charge coefficient for boreholes detonated after the initial blast is smaller than that for boreholes detonated before the initial blast. .
2. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that: In step 7, based on the cut hole closed-loop layout standard and by observing the cut blasting effect during the test blasting process, the preliminary determined cut hole mesh layout and parameters are verified to meet the closed-loop layout standard. If satisfied, proceed to the next step; if not satisfied, repeat steps 3 to 6, and adjust the position of each slot hole, the charge coefficient, the arrangement and parameters of the microwave radiation hole mesh at the bottom of the hole until satisfied, and then proceed to the next step. Among them, the distance between the nth slotted hole and the (n-1th slotted hole) is similar to the distance between the nth slotted hole and the 1st slotted hole, where n is the number of slotted holes.
3. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that: In step 8, the holes are detonated sequentially according to the determined slot hole number. The detonation micro-delay time of the second slot hole after the first slot hole is detonated is 25~50ms, and the detonation micro-delay time of the remaining slot holes is 25ms.
4. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that: The diameter of the slotted hole is 40~80mm. The value ranges from 0.2 to 0.4 m. The value ranges from 1.5 to 2. and The values range from 0.7 to 0.
9. The value ranges from 1.60 to 1.
85.
5. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that, The specific process of step 4 is as follows: The microwave generator is installed at the bottom of the empty hole and the first slot hole respectively, and the rock mass at the bottom of the hole is pre-fractured by microwave radiation. The working frequency of the microwave generator in the hole is 2~3GHz, the power is 2~6kW, and the microwave action time is 1~5min. After the microwave radiation pre-fracture is completed, the borehole is washed and the rock cuttings in the hole are cleaned.
6. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that, The specific process of step 2 is as follows: To effectively control the explosive load and transient unloading disturbance intensity caused by slotting blasting, the tunnel excavation adopts microwave-assisted pre-splitting barrel-shaped straight-hole slotting blasting technology with hollow holes, and the charging method adopts radial coupling charging. Based on the blasting excavation cycle advance and the available rock drilling equipment, a large-diameter hole is arranged at the center of the working face to provide a free face for the first cut blasting hole. The diameter of a single large-diameter hole is calculated and determined according to the following formula: (4); In the formula, The diameter of the large pore is in mm; The theoretical cycle advance for blasting excavation is in meters (m). When the calculated value based on formula (4) is inconsistent with the drilling diameter specification of the rock drilling equipment, For ordinary rock drilling equipment, take a borehole diameter specification close to the calculated value. The depth of the hollow hole is 70~150mm, and the depth of the hollow hole is 0.1~0.2m larger than the depth of the slotted hole.
7. The deep metal mine roadway cutting and blasting method according to claim 6, characterized in that: like When the diameter is >150 mm, multiple small-diameter holes can be used instead. These small-diameter holes are arranged symmetrically along the centerline of the working face. The diameter of the small-diameter holes is calculated and determined according to the following formula: (5); In the formula, The diameter of the small-diameter cavity is in mm; The number of small-diameter cavities; when the calculated value based on formula (5) is inconsistent with the drilling diameter specification of the rock drilling equipment, Choose a borehole diameter specification that is close to the calculated value.
8. The deep metal mine roadway cutting and blasting method according to claim 1, characterized in that: In step 1, the magnitude and direction of the principal stress field of the initial geostress field at the roadway excavation face are directly determined by the borehole geostress field test of the roadway; if there is no borehole geostress field test data for the roadway, it is further calculated and determined by the borehole geostress field test data of the deep metal mine.
9. The deep metal mine roadway cutting and blasting method according to claim 8, characterized in that, The calculation process for the magnitude and direction of the principal stress fields in the initial in-situ stress field of the tunnel excavation face is as follows: First, based on the borehole stress field test data of the underground mining area, a univariate linear principal stress field model of the mining area was regressed: (1); (2); (3); In the formula, The maximum horizontal principal stress is expressed in MPa. The minimum horizontal principal stress is given in MPa. The vertical principal stress is MPa; The burial depth is in meters (m). Then, substituting the burial depth at the tunnel excavation face into equations (1), (2), and (3), the burial depth at the tunnel excavation face is calculated respectively. , and ; Finally, the direction of the minimum principal stress of the initial in-situ stress field at the tunnel excavation face is determined based on numerical inversion methods or focal mechanism solutions.
Citation Information
Patent Citations
Wedge-shaped underholing blast hole arrangement method suitable for deep-buried tunnel blasting excavation
CN111102892A
Roadway construction method and device based on microwave cracking rock
CN112212748A
