Guardrail device, guard system and guardrail installation method

By designing guide components and guardrail components, the problem of cumbersome disassembly and assembly of guardrail structures has been solved, enabling rapid installation and efficient construction.

CN118087909BActive Publication Date: 2026-11-24SANY CONSTR TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410435586.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2026-11-24
Estimated Expiration
2044-04-11

AI Technical Summary

Technical Problem

The existing guardrail structure involves numerous and time-consuming steps during installation and dismantling, which affects the construction period.

Method used

The design incorporates guide components and guardrail components. The guide components are detachably mounted on the wall, while the guardrail components include a support section, a protective section, and a locking component. Through the sliding cooperation of the guide structure and the use of the locking component, the guardrail can be quickly deployed and fixed.

Benefits of technology

This reduces the number of material transfers and steps during guardrail installation, improves construction efficiency, and reduces the risk of high-altitude operations for workers and construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118087909B_ABST
    Figure CN118087909B_ABST
Patent Text Reader

Abstract

This invention relates to the field of building construction technology, and discloses a guardrail device, a protective system, and a guardrail installation method. The guardrail device includes: a guide component with a guide structure; and a guardrail component movably disposed on the guide component. The guardrail component includes several support parts, several protective parts, and several locking components. Each protective part connects to any two adjacent support parts. The support parts slide in cooperation with the guide structure, and the locking components are disposed on the corresponding support parts. This invention can greatly shorten the length of the guardrail component by folding the protective parts. After the guardrail component is transported as a whole to the upper end of the wall and engaged with the guide component, the operator can quickly unfold the protective parts by moving the support parts along the guide direction of the guide component. After the support parts are fixed by the locking components, a protective strip is formed. This reduces the number of times materials need to be transferred during guardrail installation and also reduces the steps required for the guardrail installation process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, specifically to guardrail devices, protective systems, and guardrail installation methods. Background Technology

[0002] In order to ensure the safety of construction projects, safety protection devices are usually installed along the edges of the building outline. This is especially true in prefabricated concrete structures, where guardrails are required at the top of the exterior walls using precast shear wall components.

[0003] Currently, existing guardrail structures are typically formed by connecting multiple mesh panels and multiple posts. The posts need to be individually fixed to the top of the exterior wall by operators, and then the corresponding mesh panels are connected to the posts on one side by bolts. Since the posts and mesh panels are independent components, and operators also need to manually install them on the top of the exterior wall, the installation and dismantling of the guardrail structure involves many steps and is time-consuming, thus slowing down the construction period. Summary of the Invention

[0004] In view of this, the present invention provides a guardrail device, a protective system, and a guardrail installation method to solve the problem of numerous steps and long time consumption when disassembling and assembling existing guardrail structures.

[0005] In a first aspect, the present invention provides a guardrail device, comprising: a guide assembly having a guide structure, the guide assembly being adapted to be detachably mounted on the upper end of a wall; a guardrail assembly movably mounted on the guide assembly, the guardrail assembly including a plurality of support portions, a plurality of protective portions and a plurality of locking components, each protective portion connecting any two adjacent support portions, the support portions slidingly engaging with the guide structure, the protective portions including a plurality of sequentially hinged protective members, the protective portions having an unfolded state that expands as the interval between adjacent support portions increases, and a folded state that folds as the interval between adjacent support portions decreases, the locking components being mounted on corresponding support portions, the locking components having a locked state that fixes the relative position of the support portion and the guide structure, and an unlocked state that allows the support portion to move along the guide structure.

[0006] Beneficial effects: The guardrail device includes a guide assembly and a guardrail assembly. The guardrail assembly components do not require separate installation. By folding the protective section, the length of the guardrail assembly can be greatly shortened. After the guide assembly is installed at the top of the wall, the guardrail assembly is transported as a whole to the top of the wall to cooperate with the guide assembly. At this time, the operator can quickly unfold the protective section by moving the support assembly along the guide direction of the guide assembly. After the support assembly is fixed by the locking assembly, a protective strip is formed. The guardrail device has fewer overall components, which reduces the number of material transfers during guardrail installation and also reduces the steps required for the guardrail installation process. It effectively solves the problem of numerous steps and long time consumption when disassembling and assembling existing guardrail structures.

[0007] In one alternative embodiment, the guide assembly includes a mounting base and a guide rail, the guide rail forming a guide structure and being installed in conjunction with the mounting base, and the support portion includes a support rod and a mating structure, the support rod engaging with the guide structure through the mating structure.

[0008] Beneficial effects: The guide assembly has a simple and reliable structure. The support rod can be smoothly matched with the guide structure through the matching structure. The simple structure also makes it easier for operators to push the support part to move.

[0009] In one alternative embodiment, the guide rail has a guide groove, and the mating structure includes a pulley disposed on a support rod, and / or, the bottom of the guide rail is provided with a guide post, and the mounting base is provided with a guide hole that mates with the guide post.

[0010] Beneficial effects: The guide rail and mounting base can be quickly positioned and installed using the guide post and guide hole, which improves assembly accuracy and shortens assembly time.

[0011] In one alternative embodiment, the mounting base includes a support body and a fixing part, the top of the support body mates with a guide rail, and the support body is fixed to the wall by the fixing part.

[0012] Beneficial effects: The support body connects to the wall by abutting, ensuring reliable fixation while effectively reducing damage to the wall.

[0013] In one optional embodiment, the fixing part includes a fixing frame, a claw, and an abutment structure. The support body is connected to the fixing frame, the claw is fixedly disposed on the fixing frame, the claw has an abutment section that mates with one side of the wall, and the abutment structure is movably disposed on the fixing frame, the abutment structure having an abutment surface that mates with the other side of the wall.

[0014] Beneficial effects: After the clips are engaged with one side of the wall, the other side of the engagement structure is continuously moved toward the wall and engaged tightly with the wall to complete the fixing. The operation is simple and quick, and a single operator can complete the fixing process.

[0015] In one optional embodiment, the locking assembly includes a pull rod, two locking members, and a clamping member. The lower end of the support portion is provided with a through hole for the pull rod to pass through. The two locking members are disposed opposite to each other on both sides of the support rod. Each locking member is movably sleeved on the pull rod. Each locking member has a first locking section that cooperates with the support rod and a second locking section that cooperates with the guide rail. The clamping member is disposed at one end of the pull rod and cooperates with the corresponding locking member.

[0016] Beneficial effects: By pulling the lever with the clamping component, the guide rail and support rod can be fixed by the locking components on both sides. The fixing method is simple and reliable, and the fixing process is convenient and quick.

[0017] In one alternative embodiment, the clamping member is oscillatingly disposed on the pull rod. The clamping member includes a handle end and an eccentric end. One end of the pull rod is provided with a swing shaft along its own radial direction. The eccentric end is provided with a mating hole that mates with the swing shaft. And / or, the walls on both sides of the guide rail are provided with slots. The second locking section has locking teeth that mate with the slots.

[0018] Beneficial effects: The engagement state of the clamping parts can be changed by pressing down and lifting the handle end. The structure is simple and reliable, and the engagement of the teeth and grooves makes the fixation more reliable and secure.

[0019] In one alternative embodiment, the top of the support is provided with a lifting hole, and / or the number of protective members between two adjacent support members is even, and the width of the protective member connected to the support member is half the width of the protective member located in the middle.

[0020] Beneficial effects: The lifting holes here allow for the installation of slings or booms, making lifting easier. This type of protective part has a more uniform structure when folded, and is less prone to shifting during lifting.

[0021] Secondly, the present invention also provides a protection system comprising: the above-described guardrail device.

[0022] Thirdly, the present invention also provides a guardrail installation method. Using the above-mentioned guardrail device, the guardrail installation method includes: installing the guardrail device with the protective part in a folded state to the upper end of the wall; unfolding the protective part to an unfolded state to form a protective strip; and fixing the support part of the guardrail component to its own position by a corresponding locking component.

[0023] Beneficial effects: By setting the protective part to a folded state, the guardrail device with a long protective distance can be reduced to a smaller length. After the guardrail device is transported directly to the top of the wall and unfolded and fixed, it can directly form a protective strip. The installation process is simple and quick, requiring only a few operators to install quickly. This reduces the installation risk for operators and can also effectively improve the construction cycle.

[0024] In one alternative embodiment, the guide assembly includes a mounting base and a guide rail, the guide rail forming a guide structure, and the mounting base and the guide rail being mounted together. The step of installing the guardrail device with the protective part in a folded state to the upper end of the wall includes: fixing the mounting base to the upper end of the wall; assembling the guardrail assembly and folding the protective part of the guardrail assembly to a folded state; and mounting the guide rail and the guardrail assembly on the mounting base.

[0025] Beneficial effects: Compared with integrated columns and mesh panels, the installation process of the mounting base is simpler and faster, which can effectively simplify the installation steps for operators on the top of the wall.

[0026] In one alternative embodiment, the step of assembling the guardrail assembly and folding the protective part of the guardrail assembly to a folded state includes: selecting a corresponding number of support parts and protective parts according to the contour of the wall; assembling a number of support parts, a number of protective parts and a number of locking components and folding the protective part to a folded state.

[0027] Beneficial effects: Guardrail components can be assembled in advance, eliminating the need for guardrail installation time, reducing installation risks for operators, and improving the installation and construction cycle of guardrails.

[0028] In one alternative embodiment, after assembling the guardrail assembly and folding the protective portion of the guardrail assembly to a folded state, the method further includes: engaging the support portion with a corresponding guide rail; adjusting the locking component to a locked state to form an assembly assembly; and installing the guide rail and guardrail assembly on the mounting base, which includes: transporting the assembly assembly to the upper end of the wall and assembling the guide rail of the assembly assembly with the corresponding mounting base.

[0029] Beneficial effects: The guide rail can constrain the bottom of the guardrail assembly in the stored state, so that the guardrail assembly and the guide rail together form an integral assembly. When the assembly is lifted by hoisting equipment, the assembly is less likely to shake, making the hoisting process more stable and reliable.

[0030] In one alternative embodiment, the steps of transporting the assembly assembly to the upper part of the wall and assembling the guide rail of the assembly assembly with the corresponding mounting base include: passing the lifting rod through the lifting hole at the top of the support part in the assembly assembly in sequence; transporting the assembly assembly to the upper part of the wall by connecting the lifting equipment to the lifting rod; engaging the guardrail assembly and the guide assembly of the assembly assembly; and pulling the lifting rod out of the lifting hole.

[0031] Beneficial effects: By cooperating with the lifting holes at the top of the support structure, when the lifting equipment is hoisted, the guardrail assembly is subjected to uniform force, which can effectively avoid damage to the guardrail assembly during the hoisting process.

[0032] In one alternative embodiment, the step of unfolding the protective part to the unfolded state to form a protective strip includes: adjusting at least a portion of the locking component from a locked state to an unlocked state; moving at least a portion of the support rod of the support part along the guide structure of the guide component and unfolding the protective part to the unfolded state; and adjusting at least a portion of the locking component of the support rod from the unlocked state to the locked state.

[0033] Beneficial effects: The guardrail components can be used with buildings of any shape and shape. The unfolding and fixing process of the protective parts is simple and quick. The entire installation can be completed by only one operator. Not only is the installation process simple and quick, but the overall integrity and adaptability of the guardrail components are also higher. Attached Figure Description

[0034] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0035] Figure 1 This is a three-dimensional schematic diagram of a guardrail device according to an embodiment of the present invention, with the protective part in a folded state after assembly.

[0036] Figure 2 for Figure 1 The diagram shows a three-dimensional representation of the guardrail device after assembly, showing the protective section changing from a folded state to an unfolded state.

[0037] Figure 3 for Figure 1 A 3D schematic diagram of the guardrail components shown;

[0038] Figure 4 for Figure 3 The side view of the guardrail assembly shown;

[0039] Figure 5 for Figure 3 A three-dimensional schematic diagram of the guardrail assembly in its deployed state;

[0040] Figure 6 for Figure 5 The diagram shown is a three-dimensional representation of the protective section in a folded state.

[0041] Figure 7 for Figure 3 A three-dimensional schematic diagram of the support portion of the guardrail assembly shown;

[0042] Figure 8 for Figure 1A schematic diagram of the guardrail device when the locking component is in the unlocked state;

[0043] Figure 9 for Figure 8 A schematic diagram of the locking components of the guardrail device in the locked state;

[0044] Figure 10 for Figure 8 The diagram shown is a three-dimensional representation of the locking assembly in its assembled state.

[0045] Figure 11 for Figure 10 An exploded view of the locking assembly is shown below;

[0046] Figure 12 for Figure 1 A three-dimensional schematic diagram of the mounting base of the guide component of the guardrail device after assembly;

[0047] Figure 13 for Figure 12 A three-dimensional schematic diagram of the mounting bracket from a first-view perspective;

[0048] Figure 14 for Figure 12 A three-dimensional schematic diagram of the mounting base from a second perspective;

[0049] Figure 15 for Figure 1 A three-dimensional schematic diagram of the guide assembly of the guardrail device shown;

[0050] Figure 16 for Figure 15 Side view of the guide rail of the guide assembly shown;

[0051] Figure 17 for Figure 1 The diagram shows a three-dimensional representation of the guardrail device during transport.

[0052] Explanation of reference numerals in the attached figures:

[0053] 1. Guide assembly; 101. Mounting base; 1011. Support body; 1012. Fixing bracket; 1013. Claw; 1014. First abutment structure; 1015. Second abutment structure; 1016. Guide hole; 102. Guide rail; 1021. Guide structure; 1022. Guide post; 1023. Slot;

[0054] 2. Guardrail assembly; 201. Support unit; 2011. Support rod; 2012. Fitting structure; 2013. Through hole; 2014. Lifting hole; 202. Protective unit; 2021. Protective component; 2022. Hinge;

[0055] 3. Locking assembly; 301. Pull rod; 3011. Swing shaft; 302. Locking element; 3021. First locking section; 3022. Second locking section; 3023. Clamping tooth; 303. Pressing element; 3031. Handle end; 3032. Eccentric end; 3033. Mating hole; 304. Nut; 305. Washer;

[0056] 4. Wall; 5. Hanging rod; 6. Sling. Detailed Implementation

[0057] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0058] The following is combined Figures 1 to 17 The following describes embodiments of the present invention.

[0059] According to an embodiment of the present invention, in one aspect, a guardrail device is provided, comprising: a guide assembly 1 and a guardrail assembly 2. The guide assembly 1 has a guide structure 1021 and is adapted to be detachably disposed on the upper end of a wall 4. The guardrail assembly 2 is movably disposed on the guide assembly 1. The guardrail assembly 2 includes a plurality of support portions 201, a plurality of protective portions 202, and a plurality of locking components 3. Each protective portion 202 is connected to any two adjacent support portions 201. The support portions 201 are slidably engaged with the guide structure 1021. The protective portions 202 include a plurality of sequentially hinged protective members 2021. The protective portions 202 have an unfolded state that expands as the interval between adjacent support portions 201 increases, and a folded state that folds as the interval between adjacent support portions 201 decreases. The locking components 3 are disposed on the corresponding support portions 201. The locking components 3 have a locked state that fixes the relative position of the support portion 201 and the guide structure 1021, and an unlocked state that allows the support portion 201 to move along the guide structure 1021.

[0060] The guardrail device of this embodiment includes a guide component 1 and a guardrail component 2. The components of the guardrail component 2 do not need to be installed separately. The length of the guardrail component 2 can be greatly shortened by folding the protective part 202. After the guide component 1 is installed on the upper end of the wall 4, the guardrail component 2 is transported as a whole to the upper end of the wall 4 to cooperate with the guide component 1. At this time, the operator can quickly unfold the protective part 202 by moving the moving support part 201 component along the guiding direction of the guide component 1. After the locking component 3 fixes the support part 201, a protective belt is formed. The guardrail device has fewer components, which reduces the number of material transfers during guardrail installation and also reduces the steps required for guardrail installation. It effectively solves the problem of numerous steps and long time consumption when disassembling and assembling existing guardrail structures.

[0061] It should be noted that the specific type of wall 4 mentioned in this embodiment is not limited. Any wall 4 that requires a guardrail to be installed on the top can be equipped with the guardrail device of this embodiment.

[0062] In the relevant technology, the guardrail at the top of wall 4 is formed by connecting multiple mesh panels and multiple posts. If multiple mesh panels and multiple posts are installed on the ground to form a section of guardrail, although this section of guardrail is shorter than the complete guardrail, the overall structure is still longer than a single mesh panel. When a section of guardrail is moved by hoisting equipment, not only does it require repeated hoisting of each section of guardrail, but the section of guardrail is also prone to deflection during the hoisting process. At the same time, the guardrail section is also prone to deformation during the hoisting process, which can lead to structural failure. Therefore, the existing guardrail usually requires the unassembled mesh panels and posts to be hoisted to the top of wall 4 in multiple batches before installation can be carried out. The overall construction process is long and involves many steps, which will slow down the construction period.

[0063] Furthermore, when the existing wire mesh and posts are transported to the upper part of wall 4, the installation of the posts requires at least one operator to stand on the upper part of wall 4 and hold the posts while other operators fix the posts to the upper part of wall 4. Similarly, the installation of the wire mesh also requires at least one operator to stand on the upper part of wall 4 and hold the mesh while other operators use bolts and other fasteners to attach the mesh to adjacent posts. This not only requires multiple operators to spend a long time assembling the mesh on the upper part of wall 4, but also requires multiple bolt and other component installation steps for each wire mesh and post. Bolts and other components are easy to damage, and the long hours required for operators to work on the upper part of wall 4 pose safety hazards.

[0064] The guardrail device of this embodiment includes a guide component 1 and a guardrail component 2. The guide component 1 is used to support and install the guardrail component 2 on the upper end of the wall 4. The guide component 1 needs to be installed on the upper end of the wall 4 by an operator. Compared with conventional mesh panels and posts, the guide component 1 is smaller in size and lighter in weight. No additional operator is needed to hold it during installation. Only one operator is needed to complete the installation. The guardrail component 2 is an integral structure. The support part 201, the protective part 202 and the locking component 3 of the guardrail component 2 can be assembled in advance on the ground or at the factory according to the required protection length. Compared with the existing mesh panels and posts, the integral structure of the guardrail component 2 is not only more reliable, but also eliminates the step of high-altitude assembly by the operator, greatly simplifying the complexity of high-altitude operation, shortening the high-altitude operation time and reducing the risk of the operator's work.

[0065] In addition, since the installation process of the guardrail component 2 of the guardrail device in this embodiment is relatively simple, after the guardrail component 2 is hoisted to the upper end of the wall 4 and cooperates with the corresponding guide component 1, the operator does not need to stand on the top of the wall 4 to assemble them one by one. He only needs to stand on one side of the wall 4, move and unfold the guardrail component 2, and lock the locking component 3 to the locked state to complete the installation process of the guardrail component 2. The fixing operation can be easily and quickly completed by one operator.

[0066] In this embodiment, the guide assembly 1 includes a mounting base 101 and a guide rail 102. The guide rail 102 forms a guide structure 1021 and is installed in conjunction with the mounting base 101. The support part 201 includes a support rod 2011 and a mating structure 2012. The support rod 2011 is mated with the guide structure 1021 through the mating structure 2012. The guide assembly 1 has a simple and reliable structure. The support rod 2011 can be smoothly mated with the guide structure 1021 through the mating structure 2012. The simple structure also makes it easier for operators to move the support part 201.

[0067] In addition, since the mounting base 101 and the guide rail 102 are separate assembly structures, the specific setting position of a single mounting base 101 can be adjusted more flexibly when installing the mounting base 101. When it is inconvenient to install the mounting base 101 in a certain part of the wall 4, the position of the current mounting base 101 can be adjusted. The current mounting base 101 can be moved a predetermined distance along the horizontal extension direction of the wall 4 to avoid it before installation. At this time, the mounting base 101 can also reliably support the guide rail 102. Therefore, the guide component 1 of this embodiment also has the characteristics of strong installation flexibility.

[0068] Specifically, the form of the guide structure 1021 is not limited; it can be a groove-shaped guide structure or an arc-shaped track-shaped guide structure, which can be selected according to the usage requirements. The form of the mating structure 2012 is not limited; it can be a roller, a ball, or a slider with a mating groove.

[0069] Furthermore, such as Figure 1 , Figure 2 as well as Figure 15 As shown, in this embodiment, there are multiple mounting bases 101 and guide rails 102. Multiple mounting bases 101 are spaced apart along the extension direction of the wall 4, and each guide rail 102 cooperates with two adjacent mounting bases 101. The guide rails at the corners of two adjacent walls 4 can be in the form of a bend or an arc corner. Therefore, the guardrail device in this embodiment can also be applied to walls that extend in an arc in the horizontal direction, which has good application flexibility and stronger adaptability.

[0070] In this embodiment, the guide rail 102 has a guide groove, and the cooperating structure 2012 includes a pulley disposed on the support rod 2011. The structure is simple and reliable, and easy to process and manufacture. The guide groove provides more reliable constraint on the support rod 2011 during its movement, thereby improving the structural stability.

[0071] Preferably, such as Figure 8 As shown, the top of the mounting base 101 forms a mounting position, and the guide rail 102 is installed in conjunction with the corresponding mounting position.

[0072] In this embodiment, a guide post 1022 is provided at the bottom of the guide rail 102, and a guide hole 1016 is provided in the mounting base 101 to cooperate with the guide post 1022. The guide rail 102 and the mounting base 101 can be quickly positioned and installed by the guide post 1022 and the guide hole 1016, which improves the assembly accuracy and shortens the assembly time.

[0073] It should be noted that the guide rail 102 and the mounting base 101 are not only fixed by the positioning of the guide post 1022 and the guide hole 1016, but also need to be fixedly connected by other means, such as bolts, nuts, buckles and other structures. The types of fixed connection can adopt existing fixing forms, which will not be elaborated here.

[0074] Specifically, such as Figure 4 and Figure 8 As shown, the bottom wall and the side walls on both sides of the support rod 2011 are provided with mating structures 2012. Since the bottom wall and the side walls on both sides of the support rod 2011 will mate with the guide groove, the mating structures 2012 arranged in this way can ensure that the mating surfaces of the support rod 2011 avoid direct friction with the guide groove.

[0075] In this embodiment, the mounting base 101 includes a support body 1011 and a fixing part. The top of the support body 1011 cooperates with the guide rail 102. The support body 1011 is fixed to the wall 4 by the fixing part. The support body 1011 is connected to the wall 4 by abutting, which ensures the reliability of the fixation and can effectively reduce the damage to the wall 4.

[0076] Specifically, wall 4 is the outer wall of a precast shear wall component. This type of wall 4 usually includes an inner panel and an outer panel. The installation position of the guardrail device in this embodiment is not strictly limited. It can be set on the inner panel or the outer panel, and can be flexibly selected according to the needs. Preferably, the guardrail device in this embodiment is set on the top of the outer panel of wall 4.

[0077] In this embodiment, the fixing part includes a fixing frame 1012, a claw 1013, and an abutment structure. The support body 1011 is connected to the fixing frame 1012. The claw 1013 is fixedly installed on the fixing frame 1012. The claw 1013 has an abutment section that engages with one side of the wall 4. The abutment structure is movably installed on the fixing frame 1012. The abutment structure has an abutment surface that engages with the other side of the wall 4. After the claw 1013 engages with one side of the wall 4, the abutment structure on the other side is continuously moved toward the wall 4 and tightly abuts against the wall 4, thus completing the fixing. The operation process is simple and quick, and a single operator can complete the fixing process.

[0078] It is understandable that, as an alternative implementation, the claw 1013 may not be provided and both sides may be abutment structures.

[0079] Specifically, there are no restrictions on the form and number of the abutment structure. The number can be one or more, and the abutment structure can be in the form of a plate, block, or column, etc., which can be selected according to the needs.

[0080] Furthermore, such as Figure 13 and Figure 14 As shown, the abutting structure includes a first abutting structure 1014 and a second abutting structure 1015 arranged vertically. The first abutting structure 1014 and the second abutting structure 1015 are movably arranged on the fixing frame 1012. The first abutting structure 1014 has a first abutting surface that cooperates with the other side wall surface of the wall 4, and the second abutting structure 1015 has a first abutting surface that cooperates with the other side wall surface of the wall 4.

[0081] The bottom of the fixing frame 1012 is provided with a first mating seat for the first abutting structure 1014 to pass through. The first abutting structure 1014 is a fastening bolt. The bottom of the fixing frame 1012 is provided with a second mating seat for the second abutting structure 1015 to pass through. The first abutting structure 1014 is an abutting plate with a threaded rod.

[0082] In this embodiment, the locking assembly 3 includes a pull rod 301, two locking members 302, and a clamping member 303. The lower end of the support part 201 is provided with a through hole 2013 for the pull rod 301 to pass through. The two locking members 302 are arranged opposite to each other on both sides of the support rod 2011. Each locking member 302 is movably sleeved on the pull rod 301. Each locking member 302 has a first locking section 3021 that cooperates with the support rod 2011, and each locking member 302 also has a second locking section 3022 that cooperates with the guide rail 102. The clamping member 303 is arranged at one end of the pull rod 301 and cooperates with the corresponding locking member 302. By pulling the pull rod 301 with the clamping member 303, the guide rail 102 and the support rod 2011 can be fixed by the locking members 302 on both sides. The fixing method is simple and reliable, and the fixing process is convenient and quick.

[0083] In this embodiment, the clamping member 303 is oscillatingly disposed on the pull rod 301. The clamping member 303 includes a handle end 3031 and an eccentric end 3032. One end of the pull rod 301 is provided with a swing shaft 3011 along its own radial direction. The eccentric end 3032 is provided with a mating hole 3033 that mates with the swing shaft 3011. The mating state of the clamping member 303 can be changed by pressing down and lifting the handle end 3031. The structure is simple and reliable.

[0084] It should be noted that the eccentric end 3032 refers to eccentric structures such as cams and eccentric wheels.

[0085] In this embodiment, the walls on both sides of the guide rail 102 are provided with slots 1023, and the second locking section 3022 has teeth 3023 that cooperate with the slots 1023. The cooperation between the teeth 3023 and the slots 1023 makes the fixation more reliable and secure.

[0086] Specifically, such as Figures 9 to 11 As shown, the locking assembly 3 also includes a nut 304 and a washer 305. The end of the pull rod 301 without the clamping member 303 is threaded, and the nut 304 engages with the corresponding thread. The nut 304 abuts against the locking member 302 on one side through the washer 305. The end of the pull rod 301 with the swing shaft 3011 is also fitted with a washer 305. The eccentric end 3032 of the clamping member 303 abuts against the locking member 302 on the same side through the washer 305.

[0087] Furthermore, such as Figure 10 and Figure 11 As shown, the outer wall of the handle end 3031 of the clamping member 303 is also provided with anti-slip texture to increase the friction when it is used with the operator's hand, making it easier for the operator to use.

[0088] In this embodiment, the top of the support 201 is provided with a lifting hole 2014, through which a sling or a boom 5 can be passed, making it easier to lift.

[0089] Specifically, such as Figure 7 As shown, the location of the lifting hole 2014 is not strictly limited. An annular lifting hole can be independently provided at the top of the support part 201, or a pile hole can be formed at the top of the support part 201. Additionally, each support part 201 has a lifting hole 2014 at its top, such as... Figure 17 As shown, after the boom 5 passes through each lifting hole 2014, the lifting equipment can directly cooperate with both ends of the boom 5. The boom 5 is the main component that bears the bending moment during the lifting process, which can ensure that the guardrail assembly 2 is subjected to uniform force during the lifting process and prevent the guardrail assembly 2 from deforming during the lifting process.

[0090] In this embodiment, the number of protective members 2021 between two adjacent support portions 201 is even, and the width of the protective member 2021 connected to the support portion 201 is half the width of the middle protective member 2021, such as... Figure 6 As shown, this type of protective part 202 has a more uniform structure when folded, and is less prone to displacement during hoisting.

[0091] Specifically, the number of protective components 2021 between two adjacent support parts 201 can also be odd, and there is no strict limitation here.

[0092] Furthermore, such as Figure 6 As shown, the protective component 2021 is connected to the adjacent component via hinges 2022. The protective component 2021 can rotate 360 ​​degrees, providing good flexibility. Multiple hinges 2022 are provided on both sides of the protective component 2021, making the hinge connection more reliable and the overall integrity better.

[0093] According to an embodiment of the present invention, in another aspect, a protective system is provided, which includes the above-described guardrail device.

[0094] In this embodiment, the protection system also includes necessary protective components such as a warning light structure, a protective structure around the building, and a protective structure at the bottom of the building.

[0095] In this embodiment, the protection system also includes necessary equipment such as storage devices for storing guardrail devices, disassembly and assembly devices for disassembling and assembling guardrail devices, and transfer devices for transferring guardrail devices.

[0096] According to an embodiment of the present invention, in another aspect, a guardrail installation method is provided, using the above-described guardrail device. The guardrail installation method includes:

[0097] Install the guardrail device with the protective part 202 in a folded state onto the upper end of the wall 4; unfold the protective part 202 to the unfolded state to form a protective strip; fix the support part 201 of the guardrail assembly 2 to its own position by the corresponding locking component 3.

[0098] By applying the guardrail installation method of this embodiment, the protective part 202 is set to a folded state, so that the guardrail device with a long protective distance can be reduced to a smaller length. After the guardrail device is directly transported to the upper end of the wall 4 and unfolded and fixed, a protective belt can be directly formed. The installation process is simple and quick, requiring only a few operators to install quickly, reducing the installation risk for operators while effectively improving the construction pace.

[0099] In this embodiment, the guide assembly 1 includes a mounting base 101 and a guide rail 102. The guide rail 102 forms a guide structure 1021, and the mounting base 101 is installed in conjunction with the guide rail 102.

[0100] The steps of installing the guardrail device with the protective part 202 in a folded state onto the upper end of the wall 4 include: fixing the mounting base 101 to the upper end of the wall 4; assembling the guardrail assembly 2 and folding the protective part 202 of the guardrail assembly 2 into a folded state; and installing the guide rail 102 and the guardrail assembly 2 onto the mounting base 101.

[0101] Compared to the integrated column and mesh panel, the installation process of mounting base 101 is simpler and faster, which can effectively simplify the installation steps for operators on the top of wall 4.

[0102] In this embodiment, the steps of assembling the guardrail assembly 2 and folding the protective portion 202 of the guardrail assembly 2 to a folded state include:

[0103] Select the corresponding number of support parts 201 and protective parts 202 according to the outline of the wall 4; assemble the support parts 201, the protective parts 202 and the locking components 3 and fold the protective parts 202 to the folded state.

[0104] The guardrail component 2 can be safely and quickly assembled on the ground or in the factory, without the need for installation work on the top of the wall 4. The guardrail component 2 can be assembled in advance, without taking up guardrail installation time, reducing the installation risk for operators, and also improving the installation and construction cycle of the guardrail.

[0105] In this embodiment, after assembling the guardrail assembly 2 and folding the protective portion 202 of the guardrail assembly 2 to a folded state, the method further includes:

[0106] The support 201 is matched with the corresponding guide rail 102;

[0107] Locking component 3 is locked to form the assembly component;

[0108] The steps of mounting the guide rail 102 and the guardrail assembly 2 on the mounting base 101 include:

[0109] The assembly components are transferred to the upper part of the wall 4 and the guide rail 102 of the assembly components is assembled with the corresponding mounting base 101.

[0110] like Figure 17 As shown, before the guardrail assembly 2 is officially hoisted, the support part 201 is matched with the corresponding guide rail 102 and fixed by the locking component 3. At this time, the guide rail 102 can directly constrain the bottom of the guardrail assembly 2 in the storage state without the need for additional constraint structure. This makes the guardrail assembly 2 and the guide rail 102 form an integral assembly. When the assembly is hoisted by the hoisting equipment, the assembly is not easy to shake, which makes the hoisting process more stable and reliable.

[0111] It should be noted that since some guide rails 102 are integrated with guardrail components 2 to form a whole, these guide rails 102 do not need to be installed separately. They can be moved together with guardrail components 2 to the upper part of the wall 4 for installation. The remaining guide rails 102 can be installed before the guardrail components 2 are hoisted, or they can be installed one by one after the guardrail components 2 are hoisted. This process can be flexibly selected according to the needs.

[0112] In this embodiment, the steps of transporting the assembly assembly to the upper end of the wall 4 and assembling the guide rail 102 of the assembly assembly with the corresponding mounting base 101 include:

[0113] Pass the lifting rod 5 through the lifting hole 2014 at the top of the support part 201 in the assembly assembly in sequence; transfer the assembly assembly to the upper end of the wall 4 by connecting the lifting equipment with the lifting rod 5; mate the guardrail assembly 2 of the assembly assembly with the guide assembly 1; and pull the lifting rod 5 out of the lifting hole 2014.

[0114] By cooperating with the lifting hole 2014 at the top of the support 201 through the structure of the lifting rod 5, when the lifting equipment lifts the lifting rod 5, the guardrail assembly 2 is subjected to uniform force, which can effectively avoid damage to the guardrail assembly 2 during the lifting process.

[0115] In this embodiment, the step of unfolding the protective part 202 to the unfolded state to form a protective strip includes:

[0116] At least a portion of the locking component 3 is switched from the locked state to the unlocked state; at least a portion of the support rod 2011 of the support part 201 is moved along the guide structure 1021 of the guide component 1 and the protective part 202 is unfolded to the unfolded state; at least a portion of the locking component 3 of the support rod 2011 is switched from the unlocked state to the locked state.

[0117] The guardrail component 2 can be used with buildings of any shape. The unfolding and fixing process of the protective part 202 is simple and quick. The entire installation can be completed by only one operator. Not only is the installation process simple and quick, but the overall integrity and adaptability of the guardrail component 2 are also higher.

[0118] Although embodiments of the invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations all fall within the scope defined by the appended claims.

Claims

1. A guardrail device, characterized in that, include: A guide assembly (1) having a guide structure (1021) is adapted to be detachably disposed at the upper end of the wall (4); A guardrail assembly (2) is movably disposed on the guide assembly (1). The guardrail assembly (2) includes a plurality of support parts (201), a plurality of protective parts (202), and a plurality of locking components (3). Each protective part (202) is connected to any two adjacent support parts (201). The support parts (201) are slidably engaged with the guide structure (1021). The protective parts (202) include a plurality of sequentially hinged protective members (2021). The protective parts (202) have an unfolded state that expands as the interval between adjacent support parts (201) increases, and a folded state that folds as the interval between adjacent support parts (201) decreases. The locking components (3) are disposed on the corresponding support parts (201). The locking components (3) have a locked state that fixes the relative position of the support parts (201) and the guide structure (1021), and an unlocked state that allows the support parts (201) to move along the guide structure (1021). The guide assembly (1) includes a mounting base (101) and a guide rail (102). The guide rail (102) forms the guide structure (1021) and is installed in conjunction with the mounting base (101). The support part (201) includes a support rod (2011) and a mating structure (2012). The support rod (2011) is mated with the guide structure (1021) through the mating structure (2012). There are multiple mounting bases (101) and guide rails (102), and the multiple mounting bases (101) are spaced apart along the extension direction of the wall (4).

2. The guardrail device according to claim 1, characterized in that, The guide rail (102) has a guide groove, and the mating structure (2012) includes a pulley disposed on the support rod (2011). And / or, the bottom of the guide rail (102) is provided with a guide post (1022), and the mounting base (101) is provided with a guide hole (1016) that cooperates with the guide post (1022).

3. The guardrail device according to claim 1, characterized in that, The mounting base (101) includes a support (1011) and a fixing part. The top of the support (1011) cooperates with the guide rail (102), and the support (1011) is fixed to the wall (4) through the fixing part.

4. The guardrail device according to claim 3, characterized in that, The fixing part includes a fixing frame (1012), a claw (1013) and an abutment structure. The support body (1011) is connected to the fixing frame (1012). The claw (1013) is fixedly installed on the fixing frame (1012). The claw (1013) has an abutment section that cooperates with one side wall surface of the wall (4). The abutment structure is movably installed on the fixing frame (1012). The abutment structure has an abutment surface that cooperates with the other side wall surface of the wall (4).

5. The guardrail device according to any one of claims 1 to 4, characterized in that, The locking assembly (3) includes a pull rod (301), two locking members (302) and a clamping member (303). The lower end of the support part (201) is provided with a through hole (2013) for the pull rod (301) to pass through. The two locking members (302) are arranged opposite to each other on both sides of the support rod (2011). Each locking member (302) is movably sleeved on the pull rod (301). Each locking member (302) has a first locking section (3021) that cooperates with the support rod (2011) and a second locking section (3022) that cooperates with the guide rail (102). The clamping member (303) is arranged at one end of the pull rod (301) and cooperates with the corresponding locking member (302).

6. The guardrail device according to claim 5, characterized in that, The clamping member (303) is oscillatingly disposed on the pull rod (301). The clamping member (303) includes a handle end (3031) and an eccentric end (3032). One end of the pull rod (301) is provided with a swing shaft (3011) along its own radial direction. The eccentric end (3032) is provided with a mating hole (3033) that mates with the swing shaft (3011). And / or, the walls on both sides of the guide rail (102) are provided with slots (1023), and the second locking section (3022) has teeth (3023) that cooperate with the slots (1023).

7. The guardrail device according to any one of claims 1 to 4, characterized in that, The top of the support (201) is provided with a lifting hole (2014). And / or, the number of protective members (2021) between two adjacent support portions (201) is even, and the width of the protective member (2021) connected to the support portion (201) is half the width of the protective member (2021) located in the middle.

8. A protection system, characterized in that, include: The guardrail device according to any one of claims 1 to 7.

9. A method for installing a guardrail, characterized in that, Using the guardrail device according to claim 1, the guardrail installation method includes: Install the guardrail device with the protective part (202) in a folded state onto the upper end of the wall (4); The protective part (202) is unfolded to form a protective strip; The support part (201) of the guardrail assembly (2) is fixed in position by the corresponding locking component (3).

Citation Information

Patent Citations

  • Edge protection device

    CN108442807A

  • Protective device and connector

    CN219060987U

  • Construction guardrail capable of being quickly disassembled and assembled

    CN220539282U