Irregular slope surface slope concrete construction formwork system and construction method
By using a combination system of connecting frames, formwork components, and shaping components on irregular slopes, the problems of difficult formwork connection and assembly were solved, enabling rapid formwork splicing and effective concrete shaping, thus improving construction efficiency.
Patent Information
- Application Number
- CN202410147175.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-02-01
AI Technical Summary
When building roads on irregular slopes, the connection and assembly of formwork are difficult, affecting the construction process.
The system employs a combination of connecting frames, template components, and shaping components. The connecting components adjust the angle between templates, while the shaping components prevent concrete slippage, enabling rapid splicing and shaping of the templates.
It enables rapid and convenient splicing of formwork and effective shaping of concrete on irregular slopes, thereby improving construction efficiency.
Smart Images

Figure CN118087342B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of building construction technology, and specifically relates to a formwork system and construction method for irregular slope concrete construction. Background Technology
[0002] Concrete is a general term for engineering composite materials that bind aggregates together with cementing materials. Generally, concrete refers to concrete using cement as the cementing material and sand and gravel as aggregates. Concrete is widely used in civil engineering. When building roads on slopes, concrete needs to be poured into formwork to shape it.
[0003] When constructing roads on irregular slopes, due to the numerous gradient layers with varying slopes, different shaped connectors and templates are required at the joints of the templates at the gradient layers. This necessitates on-site cutting of templates or customization of templates according to different slopes, making construction more complicated and affecting the construction progress.
[0004] Therefore, there is an urgent need to provide a convenient and safe concrete formwork system and construction method for irregular slopes to solve the problem that the construction process is affected by the presence of gradual layers with varying slopes when constructing roads on irregular slopes. Summary of the Invention
[0005] This invention provides a formwork system and construction method for irregular slope concrete construction. By setting up connecting components, the connection angle between the formwork can be adjusted when splicing the formwork at the transition layer during the construction of roads on irregular slopes. The adjustment is convenient and the adjustable angle is large. Different on-site cut formwork can be assembled, making the splicing of formwork more convenient and faster when constructing roads on irregular slopes.
[0006] To solve the above technical problems, the present invention includes the following technical solutions:
[0007] An irregular slope concrete construction formwork system includes:
[0008] The connecting frame is located on the slope.
[0009] A template assembly is provided on both sides of the connecting frame. The template assembly is provided with a first baffle, a second baffle, and a third baffle to block the edge of the concrete.
[0010] A connecting component is disposed inside a connecting frame, and the connecting component is used to connect a first baffle and a second baffle located at the turning point of an irregular slope by providing a first connecting frame and a second connecting frame.
[0011] A shaping component is disposed on a first baffle and a second baffle. The shaping component shapes the concrete by setting a pressure plate.
[0012] Furthermore, the template assembly includes a first clip, a first snap-fit frame, a second clip, a second snap-fit frame, and several reinforcing parts. The first clip and the first snap-fit frame are respectively fixedly installed on both sides of the first baffle and the second baffle. The second snap-fit frame is fixedly installed on one end of the third baffle. The second clip is fixedly installed on one side of the third baffle. The several reinforcing parts are respectively fixedly installed inside the first baffle, the second baffle, and the third baffle.
[0013] Furthermore, the reinforcing components are respectively disposed between the first card and the first card frame, and between the second card and the second card frame.
[0014] Furthermore, each of the first, second, and third baffles has several through holes on one side. A first fixing plate is provided on one side of the first and second baffles, and a second fixing plate is provided on one side of the second and third baffles. Each of the first and second fixing plates has several holes at one end. The holes on the first and second fixing plates correspond to the through holes, and a fixing post is installed on the inner wall of the through hole.
[0015] Furthermore, the connecting assembly includes a connecting groove, a first mounting shaft, a first fixing hole, a first mounting block, a second mounting shaft, a second fixing hole, and a second mounting block. The connecting groove is formed on both sides of the connecting frame. The first mounting shaft is fixedly installed on both sides of the first connecting frame, and the second mounting shaft is fixedly installed on both sides of the second connecting frame. The first connecting frame and the second connecting frame are rotatably mounted on the corresponding groove walls of the connecting groove via the first mounting shaft and the second mounting shaft, respectively. The first fixing hole is formed at one end of the first connecting frame, and the second fixing hole is formed at one end of the second connecting frame. The first mounting block is fixedly installed on one side of the first connecting frame, and the second mounting block is fixedly installed on one side of the second connecting frame.
[0016] Furthermore, the first baffle is slidably mounted on one side of the first mounting block of the first connecting frame via a first snap-fit frame on one side, and the second baffle is slidably mounted on the inner wall of the second mounting block of the second connecting frame via a first snap-fit piece on one side.
[0017] Furthermore, a first fixing plate is fixedly installed at one end of the first connecting frame by bolts, and a second fixing plate is fixedly installed at the second connecting frame by bolts.
[0018] Furthermore, the shaping component includes two pressure plate mounting parts, a sliding groove, a pressure plate, and a fixing screw. The pressure plate mounting parts are slidably mounted on the top of the corresponding first baffle, second baffle, and connecting frame, respectively, and the two pressure plate mounting parts are positioned opposite each other. The sliding groove is opened on one side of the pressure plate mounting part, and the pressure plate is slidably mounted on the groove wall of the sliding groove. The pressure plate is located between the two pressure plate mounting parts. A plurality of threaded grooves are opened on one side of the pressure plate mounting part, and the fixing screw is movably mounted on the groove wall of the corresponding threaded groove. A rubber gasket is fixedly mounted on one end of the fixing screw.
[0019] Furthermore, a side plate is fixedly installed on the bottom of one side of the connecting frame, and the side plate is located on one side of the connecting frame where the first connecting frame is located. A slot is opened on one side of the side plate, and an mounting plate is fixedly installed on the bottom of one side of the connecting frame.
[0020] This invention also provides a construction method for an irregular slope concrete formwork system, and provides the irregular slope concrete formwork system for later use. The method includes:
[0021] When assembling the template, the template assembly formed by the first and second baffles is divided into two rows. The first, second, and third baffles are fixed on the slope and ground, forming a circle for concrete pouring. The first, second, and third baffles are nailed to the ground by fixing posts passing through the first and second fixing plates and corresponding through holes. When assembling the template at the gradient layer, the first baffle is installed on one side of the first connecting frame, and the second baffle is installed on the other side of the second connecting frame. The angle between the first and second baffles is adjusted by rotating the first and second connecting frames to adapt to different slopes. After adjusting the angle, the positions of the first and second baffles on the first and second connecting frames are slid to different heights. Then, the first baffle, second baffle, and connecting frame are fixed with fixing posts and nails.
[0022] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0023] This invention provides a formwork system for constructing concrete on irregular slopes, comprising a connecting frame, formwork components, connecting components, and shaping components. The connecting frame is located on the slope surface; the formwork components are positioned on both sides of the connecting frame, each equipped with a first baffle, a second baffle, and a third baffle to prevent damage to the concrete edges; the connecting components are located inside the connecting frame and connect the first and second baffles located at the transition points of the irregular slope via a first connecting frame and a second connecting frame; the shaping components are positioned on the first and second baffles and shape the concrete by using pressure plates. This connecting component allows for easy adjustment of the connection angle between formwork sections when splicing formwork at transition layers on irregular slopes during road construction. The adjustment is convenient and allows for a wide range of angles, enabling the assembly of different on-site cut formwork sections, making formwork splicing more convenient and faster when constructing roads on irregular slopes. The height of the shaping component is adjusted by moving the pressure plate mounting piece between the clamping height of the first and second baffles. Several shaping components are set above the concrete in the template to press and shape the concrete, preventing it from sliding downwards due to the slope and affecting the shaping of the concrete. Attached Figure Description
[0024] Figure 1 This is a schematic diagram of the structure of an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0025] Figure 2 This is a schematic diagram of the connecting frame in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0026] Figure 3 This is a schematic diagram of the installation of the first and second baffles in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0027] Figure 4 This is a schematic diagram of the installation of the first baffle and the first connecting frame in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0028] Figure 5 This is a schematic diagram of the installation of the second baffle and the second connecting frame in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0029] Figure 6 This is a schematic diagram of the installation of the third baffle in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0030] Figure 7 This is a schematic diagram of the installation of the second fixing plate in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0031] Figure 8This is a schematic diagram of the installation of a standardized component in an irregular slope concrete construction formwork system according to an embodiment of the present invention;
[0032] Figure 9 This is a cross-sectional view of the first baffle in an irregular slope concrete construction formwork system according to an embodiment of the present invention.
[0033] In the picture:
[0034] 1-Connecting frame; 2-Connecting groove; 3-First connecting bracket; 4-First mounting shaft; 5-First fixing hole; 6-First mounting block; 7-First fixing piece; 8-Second connecting bracket; 9-Second mounting shaft; 10-Second fixing hole; 11-Second mounting block; 12-Second fixing piece; 13-First baffle; 14-Second baffle; 15-Third baffle; 16-First clip; 17-First snap-fit frame; 18-Reinforcing component; 19-Through hole; 20-First fixing plate; 21-Fixing post; 22-Mounting plate; 23-Slot; 24-Side plate; 25-Pressure plate mounting component; 26-Slide groove; 27-Pressure plate; 28-Fixing screw; 29-Second snap-fit frame; 30-Second clip; 31-Second fixing plate. Detailed Implementation
[0035] The following detailed description, in conjunction with the accompanying drawings and specific embodiments, provides a concrete formwork system and construction method for irregular slope surfaces provided by the present invention. The advantages and features of the present invention will become clearer from the following description. It should be noted that the accompanying drawings are all in a very simplified form and use non-precise proportions, used only to facilitate and clarify the illustration of the embodiments of the present invention. For ease of description, the terms "upper" and "lower" used below correspond to the upper and lower directions in the accompanying drawings, but this should not be construed as a limitation of the technical solution of the present invention.
[0036] Example 1
[0037] The following is combined with Figures 1 to 9 This invention provides a detailed description of the structural composition of the irregular slope concrete construction formwork system.
[0038] Please continue to refer to this. Figures 1 to 9A formwork system for constructing irregular slope concrete includes a connecting frame 1, formwork components, connecting components, and shaping components. The connecting frame 1 is placed on the slope. The formwork components are located on both sides of the connecting frame 1 and are used to block the edges of the concrete by setting a first baffle 13, a second baffle 14, and a third baffle 15. The connecting components are located inside the connecting frame 1 and are used to connect the first baffle 13 and the second baffle 14 located at the turning point of the irregular slope by setting a first connecting frame 3 and a second connecting frame 8. The shaping components are set on the first baffle 13 and the second baffle 14 and are used to shape the concrete by setting a pressure plate 27. By setting the connecting components, the connection angle between the formwork can be adjusted when splicing the formwork at the transition layer when constructing roads on irregular slopes. The adjustment is convenient and the adjustable angle is large. Different on-site cut formwork can be assembled, making the splicing of formwork more convenient and faster when constructing roads on irregular slopes.
[0039] In this embodiment, please continue to refer to Figure 1 and Figure 6The template assembly includes a first clip 16, a first snap-fit frame 17, a second clip 30, a second snap-fit frame 29, and several reinforcing members 18. The first clip 16 and the first snap-fit frame 17 are respectively fixedly installed on both sides of the first baffle 13 and the second baffle 14. The second snap-fit frame 29 is fixedly installed on one end of the third baffle 15, and the second clip 30 is fixedly installed on one side of the third baffle 15. Several reinforcing members 18 are respectively fixedly installed inside the first baffle 13, the second baffle 14, and the third baffle 15. The reinforcing members 18 are fixedly installed between the first clip 16 and the first snap-fit frame 17, and also fixedly installed between the second clip 30 and the second snap-fit frame 29. Several through holes 19 are opened on one side of the first baffle 13, the second baffle 14, and the third baffle 15. A first fixing plate 20 is provided on one side of the first baffle 13 and the second baffle 14, and a second fixing plate 31 is provided on one side of the second baffle 14 and the third baffle 15. The first fixing plate 20 and the second fixing plate 31 each have several holes at one end. The holes on the first fixing plate 20 and the second fixing plate 31 correspond to the corresponding through holes 19. The inner wall of the through holes 19 is equipped with fixing posts 21. The first snap-fit frame 17 and the second snap-fit frame 29 are U-shaped, and the first snap-fit piece 16 and the second snap-fit piece 30 are convex. The first snap-fit frame 17, the second snap-fit frame 29, the first snap-fit piece 16 and the second snap-fit piece 30 can be made of metal materials. They are fixed on the slope and the ground by setting the first baffle 13, the second baffle 14 and the third baffle 15 to form a circle for concrete irrigation. The first snap-fit frame 17, the second snap-fit frame 29, the first clip 16, and the second clip 30 are used for splicing between the first baffle 13, the second baffle 14, and the third baffle 15. The first baffle 13, the second baffle 14, and the third baffle 15 are made of metal, which increases the strength of the splice between the first snap-fit frame 17, the second snap-fit frame 29, the first clip 16, and the second clip 30. The reinforcement 18 can be made of steel bars to increase the strength of the first baffle 13, the second baffle 14, and the third baffle 15.
[0040] In this embodiment, when assembling the template, the template assembly formed by the first baffle 13 and the second baffle 14 is divided into two rows.
[0041] In this embodiment, the second clip 30 installed on one side of the third baffle 15 can be replaced with the second clip frame 29, which is used to connect the first baffle 13 and the second baffle 14 divided into two rows.
[0042] In this embodiment, after the first baffle 13, the second baffle 14, and the third baffle 15 are spliced together, the first fixing plate 20 and the second fixing plate 31 can be used to fix the splice between the first baffle 13, the second baffle 14, and the third baffle 15 for auxiliary fixation. The first fixing plate 20 is rectangular and is set at the connection between the first baffle 13 and the second baffle 14. The second fixing plate 31 is L-shaped and is set between the second baffle 14 and the third baffle 15. When fixing the first baffle 13, the second baffle 14, and the third baffle 15 on the slope and the ground, the first baffle 13, the second baffle 14, and the third baffle 15 are nailed to the ground by passing the fixing post 21 through the first fixing plate 20, the second fixing plate 31, and the corresponding through hole 19.
[0043] In this embodiment, please continue to refer to Figure 2 , Figure 4 and Figure 5 The connecting assembly includes a connecting groove 2, a first mounting shaft 4, a first fixing hole 5, a first mounting block 6, a second mounting shaft 9, a second fixing hole 10, and a second mounting block 11. The connecting groove 2 is located on both sides of the connecting frame 1. The first mounting shaft 4 is fixedly mounted on both sides of the first connecting frame 3, and the second mounting shaft 9 is fixedly mounted on both sides of the second connecting frame 8. The first connecting frame 3 and the second connecting frame 8 are rotatably mounted on the corresponding connecting groove 2 walls via the first mounting shaft 4 and the second mounting shaft 9, respectively. The first fixing hole 5 is located at one end of the first connecting frame 3, and the second fixing hole 10 is located at one end of the second connecting frame 8. The first mounting block 6 is fixedly mounted on one side of the first connecting frame 3, and the second mounting block 11 is fixedly mounted on one side of the second connecting frame 8. The first baffle 13 is slidably mounted on one side of the first mounting block 6 of the first connecting frame 3 via a first snap-fit frame 17 on one side. The second baffle 14 is slidably mounted on the inner wall of the second mounting block 11 of the second connecting frame 8 via a first snap-fit piece 16 on one side. A first fixing piece 7 is fixedly mounted on one end of the first connecting frame 3 by bolts, and a second fixing piece 12 is fixedly mounted on the second connecting frame 8 by bolts. When splicing the template at the gradient layer, the first baffle 13 is installed on one side of the first connecting frame 3, and the second baffle 14 is installed on one side of the second connecting frame 8. The first connecting frame 3 and the second connecting frame 8 are rotatable. The angle between the first baffle 13 and the second baffle 14 can be adjusted by rotating the first connecting frame 3 and the second connecting frame 8 to adapt to different slopes. After adjusting the angle, the position height of the first baffle 13 and the second baffle 14 on one side of the first connecting frame 3 and the second connecting frame 8 is slid to optimize the position of the connection between the first baffle 13 and the second baffle 14 and the connecting frame 1, and reduce the gap between the first baffle 13 and the second baffle 14 and the connecting frame 1.
[0044] In this embodiment, the first baffle 13 and the second baffle 14 are in contact with the wall of the connecting groove 2 to prevent concrete leakage. The connecting groove 2 passes through the connecting frame 1. The first connecting frame 3 rotates clockwise to adjust the upward tilt angle of the first baffle 13, and the second connecting frame 8 rotates counterclockwise to adjust the downward tilt angle of the second baffle 14.
[0045] In this embodiment, please refer to Figure 1 and Figure 8 The shaping assembly includes two pressure plate mounting pieces 25, a sliding groove 26, a pressure plate 27, and a fixing screw 28. The pressure plate mounting pieces 25 are slidably mounted on the top of the corresponding first baffle 13, second baffle 14, and connecting frame 1, respectively, and the two pressure plate mounting pieces 25 are positioned opposite each other. The sliding groove 26 is opened on one side of each pressure plate mounting piece 25, and the pressure plate 27 is slidably mounted on the groove wall of the sliding groove 26, with the pressure plate 27 located between the two pressure plate mounting pieces 25. Several threaded grooves are opened on one side of each pressure plate mounting piece 25, and the fixing screw 28 is movably mounted on the groove wall of the corresponding threaded groove. A rubber gasket is fixedly installed at one end of the fixing screw 28. The side of the pressure plate mounting piece 25 that is mounted on the first baffle 13 and the second baffle 14 is U-shaped and can be... A flexible metal plate is selected, which can be clamped at the first baffle 13 and the second baffle 14. By tightening the fixing screws 28, the clamping of the pressure plate mounting piece 25 can be made tighter, and the pressure plate 27 can move and extend in the sliding grooves 26 on the pressure plate mounting pieces 25 on both sides. The length of the shaping component can be adjusted according to the distance between the first baffle 13 and the second baffle 14 divided into two rows. The height of the shaping component can be adjusted by moving the clamping height of the pressure plate mounting piece 25 at the first baffle 13 and the second baffle 14. By setting several shaping components above the concrete in the template, the concrete is pressed and shaped, preventing the concrete from sliding downwards due to the slope and affecting the shaping of the concrete.
[0046] In this embodiment, please refer to Figure 1 A side plate 24 is fixedly installed on one side of the bottom of the connecting frame 1, and the side plate 24 is located on one side of the connecting frame 1 where the first connecting frame 3 is located. A slot 23 is opened on one side of the side plate 24. By setting the side plate 24, the diagonal corners adjacent to the bottom of the first baffle 13 and the connecting frame 1 are blocked, and the gap between the diagonal corners adjacent to the bottom of the first baffle 13 and the connecting frame 1 is blocked. Expanding sealant can be sprayed into the gap between the diagonal corners adjacent to the bottom of the first baffle 13 and the connecting frame 1 through the slot 23 to increase the sealing performance of the diagonal corners adjacent to the bottom of the first baffle 13 and the connecting frame 1.
[0047] In this embodiment, please refer to Figure 1 A mounting plate 22 is fixedly installed on one bottom side of the connecting frame 1. The mounting plate 22 has several mounting holes. The mounting plate 22 is nailed to the ground to fix the connecting frame 1.
[0048] The workflow and principle of this invention are as follows: When assembling the template, the template assembly formed by the first baffle 13 and the second baffle 14 is divided into two rows. The first baffle 13, the second baffle 14, and the third baffle 15 are fixed on the slope and the ground, forming a circle for concrete pouring. The first baffle 13, the second baffle 14, and the third baffle 15 are nailed to the ground by passing through the first fixing plate 20, the second fixing plate 31, and the corresponding through hole 19 with the fixing column 21. When assembling the template at the gradient layer, the first baffle 13 is installed on one side of the first connecting frame 3, and the second baffle 14 is installed on one side of the second connecting frame 8. The angle between the first baffle 13 and the second baffle 14 is adjusted by rotating the first connecting frame 3 and the second connecting frame 8 to adapt to different slopes. After adjusting the angle, the position height of the first baffle 13 and the second baffle 14 on one side of the first connecting frame 3 and the second connecting frame 8 is slid respectively. Then, the first baffle 13, the second baffle 14, and the connecting frame 1 are fixed with the fixing column 21 and nails.
[0049] The above examples are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. The above embodiments only illustrate several implementations of the present invention, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the invention patent. It should be noted that, for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all fall within the protection scope of the present invention. Therefore, the protection scope of this patent should be determined by the appended claims.
Claims
1. A formwork system for constructing irregular slope concrete, characterized in that, include: The connecting frame is located on the slope. A template assembly is provided on both sides of the connecting frame. The template assembly is provided with a first baffle, a second baffle, and a third baffle to block the edge of the concrete. A connecting component is disposed inside a connecting frame and is used to connect a first baffle and a second baffle located at the bend of an irregular slope by means of a first connecting bracket and a second connecting bracket. The connecting component includes a connecting groove, a first mounting shaft, a first fixing hole, a first mounting block, a second mounting shaft, a second fixing hole, and a second mounting block. The connecting groove is opened on both sides of the connecting frame. The first mounting shaft is fixedly installed on both sides of the first connecting bracket, and the second mounting shaft is fixedly installed on both sides of the second connecting bracket. The first connecting bracket and the second connecting bracket are rotatably installed on the corresponding groove wall of the connecting groove by means of the first mounting shaft and the second mounting shaft, respectively. The first fixing hole is opened at one end of the first connecting bracket, the second fixing hole is opened at one end of the second connecting bracket, the first mounting block is fixedly installed on one side of the first connecting bracket, and the second mounting block is fixedly installed on one side of the second connecting bracket. A shaping component is disposed on a first baffle and a second baffle, and the shaping component shapes the concrete above by setting a pressure plate; The first baffle is slidably mounted on one side of the first mounting block of the first connecting frame via a first snap-fit frame on one side, and the second baffle is slidably mounted on the inner wall of the second mounting block of the second connecting frame via a first snap-fit piece on one side.
2. The irregular slope concrete construction formwork system according to claim 1, characterized in that, The template assembly includes a first clip, a first snap-fit frame, a second clip, a second snap-fit frame, and several reinforcing parts. The first clip and the first snap-fit frame are fixedly installed on both sides of the first baffle and the second baffle, respectively. The second snap-fit frame is fixedly installed on one end of the third baffle. The second clip is fixedly installed on one side of the third baffle. The several reinforcing parts are fixedly installed inside the first baffle, the second baffle, and the third baffle, respectively.
3. The irregular slope concrete construction formwork system according to claim 2, characterized in that, The reinforcing components are respectively disposed between the first card and the first card frame, and between the second card and the second card frame.
4. The irregular slope concrete construction formwork system according to claim 2, characterized in that, The first baffle, the second baffle, and the third baffle each have several through holes on one side. The first baffle and the second baffle each have a first fixing plate on one side and a second fixing plate on one side. The first fixing plate and the second fixing plate each have several holes at one end. The holes on the first fixing plate and the second fixing plate correspond to the through holes. A fixing post is installed inside the through hole.
5. The irregular slope concrete construction formwork system according to claim 2, characterized in that, The first connecting frame has a first fixing plate fixedly installed at one end by bolts, and the second connecting frame has a second fixing plate fixedly installed by bolts.
6. The irregular slope concrete construction formwork system according to claim 2, characterized in that, The shaping assembly includes two pressure plate mounting parts, a sliding groove, a pressure plate, and a fixing screw. The pressure plate mounting parts are slidably mounted on the top of the corresponding first baffle, second baffle, and connecting frame, and the two pressure plate mounting parts are positioned opposite each other. The sliding groove is opened on one side of the pressure plate mounting part. The pressure plate is slidably mounted on the groove wall and is located between the two pressure plate mounting parts. A plurality of threaded grooves are opened on one side of the pressure plate mounting part. The fixing screw is movably mounted on the groove wall corresponding to the threaded groove. A rubber gasket is fixedly mounted on one end of the fixing screw.
7. The irregular slope concrete construction formwork system according to claim 2, characterized in that, A side plate is fixedly installed on one bottom side of the connecting frame, and the side plate is located on one side of the connecting frame where the first connecting frame is located. A slot is opened on one side of the side plate, and an mounting plate is fixedly installed on one bottom side of the connecting frame.
8. A construction method for a concrete formwork system for irregular slopes, characterized in that, Provide the irregular slope concrete construction formwork system of claim 4 for later use, the method comprising: When assembling the template, the template assembled from the first and second baffles is divided into two rows. The first, second, and third baffles are fixed on the slope and the ground, forming a circle for concrete pouring. The first, second, and third baffles are nailed to the ground by fixing posts passing through the first and second fixing plates and corresponding through holes. When assembling the template at the transition layer, the first baffle is installed on one side of the first connecting frame, and the second baffle is installed on the other side of the second connecting frame. The first and second connecting frames are rotated to adjust the angle between the first and second baffles to adapt to different slopes. After adjusting the angle, the first and second baffles are slid separately, and then the first baffle, second baffle, and connecting frame are fixed with fixing posts and nails.
Citation Information
Patent Citations
Disclosed is fair-faced concrete frame channel steel reinforcing device
CN211775793U
Slope concrete construction device
CN217601436U
