Anchoring method and anchoring device for crossing water-rich sand layers

By implanting fixed piles in water-rich sand layers and using casing and inner tube grouting, the anchoring force point was optimized, solving the problems of unstable prestress in the anchoring layer and poor grouting formation, thus achieving stable anchoring effect and grouting efficiency.

CN118087541BActive Publication Date: 2026-11-24JINAN URBAN CONSTRUCTION GROUP CO LTD +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311817575.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2026-11-24
Estimated Expiration
2043-12-27

AI Technical Summary

Technical Problem

When anchoring in water-rich sandy layers, the prestress of the anchoring layer is easily unstable due to slope deformation and changes in groundwater level. Severe water inflow in the borehole leads to poor grouting of the anchor cable. In addition, the micro-displacement and disturbance of some soil layers during the water inflow process results in poor anchoring effect.

Method used

By implanting fixed piles in the anchorage area and using casing drilling and inner tube grouting, the anchorage point is optimized. The inner tube extends into the fixed pile, and grouting is performed after the casing is pulled out, forming a stable grout return channel. Support bars and anti-return bars are used to prevent the anchor from moving and reduce mud intrusion.

Benefits of technology

It achieves stable anchoring in water-rich sand layers, prevents anchor corrosion, reduces grout loss, and improves anchoring stability and grouting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118087541B_ABST
    Figure CN118087541B_ABST
Patent Text Reader

Abstract

This invention relates to the field of civil engineering construction, and particularly to an anchoring method and device for penetrating water-rich sand layers. The anchoring method includes: S1, identifying the area of ​​the water-rich sand layer within the slope and determining the anchoring area in the strata; S2, implanting a fixed pile in the anchoring area; S3, drilling a hole in the slope using a casing, inserting the fixed pile into the casing, and performing hole washing; S5, installing a detachable inner tube inside the casing, extending the anchor through the inner tube into the fixed pile, and pulling the casing outwards a predetermined distance, with the ends of the casing and inner tube located at the section of the fixed pile facing the borehole opening; S6, removing the casing; S7, grouting the inside of the inner tube. This invention effectively solves the problems existing in the prior art by optimizing the anchoring force point of the anchor rod and using an inner tube for grouting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of civil engineering construction, and in particular to an anchoring method and anchoring device for penetrating water-rich sand layers. Background Technology

[0002] During foundation pit construction, it is often necessary to pre-anchor the slope of the pit. For shallow foundation pit support, anchor bolts or anchor cables are often used to anchor the pit in the stratum. Among these methods, grouting anchoring is a common anchoring method. Existing grouting anchoring technology involves drilling a hole at the anchoring location, cleaning the hole, inserting the anchor bolt or anchor cable, and then grouting for anchoring.

[0003] During the construction of the underground integrated pipe gallery foundation pit of the Yellow River North Expressway, the applicant encountered water-rich sand layers in some construction sections due to the high sand content of the strata and the high groundwater level. The following problems occurred when anchoring in the water-rich sand layers: the anchoring layer was easily disturbed by slope deformation and groundwater level changes, resulting in unstable prestressing of the anchor cables; severe water inflow during drilling resulted in poor grouting of the anchor cables; and the slight displacement of quicksand in some soil layers during drilling further contributed to poor anchoring effect.

[0004] Therefore, there is an urgent need to improve existing anchoring technologies to achieve stable anchoring in water-rich sand layers. Summary of the Invention

[0005] To address the aforementioned technical problems, this invention provides an anchoring method and device for penetrating water-rich sand layers. By optimizing the anchoring point of the anchor rod and using an inner tube for grouting, the problems existing in the prior art are effectively solved.

[0006] To solve the above problems, the present invention provides an anchoring method for penetrating water-rich sand layers, comprising: S1, identifying the area of ​​water-rich sand layers within the slope, and determining the anchoring area in the strata;

[0007] S2. Install fixing piles in the anchoring area;

[0008] S3. Drill holes through casing on the slope, insert the casing into the fixed pile, and perform hole washing operation.

[0009] S5. A separable inner tube is installed inside the casing. The anchor is inserted into the inner tube and extends into the fixed pile. The casing is pulled out a set distance. The ends of the casing and the inner tube are located at the section of the fixed pile facing the borehole opening.

[0010] S6. Remove the sleeve;

[0011] S7. Grouting into the inner side of the inner pipe.

[0012] Furthermore, S2 includes:

[0013] The first pile body is formed by jet grouting from the ground to the anchoring area.

[0014] Furthermore, after drilling the S3 casing into the fixed pile, the process includes: extending the jet grouting drill rod into the casing, and then jet grouting the jet grouting drill rod through the first pile body to form a second pile body on the side of the first pile body away from the borehole opening, with the first pile body and the second pile body forming the fixed pile.

[0015] Furthermore, the length of the second pile is greater than or equal to 2m, and the distance between the deepest point of the casing drilled into the second pile and the edge of the second pile away from the borehole opening is greater than or equal to 0.3m.

[0016] Furthermore, the anchor is connected to the inner tube, and the anchor and the inner tube extend together into the sleeve.

[0017] The present invention also provides an anchoring device, including an anchor and an inner tube. One end of the anchor forms an anchoring end, and the inner tube can be sleeved on the outside of the anchor, with the anchoring end of the inner tube extending out of the inner tube. A slurry return channel is formed between the inner tube and the anchor. The anchor and the inner tube are connected by a support rib.

[0018] Furthermore, the support rib includes a fixing ring fixed to the anchor and a plurality of support rods spaced apart around the edge of the fixing ring; the fixing ring is also provided with a check rib on the side of the support rod facing the anchor end, the check rib being arranged such that when the check rib is inside the sleeve, the check rib folds and contracts, and when the check rib extends outside the sleeve, the check rib extends outward.

[0019] Furthermore, a rubber sleeve is provided at one end of the inner tube facing the anchoring end, and the outer end of the check rib abuts against the inner end of the rubber sleeve.

[0020] Furthermore, the check rib is configured as a metal elastic check rib, and the check rib is configured in an arc shape.

[0021] Furthermore, the outer surface of the outer end of the check rib is provided with protruding teeth.

[0022] The beneficial effect of this invention is that by optimizing the anchoring point of the anchor bolt and using an inner tube for grouting, the problems existing in the prior art are effectively solved. Attached Figure Description

[0023] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this invention, illustrate exemplary embodiments of the invention and are used to explain the invention, but do not constitute an undue limitation of the invention. In the drawings:

[0024] Figure 1This is a schematic diagram of the structure of jet grouting drill rod operation after casing drilling according to an embodiment of the present invention.

[0025] Figure 2 for Figure 1 The illustrated embodiment shows a schematic diagram of the structure in which the anchor and inner tube are placed inside the sleeve.

[0026] Figure 3 for Figure 2 A magnified schematic diagram of the structure at point A in the middle.

[0027] Figure 4 for Figure 3 The diagram shown is a structural schematic of the part after the inner check rib extends out of the sleeve.

[0028] Figure 5 for Figure 3 The diagram shows the structure after the sleeve has been pulled out.

[0029] Figure 6 for Figure 5 A partial cross-sectional view of the structure after removing the rubber sleeve in the middle BB direction.

[0030] Among them: 1. Fixed pile; 101. First pile body; 102. Second pile body; 2. Sleeve; 3. Inner tube; 4. Jet grouting drill rod; 5. Anchor; 501. Anchor end; 7. Fixing ring; 8. Support rod; 9. Check bar; 10. Rubber sleeve; 11. Convex tooth. Detailed Implementation

[0031] To more clearly illustrate the overall concept of the present invention, a detailed description will be provided below with reference to the accompanying drawings and examples.

[0032] It should be noted that many specific details are set forth in the following description in order to provide a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the scope of protection of the present invention is not limited to the specific embodiments disclosed below.

[0033] Furthermore, in the description of this invention, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0034] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral unit; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. However, specifying a direct connection indicates that the two connected entities do not establish a connection relationship through an intermediate structure, but are simply connected to form a whole through a connecting structure. For those skilled in the art, the specific meaning of the above terms in this invention can be understood according to the specific circumstances.

[0035] In this invention, unless otherwise expressly specified and limited, the first feature "on" or "below" the second feature may be in direct contact with the first and second features, or indirect contact through an intermediate medium. In the description of this specification, references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0036] In this invention, such as Figure 1-6 As shown, an anchoring method for penetrating a water-rich sand layer is provided, comprising: S1, identifying the area of ​​the water-rich sand layer within the slope and determining the anchoring area in the strata; S2, implanting a fixed pile 1 in the anchoring area; S3, drilling a hole in the slope through a casing 2, inserting the fixed pile 1 into the casing 2, and performing hole washing operations; S5, installing a separable inner tube 3 inside the casing 2, inserting the anchor 5 through the inner tube 3 and extending it into the fixed pile 1, and pulling the casing 2 outward by a set distance, with the ends of the casing and the inner tube 3 located at the section of the fixed pile 1 facing the borehole opening; S6, removing the casing 2;

[0037] S7. Grout the inside of inner pipe 3.

[0038] In the anchoring method of this invention, a preliminary geological survey or ground drilling exploration is conducted to determine whether the area to be anchored is a water-rich sand layer, and the anchoring area is determined. A fixing pile 1 is pre-installed in the anchoring area. A hole is drilled into the anchor pile on the slope. An inner tube 3 is installed inside the casing 2. After the anchor 5 is inserted into the borehole, the casing 2 is removed, and grouting is performed. During the grouting process, the grout flowing out of the borehole is pure grout. Through this operation, the technical effect of this invention is as follows:

[0039] Firstly, during the grouting and anchoring process, one end of the inner tube 3 extends directly into the borehole of the fixed pile 1, while the other end can pass through the water-rich sand layer or exit the outside of the borehole. External water, sand, and mud are less likely to disturb the grout, making the grout anchoring in the fixed pile 1 stable. Furthermore, the grout forming in the inner tube 3 is stable, preventing corrosion damage caused by the anchor 5 not being wrapped by mud.

[0040] Secondly, by using the implanted fixed piles as anchoring points in the strata, compared with the direct anchoring method in the soil layer of water-rich sand, the fixed pile 1 has less displacement and deformation when disturbed, thus further achieving stable anchoring.

[0041] Third, during the grouting and anchoring stage of anchor 5, less grout flows out of the water-rich sand layer, which can save grout.

[0042] Preferably, the anchor 5 can be an existing anchor bolt or anchor cable.

[0043] In a preferred embodiment, a further optimization of the present invention is that S2 includes: jet grouting the ground into the anchoring area to form a first pile body 101.

[0044] As shown in the figure, the first pile 101 is formed by ground jet grouting. The first pile 101 extends vertically and can penetrate stable strata. Furthermore, the first pile 101 has a large vertical dimension, so it is less prone to significant displacement when the strata are disturbed by water level or slope deformation, further stabilizing the strata. Moreover, ground jet grouting is easy to perform and can form local water-blocking walls through continuous jet grouting, reducing water inflow towards the slope of the foundation pit.

[0045] In a preferred embodiment, a further optimization of the present invention is that after the S3 casing 2 is drilled into the fixed pile 1, the following steps are taken: the jet grouting drill rod 4 is inserted into the casing 2, and the jet grouting drill rod passes through the first pile body 101 and then jet grouts the second pile body 102 on the side of the first pile body 101 away from the hole opening, and the first pile body 101 and the second pile body 102 form the fixed pile 1.

[0046] As shown in the figure, the second pile body 102 can extend the size of the fixed pile 1 in the drilling extension direction to increase the anchorage length of the anchor 5.

[0047] In a preferred embodiment, a further optimization of the present invention is that the length of the second pile body 102 is greater than or equal to 2m, and the distance between the deepest position of the casing 2 drilled into the second pile body 102 and the edge of the second pile body 102 away from the borehole is greater than or equal to 0.3m.

[0048] In a preferred embodiment, a further optimization of the present invention is that the anchor 5 is connected to the inner tube 3, and the anchor 5 and the inner tube 3 extend together into the sleeve 2. This arrangement allows the anchor 5 to be connected to the inner tube 3 from outside the slope, ensuring a stable connection between the anchor 5 and the inner tube 3, and preventing the inner tube 3 from being pulled outwards when the sleeve 2 is pulled out.

[0049] The present invention also provides an anchoring device, including an anchor 5 and an inner tube 3. One end of the anchor 5 forms an anchoring end 501. The inner tube 3 can be sleeved on the outside of the anchor 5, and the anchoring end 501 of the inner tube 3 extends out of the inner tube 3. A slurry return channel is formed between the inner tube 3 and the anchor 5. The anchor 5 and the inner tube 3 are connected by a support rib.

[0050] The anchoring device of the present invention can be applied in the above-mentioned anchoring method. After the anchor 5 and the inner tube 3 are fixed by the support bar, the anchor 5 can be extended from the sleeve 2, and the anchoring end 501 of the anchor 5 can be extended into the borehole of the fixed pile 1. After the sleeve 2 is pulled out, when grouting is injected into the borehole of the fixed pile 1, the grout can flow from the inner tube 3 towards the slope opening to promote the replacement of the internal mud by the grout.

[0051] In a preferred embodiment, a further optimization of the present invention is that the supporting rib includes a fixing ring 7 fixed to the anchor 5 and a plurality of supporting rods 8 spaced apart around the edge of the fixing ring 7; the fixing ring 7 is also provided with a check rib 9 on the side of the supporting rod 8 facing the anchor end 501, the check rib 9 being arranged such that when the check rib 9 is located inside the sleeve 2, the check rib 9 folds and contracts, and when the check rib 9 extends outside the sleeve 2, the check rib 9 extends outward.

[0052] As shown in the figure, by setting up supporting ribs, the anchor 5 can be stably connected to the inner tube 3, so that the anchor 5 can drive the inner tube 3 to move. By setting up a check rib 9, after the check rib 9 extends out of the sleeve 2, it can abut against the inner wall of the borehole of the fixed pile 1 to fix it, so as to further fix the anchor 5 in the borehole of the fixed pile 1 and prevent the anchor 5 from moving outward.

[0053] In the illustrated embodiment, a further optimization of the present invention is that a rubber sleeve 10 is provided at one end of the inner tube 3 facing the anchoring end 501, and the outer end of the check rib 9 abuts against the inner end of the rubber sleeve 10.

[0054] As shown in the figure, a rubber sleeve 10 is installed. After the inner tube 3 extends out of the sleeve 2, the check rib 9 extends outward, causing the rubber sleeve 10 to extend further. During grouting in the fixed pile 1, as the grout flows back towards the borehole, the rubber sleeve 10 is further expanded and comes into contact with the inner wall of the borehole in the fixed pile 1. This further prevents mud and sand in the water-rich sand layer from entering the borehole of the fixed pile 1, and also reduces grout leakage into the soil layer during the grouting process.

[0055] In the illustrated embodiment, more specifically, as shown in the figure, the check rib 9 is configured as a metal elastic check rib 9, and the check rib 9 is configured in an arc shape.

[0056] The metal check bar 9 can be folded, contracted, and extended outward by utilizing the elastic deformation capacity of the metal itself. The structure of the check bar 9 is stable. When the check bar 9 abuts against the inner wall of the borehole of the fixed pile 1, and when the anchor 5 has a tendency to move outward, the check bar 9 is roughly arched, which can effectively suppress the outward movement of the anchor 5.

[0057] In optional embodiments, other forms can also be used for the setting of the check rib 9, such as the check rib 9 being set in the fixed ring 7 in a hinged form, and a torsion spring or spring being set between the check rib 9 and the fixed ring 7, the torsion spring or spring providing the force for the check rib 9 to extend outward.

[0058] In the illustrated embodiment, a further optimization of the present invention is that, as shown in the figure, the outer surface of the outer end of the check bar 9 is provided with protruding teeth 11. As shown in the figure, the protruding teeth 11 allow the check bar 9 to abut against the inner wall of the borehole when it extends into the borehole of the fixed pile 1, thereby further increasing the resistance to the movement of the check bar 9 toward the slope opening and further improving the check stability of the check bar 9.

[0059] In the illustrated embodiment, the connection between the rubber hose and the check rib 9 is preferably achieved by bonding.

[0060] In the above embodiments, for grouting operations, preferably, the anchor 5 can be a grouting anchor 5, such as an anchor rod or anchor cable with a grouting pipe; or, a separate grouting pipe can be used, which is connected to the anchor 5 and inserted together.

[0061] The various embodiments in this specification are described in a progressive manner. Similar or identical parts between embodiments can be referred to interchangeably. Each embodiment focuses on describing the differences from other embodiments. In particular, the system embodiments are basically similar to the method embodiments, so the description is relatively simple; relevant parts can be referred to the descriptions in the method embodiments.

[0062] The above description is merely an embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principle of this application should be included within the scope of the claims of this application.

Claims

1. An anchoring device, characterized in that, It includes an anchor and an inner tube. The inner tube is fitted inside the casing. One end of the anchor forms an anchoring end. The inner tube can be fitted outside the anchor, and the anchoring end of the anchor extends out of the inner tube. A slurry return channel is formed between the inner tube and the anchor. The anchor is connected to the inner tube by a support rib; The supporting rib includes a fixing ring fixed to the anchor and a plurality of supporting rods spaced apart around the edge of the fixing ring; The fixing ring is also provided with a check rib on the side of the support rod facing the anchor end. The check rib is arranged such that when the check rib is inside the sleeve, the check rib folds and contracts, and when the check rib extends outside the sleeve, the check rib extends outward. A rubber sleeve is provided at one end of the inner tube facing the anchoring end, and the outer end of the check rib abuts against the inner end of the rubber sleeve.

2. The anchoring device according to claim 1, characterized in that, The check rib is a metal elastic check rib, and the check rib is arc-shaped.

3. The anchoring device according to claim 1, characterized in that, The outer surface of the outer end of the check rib is provided with protruding teeth.

4. An anchoring method for penetrating water-rich sand layers, using the anchoring device described in any one of claims 1 to 3, characterized in that, include: S1. Identify the water-rich sand layer within the slope and determine the anchorage area in the strata. S2. Install fixing piles in the anchoring area; S3. Drill holes through casing on the slope, insert the casing into the fixed pile, and perform hole washing operation. S5. A separable inner tube is installed inside the casing. The anchor is inserted into the inner tube and extends into the fixed pile. The casing is pulled out a set distance. The ends of the casing and the inner tube are located at the section of the fixed pile facing the borehole opening. S6. Remove the sleeve; S7. Grouting into the inner side of the inner pipe.

5. The anchoring method for penetrating water-rich sand layers according to claim 4, characterized in that, S2 includes: The first pile body is formed by jet grouting from the ground to the anchoring area.

6. The anchoring method for penetrating water-rich sand layers according to claim 5, characterized in that, After the S3 casing is drilled into the fixed pile, the following steps are included: The jet grouting drill rod is inserted into the casing, and after passing through the first pile body, a second pile body is formed by jet grouting on the side of the first pile body away from the borehole. The first pile body and the second pile body form the fixed pile.

7. The anchoring method for penetrating water-rich sand layers according to claim 6, characterized in that, The length of the second pile is greater than or equal to 2m, and the distance between the deepest point of the casing drilled into the second pile and the edge of the second pile away from the borehole opening is greater than or equal to 0.3m.

8. The anchoring method for penetrating water-rich sand layers according to claim 7, characterized in that, The anchor is connected to the inner tube, and the anchor and the inner tube extend into the sleeve together.

Citation Information

Patent Citations

  • Umbrella-shaped anti-floating anchor rod device and using method

    CN113202092A

  • Grouting reinforcement method for water-rich sand layer anchor cable construction

    CN115110977A

  • Coastal area deep foundation pit anchor cable construction device and construction method

    CN116905513A

  • Method of constructing ground anchor in soft ground

    JP1997184137A