Root-anchored reinforcement structure and construction method in highway embankment widening project
By adopting a root-based anchor reinforcement structure in highway embankment widening projects, combined with a crushed stone filling layer and geogrid, the problem of insufficient anchorage length was solved, improving the stability and construction efficiency of the embankment, and making it suitable for various soil conditions.
Patent Information
- Application Number
- CN202410318302.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-03-20
AI Technical Summary
In traditional highway embankment widening projects, the anchoring length of anchored geogrids is insufficient, leading to differential settlement between the old and new embankments, which affects pavement stability and reinforcement effect.
A root-based anchor reinforcement structure is adopted, which connects the root anchors to the geogrid on the slope of the old embankment to form a multi-layer reinforcement layer, including a crushed stone filling layer and a geogrid. The hollow structure of the anchors and sleeves is used to enhance the anchoring effect, and grouting materials are used to consolidate the soil.
It improves the overall stability and bearing capacity of the embankment, reduces differential settlement between new and old embankments, saves construction time, adapts to the construction needs of special soil types and hot and humid areas, and the grouting material is environmentally friendly and low-carbon.
Smart Images

Figure CN118087326B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of embankment widening technology, and relates to a root anchor reinforcement structure and construction method in highway embankment widening projects. Background Technology
[0002] Embankment widening projects involve key technologies for splicing new and old embankments. Employing appropriate splicing methods can reduce uneven settlement between the old and new embankments and prevent pavement cracking. Traditional highway embankment splicing technology involves cutting slopes and excavating steps in the old embankment, then laying geogrids at the steps to form a synergistic deformation body of embankment and geogrid, effectively reducing differential settlement between the old and new embankments. However, the soil properties of various embankments in my country vary greatly, especially in the hot and humid regions of southern my country, where soil properties are significantly affected by climate. Excavated steps in old embankments often have limited width and are prone to loosening and collapse, resulting in insufficient anchorage length for the geogrids. For new embankments constructed with special soil types, significant differential settlement will inevitably occur between the new and old embankments. The geogrids may also slip due to insufficient anchorage length, leading to the failure of the reinforcement effect.
[0003] Chinese invention patent application CN113846524A discloses an anchored geogrid, comprising an anchored geogrid with pointed and inverted fibers, an anchoring portion, and a connecting portion. The process involves vertical excavation at the connection point of an earthwork embankment, reaching the new fill base, manually driving in the anchored geogrid, connecting the anchored geogrid to the widened section geogrid, backfilling the soil, and compacting it.
[0004] In the process of realizing this invention, the inventors discovered that the prior art has at least the following problems: the quality of manually driven planar anchor grid is difficult to guarantee, and lateral force is prone to occur, resulting in uneven stress on the anchor grid, affecting the quality of embankment splicing, causing uneven settlement of the embankment, and leading to a series of defects such as road surface cracking. Summary of the Invention
[0005] To address the aforementioned problems, this invention provides a root anchor reinforcement structure for highway embankment widening projects. A specific root anchor structure is anchored at the steps of the reconstructed old embankment. The anchor is connected to a geogrid, achieving coordinated deformation of the old embankment, the new root anchor, and the geogrid, thereby improving the overall stability of the embankment.
[0006] Another objective of this invention is to provide a construction method for a root anchor reinforcement structure in highway embankment widening projects.
[0007] The technical solution adopted in this invention is a root anchor reinforcement structure in a highway embankment widening project, including a new embankment and an old embankment. The new embankment has multiple sets of reinforcement layers distributed from top to bottom. Each set of reinforcement layers includes two layers of crushed stone filling and a geogrid sandwiched in the middle. Root anchors are installed at the location of the reinforcement layer. The root anchors are anchored vertically to the slope of the old embankment and inside the old embankment. The geogrid is connected to the root anchors.
[0008] Furthermore, the root anchor includes a hollow first main root anchor, and a plurality of hollow first side root anchors are fixedly connected to the outer wall of the first main root anchor. The internal cavity of the first side root anchor is connected to the internal cavity of the first main root anchor, and the angle between the first side root anchor and the first main root anchor is 15~40°. A side grout outlet is opened at the end of the first side root anchor rod, and a main grout outlet is opened at the anchor head of the first main root anchor rod; the grouting material injected from the upper end of the first main root anchor rod flows out from the side grout outlet and the main grout outlet, so that the root anchor rod is consolidated with the soil inside the old embankment. The root anchors are used to anchor the slope of the old embankment with excavated steps.
[0009] Furthermore, the root anchor includes a hollow second main root anchor, which penetrates the inside of the casing. The lower end of the casing is connected in sequence to a hollow petal-shaped casing and an expansion tube. A grout outlet is opened at the lower end of the second main root anchor, and a second lateral root anchor is fixed to the outer wall of the expansion tube. The inner diameter of the expansion tube in its natural state is smaller than the outer diameter of the second main root anchor. As the second main root anchor is drilled downwards, the expansion tube is supported by the second main root anchor and expands radially, thus fixing the lower end of the expansion tube. The side wall of the petal-shaped sleeve is provided with multiple axial through grooves. When the nut at the upper end of the sleeve is screwed down, the upper end of the petal-shaped sleeve is squeezed by force, and the side wall of the petal-shaped sleeve arches radially. At this time, the pad between the sleeve and the nut is locked and fixed to the sloped surface. The grouting material injected from the upper end of the second main root anchor flows out from the grout outlet, which consolidates the root anchor with the soil inside the old embankment; the root anchor is used to anchor the slope of the old embankment without excavating steps.
[0010] Furthermore, both the first and second main anchor rods are threadedly connected to the claw sleeve, with the claw-shaped part of the claw sleeve passing through the geogrid and inserted into the soil, and then fixed by binding.
[0011] Furthermore, the claw-shaped sleeve includes a sleeve, one end of which is fixedly connected to a claw-shaped rod, and the other end of which is threadedly connected to a root anchor rod. At least two bent rods of the claw-shaped rod pass through the geogrid and are inserted into the soil, and are fixed by binding.
[0012] Furthermore, the outer wall of the expansion tube is provided with spaced trapezoidal protrusions.
[0013] Furthermore, the height interval between adjacent reinforced layers ranges from 3 to 4 meters, the top of the old embankment is the old asphalt pavement, and the top of the new embankment is the new asphalt pavement.
[0014] Furthermore, the crushed stone filling layer has a particle size of 9.5~31.5 mm, including angular particles; the thickness of each crushed stone filling layer is 20~40 cm; the geogrid is a tensile biaxial plastic geogrid; the geogrid is fixed to the crushed stone filling layer below by U-shaped nails.
[0015] A construction method for a root anchor reinforcement structure in a highway embankment widening project includes the following steps: S1, clean up and remove the old embankment slope, determine the widening width of the expressway, and cut the slope to form a cut surface or cut the slope and excavate it into a stepped surface according to the embankment slope. S2, a new embankment is constructed by filling the slope or stepped surface of the old embankment, and a reinforcement layer is laid at the design location. During construction, the lower layer of crushed stone filling is mixed evenly and compacted. S3, Drill holes on the slope or step surface in the direction perpendicular to the slope. The diameter of the holes is 65~80 mm and the depth is 3~5 m. The spacing between the holes is 2~3 m along the direction of traffic. S4. Place root anchors in the borehole and inject grouting material into the borehole until it is full and overflows, ensuring no gaps are left. After grouting is completed, cure the root anchors. S5: Lay the bidirectional geogrid on the surface of the underlying crushed stone filling layer and fix it in place; S6, the geogrid and root anchor are connected as a whole; S7, Lay the upper layer of crushed stone filling on the geogrid and compact it; S8. Continue to fill and compact the new embankment on the reinforced layer. When another reinforced layer is needed, repeat steps S2-S7 until the new and old embankments are level. Construction is then complete.
[0016] The beneficial effects of this invention are: 1. Traditional anchors suffer from uneven stress and limited load-bearing capacity. The root-type anchors of this invention resemble plant roots. The lateral roots and main roots of the anchors reinforce and anchor the soil in the old embankment, effectively sharing the stress on the geogrid, improving the load-bearing capacity, and reducing differential settlement of the embankment.
[0017] 2. Traditional geogrid reinforcement technology suffers from reduced friction between the geogrid and the embankment soil due to increased moisture content, resulting in the failure of geogrid reinforcement. This invention constructs a sandwich reinforcement structure by laying crushed stone layers on top and bottom of the geogrid, which increases the friction between the geogrid and the embankment soil, effectively ensuring the bonding between the geogrid and the embankment. This overcomes the slippage problem of the geogrid when the embankment has high moisture content and reduces differential settlement in the widening of new and old embankments.
[0018] 3. Embodiments of this invention employ a root-system anchor composed of a hollow anchor rod and a sleeve. As the anchor rod is screwed in, the upper sleeve unfolds, while the lower sleeve expands within the hole, forming a tight fit. Compared to conventional anchor rods, this design significantly increases its load-bearing capacity. This mechanism is similar to the structure of plant roots, achieving a more stable anchoring effect through the expansion and fit of the sleeve. This design not only improves the load-bearing capacity of the anchor rod but also enhances its bonding with the surrounding soil, thereby effectively reinforcing the embankment and reducing differential settlement. This specific anchor rod structure is suitable for slopes without excavation steps, greatly saving construction time and improving construction efficiency, thus better meeting the special requirements of highway widening projects.
[0019] 4. The grouting materials of this invention include organic and inorganic soil stabilizers. These stabilizers have different stabilization effects for different soil types, so they can be selected according to actual conditions to achieve the best consolidation effect. Compared with traditional grouting materials, these stabilizers not only effectively consolidate the soil and root anchors, but also have the characteristics of being green, environmentally friendly, and low-carbon. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0021] Figure 1 This is an overall side view of the root anchor reinforcement structure for the embankment widening project according to an embodiment of the present invention.
[0022] Figure 2 This is an elevation view of the root anchor reinforcement structure in the embankment widening project according to an embodiment of the present invention.
[0023] Figure 3 This is a schematic diagram of the reinforcing layer in an embodiment of the present invention.
[0024] Figure 4 This is a schematic diagram of the root anchor rod structure in an embodiment of the present invention.
[0025] Figure 5 This is a structural diagram of the claw-shaped steel sleeve connecting the geogrid and the root anchor rod in an embodiment of the present invention.
[0026] Figure 6 This is an overall side view of Embodiment 3 of the present invention.
[0027] Figure 7 This is an elevation view of Embodiment 3 of the present invention.
[0028] Figure 8 This is a schematic diagram of the root anchor rod in Embodiment 3 of the present invention.
[0029] Figure 9 This is a schematic diagram showing the structure of the root anchor rod in Embodiment 3 of the present invention.
[0030] Figure 10 These are the displacement-load curves of the root anchor rod and the ordinary anchor rod in Embodiment 1 of the present invention.
[0031] Figure 11 These are the displacement-shear stress curves of the root anchor rods in Embodiments 1 and 3 of the invention.
[0032] In the diagram: 1. New embankment, 2. Crushed stone filling layer, 3. Geogrid, 4. Old embankment, 5. Step surface, 6. Root anchor, 7. Old asphalt pavement, 8. New asphalt pavement, 9. Old embankment slope, 10. Cement mortar, 11. U-shaped nail, 12. Thread, 13. Nut, 14. Washer, 15. Grout stopper, 16. First main root anchor, 17. First lateral root anchor, 18. Side grout outlet, 19. Main grout outlet, 20. Anchor head, 21. Sleeve, 22. Claw rod, 23. Slope cut, 25. Soil stabilizer, 26. Sleeve, 27. Second main root anchor, 28. Petal-shaped sleeve, 29. Second lateral root anchor, 30. Expansion tube, 31. Grout outlet. Detailed Implementation
[0033] The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0034] Example 1, A root anchor reinforcement structure for highway embankment widening projects, such as Figures 1-2 As shown, it includes a new embankment 1 and an old embankment 4. The old embankment 4 includes a stepped surface 5, which is excavated by cutting the slope of the old embankment 9 according to the slope of the embankment. The slope is cut by 30-50 cm and the original topsoil is removed. The height of the stepped surface 5 is 50-100 cm and the width is 75-150 cm. The root anchor rods 6 are anchored inside the stepped surface 5.
[0035] The new embankment 1 includes multiple sets of reinforced layers distributed from top to bottom. These multiple sets of reinforced layers are filled in layers at intervals on the outside of the stepped surface 5. Each set of reinforced layers includes two layers of crushed stone filling 2 and a geogrid 3 sandwiched in the middle, forming a sandwich structure. The geogrid 3 is connected to the root anchor 6 to ensure coordinated deformation of the new and old embankments, improve the overall integrity of the embankment, and effectively reduce differential settlement.
[0036] The top of the old embankment 4 is the old asphalt pavement 7, and the top of the new embankment 1 is the new asphalt pavement 8.
[0037] The height interval between adjacent reinforcement layers should be 3-4 meters. Laying reinforcement layers outside this range will make it difficult to achieve a good reinforcement effect. Reinforcement layers placed at the bottom of the embankment typically provide the best reinforcement effect. If the interval is too small, laying too many reinforcement layers will lead to material waste and increased construction costs, and will not significantly improve the reinforcement effect compared to the original design.
[0038] like Figure 3 As shown, the geogrid 3 is fixed to the underlying gravel filling layer 2 by U-shaped nails 11.
[0039] In some embodiments, the crushed stone filling layer 2 has a particle size of 9.5~31.5 mm, mainly composed of angular particles, and does not contain clay lumps or plant debris. The crushed stone structure increases the lateral friction of the geogrid 3, preventing the reinforcement effect from failing due to increased humidity, and ensuring the combined effect of the reinforcement structure and the root anchors 6. Each layer of crushed stone filling layer 2 is 20~40 cm thick; the geogrid 3 is a tensile biaxial plastic geogrid, and the ends of the stepped surface 5 are fixed with U-shaped nails 11, and then tightened sequentially for fixation. The U-shaped nails 11 are fixed at intervals of 0.5~1 cm and are arranged parallel to the driving direction. The U-shaped nails are galvanized steel nails, 1~3 cm wide and with legs 5~10 cm long. By increasing the friction of the geogrid 3, the failure of the geogrid reinforcement layer due to increased humidity is prevented. Secondly, the sandwich reinforcement layer can firmly fix the geogrid 3, making the connection between the geogrid 3 and the new root anchors more secure, thereby effectively reducing the differential settlement between the old and new embankments.
[0040] like Figure 4 As shown, the root anchor 6 includes a thread 12, a nut 13, a washer 14, a grout stop plug 15, a first main root anchor 16, a first side root anchor 17, a side grout outlet 18, a main grout outlet 19, and a steel anchor head 20.
[0041] The pad 14 is made of stainless steel and has a rectangular shape with dimensions of 150×150×6 mm. It has an internal hole for the first main anchor rod 16 to pass through. The grout stop plug 15 is a cone with a diameter of 100 mm at the large end and 25 mm at the bottom, which fits onto the first main anchor rod 16. The grout stop plug 15 is made of silicone, which is heat-resistant and elastic. It can adjust the grouting pressure and has a threaded design that matches the first main anchor rod 16 to ensure that they can be tightly connected together. This design can prevent grout from leaking from the bottom of the borehole and maintain the stability of the first main anchor rod 16.
[0042] Nut 13 is a hexagonal nut, which is connected to the first main anchor rod 16 by thread. It can lock and fix the pad 14 and the grout stop plug 15 to the step surface 5, so that the force supported by the first main anchor rod 16 can be effectively transmitted to the pad 14. It can also effectively change the force distribution of the first main anchor rod 16, making the axial force distribution more uniform and improving the support effect.
[0043] The first main anchor rod 16 is a hollow structure with an outer diameter of 25 mm and an inner diameter of 10 mm, and is made of threaded steel bars. The first side anchor rod 17 is a hollow structure with an outer diameter of 20 mm and an inner diameter of 10 mm, and is made of plain round steel bars. The outer wall of the first main anchor rod 16 is welded to the first side anchor rod 17. The internal cavity of the first side anchor rod 17 is connected to the internal cavity of the first main anchor rod 16. The angle between the first side anchor rod 17 and the first main anchor rod 16 is 15~40°. If the angle is too small or too large, it will not play a corresponding anchoring role.
[0044] The first lateral anchor rod 17 has a side grout outlet 18 at its end, and the main anchor rod 16 has a main grout outlet 19 at its anchor head 20. The anchor head 20 is a solid structure, consisting of a cylinder, a flat rectangular prism, and a cone. The cylinder has threads that connect it to the first main anchor rod 16, achieving a tight connection. The flat rectangular prism and the cone are solid structures, and the entire structure is integrally formed. This transfers the force of the first main anchor rod 16 to the anchor body, enabling the entire support structure to withstand the pressure and mechanical action of the soil, improving the tensile strength of the first main anchor rod 16, and increasing the stability and safety of the support structure.
[0045] The maximum opening width of the first side anchor rod 17 in the corresponding group is 25 mm-65 mm. Exceeding this range firstly increases the diameter of the anchor rod, making construction inconvenient; secondly, the larger the opening range of the first side anchor rod 17 in each group, the higher the strength requirement of the connection part, which affects the overall bearing capacity and stability, and does not significantly improve the anchoring effect.
[0046] In some embodiments, each first main anchor bolt 16 is welded with 2-4 pairs of first lateral anchor bolts 17. The appropriate number of first lateral anchor bolts 17 is crucial to ensuring their effectiveness; an excessive number will significantly increase manufacturing costs and complicate the manufacturing process. Furthermore, an excessive number of first lateral anchor bolts 17 does not necessarily significantly improve anchoring performance, as increasing the number of first lateral anchor bolts 17 within a certain range does not linearly improve overall efficiency. Therefore, a balance needs to be found in the arrangement of the first lateral anchor bolts 17 while ensuring effective anchoring.
[0047] like Figure 5As shown, the geogrid 3 and the root anchor 6 are connected and fixed by a claw-shaped sleeve 21. The claw-shaped sleeve 21 includes a sleeve, and a claw-shaped rod 22 is fixedly connected to one end of the sleeve. Both the sleeve 21 and the claw-shaped rod 22 are made of steel. The outer diameter of the sleeve 21 is 37 mm and the inner diameter is 25 mm. The claw-shaped rod 22 is made of four steel rods with a diameter of 6 mm, bent and welded. The four bent rods are connected to the end plane of the sleeve 21 at 0°, 90°, 180° and 270° respectively, and are evenly distributed circumferentially. The thread 12 of the root anchor 6 is fixedly connected to the internal thread of the sleeve 21. At least two bent rods of the claw-shaped rod 22 pass through the geogrid 3 and are inserted into the soil, and are fixed to the geogrid 3 by steel reinforcement.
[0048] Example 2, A construction method for a root anchor reinforcement structure in a highway embankment widening project includes the following steps: S1, clean up and remove debris, vegetation, etc. from the original road surface slope; determine the widening width of the highway reconstruction and expansion project, excavate the old embankment slope 9 to 30-50 cm to remove the topsoil, then cut the slope according to a 1:1.5 slope ratio, and finally excavate the old embankment slope into a stepped surface 5.
[0049] S2, a reinforcing layer is laid on the embankment step surface 5. During construction, the lower crushed stone filling layer 2 is mixed evenly to prevent the separation of coarse and fine particles. It is then compacted to the required compaction degree at an appropriate moisture content.
[0050] S3, at the junction of the vertical surface of the excavated step and the horizontal surface of the lower gravel filling layer 2, drill holes inward at a vertical angle of 15~30° towards the step surface 5 (the holes are perpendicular to the slope of the step surface 5). The diameter of the holes is 65~100mm and the depth is 3~5m. The spacing between the holes along the direction of travel is 2~3m.
[0051] S4. Place root anchor rods 6 in the borehole and inject cement mortar 10 into the borehole. The water-cement ratio of cement mortar 10 is 1:0.5~1:1 until it is full and overflows, ensuring that no gaps are left. After the grouting is completed, the root anchor rods 6 need to be cured.
[0052] S5: Prepare bidirectional geogrid 3, ensuring it is intact. When laying geogrid 3, it should be flat and smooth without wrinkles. At the end of the step surface 5, use U-shaped nails 11 to fix the geogrid 3 to the lower gravel filling layer 2, then tighten and fix it in sequence. The overlap width of each piece of geogrid 3 should be 20~30 cm, and it should be tied tightly.
[0053] Uniaxial geogrids and biaxial geogrids are two different geogrid materials. The main difference is that uniaxial geogrids mainly bear horizontal loads, while biaxial geogrids can bear biaxial loads and have higher stiffness and strength.
[0054] S6, the geogrid 3 and the root anchor 6 are connected as a whole: the thread 12 at the end of the root anchor 6 is threaded to the sleeve 21, the exposed part of the root anchor 6 is treated with anti-corrosion, at least two claw rods 22 pass through the geogrid 3 and are inserted into the soil, and are fixed to the geogrid 3 by steel reinforcement, and then the root anchor 6 and the geogrid 3 are fixed together in the lower crushed stone filling layer 2 by U-shaped nails.
[0055] S7. Lay the upper layer of crushed stone filling layer 2 on the geogrid 3. During construction, pay attention to the integrity of the geogrid 3 and avoid damage to the geogrid 3 during compaction. Compact it to the required compaction degree under appropriate moisture content.
[0056] S8. Fill the embankment soil on the reinforced layer and use compaction machinery to compact the embankment soil to the corresponding compaction degree (zone 96, zone 94 and zone 93). When filling upwards to the point where another reinforced layer is needed, repeat steps S2-S7 until the old and new embankments are level, and the construction is completed.
[0057] Example 3, A root anchor reinforcement structure for highway embankment widening projects, such as Figures 6-7 As shown, it includes a new embankment 1 and an old embankment 4. The old embankment 4 includes a slope cutting surface 23, which is formed by cutting the slope of the old embankment 9 according to the embankment slope, cutting the slope by 30-50 cm and removing the original topsoil; the root anchor rods 6 are anchored inside the slope cutting surface 23.
[0058] like Figure 8 As shown, the root anchor 6 includes a thread 12, a nut 13, a washer 14, a sleeve 26, a second main root anchor 27, a petal-shaped sleeve 28, a second lateral root anchor 29, an expansion tube 30, and a grout outlet 31.
[0059] The second main anchor rod 27 penetrates the interior of the sleeve 26. The lower end of the sleeve 26 is connected in sequence to the hollow petal-shaped sleeve 28 and the expansion tube 30. The inner diameter of the pad 14 is larger than that of the second main anchor rod 27 and smaller than that of the sleeve 26. After penetrating the second main anchor rod 27, the pad 14 contacts the upper end of the sleeve 26.
[0060] The petal-shaped sleeve 28 is composed of multiple vertical ribs. Each vertical rib has a semi-circular opening on both the left and right sides of the middle position. The width of the through groove between the vertical ribs is 2 mm-5 mm and the length is 2 mm-6 mm.
[0061] The outer wall of the expansion tube 30 has spaced trapezoidal protrusions. A second lateral anchor rod 29 is welded to the outer wall of the expansion tube 30. The angle between the second lateral anchor rod 29 and the axis of the expansion tube 30 is 15~40°. A grout outlet 31 is opened at the lower end of the second main anchor rod 27. In its natural state, the diameter of the expansion tube 30 when it connects with the sleeve 26 is 30 mm, gradually transitioning to 24 mm. As the second main anchor rod 27 is continuously rotated in, the expansion tube 30 expands accordingly (see...). Figure 9 The second lateral anchor 29 is expanded, and the expansion tube 30 and the second main anchor 27 have a certain friction force, so that the lower end of the expansion tube 30 is fixed. The nut 13 is a hexagonal screw, which is threaded to the second main anchor 27. By screwing the nut 13 downward, the sleeve 26 moves axially downward. When the stress concentration in the middle position of the petal-shaped sleeve 28 is too large, it will bend and deform outward. At this time, the pad 14 is locked and fixed to the slope surface 23. The maximum diameter of the petal-shaped sleeve 28 after deformation is 40-60 mm, and the maximum diameter of the expansion tube 30 after deformation is 24-25.5 mm. The petal-shaped sleeve 28, the second lateral anchor 29, and the trapezoidal protrusion together improve the anchoring effect.
[0062] The pad 14 is made of stainless steel and measures 150×150×6 mm. The second main anchor rod 27 is a hollow structure with an outer diameter of 25 mm and an inner diameter of 10 mm, and is made of threaded steel bars. The second lateral anchor rod 29 (solid) has a diameter of 6 mm and is made of plain round steel bar; the sleeve 26, the petal-shaped sleeve 28 and the expansion tube 30 are made of galvanized carbon steel, and the sleeve 26 has a diameter of 30 mm.
[0063] Example 4, A construction method for a root anchor reinforcement structure in a highway embankment widening project includes the following steps: S1, clean up and remove debris, vegetation, etc. from the original road surface slope; determine the widening width of the highway reconstruction and expansion project, excavate the old embankment slope 9 to 30~50 cm to remove the surface soil, and then cut the slope at a ratio of 1:1.5 to form a cut slope surface 23.
[0064] S2, lay a reinforcing layer on the slope surface 23. During construction, first mix the lower crushed stone filling layer 2 evenly to prevent the separation of coarse and fine particles, and compact it to the required compaction degree under appropriate moisture content.
[0065] S3, drill holes perpendicular to the slope surface 23, with a diameter of 45~65 mm and a depth of 3~5 m, and the spacing between the holes along the driving direction is 2~3 m.
[0066] S4. Inside the borehole, first place the assembly of casing 26, petal-shaped casing 28, and expansion tube 30. Then, gradually screw in the second main root anchor 27. As the second main root anchor 27 is screwed in, the interior of the expansion tube 30 is expanded by the second main root anchor 27 until the second main root anchor 27 and the expansion tube 30 are securely fastened. By screwing the nut 13 downwards, the petal-shaped casing 28 will bend due to excessive stress concentration in the middle position. At this time, the pad 14 is locked and fixed to the slope surface 23. Next, inject soil stabilizer 25 into the second main root anchor 27 until it is full and overflows, ensuring complete filling without any gaps. After grouting is completed, the root anchors 6 need to be cured to ensure their stability and durability.
[0067] S5: Prepare bidirectional geogrid 3, ensuring it is intact. When laying geogrid 3, it should be flat and smooth without wrinkles. At the end of the slope surface 23, use U-shaped nails 11 to fix the geogrid 3 to the lower gravel filling layer 2, then tighten and fix it in sequence. The overlap width of each piece of geogrid 3 should be 20~30 cm, and it should be tied tightly.
[0068] S6, the geogrid 3 and the root anchor 6 are connected as a whole: the thread 12 at the end of the root anchor 6 is threaded to the sleeve 21, the exposed part of the root anchor 6 is treated with anti-corrosion, at least two claw rods 22 pass through the geogrid 3 and are inserted into the soil, and are fixed to the geogrid 3 by steel reinforcement, and then the root anchor 6 and the geogrid 3 are fixed together in the lower crushed stone filling layer 2 by U-shaped nails.
[0069] S7. Lay the upper layer of crushed stone filling layer 2 on the geogrid 3. During construction, pay attention to the integrity of the geogrid 3 and avoid damage to the geogrid 3 during the compaction process. Compact it to the required compaction degree under appropriate moisture content.
[0070] S8. Fill the embankment soil on the reinforced layer and use compaction machinery to compact the embankment soil to the corresponding compaction degree (zone 96, zone 94 and zone 93). When filling upwards to the point where another reinforced layer is needed, repeat steps S2-S7 until the old and new embankments are level, and the construction is completed.
[0071] The grouting material (soil stabilizer 25) in Example 4 can be inorganic, organic, or ionic. Inorganic stabilizers typically use cement, lime, fly ash, coal gangue, zeolite, and various types of slag as main components, and are usually in powder form, with the addition of an appropriate amount of activator. Inorganic stabilizers have a long history of application, mature technology, convenient construction, and low price. They are mainly used for treating construction waste soil, and the improved construction waste soil has high strength.
[0072] Organic curing agents currently mainly include polymers, resins, and high-molecular materials, and are formulated by mixing one or more of these components. Organic curing agents typically reinforce soil through ion exchange or the polymerization of the material itself. They can reduce adsorbed water in the soil, improve the impermeability of the solidified soil, and improve the engineering properties of the soil. They are suitable for improving soils such as silty sand and silty clay.
[0073] Ionic soil conditioners have been used for many years in improving poor soil conditions, mainly for clay and sandy soils. They can effectively improve soil mechanical properties, suppress dust generation, increase maximum dry density, and reduce soil permeability. Depending on the specific renovation or expansion project and soil conditions, different types of soil can be selected for targeted application, achieving green, environmentally friendly, and low-carbon effects. The aforementioned soil conditioner 25 can also be used in Example 2.
[0074] Traditional highway embankment splicing techniques typically involve cutting slopes and excavating steps in existing embankments, then laying geogrids at these steps. However, due to the wide geographical differences in my country, the soil properties of various embankments differ significantly, especially in the hot and humid regions of southern my country, where soil properties are greatly affected by climate. This results in limited step widths in existing embankments, making them prone to loosening and collapse. Insufficient anchorage length of the geogrids also makes them susceptible to slippage when embankment humidity rises, leading to the failure of the reinforcement effect.
[0075] This invention employs a sandwich structure for the reinforcing layer. The bidirectional geogrid 3 has transverse and longitudinal ribs, with crushed stone filling layers 2 positioned above and below. When the geogrid 3 tends to slide, firstly, the surface of the geogrid 3 rubs against the upper and lower crushed stone filling layers 2 (the unevenness of the crushed stone layers increases the frictional force compared to ordinary soil). Secondly, the pores of the geogrid 3 "lock" the upper and lower crushed stone filling layers 2. Finally, the upper and lower crushed stone filling layers 2 passively resist the transverse and longitudinal ribs of the geogrid 3. These three effects collectively constrain the lateral displacement of the geogrid 3, thereby fully utilizing its reinforcing function and effectively solving the problem of embankment splicing in old roads in humid and hot regions.
[0076] Both Embodiments 1 and 3 of this invention improve the anchor bolt, enhancing the anchoring effect; the displacement-load curves of the root anchor bolt 6 in Embodiment 1 and the ordinary anchor bolt are shown below. Figure 10 As shown, Figure 10 The common anchor bolt is an enlarged-head anchor bolt, made of high-strength steel. It has an enlarged-head structure at the end, made of steel plate, shaped like a cone or mushroom. The anchor bolt's length and diameter are the same as the diameter and length of the first main anchor bolt 16 in this embodiment. Figure 10 As can be seen from the above, the root anchor 6 of Embodiment 1 of the present invention has a better anchoring effect.
[0077] The displacement-shear stress curves of two root anchor rods 6 with different structures in Embodiments 1 and 3 of the present invention are as follows: Figure 11 As shown, the anchor bolt with a specific structure in Embodiment 3 of the present invention has excellent anchoring effect, effectively reinforcing the embankment. Combined with the sandwich grid reinforcement layer, it further reduces the differential settlement between the old and new embankments. It is suitable for slopes without excavation steps, and the borehole diameter is significantly reduced, greatly saving construction time and improving construction efficiency. The borehole diameter range of traditional anchor bolts is 80 mm-100 mm, while the borehole diameter range of the anchor bolt in Embodiment 3 is 45-65 mm.
[0078] The above description is merely a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention are included within the scope of protection of the present invention.
Claims
1. A root anchor reinforcement structure for highway subgrade widening projects, comprising a new subgrade (1) and an old subgrade (4), wherein the new subgrade (1) has multiple sets of reinforcement layers distributed from top to bottom, characterized in that, Each group of the reinforced layers includes two layers of crushed stone filling (2) and a geogrid (3) sandwiched in between; The reinforcement layer is provided with root anchors (6), which are anchored to the inside of the old roadbed (4) perpendicular to the slope of the old roadbed (4). The geogrid (3) is connected to the root anchors (6). The root anchor (6) includes a hollow second main root anchor (27), which penetrates the inside of the sleeve (26). The lower end of the sleeve (26) is connected to a hollow petal-shaped sleeve (28) and an expansion tube (30). A grout outlet (31) is opened at the lower end of the second main root anchor (27), and a second side root anchor (29) is fixed on the outer wall of the expansion tube (30). The inner diameter of the expansion tube (30) in its natural state is smaller than the outer diameter of the second main root anchor (27). As the second main root anchor (27) is drilled downward, the expansion tube (30) is supported by the second main root anchor (27) and expands radially, so that the lower end of the expansion tube (30) is fixed. The sidewall of the petal-shaped sleeve (28) is provided with multiple axial through grooves. The petal-shaped sleeve (28) is composed of multiple vertical ribs. Each vertical rib has a semi-circular opening on both the left and right sides at the middle position. When the nut (13) at the upper end of the sleeve (26) is screwed downward, the upper end of the petal-shaped sleeve (28) is squeezed by force, and the sidewall of the petal-shaped sleeve (28) arches radially. At this time, the pad (14) between the sleeve (26) and the nut (13) is locked and fixed to the slope surface (23). The grouting material injected from the upper end of the second main root anchor (27) flows out from the grout outlet (31), so that the root anchor (6) is consolidated with the soil inside the old roadbed (4); the root anchor (6) is used to anchor the slope of the old roadbed (4) without excavation steps; The second main anchor rod (27) is threadedly connected to the claw sleeve through the thread (12). The claw part of the claw sleeve passes through the geogrid (3) and is inserted into the soil and fixed by binding. The outer wall of the expansion tube (30) is provided with spaced trapezoidal protrusions.
2. The root anchor reinforcement structure in a highway subgrade widening project according to claim 1, characterized in that, The root anchor (6) includes a hollow first main root anchor (16), and a plurality of hollow first side root anchors (17) are fixedly connected to the outer wall of the first main root anchor (16). The internal cavity of the first side root anchor (17) is connected to the internal cavity of the first main root anchor (16), and the included angle between the first side root anchor (17) and the first main root anchor (16) is 15~40°. A side grout outlet (18) is opened at the end of the first side root anchor (17), and a main grout outlet (19) is opened at the anchor head (20) of the first main root anchor (16); the grouting material injected from the upper end of the first main root anchor (16) flows out from the side grout outlet (18) and the main grout outlet (19), so that the root anchor (6) is consolidated with the soil inside the old roadbed (4); The root anchor (6) is used to anchor the slope of the old roadbed (4) with the excavated steps.
3. The root anchor reinforcement structure in a highway subgrade widening project according to claim 1, characterized in that, The claw-shaped sleeve includes a sleeve (21), one end of which is fixedly connected to a claw-shaped rod (22), and the other end of the sleeve (21) is threadedly connected to a root anchor rod (6). At least two bent rods in the claw-shaped rod (22) pass through the geogrid (3) and are inserted into the soil and fixed by binding.
4. The root anchor reinforcement structure in a highway subgrade widening project according to claim 1, characterized in that, The height range between adjacent reinforced layers is 3-4 meters. The top of the old roadbed (4) is the old asphalt pavement (7), and the top of the new roadbed (1) is the new asphalt pavement (8).
5. The root anchor reinforcement structure in a highway subgrade widening project according to claim 1, characterized in that, The crushed stone filling layer (2) has a crushed stone particle size of 9.5~31.5 mm, including angular particles; the thickness of each crushed stone filling layer (2) is 20~40 cm; the geogrid (3) is a tensile biaxial plastic geogrid; the geogrid (3) is fixed to the crushed stone filling layer (2) below by U-shaped nails (11).
6. The construction method of the root anchor reinforcement structure in a highway subgrade widening project as described in claim 1, characterized in that, Includes the following steps: S1, clean up and remove the old roadbed (4) slope, determine the widening width of the expressway, cut the slope according to the roadbed slope to form a cut surface (23) or cut the slope and excavate into a stepped surface (5). S2, fill the new roadbed (1) along the slope (23) or step surface (5) of the old roadbed (4), lay the reinforcement layer at the design position, and mix the lower crushed stone filling layer (2) evenly and compact it during construction; S3, Drill holes in the direction perpendicular to the slope on the cut surface (23) or the step surface (5). The diameter of the holes is 65~80 mm and the depth is 3~5 m. The spacing between the holes is 2~3 m along the driving direction. S4, place root anchor rods (6) in the borehole, inject grouting material into the borehole until it is full and overflows, ensuring no gaps are left. After the grouting is completed, cure the root anchor rods (6). S5: Lay the bidirectional geogrid (3) on the surface of the underlying gravel filling layer (2) and fix it; S6, the geogrid (3) and the root anchor (6) are connected as a whole; S7, lay the upper layer of crushed stone filling layer (2) on the geogrid (3) and compact it; S8. Continue to fill the new roadbed (1) on the reinforced layer, compact it, and fill upwards until another reinforced layer is needed. Repeat steps S2-S7 until the new and old roadbeds are level, and the construction is completed.
Citation Information
Patent Citations
Anchoring type geogrid for earthwork roadbed reconstruction and extension and construction method thereof
CN113846524A
Anchored roadbed widening method
CN102619150A
Soft soil area roadbed widening structure and construction method thereof
CN106988178A
Prestressed reinforced embankment structure
CN116240764A
Prestressed anchor rod composite soil nail reinforced slope structure and construction method thereof
CN116791640A