A three-dimensional model data management system and method for engineering surveying and mapping

CN118094711BActive Publication Date: 2024-10-11SHENZHEN NEW DOMAIN SPATIAL INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410225626.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-11
Estimated Expiration
2044-02-29

Smart Images

  • Figure CN118094711B_ABST
    Figure CN118094711B_ABST
Patent Text Reader

Abstract

The present invention discloses a three-dimensional model data management system and method for engineering surveying and mapping, and relates to the technical field of engineering surveying and mapping. The present invention comprises: S10: determining the construction position in the three-dimensional geological model; S20: predicting the surveying and mapping data of the construction position before construction at the construction position; S30: analyzing the construction difficulty of each construction position according to the construction content and surveying and mapping data of each construction position; S40: determining the construction management strength of each construction position. The present invention predicts the real-time change rate of various surveying and mapping data obtained by surveying and mapping at the construction position, and adjusts the predicted surveying and mapping data according to the correlation between various surveying and mapping data, so as to ensure that accurate and effective surveying and mapping data can be obtained before construction at the construction position, which is conducive to the smooth progress of engineering construction and reduces the delay time of engineering construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering surveying and mapping, and in particular to a three-dimensional model data management system and method for engineering surveying and mapping. Background Art

[0002] Engineering surveying and mapping refers to the surveying and mapping work that surveyors conduct before large-scale engineering construction, in which they draw maps and provide other information. It is a variety of surveying work carried out during the survey, design, construction and management stages of engineering construction.

[0003] Existing 3D model data management systems usually compare known engineering surveying and mapping data with standard construction parameters, and manage and analyze the engineering construction status based on the comparison results. However, they do not consider whether other influencing factors will affect the engineering surveying and mapping data, that is, whether the engineering surveying and mapping data changes over time, and are unable to effectively analyze the engineering construction status based on the known engineering surveying and mapping data, resulting in a lack of effective management during construction, thereby delaying the completion time of the engineering construction.

[0004] Therefore, people are in urgent need of a three-dimensional model data management system and method for engineering surveying and mapping to solve the above technical problems. Summary of the invention

[0005] The object of the present invention is to provide a three-dimensional model data management system and method for engineering surveying and mapping to solve the problems raised in the prior art.

[0006] To achieve the above object, the present invention provides the following technical solution: a three-dimensional model data management method for engineering surveying and mapping, the method comprising:

[0007] S10: constructing a three-dimensional geological model based on the acquired engineering surveying and mapping data, searching for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model, using the found building red line as the coincidence line, and determining the construction position in the three-dimensional geological model;

[0008] S20: predicting the real-time change rate of various surveying and mapping data obtained by surveying and mapping at the construction location, and predicting the surveying and mapping data of the construction location before construction is performed at the construction location based on the prediction result;

[0009] S30: Analyze the construction difficulty of each construction location according to the construction content and surveying data of each construction location;

[0010] S40: Determine the construction management strength of each construction location.

[0011] Further, the S20 includes:

[0012] S201: According to the surveying and mapping data of each construction position, each construction position is divided and processed. In the same construction position, in any divided position, the surveying and mapping data corresponding to each divided position point is the same. A displacement sensor, a pressure sensor, a water level gauge and an electromagnetic sensor are placed at each divided position in the construction position to obtain the surveying and mapping data of each divided position in real time;

[0013] S202: Calculate the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment. If the difference corresponding to each type of surveying and mapping data is within the error range, it means that the real-time change rate of each type of surveying and mapping data obtained at the construction location is 0.

[0014] S203: When the difference values ​​corresponding to various types of surveying and mapping data are not within the error range, the real-time change rate of various types of surveying and mapping data obtained by surveying and mapping at the construction location is predicted. The specific prediction method is:

[0015] use A preliminary prediction is made on the real-time change rate of various surveying and mapping data in the construction location, where u = 1, 2, ..., U, represents the number corresponding to the number of surveying and mapping equipment, q = 1, 2, ..., p, represents the number corresponding to each type of surveying and mapping data, p represents the total number of surveying and mapping data types, the number corresponding to the soil softness value is 1, U represents the total number of surveying and mapping equipment, k = 1, 2, ..., h, represents the number corresponding to each division position in the construction location, h represents the total number of division positions in the construction location, and f quk represents the surveying value of the qth type of surveying data obtained during the uth surveying by the surveying equipment placed at the kth division position in the construction location, γ q It represents the real-time change rate of the qth type of surveying and mapping data obtained at the construction location;

[0016] S204: Searching for the associated surveying and mapping data of the qth type of surveying and mapping data, according to The ratio of the real-time change rate between the qth type of surveying and mapping data and the associated surveying and mapping data is calculated. y represents the number corresponding to the associated surveying and mapping data of the qth type of surveying and mapping data to be found. If α qy =β qy , then it is not correct for γ q The value is adjusted. If α qy ≠β qy , then for γ q The value is adjusted. Among them, β qy represents the correlation coefficient between the qth type of surveying and mapping data and the associated surveying and mapping data;

[0017] S205: According to f′ qk =f q1k +[(t2k -t 1k )*γ q ], before construction is carried out at the construction location, the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location are predicted, among which, t 2k represents the construction time point corresponding to the kth division position in the construction location, t 1k represents the time point corresponding to the first survey of the surveying equipment placed at the kth division position in the construction location, f q1k represents the surveying value of the qth type of surveying data obtained during the first surveying of the surveying equipment placed at the kth division position in the construction location, f′ qk It represents the surveying value of the qth type of surveying and mapping data obtained by surveying and mapping equipment placed at the kth division position in the predicted construction location before construction is carried out at the construction location.

[0018] Further, the S30 includes:

[0019] S301: Determine standard construction parameters for each construction location according to the construction component specifications corresponding to each construction location in the three-dimensional model of the engineering construction and the construction parameter requirements corresponding to each construction location. The standard construction parameters refer to the surveying and mapping data corresponding to the construction location when the construction components can be directly installed at the construction location.

[0020] S302: Determine the standard engineering quantity V of each construction location according to the standard construction parameters of each construction location, where V=the bottom area of ​​the construction component*the buried height of the construction component;

[0021] According to the surveying and mapping data of the predicted construction locations, the engineering quantity of each construction location is calculated. Where i = 1, 2, ..., m, represents the number of the construction location, m represents the total number of construction locations, S ik In the construction location numbered i, the area corresponding to the kth division position, h ik V represents the ground elevation corresponding to the kth division position in the construction position numbered i. i represents the standard engineering quantity corresponding to the construction location numbered i, G i Indicates the engineering quantity corresponding to the construction location numbered i;

[0022] S303: Calculate the added value of the construction time at each construction location based on the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location. The specific calculation formula is:

[0023] When the soil softness value obtained by mapping at the construction location is ≥ the soil softness requirement value corresponding to the construction location:

[0024]

[0025] When the soil softness value obtained by mapping at the construction location is less than the soil softness requirement value corresponding to the construction location:

[0026]

[0027] Among them, f iqk Indicates the surveying value corresponding to the qth type of surveying data obtained by surveying at the kth division position in the construction position numbered i, Indicates the required construction parameter value corresponding to the qth type of surveying and mapping data at the construction location numbered i. hour, when hour, H i Indicates the bottom area of ​​the construction component at the construction position numbered i, L q It indicates the time required by the construction team to adjust the qth type of surveying and mapping data to the required value of the construction parameters under the unit engineering quantity. F indicates the time required by the construction team to reinforce the soil under the unit engineering quantity. Indicates that when the soil softness value is f i1k When the construction team takes extra time to dig the soil under the unit engineering workload, W i Indicates the added value of construction time corresponding to the construction location numbered i;

[0028] S304: Analyze the construction difficulty of each construction location.

[0029] Furthermore, the specific formula for analyzing the construction difficulty of each construction location in S304 is:

[0030] E i =|1-[W i +(G i *t i )] / (t i *V i )|;

[0031] Among them, t i It represents the average construction time of the construction team for the construction location numbered i under the unit construction volume, E i Represents the construction difficulty value of the construction unit numbered i.

[0032] Furthermore, the specific method of determining the construction management strength of each construction location in S40 is: determining the construction management strength of each construction location according to the construction difficulty corresponding to each construction location, and the construction management strength value = construction difficulty value.

[0033] A three-dimensional model data management system for engineering surveying and mapping, the system comprising a construction location determination module, a surveying and mapping data prediction module, a construction difficulty analysis module and a construction management module;

[0034] The construction position determination module is used to determine the construction position in the three-dimensional geological model;

[0035] The surveying and mapping data prediction module is used to predict the surveying and mapping data of the construction location before construction is carried out at the construction location;

[0036] The construction difficulty analysis module is used to analyze the construction difficulty of each construction location;

[0037] The construction management module is used to determine the construction management intensity of each construction location.

[0038] Furthermore, the construction location determination module constructs a three-dimensional geological model based on the engineering surveying and mapping data, searches for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model, and uses the found building red line as the coincidence line to determine the construction location in the three-dimensional geological model.

[0039] Further, the surveying and mapping data prediction module includes a real-time surveying and mapping data acquisition unit, a surveying and mapping data real-time change rate prediction unit, an adjustment unit and a surveying and mapping data prediction unit;

[0040] The real-time surveying and mapping data acquisition unit uses surveying and mapping equipment to acquire the surveying and mapping data of each divided position in the construction position in real time, and transmits the acquired real-time surveying and mapping data to the surveying and mapping data real-time change rate prediction unit;

[0041] The real-time change rate prediction unit for surveying and mapping data receives the real-time surveying and mapping data transmitted by the real-time surveying and mapping data acquisition unit, calculates the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment, determines whether the calculated difference is within the error range, predicts the real-time change rate of various surveying and mapping data obtained at the construction location according to the judgment result, and transmits the prediction result to the adjustment unit;

[0042] The adjustment unit receives the prediction result transmitted by the surveying and mapping data real-time change rate prediction unit, adjusts the real-time change rate of various surveying and mapping data obtained by surveying at the construction location in combination with the associated surveying and mapping data corresponding to various surveying and mapping data, and transmits the adjustment result to the surveying and mapping data prediction unit;

[0043] The surveying and mapping data prediction unit receives the adjustment result transmitted by the adjustment unit, and based on the received information, predicts the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location before construction is carried out at the construction location, and transmits the prediction result to the construction difficulty analysis module.

[0044] Further, the construction difficulty analysis module includes a standard construction parameter determination unit, a construction quantity calculation unit, a construction time added value calculation unit and a construction difficulty analysis unit;

[0045] The standard construction parameter determination unit determines the standard construction parameters of each construction position according to the construction component specifications corresponding to each construction position in the three-dimensional model of the engineering construction and the construction parameter requirements corresponding to each construction position, and transmits the determined standard construction parameters to the engineering quantity calculation unit;

[0046] The engineering quantity calculation unit receives the standard construction parameters transmitted by the standard parameter determination unit and the prediction results transmitted by the surveying and mapping data prediction unit, calculates the engineering quantity and standard engineering quantity of each construction location based on the received information, transmits the calculated standard engineering quantity to the construction time added value calculation unit and the construction difficulty analysis unit, and transmits the calculated engineering quantity to the construction difficulty analysis unit;

[0047] The construction time added value calculation unit receives the standard engineering quantity transmitted by the engineering quantity calculation unit, calculates the construction time added value of each construction location in combination with the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location, and transmits the calculation result to the construction difficulty analysis unit;

[0048] The construction difficulty analysis unit receives the engineering quantity and standard engineering quantity transmitted by the engineering quantity calculation unit, as well as the calculation results transmitted by the construction time added value calculation unit, analyzes the construction difficulty of each construction location based on the received information, and transmits the analysis results to the construction management module.

[0049] Furthermore, the construction management module receives the analysis results transmitted by the construction difficulty analysis unit, and determines the construction management intensity of each construction location based on the received information.

[0050] Compared with the prior art, the present invention has the following beneficial effects:

[0051] 1. The present invention predicts the real-time change rate of various types of surveying and mapping data obtained by surveying and mapping equipment based on known surveying and mapping data, and adjusts the predicted surveying and mapping data according to the correlation between various types of surveying and mapping data, so as to ensure that accurate and effective surveying and mapping data can be obtained before construction is carried out at the construction location, which is conducive to the smooth progress of engineering construction and reduces the delay time of engineering construction.

[0052] 2. The present invention calculates the engineering quantity of each construction location based on the surveying and mapping data of the predicted construction location and the standard construction parameters of each construction location, and compares the surveying and mapping data of the predicted construction location with the standard construction parameters of each construction location. When a certain type of surveying and mapping data exceeds the required value of the corresponding construction parameter at the construction location, the additional construction time of each construction location is predicted according to the engineering quantity, and the construction difficulty of each construction location is analyzed based on the prediction result, thereby further improving the system's management effect on the three-dimensional model data.

[0053] 3. The present invention determines the construction management intensity corresponding to each construction location according to the construction difficulty corresponding to each construction location. The construction management personnel effectively control the construction progress according to the determined construction management intensity to ensure that the project can be completed within the specified time. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 A schematic diagram of the workflow of a three-dimensional model data management system and method for engineering surveying and mapping according to the present invention;

[0055] Figure 2 The present invention is a schematic diagram of the working principle structure of a three-dimensional model data management system and method for engineering surveying and mapping. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] like Figure 1 and Figure 2 As shown, the present invention provides the following technical solution, a three-dimensional model data management method for engineering surveying and mapping, the method comprising:

[0058] S10: construct a three-dimensional geological model based on the acquired engineering surveying and mapping data, and search for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model. The building red line refers to the boundary that the facade of the building cannot exceed. The found building red line is used as the coincidence line to determine the construction position in the three-dimensional geological model. The engineering surveying and mapping data includes ground elevation, soil softness value, groundwater level elevation, and underground pipeline depth, etc.;

[0059] S20: predicting the real-time change rate of various surveying and mapping data obtained by surveying and mapping at the construction location, and predicting the surveying and mapping data of the construction location before construction is performed at the construction location based on the prediction result;

[0060] The S20 includes:

[0061] S201: According to the surveying and mapping data of each construction location, each construction location is divided and processed. In the same construction location, in any divided location, the surveying and mapping data corresponding to each divided location point is the same. A displacement sensor, a pressure sensor, a water level meter and an electromagnetic sensor are placed at each divided location in the construction location to obtain the surveying and mapping data of each divided location in real time. The displacement sensor is used to measure the ground elevation, the pressure sensor is used to measure the softness of the soil, the water level meter is used to measure the groundwater level elevation, and the electromagnetic sensor is used to measure the depth of the underground pipeline;

[0062] S202: Calculate the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment. If the difference corresponding to each type of surveying and mapping data is within the error range, it means that the real-time change rate of each type of surveying and mapping data obtained at the construction location is 0.

[0063] S203: When the difference values ​​corresponding to various types of surveying and mapping data are not within the error range, the real-time change rate of various types of surveying and mapping data obtained by surveying and mapping at the construction location is predicted. The specific prediction method is:

[0064] use A preliminary prediction is made on the real-time change rate of various types of surveying and mapping data in the construction location, where u = 1, 2, ..., U, represents the number corresponding to the number of surveying and mapping equipment surveying times, q = 1, 2, ..., p, represents the number corresponding to each type of surveying and mapping data, p represents the total number of surveying and mapping data types, the number corresponding to the soil softness value is 1, and the numbers corresponding to other types of surveying and mapping data except the soil softness are not specifically limited, U represents the total number of surveying and mapping equipment surveying times, k = 1, 2, ..., h, represents the number corresponding to each division position in the construction location, h represents the total number of division positions in the construction location, and f represents the total number of division positions in the construction location. quk represents the surveying value of the qth type of surveying data obtained during the uth surveying by the surveying equipment placed at the kth division position in the construction location, γ q It represents the real-time change rate of the qth type of surveying and mapping data obtained at the construction location;

[0065] Predict the real-time change rate of various surveying and mapping data obtained at the construction location to ensure that the surveying and mapping data obtained after the construction team is working at the construction location meets the standard construction requirements, further improving the construction accuracy. At the same time, according to the prediction results, the construction tools can be dispatched in time to avoid delays in the construction progress.

[0066] S204: Searching for the associated surveying and mapping data of the qth type of surveying and mapping data, according to The ratio of the real-time change rate between the qth type of surveying and mapping data and the associated surveying and mapping data is calculated. y represents the number corresponding to the associated surveying and mapping data of the qth type of surveying and mapping data to be found. If α qy =β qy , then it is not correct for γ q The value is adjusted. If α qy ≠β qy , then for γ q The value is adjusted. Among them, β qy represents the correlation coefficient between the qth type of surveying and mapping data and the associated surveying and mapping data;

[0067] According to the correlation between various types of surveying and mapping data, the predicted surveying and mapping values ​​of various types of surveying and mapping data are adjusted, which is conducive to improving the prediction accuracy of surveying and mapping data;

[0068] S205: According to f′ qk =f q1k +[(t 2k -t 1k )*γ q ], before construction is carried out at the construction location, the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location are predicted, among which, t 2k represents the construction time point corresponding to the kth division position in the construction location, t 1k represents the time point corresponding to the first survey of the surveying equipment placed at the kth division position in the construction location, f q1k represents the surveying value of the qth type of surveying data obtained during the first surveying of the surveying equipment placed at the kth division position in the construction location, f′ qk It represents the surveying value of the qth type of surveying data obtained by the surveying equipment placed at the kth division position in the predicted construction position before the construction is carried out at the construction position;

[0069] S30: Analyze the construction difficulty of each construction location according to the construction content and surveying data of each construction location;

[0070] S30 includes:

[0071] S301: According to the construction component specifications corresponding to each construction location in the three-dimensional model of the engineering construction, and the construction parameter requirements corresponding to each construction location, the construction components include building structures and structural components, and the standard construction parameters of each construction location are determined. The standard construction parameters refer to the surveying and mapping data corresponding to the construction location when the construction components can be directly installed at the construction location;

[0072] S302: Determine the standard engineering quantity V of each construction location according to the standard construction parameters of each construction location, where V=the bottom area of ​​the construction component*the buried height of the construction component;

[0073] According to the surveying and mapping data of the predicted construction locations, the engineering quantity of each construction location is calculated. Where i = 1, 2, ..., m, represents the number of the construction location, m represents the total number of construction locations, S ik In the construction location numbered i, the area corresponding to the kth division position, h ik Indicates the ground elevation corresponding to the kth division position in the construction position numbered i. The ground elevation refers to the distance from a point on the ground to the reference plane along the vertical direction. It is the elevation relative to the reference plane (such as sea level or set reference plane). V i represents the standard engineering quantity corresponding to the construction location numbered i, G i Indicates the engineering quantity corresponding to the construction location numbered i;

[0074] S303: Calculate the added value of the construction time at each construction location based on the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location. The specific calculation formula is:

[0075] When the soil softness value obtained by mapping at the construction location is ≥ the soil softness requirement value corresponding to the construction location:

[0076]

[0077] When the soil softness value obtained by mapping at the construction location is less than the soil softness requirement value corresponding to the construction location:

[0078]

[0079] Among them, f iqk It represents the surveying value corresponding to the qth type of surveying data obtained by surveying at the kth division position in the construction position numbered i. Indicates the required construction parameter value corresponding to the qth type of surveying and mapping data at the construction location numbered i. hour, when hour, f i1k H represents the surveying value corresponding to the first type of surveying data obtained by surveying at the kth division position in the construction position numbered i, i Indicates the bottom area of ​​the construction component at the construction position numbered i, L qIt indicates the time required by the construction team to adjust the qth type of surveying and mapping data to the required value of the construction parameters under the unit engineering quantity. F indicates the time required by the construction team to reinforce the soil under the unit engineering quantity. Indicates that when the soil softness value is f i1k When the construction team takes extra time to dig the soil under the unit engineering workload, W i Indicates the added value of construction time corresponding to the construction location numbered i;

[0080] S304: Analyze the construction difficulty of each construction location. The specific formula is:

[0081] E i =|1-[W i +(G i *t i )] / (t i *V i )|;

[0082] Among them, t i It represents the average construction time of the construction team for the construction location numbered i under the unit construction volume, E i Indicates the construction difficulty value of the construction unit numbered i;

[0083] According to the engineering quantity corresponding to each construction location and the construction time corresponding to the unit engineering quantity of the construction team, the construction difficulty of each construction location is analyzed. This process takes into account the impact of the specific value of the surveying and mapping data on the construction situation of the project, ensuring that various construction situations can be actively responded to during construction. At the same time, the construction management personnel can determine the delay time of each construction location based on the construction difficulty value obtained by analysis, which is conducive to the effective planning of the construction situation of each construction location;

[0084] S40: Determine the construction management strength of each construction location;

[0085] The specific method of determining the construction management strength of each construction location in S40 is: determining the construction management strength of each construction location according to the construction difficulty corresponding to each construction location, and the construction management strength value = construction difficulty value.

[0086] A three-dimensional model data management system for engineering surveying and mapping, the system includes a construction location determination module, a surveying and mapping data prediction module, a construction difficulty analysis module and a construction management module;

[0087] The construction location determination module is used to determine the construction location in the three-dimensional geological model;

[0088] The construction location determination module constructs a three-dimensional geological model based on the engineering surveying and mapping data, searches for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model, and uses the found building red line as the coincidence line to determine the construction location in the three-dimensional geological model;

[0089] The surveying and mapping data prediction module is used to predict the surveying and mapping data of the construction location before construction is carried out at the construction location;

[0090] The surveying and mapping data prediction module includes a real-time surveying and mapping data acquisition unit, a surveying and mapping data real-time change rate prediction unit, an adjustment unit and a surveying and mapping data prediction unit;

[0091] The real-time surveying and mapping data acquisition unit uses surveying and mapping equipment to acquire the surveying and mapping data of each divided position in the construction position in real time, and transmits the acquired real-time surveying and mapping data to the surveying and mapping data real-time change rate prediction unit;

[0092] The real-time change rate prediction unit of the surveying and mapping data receives the real-time surveying and mapping data transmitted by the real-time surveying and mapping data acquisition unit, calculates the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment, determines whether the calculated difference is within the error range, and predicts the real-time change rate of various surveying and mapping data obtained at the construction location according to the judgment result, and transmits the prediction result to the adjustment unit;

[0093] The adjustment unit receives the prediction result transmitted by the surveying and mapping data real-time change rate prediction unit, adjusts the real-time change rate of various surveying and mapping data obtained by surveying at the construction location in combination with the associated surveying and mapping data corresponding to various surveying and mapping data, and transmits the adjustment result to the surveying and mapping data prediction unit;

[0094] The surveying and mapping data prediction unit receives the adjustment result transmitted by the adjustment unit, and based on the received information, predicts the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location before construction is carried out at the construction location, and transmits the prediction result to the construction difficulty analysis module;

[0095] The construction difficulty analysis module is used to analyze the construction difficulty of each construction location;

[0096] The construction difficulty analysis module includes a standard construction parameter determination unit, a project quantity calculation unit, a construction time added value calculation unit and a construction difficulty analysis unit;

[0097] The standard construction parameter determination unit determines the standard construction parameters of each construction position according to the construction component specifications corresponding to each construction position in the three-dimensional model of the engineering construction and the construction parameter requirements corresponding to each construction position, and transmits the determined standard construction parameters to the engineering quantity calculation unit;

[0098] The engineering quantity calculation unit receives the standard construction parameters transmitted by the standard parameter determination unit and the prediction results transmitted by the surveying and mapping data prediction unit, calculates the engineering quantity and standard engineering quantity of each construction location based on the received information, transmits the calculated standard engineering quantity to the construction time added value calculation unit and the construction difficulty analysis unit, and transmits the calculated engineering quantity to the construction difficulty analysis unit;

[0099] The construction time added value calculation unit receives the standard engineering quantity transmitted by the engineering quantity calculation unit, calculates the construction time added value of each construction location in combination with the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location, and transmits the calculation result to the construction difficulty analysis unit;

[0100] The construction difficulty analysis unit receives the engineering quantity and standard engineering quantity transmitted by the engineering quantity calculation unit, as well as the calculation results transmitted by the construction time added value calculation unit, analyzes the construction difficulty of each construction location based on the received information, and transmits the analysis results to the construction management module;

[0101] The construction management module is used to determine the construction management intensity of each construction location;

[0102] The construction management module receives the analysis results transmitted by the construction difficulty analysis unit, and determines the construction management intensity of each construction location based on the received information.

[0103] Example 1: Assuming that the construction additional time value corresponding to the construction position numbered 1 is 2 hours, the construction volume corresponding to the construction position numbered 1 is 20 cubic meters, and the standard construction volume corresponding to the construction position numbered 1 is 15 cubic meters. Under the condition of 1 cubic meter of construction volume, the construction time value of the construction team for the construction position numbered 1 is an average construction time value of 10 minutes, then the construction difficulty of the construction position numbered 1 is:

[0104]

[0105] The construction difficulty value of the construction location numbered 1 is 1.13.

[0106] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A three-dimensional model data management method for engineering surveying and mapping, characterized in that: The method comprises: S10: constructing a three-dimensional geological model based on the acquired engineering surveying and mapping data, searching for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model, using the found building red line as the coincidence line, and determining the construction position in the three-dimensional geological model; S20: predicting the real-time change rate of various surveying and mapping data obtained by surveying and mapping at the construction location, and predicting the surveying and mapping data of the construction location before construction is performed at the construction location based on the prediction result; The S20 includes: S201: According to the surveying and mapping data of each construction position, each construction position is divided and processed. In the same construction position, in any divided position, the surveying and mapping data corresponding to each divided position point is the same. A displacement sensor, a pressure sensor, a water level gauge and an electromagnetic sensor are placed at each divided position in the construction position to obtain the surveying and mapping data of each divided position in real time; S202: Calculate the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment. If the difference corresponding to each type of surveying and mapping data is within the error range, it means that the real-time change rate of each type of surveying and mapping data obtained at the construction location is 0. S203: When the difference values ​​corresponding to various types of surveying and mapping data are not within the error range, the real-time change rate of various types of surveying and mapping data obtained by surveying and mapping at the construction location is predicted. The specific prediction method is: use A preliminary prediction is made on the real-time change rate of various surveying and mapping data in the construction location, where u=1,2,…,U represents the number corresponding to the number of surveying and mapping equipment, q=1,2,…,p represents the number corresponding to each type of surveying and mapping data, p represents the total number of surveying and mapping data types, the number corresponding to the soil softness value is 1, U represents the total number of surveying and mapping equipment, k=1,2,…,h represents the number corresponding to each division position in the construction location, h represents the total number of division positions in the construction location, It represents the surveying value of the qth type of surveying data obtained by the surveying equipment placed at the kth division position in the construction location during the uth surveying. It represents the real-time change rate of the qth type of surveying and mapping data obtained at the construction location; S204: Searching for the associated surveying and mapping data of the qth type of surveying and mapping data, according to Calculate the ratio of the real-time change rate of the qth type of surveying and mapping data to the associated surveying and mapping data. y represents the number of the associated surveying and mapping data corresponding to the qth type of surveying and mapping data being found. , then it is not correct If the value is adjusted , then The value is adjusted. ,in, represents the correlation coefficient between the qth type of surveying and mapping data and the associated surveying and mapping data; S205: According to Before construction is carried out at the construction location, the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location are predicted, among which, represents the construction time point corresponding to the kth division position in the construction location, Indicates the time point corresponding to the first survey of the surveying equipment placed at the kth division position in the construction location, It represents the surveying value of the qth type of surveying data obtained during the first surveying by the surveying equipment placed at the kth division position in the construction location. It represents the surveying value of the qth type of surveying data obtained by the surveying equipment placed at the kth division position in the predicted construction position before the construction is carried out at the construction position; S30: Analyze the construction difficulty of each construction location according to the construction content and surveying data of each construction location; The S30 includes: S301: Determine standard construction parameters for each construction location according to the construction component specifications corresponding to each construction location in the three-dimensional model of the engineering construction and the construction parameter requirements corresponding to each construction location. The standard construction parameters refer to the surveying and mapping data corresponding to the construction location when the construction components can be directly installed at the construction location. S302: Determine the standard engineering quantity V of each construction location according to the standard construction parameters of each construction location, where V=the bottom area of ​​the construction component*the buried height of the construction component; According to the surveying and mapping data of the predicted construction locations, the engineering quantity of each construction location is calculated. , where i=1,2,…,m, represents the number corresponding to the construction location, and m represents the total number of construction locations. It represents the division area corresponding to the kth division position in the construction position numbered i. Indicates the ground elevation corresponding to the kth division position in the construction position numbered i, Indicates the standard engineering quantity corresponding to the construction location numbered i. Indicates the engineering quantity corresponding to the construction location numbered i; S303: Calculate the added value of the construction time at each construction location based on the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location. The specific calculation formula is: When the soil softness value obtained by mapping at the construction location is ≥ the soil softness requirement value corresponding to the construction location: ; When the soil softness value obtained by mapping at the construction location is less than the soil softness requirement value corresponding to the construction location: ; in, It represents the surveying value corresponding to the qth type of surveying data obtained by surveying at the kth division position in the construction position numbered i. Indicates the required construction parameter value corresponding to the qth type of surveying and mapping data at the construction location numbered i. hour, ,when hour, , Indicates the bottom area of ​​the construction component at the construction position numbered i. It indicates the time required by the construction team to adjust the Q-type surveying and mapping data to the required value of the construction parameters under the unit engineering quantity. It indicates the time required by the construction team to reinforce the soil under the unit engineering volume. Indicates that when the soil softness value is When the construction team digs the soil for a unit of work, the extra time required is Indicates the added value of construction time corresponding to the construction location numbered i; S304: Analyze the construction difficulty of each construction location. The specific formula is: ; in, It represents the average construction time of the construction team for the construction location numbered i under the unit construction volume. Indicates the construction difficulty value of the construction unit numbered i; S40: Determine the construction management strength of each construction location.

2. A three-dimensional model data management method for engineering surveying and mapping according to claim 1, characterized in that: The specific method of determining the construction management strength of each construction location in S40 is: determining the construction management strength of each construction location according to the construction difficulty corresponding to each construction location, and the construction management strength value = construction difficulty value.

3. A three-dimensional model data management system for engineering surveying and mapping applied to the three-dimensional model data management method for engineering surveying and mapping as claimed in any one of claims 1 to 2, characterized in that: The system includes a construction location determination module, a surveying and mapping data prediction module, a construction difficulty analysis module and a construction management module; The construction position determination module is used to determine the construction position in the three-dimensional geological model; The surveying and mapping data prediction module is used to predict the surveying and mapping data of the construction location before construction is carried out at the construction location; The construction difficulty analysis module is used to analyze the construction difficulty of each construction location; The construction management module is used to determine the construction management intensity of each construction location.

4. A three-dimensional model data management system for engineering surveying and mapping according to claim 3, characterized in that: The construction location determination module constructs a three-dimensional geological model based on the engineering surveying and mapping data, searches for the building red line in the three-dimensional geological model and the engineering construction three-dimensional model, and uses the found building red line as the coincidence line to determine the construction location in the three-dimensional geological model.

5. A three-dimensional model data management system for engineering surveying and mapping according to claim 4, characterized in that: The surveying and mapping data prediction module includes a real-time surveying and mapping data acquisition unit, a surveying and mapping data real-time change rate prediction unit, an adjustment unit and a surveying and mapping data prediction unit; The real-time surveying and mapping data acquisition unit uses surveying and mapping equipment to acquire the surveying and mapping data of each divided position in the construction position in real time, and transmits the acquired real-time surveying and mapping data to the surveying and mapping data real-time change rate prediction unit; The real-time change rate prediction unit for surveying and mapping data receives the real-time surveying and mapping data transmitted by the real-time surveying and mapping data acquisition unit, calculates the difference between the acquired real-time surveying and mapping data and the surveying and mapping data acquired at the previous moment, determines whether the calculated difference is within the error range, predicts the real-time change rate of various surveying and mapping data obtained at the construction location according to the judgment result, and transmits the prediction result to the adjustment unit; The adjustment unit receives the prediction result transmitted by the surveying and mapping data real-time change rate prediction unit, adjusts the real-time change rate of various surveying and mapping data obtained by surveying at the construction location in combination with the associated surveying and mapping data corresponding to various surveying and mapping data, and transmits the adjustment result to the surveying and mapping data prediction unit; The surveying and mapping data prediction unit receives the adjustment result transmitted by the adjustment unit, and based on the received information, predicts the surveying and mapping values ​​of various surveying and mapping data obtained at the construction location before construction is carried out at the construction location, and transmits the prediction result to the construction difficulty analysis module.

6. A three-dimensional model data management system for engineering surveying and mapping according to claim 5, characterized in that: The construction difficulty analysis module includes a standard construction parameter determination unit, a construction quantity calculation unit, a construction time added value calculation unit and a construction difficulty analysis unit; The standard construction parameter determination unit determines the standard construction parameters of each construction position according to the construction component specifications corresponding to each construction position in the three-dimensional model of the engineering construction and the construction parameter requirements corresponding to each construction position, and transmits the determined standard construction parameters to the engineering quantity calculation unit; The engineering quantity calculation unit receives the standard construction parameters transmitted by the standard parameter determination unit and the prediction results transmitted by the surveying and mapping data prediction unit, calculates the engineering quantity and standard engineering quantity of each construction location based on the received information, transmits the calculated standard engineering quantity to the construction time added value calculation unit and the construction difficulty analysis unit, and transmits the calculated engineering quantity to the construction difficulty analysis unit; The construction time added value calculation unit receives the standard engineering quantity transmitted by the engineering quantity calculation unit, calculates the construction time added value of each construction location in combination with the surveying and mapping data of the predicted construction location and the construction parameter requirements corresponding to each construction location, and transmits the calculation result to the construction difficulty analysis unit; The construction difficulty analysis unit receives the engineering quantity and standard engineering quantity transmitted by the engineering quantity calculation unit, as well as the calculation results transmitted by the construction time added value calculation unit, analyzes the construction difficulty of each construction location based on the received information, and transmits the analysis results to the construction management module.

7. A three-dimensional model data management system for engineering surveying and mapping according to claim 6, characterized in that: The construction management module receives the analysis results transmitted by the construction difficulty analysis unit, and determines the construction management intensity of each construction location based on the received information.