Super-large area seamless prestressed concrete floor slab and construction method thereof
By using a large-area seamless prestressed concrete floor structure, combined with an extruded polystyrene board buffer layer and a PE film moisture-proof layer, the problem of cracking in large factory floors has been solved, achieving crack resistance and waterproofing, and improving aesthetics and service life.
Patent Information
- Application Number
- CN202410254007.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-03-06
AI Technical Summary
The floor of a large factory building is prone to cracking due to concrete shrinkage stress and external loads when the floor is long, resulting in poor aesthetics and a shortened service life. Existing technology solves this problem by cutting seams, but this affects the appearance.
The structure adopts an ultra-large area seamless prestressed concrete floor, which includes a combination of rammed soil layer, ground beam, cement blanket, concrete cushion layer, support, prestressed tendons, steel bar layer and steel mesh, combined with extruded polystyrene board buffer layer and PE film moisture-proof layer to form crack-resistant and waterproof isolation effect.
It effectively prevents floor cracking, improves aesthetics and service life, and uses environmentally friendly materials and zoned tensioning construction to reduce construction intensity, achieving long-term drying and crack resistance.
Smart Images

Figure CN118065582B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology, specifically to a seamless prestressed concrete floor with an ultra-large area and its construction method. Background Technology
[0002] Flooring refers to the surface that has been treated using specific materials and processes to achieve a certain level of decoration and functionality.
[0003] Some large factory buildings have long floor lengths, and the concrete thickness is generally about 200-300mm. The floor structure is prone to cracking under the shrinkage stress of the concrete itself and the external load during normal use, which greatly affects the service life of the floor. In order to alleviate this cracking phenomenon, the current method is to lay the floor in sections and add ordinary steel mesh, which requires cutting joints in the floor, affecting the use and aesthetics of the floor. Summary of the Invention
[0004] To overcome the shortcomings of existing technologies, a seamless prestressed concrete floor with ultra-large area and its construction method are provided to solve the problem of poor aesthetics caused by cutting seams in existing long floor floors to avoid cracking.
[0005] To achieve the above objectives, a seamless prestressed concrete floor with an ultra-large area is provided, comprising:
[0006] A compacted soil layer is laid on top of the compacted soil layer;
[0007] A ground beam is poured into the compacted soil layer, and the top of the ground beam extends above the crushed stone layer;
[0008] A cement blanket is laid on the gravel layer and the ground beam;
[0009] A concrete cushion layer is poured onto the cement blanket;
[0010] Multiple supports, each support including a shear-resistant member and a limiting ring, the lower part of the shear-resistant member being embedded in the concrete pad, the limiting ring being connected to the top of the shear-resistant member, the limiting rings of the multiple supports forming a limiting channel, and a corrugated pipe passing through the limiting channel;
[0011] Prestressing tendons are inserted into the corrugated pipe;
[0012] A reinforcing steel layer connected to the limiting rings of the plurality of supports;
[0013] A steel mesh is erected above the steel reinforcement layer;
[0014] The concrete surface layer is poured on the concrete cushion layer and covers the plurality of supports, the prestressed tendons, the steel reinforcement layer and the steel mesh.
[0015] Furthermore, buffer layers are installed on opposite sides of the ground beam.
[0016] Furthermore, the buffer layer is an extruded polystyrene board.
[0017] Furthermore, a moisture-proof membrane is laid on the concrete subbase, and the concrete surface layer is poured on the moisture-proof membrane.
[0018] Furthermore, the moisture-proof film is a PE film.
[0019] This invention provides a construction method for ultra-large area seamless prestressed concrete flooring, comprising the following steps:
[0020] Excavate the base layer to the original soil design elevation;
[0021] The ground beam was poured on the original soil;
[0022] Backfill the original soil with soil and compact it to form a compacted soil layer;
[0023] A layer of crushed stone is laid on the compacted soil layer, such that the top of the ground beam extends above the layer of crushed stone;
[0024] A cement blanket was laid on the crushed stone layer and the ground beam;
[0025] A concrete cushion layer is poured on the cement blanket;
[0026] The lower part of the shear-resistant component of multiple supports is embedded in the concrete cushion layer;
[0027] A corrugated pipe is inserted into the limiting channel formed by the limiting rings of the plurality of supports;
[0028] Prestressing tendons are inserted into the corrugated pipe;
[0029] The reinforcing steel layer is tied and connected to the limiting rings of the plurality of supports;
[0030] A steel mesh is installed above the steel reinforcement layer;
[0031] Concrete is poured on the concrete cushion layer, and the concrete covers the plurality of supports, the prestressed tendons, the steel reinforcement layer and the steel mesh to solidify and form a concrete surface layer;
[0032] After the concrete surface layer has solidified, the prestressed tendons are tensioned.
[0033] The beneficial effects of this invention are that the super-large area seamless prestressed concrete floor of this invention adds a support frame inside the concrete surface layer to perform shear resistance, connects the concrete pad layer and the concrete surface layer, prevents the concrete surface layer from arching or becoming void due to prestress tension, and at the same time serves as a support frame for the corrugated pipes of the prestressing tendons, ensuring that the corrugated pipes are not disturbed and playing a role in fixing the corrugated pipes.
[0034] The large-area seamless prestressed concrete flooring of this invention uses a cement blanket placed between the crushed stone layer and the concrete subbase. The cement blanket is a low-carbon and environmentally friendly building material with high plasticity, easy installation, rapid shaping upon contact with water, and resistance to acids and alkalis. It hardens into a very thin, waterproof, fireproof, and durable concrete layer, effectively isolating groundwater.
[0035] The ultra-large area seamless prestressed concrete floor of this invention combines a moisture-proof membrane with a cement blanket to form a double isolation effect against groundwater, ensuring that the ground is dry and free from water seepage for a long time.
[0036] The ultra-large area seamless prestressed concrete floor of the present invention uses prestressed tendons for crack prevention inside. Furthermore, a layer of steel mesh is set in the upper part of the concrete surface layer of the ultra-large area seamless prestressed concrete floor of the present invention as a crack-resistant steel mesh to increase the crack resistance of the surface concrete. Attached Figure Description
[0037] Other features, objects, and advantages of this application will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:
[0038] Figure 1 This is a schematic diagram of the structure of a large-area seamless prestressed concrete floor according to an embodiment of the present invention.
[0039] Figure 2 This is a schematic diagram of the ground beam according to an embodiment of the present invention.
[0040] Figure 3 This is a schematic diagram of the structure of the bracket according to an embodiment of the present invention. Detailed Implementation
[0041] The present application will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, only the parts relevant to the invention are shown in the accompanying drawings.
[0042] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0043] Reference Figures 1 to 3 As shown, the present invention provides a seamless prestressed concrete floor with an ultra-large area, comprising: a compacted soil layer 1, a ground beam 2, a concrete cushion layer 4, a support 5, prestressed tendons, a steel reinforcement layer 6, a steel mesh 7, and a concrete surface layer 8.
[0044] The compacted soil layer 1 is formed by compacting the original soil. A layer of crushed stone 11 is laid on top of the compacted soil layer 1.
[0045] Ground beam 2 is poured into the compacted soil layer 1. The top of ground beam 2 extends above the crushed stone layer 11.
[0046] Specifically, after excavating the base layer down to the original soil layer, a trench is dug in the original soil layer to pour the ground beam.
[0047] As a preferred embodiment, buffer layers 21 are installed on opposite sides of the ground beam 2.
[0048] In this embodiment, the buffer layer 21 is an extruded polystyrene board.
[0049] The crushed stone layer consists of graded crushed stone.
[0050] Cement blanket 3 is laid on crushed stone layer 11 and ground beam 2.
[0051] The concrete cushion layer 4 is poured on the cement blanket 3.
[0052] There are multiple supports 5. Multiple supports 5 are arranged at intervals along the length of the prestressing tendons.
[0053] Specifically, the stent 5 includes a shear-resistant member 51 and a limiting ring 52. The lower part of the shear-resistant member 51 is embedded in the concrete pad 4. The limiting ring 52 is connected to the top of the shear-resistant member 51. The limiting rings 52 of multiple stents 5 form limiting channels.
[0054] A corrugated pipe 53 is inserted through the limiting duct. Prestressing tendons are inserted through the corrugated pipe 53.
[0055] The reinforcing steel layer 6 is connected to the limiting ring 52 of multiple supports 5.
[0056] The steel mesh 7 is erected above the steel layer 6.
[0057] The concrete surface layer 8 is poured on the concrete foundation layer 4. The concrete surface layer 8 is covered by multiple supports 5, prestressed tendons, steel reinforcement layer 6 and steel mesh 7.
[0058] A moisture-proof membrane 41 is laid on the concrete subbase 4. The concrete surface layer 8 is poured on the moisture-proof membrane 41.
[0059] The moisture-proof film is a PE film.
[0060] The ultra-large area seamless prestressed concrete floor of the present invention fully optimizes the structure of traditional flooring. It sets up an extruded polystyrene board buffer layer to mitigate the lateral pressure on the ground beam when the foundation shrinks, and to mitigate the lateral pressure on the ground beam when the compacted soil layer and crushed stone layer are filled. At the same time, the extruded polystyrene board buffer layer can also serve as a protective layer for the ground beam, reducing damage to the ground beam during compaction and backfilling.
[0061] The present invention provides a support frame for shear resistance within the concrete surface layer of the ultra-large area seamless prestressed concrete floor, which connects the concrete sub-layer and the concrete surface layer to prevent arching and voiding caused by prestressing tension. At the same time, it serves as a support frame for the corrugated pipes of the prestressing tendons, ensuring that the corrugated pipes are not disturbed and thus fixing them in place.
[0062] This invention relates to a large-area seamless prestressed concrete floor with a post-cast strip. 10% SY-K type expansive fiber anti-cracking agent is added to the concrete used for the post-cast strip. This forms an expansion reinforcement strip between the floor slabs. The expansion reinforcement strip is fully water-cured, allowing the expansion fiber anti-cracking agent to fully react during its curing period, ensuring the stability and preventing cracking of the post-cast strip.
[0063] The large-area seamless prestressed concrete flooring of this invention uses a cement blanket placed between the crushed stone layer and the concrete subbase. The cement blanket is a low-carbon and environmentally friendly building material with high plasticity, easy installation, rapid shaping upon contact with water, and resistance to acids and alkalis. It hardens into a very thin, waterproof, fireproof, and durable concrete layer, effectively isolating groundwater.
[0064] The ultra-large area seamless prestressed concrete floor of this invention uses a 0.5mm PE film as a moisture-proof membrane. The moisture-proof membrane is combined with the cement blanket to form a double isolation effect against groundwater, ensuring that the ground is dry and free from water seepage for a long time.
[0065] The present invention provides a layer of steel mesh as a crack-resistant steel mesh in the upper part of the concrete surface layer of the ultra-large area seamless prestressed concrete floor, thereby increasing the crack resistance of the surface concrete.
[0066] The present invention provides a method for setting up post-pouring strips in reasonable blocks for ultra-large area seamless prestressed concrete flooring, and for zoned tensioning, which can not only ensure the prestressing tensioning effect, but also reduce the construction intensity of each block.
[0067] This invention provides a construction method for ultra-large area seamless prestressed concrete flooring, comprising the following steps:
[0068] S1, excavate the base layer to the original soil design elevation.
[0069] S2. Construct ground beam 2 on the original soil.
[0070] S3. Backfill the original soil and compact it to form a compacted soil layer 1.
[0071] S4. Lay a layer of crushed stone 11 on the compacted soil layer 1, so that the top of the ground beam 2 extends above the layer of crushed stone 11.
[0072] Cement blanket 3 is laid on S5, crushed stone layer 11 and ground beam 2.
[0073] S6. Pour concrete cushion layer 4 into cement blanket 3.
[0074] After the concrete foundation is poured, a moisture-proof layer is laid. The moisture-proof layer is made of 0.5mm thick PE film laid and welded. The overlap length of the 0.5mm PE film is no less than 100mm, and hot-melt welding is used.
[0075] S7. The lower part of the shear-resistant component 51 of the multiple supports 5 is implanted into the concrete cushion layer 4.
[0076] After the concrete subbase is constructed, holes are drilled in the concrete subbase according to the arrangement of the prestressing tendons, with the holes spaced apart along the length of the prestressing tendons. After the moisture barrier is laid, shear members are inserted, and non-curing asphalt is poured into the perforations of the moisture barrier for sealing.
[0077] S8. A corrugated pipe 53 is inserted into the limiting channel formed by the limiting rings 52 of multiple supports 5.
[0078] S9. Prestressed tendons are inserted into the corrugated pipe 53.
[0079] S10. Tie the reinforcing bar layer 6 and connect the reinforcing bar layer 6 to the limiting ring 52 of the multiple supports 5.
[0080] In this embodiment, the reinforcing steel layer is tied to the limiting ring of the support.
[0081] S11. A steel mesh 7 is installed above the steel reinforcement layer 6.
[0082] S12. Concrete is poured on the concrete cushion layer 4, and the concrete covers multiple supports 5, prestressed tendons, steel reinforcement layer 6 and steel mesh 7 to form a concrete surface layer 8.
[0083] S13. After the concrete surface layer 8 has solidified, tension the prestressing tendons.
[0084] After the prestressing tendons are tensioned, 5cm high gray sand bricks are laid on the completed slabs on both sides of the post-cast strip to form a water barrier, and water is stored in the water barrier, so that the post-cast strip concrete can be cured by water storage after the concrete is poured, and the curing time is not less than 14 days.
[0085] Before the post-cast strip is poured, 25% prestress is applied for initial tensioning when the concrete strength of the concrete surface layer reaches 25%; when the concrete strength of the concrete surface layer reaches 75%, the final tensioning is completed.
[0086] The concrete in the post-cast strip has a strength grade one grade higher than that of the concrete on both sides, and 10% SY-K type expansion fiber anti-cracking agent is added.
[0087] The concrete surface is covered with geotextile and cured with water.
[0088] The above description is merely a preferred embodiment of this application and an explanation of the technical principles employed. Those skilled in the art should understand that the scope of the invention involved in this application is not limited to technical solutions formed by specific combinations of the above-described technical features, but should also cover other technical solutions formed by arbitrary combinations of the above-described technical features or their equivalents without departing from the inventive concept. For example, technical solutions formed by substituting the above features with (but not limited to) technical features with similar functions disclosed in this application.
Claims
1. A seamless prestressed concrete floor with an ultra-large area, characterized in that, include: A compacted soil layer is laid on top of the compacted soil layer; A ground beam is poured into the compacted soil layer, and the top of the ground beam extends above the crushed stone layer; A cement blanket is laid on the gravel layer and the ground beam; A concrete cushion layer is poured onto the cement blanket; Multiple supports, each support including a shear-resistant member and a limiting ring, the lower part of the shear-resistant member being embedded in the concrete pad, the limiting ring being connected to the top of the shear-resistant member, the limiting rings of the multiple supports forming a limiting channel, and a corrugated pipe passing through the limiting channel; Prestressing tendons are inserted into the corrugated pipe; A reinforcing steel layer connected to the limiting rings of the plurality of supports; A steel mesh is erected above the steel reinforcement layer; A concrete surface layer is poured on the concrete cushion layer and covers the plurality of supports, the prestressed tendons, the steel reinforcement layer and the steel mesh; Buffer layers are installed on opposite sides of the ground beam.
2. The ultra-large area seamless prestressed concrete floor according to claim 1, characterized in that, The buffer layer is an extruded polystyrene board.
3. The ultra-large area seamless prestressed concrete floor according to claim 1, characterized in that, A moisture-proof membrane is laid on the concrete subbase, and the concrete surface layer is poured on the moisture-proof membrane.
4. The ultra-large area seamless prestressed concrete floor according to claim 3, characterized in that, The moisture-proof film is a PE film.
5. A construction method for a large-area seamless prestressed concrete floor as described in any one of claims 1 to 4, characterized in that, Includes the following steps: Excavate the base layer to the original soil design elevation; The ground beam was poured on the original soil; Backfill the original soil with soil and compact it to form a compacted soil layer; A layer of crushed stone is laid on the compacted soil layer, such that the top of the ground beam extends above the layer of crushed stone; A cement blanket was laid on the crushed stone layer and the ground beam; A concrete cushion layer is poured on the cement blanket; The lower part of the shear-resistant component of multiple supports is embedded in the concrete cushion layer; A corrugated pipe is inserted into the limiting channel formed by the limiting rings of the plurality of supports; Prestressing tendons are inserted into the corrugated pipe; The reinforcing steel layer is tied and connected to the limiting rings of the plurality of supports; A steel mesh is installed above the steel reinforcement layer; Concrete is poured on the concrete cushion layer, and the concrete covers the plurality of supports, the prestressed tendons, the steel reinforcement layer and the steel mesh to solidify and form a concrete surface layer; After the concrete surface layer has solidified, the prestressed tendons are tensioned.
Citation Information
Patent Citations
Prestressed integral seamless terrace
CN113738062A