Method for installing rough steel bars of T-beam diaphragm
By using the lower transverse rebar positioning mechanism and the isolation membrane system, the problems of poor connection strength of T-beam diaphragms and inaccurate rebar positioning were solved, achieving reliable connection and accurate positioning, and simplifying mold operation.
Patent Information
- Application Number
- CN202410262906.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-03-07
AI Technical Summary
The existing T-beam diaphragm and intermediate beam have poor connection strength, the lower transverse reinforcement is not accurately positioned, and the mold installation and disassembly are troublesome.
A lower transverse rebar positioning mechanism is adopted, including a fixed connecting plate, a movable connecting plate, and a threaded tensioning rod, which achieves reliable rebar positioning through threaded connection; an isolation membrane sleeve and tie rod system are used for venting to ensure the venting effect during concrete pouring; and a rebar assembly locator and scale plate are used to achieve accurate positioning of the upper transverse rebar.
This improved the reliability of the connection between the diaphragm and the intermediate beam, as well as the positioning accuracy of the upper transverse reinforcement, simplified the installation and disassembly process of the formwork, and improved construction efficiency.
Smart Images

Figure CN118127928B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of bridge construction technology, specifically to a method for installing thick steel bars in the transverse diaphragms of T-beams. Background Technology
[0002] A T-beam includes a middle beam extending longitudinally along the bridge and a top beam connected to the upper end of the middle beam. The top beam extends transversely to both sides of the middle beam. The middle beam includes a reinforcing steel skeleton and concrete poured to hold the reinforcing steel skeleton. Some T-beams have several transverse diaphragms distributed longitudinally on both transverse sides of the middle beam. Each diaphragm includes a reinforcing steel skeleton and concrete poured to hold the reinforcing steel skeleton. The reinforcing steel skeleton of the diaphragm is connected to the reinforcing steel of the middle beam, and the concrete of the middle beam is poured together with the concrete of the diaphragm. For T-beams with diaphragms, the diaphragms and the middle beam are not poured together at the same time, but are poured later by setting up fixed casting molds on both sides of the middle beam. Existing molds are cumbersome to install and disassemble when pouring diaphragms; the connection strength between the diaphragm and the middle beam is poor, and the thick reinforcing bars (lower transverse bars) of the reinforcing steel skeleton of the diaphragm cannot be accurately positioned. Summary of the Invention
[0003] This invention aims to provide a method for installing the thick steel bars of the transverse diaphragm of a T-beam that ensures reliable connection between the transverse diaphragm and the intermediate beam and accurate positioning of the lower transverse steel bars, thereby solving the problems of poor connection strength and inaccurate positioning of the upper transverse steel bars in existing T-beam transverse diaphragms.
[0004] The above technical problems are solved by the following technical solution: a method for installing thick steel bars in the transverse diaphragms of a T-beam, wherein the T-beam includes a middle beam extending along the longitudinal direction of the bridge and a top beam connected to the upper end of the middle beam, the top beam extending to both sides of the transverse direction of the bridge to form the middle beam, and several transverse diaphragms distributed along the longitudinal direction of the bridge on both sides of the middle beam in the transverse direction of the bridge, the middle beam including a middle beam steel reinforcement skeleton and middle beam concrete for pouring the middle beam steel reinforcement skeleton, the transverse diaphragms including a transverse diaphragm steel reinforcement skeleton and transverse diaphragm concrete for pouring the transverse diaphragm steel reinforcement skeleton, the transverse diaphragm steel reinforcement skeleton being connected to the middle beam steel reinforcement, the middle beam concrete being poured together with the transverse diaphragm concrete, and the transverse diaphragms on both sides of the middle beam being aligned one-to-one, characterized in that it further includes a transverse diaphragm casting mold for pouring the transverse diaphragms one-to-one, the transverse diaphragm steel reinforcement skeleton including steel reinforcement skeletons distributed along the transverse direction of the bridge to form the middle beam steel reinforcement skeleton. Several lower transverse reinforcing bars extend from the middle beam and are aligned on both sides of the transverse diaphragm. One end of the lower transverse reinforcing bars is connected together, and the other end extends out of the transverse diaphragm casting mold. The transverse diaphragm casting mold is provided with a lower transverse reinforcing bar positioning mechanism. The lower transverse reinforcing bar positioning mechanism includes a fixed connecting plate, a movable connecting plate, and a threaded tensioning rod with one end fixed to the fixed connecting plate. The fixed connecting plate is fixed to the transverse diaphragm casting mold. The other end of the threaded tensioning rod passes through the movable connecting plate and is threadedly connected to the locking nut. The movable connecting plate is provided with several positioning cylinders. The process of positioning the lower transverse reinforcing bars is as follows: when installing the lower transverse reinforcing bars, the lower transverse reinforcing bars pass through the top connecting plate and are then inserted one by one into the positioning cylinders. Then, the locking nut is rotated so that the movable connecting plate is pressed against the end of the lower transverse reinforcing bar, thereby achieving reliable positioning.
[0005] Preferably, a connecting threaded sleeve is fixed on the top connecting plate, and the threaded tensioning rod is threadedly connected in the connecting threaded sleeve and fixed together with the fixed connecting plate.
[0006] Preferably, the diaphragm reinforcement cage includes several upper transverse reinforcement bars extending in the transverse direction, and the upper transverse reinforcement bars of the diaphragm located on both sides of the intermediate beam and aligned are connected together.
[0007] Preferably, the intermediate beam reinforcement cage includes two lower longitudinal reinforcement bars exposed on the lower side of the transverse through-hole, extending along the longitudinal direction of the bridge, so that a lower limiting groove is formed between the two lower longitudinal reinforcement bars, and the upper transverse reinforcement bars are provided with hooks to hook into the lower limiting groove.
[0008] Preferably, the system also includes an isolation membrane sleeve. Two upper transverse reinforcing bars are inserted into one of the transverse bridge through holes. The two upper transverse reinforcing bars can be inserted into the isolation membrane sleeve simultaneously. Two ventilation channels are formed between the upper transverse reinforcing bars and the isolation membrane sleeve. A tie rod is inserted into the ventilation channel, and the inner end of the tie rod is equipped with a cutter for cutting the isolation membrane sleeve. During the pouring of the transverse diaphragm, the upper transverse reinforcing bars are inserted into the transverse bridge through holes and hooked into the limiting grooves. The two tie rods are inserted one-to-one into the two upper and lower grooves formed by the two upper transverse reinforcing bars. Then, the isolation sleeve is placed on the upper transverse reinforcement and tie rod until it reaches the lower longitudinal reinforcement. The cutter is located outside the inner end of the isolation sleeve. When the transverse diaphragm concrete is poured, the concrete flows from between the isolation sleeve and the transverse through hole into the transverse through hole. As the concrete flows out of the transverse through hole, the tie rod is pulled outward simultaneously. The cutter is always located inside the concrete, so that the cutter cuts the isolation sleeve and discharges the concrete. After the pouring is completed, the two ends of the upper transverse reinforcement are connected to the two ends of the power supply to generate a short circuit and heat up, which melts the isolation sleeve.
[0009] Preferably, the intermediate beam reinforcement cage also includes two upper longitudinal reinforcement bars exposed on the upper side of the transverse through hole, extending along the longitudinal direction of the bridge, so that an upper limit groove is formed between the two upper longitudinal reinforcement bars, and the lower hook head on one upper transverse reinforcement bar is hooked into the lower limit groove, and the lower hook head on the other upper transverse reinforcement bar is hooked into the upper limit groove.
[0010] Preferably, a rebar assembly locator is also included, wherein one of the two lower longitudinal rebars extends beyond the other lower longitudinal rebar. The rebar assembly locator includes a clamp for fixing to the upper transverse rebar, a comparison rod connected to the clamp, and a scale plate with an elastic connecting seat. The elastic connecting seat is used to insert into the transverse through hole to fix the scale plate at the end of the transverse through hole. The scale plate has a limiting notch for the upper transverse rebar to pass through and two sets of reference lines located on the upper and lower sides of the limiting notch. The reference line sets include a reference line near the notch side and a reference line far from the notch side. When the scale plate is fixed in the transverse through hole by the elastic connecting seat, the reference line near the notch side in the lower reference line set is the same as the upper one. The highest point of the tallest lower longitudinal reinforcement is on a horizontal plane, and the baseline on the far side of the notch is on the same horizontal plane as the highest point of the lower lower longitudinal reinforcement on the upper side. The process of inserting the upper transverse reinforcement into the transverse through-hole is as follows: insert one upper transverse reinforcement from the side where the lower lower longitudinal reinforcement is located until the hook abuts against the lower reinforcement on the upper side. The hook on one upper transverse reinforcement is directly below it. Fix the scale plate to the port of the transverse through-hole and insert one upper transverse reinforcement into the notch. Fix the clamp to one upper transverse reinforcement and place the alignment rod directly below it. Spacing the clamp and the scale plate apart, rotate the upper transverse reinforcement in one direction until the alignment rod is below the notch. Between the near-gap side baseline and the far-gap side baseline of the baseline group, push an upper transverse steel bar inward to the limit position so that the hook head is aligned with the upper higher lower longitudinal steel bar. Rotate an upper transverse steel bar in the other direction until the comparison rod is directly below the upper transverse steel bar so that the hook head of an upper transverse steel bar is hooked in the lower limit groove. Remove the clamp from an upper transverse steel bar and remove the comparison plate from the transverse bridge into the through hole. Insert an upper transverse steel bar from the side where the lower lower longitudinal steel bar is located until the hook head abuts against the lower upper steel bar. The hook head on another upper transverse steel bar is directly below the other upper transverse steel bar. Rotate the scale plate 180° (equivalent to fixing an upper transverse steel bar) and fix it on the transverse. At the port of the bridge through-hole, another upper transverse steel bar is inserted into the notch. The clamp is fixed to the other upper transverse steel bar, and the comparison rod is located directly below the other upper transverse steel bar. The clamp is spaced apart from the scale plate. The upper transverse steel bar is rotated in one direction until the comparison rod is located between the near-notch side baseline and the far-notch side baseline of the baseline group located below the notch. The other upper transverse steel bar is pushed inward to the limit position so that the hook head is aligned with the lower longitudinal steel bar on the upper side. The upper transverse steel bar is rotated in the other direction until the comparison rod is located directly above the upper transverse steel bar so that the hook head of the other upper transverse steel bar is hooked in the upper limit groove. The clamp is removed from the other upper transverse steel bar and the comparison plate is removed from the transverse bridge through-hole.
[0011] Preferably, the system also includes a diaphragm casting mold for casting diaphragms. The diaphragm casting mold includes a bottom template, two side templates distributed along the longitudinal direction of the bridge and connected at the lower end to the bottom template, and an end template that connects one end of the two side templates together. The inner surface of the end template is provided with positioning through holes, and the upper transverse reinforcing bars pass through the positioning through holes.
[0012] Preferably, a protruding post is fixed to the inner surface of the end template, the positioning through hole passes through the protruding post, the upper transverse reinforcing bar is located only inside the protruding post, and the end face of the upper transverse reinforcing bar is at least 2 cm away from the inner surface of the end template.
[0013] The beneficial effects of this invention are: reliable connection between the diaphragm and the intermediate beam; and accurate positioning of the upper transverse reinforcement. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the pouring of the transverse diaphragm in Embodiment 1 of the present invention; Figure 2 for Figure 1 A magnified view of a portion at point C; Figure 3 The lower structure of the casting mold for the diaphragm; Figure 4 This is a schematic diagram of the pouring of the transverse diaphragm in Embodiment 2 of the present invention; Figure 5 for Figure 4 A magnified view of part A; Figure 6 for Figure 4 A magnified view of part B; Figure 7 This is a schematic diagram of the transverse bridge view when a single horizontal steel bar is inserted into the transverse bridge through-hole. Figure 8 This is a schematic diagram of the transverse bridge view when another transverse steel bar is inserted into the transverse bridge through-hole. Figure 9 A schematic diagram showing the isolation membrane sleeve being fitted onto the upper transverse reinforcing bar.
[0015] In the diagram: 1. Middle beam; 2. Top beam; 3. Top beam reinforcement cage; 4. Top beam concrete; 5. Exposed part; 6. Bottom formwork; 7. Side formwork; 8. End formwork; 9. Lifting mechanism; 10. Longitudinal push-pull rod; 11. Side telescopic push-pull rod; 12. Upper telescopic push-pull rod; 13. Axle pin; 14. Traveling wheel; 15. Support foot; 16. Longitudinal hinge shaft; 17. Support rod; 18. First longitudinal connecting rod; 19. Second longitudinal connecting rod; 20. Handle; 21. Widened section of middle beam; 22. Step of middle beam; 23. Widened section of side formwork; 24. Step of side formwork; 25. Transverse steel reinforcement; 26. Transverse bridge through hole; 27. Elastic connecting seat; 29. Lower longitudinal reinforcement; 30. Upper longitudinal reinforcement; 31. Upper limit groove; 32. One upper transverse steel bar, 33. Another upper transverse steel bar, 34. Isolation membrane sleeve, 35. Exhaust channel, 36. Tie rod, 37. Cutting knife, 38. Clamp, 39. Comparison rod, 40. Scale plate, 41. Limiting notch, 42. Baseline group, 43. Baseline on the side near the notch, 44. Baseline on the side far from the notch, 45. Positioning through hole, 46. Protruding column, 47. Base frame, 48. Lower limiting groove, 50. Lower hook on another upper transverse steel bar, 51. Moving base frame, 53. Lower tie rod, 60. Lower transverse steel bar positioning mechanism, 61. Fixed connecting plate, 54. Moving connecting plate, 55. Threaded tensioning rod, 56. Locking nut, 57. Positioning cylinder, 58. Connecting threaded sleeve, 59. Detailed Implementation
[0016] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0017] See Figures 1 to 3A method for installing thick steel bars in transverse diaphragms of a T-beam, wherein the T-beam includes a middle beam 1 extending longitudinally along the bridge and a top beam 2 connected to the upper end of the middle beam. The top beam extends the middle beam to both sides transversely along the bridge, and the top beam includes a top beam steel reinforcement skeleton 3 and top beam concrete 4 poured to hold the top beam steel reinforcement skeleton. The two ends of the top beam steel reinforcement skeleton in the transverse direction are exposed in the top beam concrete to form exposed portions 5. Several transverse diaphragms are provided on both sides of the middle beam in the transverse direction, distributed along the longitudinal direction. The middle beam includes a middle beam steel reinforcement skeleton and middle beam concrete poured to hold the middle beam steel reinforcement skeleton, and the transverse diaphragms include transverse diaphragm steel reinforcement skeletons and transverse diaphragm concrete poured to hold the transverse diaphragm steel reinforcement skeletons. The transverse diaphragm steel reinforcement skeletons are connected to the middle beam steel reinforcement, and the middle beam concrete and transverse diaphragm concrete are poured together. This method utilizes a diaphragm casting mold in conjunction with an intermediate beam. The diaphragm casting mold includes a bottom formwork 6, two side formworks 7 connected at their lower ends to the bottom formwork and distributed along the longitudinal bridge direction, and an end formwork 8 connecting one end of the two side formworks together. Specifically, the end formwork is connected to the side formworks via bolts and nuts. The bottom formwork is connected to a movable base frame 51 via a lifting mechanism 9. The upper ends of the two side formworks are connected together via longitudinal push-pull rods 10 extending along the longitudinal bridge direction. The side formworks are movable along the longitudinal bridge direction and connected to the longitudinal push-pull rods. The lower end of the side formworks is hinged to the bottom formwork, and the upper end is hinged to the upper end of a side telescopic push-pull rod 11. The lower end of the side telescopic push-pull rod is hinged to the bottom formwork. The longitudinal push-pull rod is hinged to one end of an upper telescopic push-pull rod 12 that drives the longitudinal push-pull rod towards the intermediate beam. The upper end of the upper telescopic push-pull rod is rotatably connected to a pin 13 fixed to an exposed part. The push-pull rod and the pin are detachably connected together. The mobile base frame is equipped with wheels 14, and the bottom template is connected to support feet 15 that can be raised and lowered. When the transverse diaphragm casting mold is moved into place, the support feet extend to support the ground, thereby lifting the wheels off the ground. The lifting mechanism includes a base frame 47 that is slidably connected to the mobile base along the transverse bridge direction, a longitudinal hinge shaft 16 extending along the longitudinal bridge direction, and two sets of support rods 17 distributed along the longitudinal bridge direction. Each set of support rods has two support rods that are cross-connected in the middle by the longitudinal hinge shaft. The lower end of the support rod is slidably connected to the base frame along the transverse direction, and the upper end is slidably connected to the bottom template along the transverse bridge direction. The upper end of one of the two support rods in the two sets of support rods is rotatably connected to the first longitudinal connecting rod 18, and the upper end of the other support rod is rotatably connected to the second longitudinal connecting rod 19. The first longitudinal connecting rod is rotatably connected to one end of the threaded tie rod 52, and the second longitudinal connecting rod is threadedly connected to the middle screw of the tie rod. The other end of the tie rod is equipped with a crank handle 20. In use, the lifting mechanism is raised or lowered by rotating the crank to make the lever rotate. This makes lifting and lowering convenient.The lower end of the intermediate beam has a widened section 21, forming a step 22 between the widened section and the intermediate beam. The upper end of the side formwork facing the intermediate beam has a widened section 23, forming a step 24 between the widened section and the side formwork facing the intermediate beam. When the widened side formwork abuts against the upper end of the intermediate beam, the lower end of the side formwork facing the intermediate beam abuts against the widened section, and the step of the side formwork seals against the step of the intermediate beam. The lower end of the lifting mechanism is movably connected to the movable base along the transverse direction of the bridge, allowing the side formwork to move beyond the movable base on the side facing the intermediate beam. Horizontal diaphragms are aligned and distributed on both sides of the intermediate beam.
[0018] The process of casting the diaphragm is as follows: The diaphragm casting mold is moved to the location where the diaphragm is set on the intermediate beam via a movable base. The height of the diaphragm casting mold is adjusted to the required height using a lifting structure. The diaphragm reinforcement cage is located inside the casting mold. The upper telescopic push-pull rod extends, causing the diaphragm casting mold to abut against the intermediate beam. The diaphragm casting mold and the intermediate beam form a cavity for the diaphragm. Concrete is poured into the cavity and cast together with the reinforcement cage to form the diaphragm. During the process of moving the movable base to bring the diaphragm casting mold closer to and away from the intermediate beam, the mold is positioned in the center of the movable base to improve stability during movement. When the movable base approaches the intermediate beam to the set position, the diaphragm casting mold moves beyond the movable base and abuts against the intermediate beam. During demolding, first remove the lower end template, then retract the side telescopic push rods to separate the side template from the diaphragm, and at the same time retract the top telescopic push rods to separate the side template from the middle beam.
[0019] The process of casting the diaphragm is as follows: The diaphragm casting mold is moved to the location where the diaphragm is set on the intermediate beam via a movable base, and then connected by a pull rod to prevent movement. The height of the diaphragm casting mold is adjusted to the required height using a lifting structure. The diaphragm reinforcement cage is located inside the diaphragm casting mold, and the upper telescopic push rod extends, causing the diaphragm casting mold to abut against the intermediate beam. The diaphragm casting mold and the intermediate beam form a diaphragm cavity. Concrete is poured into the diaphragm cavity, forming the diaphragm together with the diaphragm reinforcement cage. During the process of moving the movable base to bring the diaphragm casting mold closer to and away from the intermediate beam, the diaphragm casting mold is positioned in the middle of the movable base to improve stability during movement. When the movable base approaches the intermediate beam to the set position, the diaphragm casting mold moves beyond the movable base and abuts against the intermediate beam. During demolding, first remove the lower end template, then retract the side telescopic push-pull rods to separate the side templates from the transverse diaphragm, and simultaneously retract the top telescopic push-pull rods to separate the side templates from the intermediate beam. The transverse diaphragm is equipped with lower transverse reinforcing bars 60. One end of the lower transverse reinforcing bars of the transverse diaphragm, located on both sides of the intermediate beam and aligned, is connected together, while the other end extends out of the end template of the transverse diaphragm casting mold. The end template is equipped with a lower transverse reinforcing bar positioning mechanism 61. The lower transverse reinforcing bar positioning mechanism includes a fixed connecting plate 54, a movable connecting plate 55, and a threaded tensioning rod 56 with one end fixed to the fixed connecting plate. The fixed connecting plate is fixed to the transverse diaphragm casting mold. The other end of the threaded tensioning rod passes through the movable connecting plate and is threadedly connected to a locking nut 57. The movable connecting plate is equipped with several positioning cylinders 58. A connecting threaded sleeve 59 is fixed to the top connecting plate, and the threaded tensioning rod is threadedly connected within the connecting threaded sleeve and fixed to the fixed connecting plate.
[0020] The process of positioning the lower transverse reinforcing bars is as follows: when installing the lower transverse reinforcing bars, the lower transverse reinforcing bars are passed through the top connecting plate and then inserted into the positioning cylinder one by one. Then, the locking nut is rotated so that the moving connecting plate is pressed against the end of the lower transverse reinforcing bar, thereby achieving reliable positioning.
[0021] Example 2 differs from Example 1 in that: See Figures 4 to 9The transverse diaphragm reinforcement cage includes several transverse steel bars 25 extending transversely along the bridge direction. The upper transverse steel bars of the transverse diaphragm, located on both sides of the intermediate beam and aligned, are connected together. The intermediate beam is constructed with transverse through-holes 26 for the upper transverse steel bars to pass through. The diaphragm concrete is poured into the transverse through-holes and is poured together with the intermediate beam concrete. The intermediate beam reinforcement cage includes two lower longitudinal steel bars extending longitudinally along the bridge direction and exposed below the transverse through-holes. A lower limiting groove 48 is formed between the two lower longitudinal steel bars. The upper transverse steel bars are provided with hooks that pass through the transverse through-holes and hook into the lower limiting groove. One of the two lower longitudinal steel bars (i.e., the upper higher lower longitudinal steel bar 28) extends upward beyond the other lower longitudinal steel bar (i.e., the upper lower longitudinal steel bar 29). The intermediate beam reinforcement cage also includes two upper longitudinal steel bars 30 extending longitudinally along the bridge direction and exposed above the transverse through-holes. An upper limiting groove 31 is formed between the two upper longitudinal steel bars. Two upper transverse reinforcing bars are inserted into the through-hole of a transverse bridge. The lower hook 49 of one upper transverse reinforcing bar 32 is hooked into the lower limiting groove, and the lower hook 50 of the other upper transverse reinforcing bar 33 is hooked into the upper limiting groove. It also includes an isolation membrane sleeve 34, in which the two upper transverse reinforcing bars can be inserted simultaneously. Two exhaust channels 35 are formed between the upper transverse reinforcing bars and the isolation membrane sleeve. A tie rod 36 is inserted into the exhaust channel, and the inner end of the tie rod is equipped with a cutter 37 for cutting the isolation membrane sleeve. It also includes a rebar assembly locator, which includes a clamp 38 for fixing to the upper transverse rebar, a comparison rod 39 connected to the clamp, and a scale plate 40 with an elastic connecting seat 27. The elastic connecting seat is used to insert into the transverse through hole to fix the scale plate to the end of the transverse through hole. The scale plate has a limiting notch 41 for the upper transverse rebar to pass through and two sets of reference lines 42 located on the upper and lower sides of the limiting notch. The reference line sets include a reference line 43 near the notch and a reference line 44 far from the notch. When the scale plate is fixed in the transverse through hole by the elastic connecting seat, the reference line near the notch in the lower reference line set is on the same horizontal plane as the highest point of the lower longitudinal rebar on the upper side, and the reference line far from the notch is on the same horizontal plane as the highest point of the lower longitudinal rebar on the upper side. A positioning through hole 45 is provided on the inner surface of the end template, and the upper transverse rebar passes through the positioning through hole. A protruding post 46 is fixed to the inner surface of the end formwork, and a positioning through hole passes through the protruding post. The upper transverse reinforcement is located only inside the protruding post, and the distance between the end face of the upper transverse reinforcement and the inner surface of the end formwork is more than 2 cm. After the crossbar plate is removed and the formwork is poured, there is a recess formed by the protruding post on the transverse diaphragm plate. The end of the upper transverse reinforcement is recessed into the recess, and the recess is sealed by filling it with concrete.
[0022] The process of inserting the upper transverse reinforcement into the transverse through-hole is as follows: Insert one upper transverse reinforcement from the side where the lower longitudinal reinforcement is located on the upper side until the hook abuts against the lower reinforcement on the upper side. The hook on one upper transverse reinforcement is directly below it. Fix the scale plate to the port of the transverse through-hole and insert one upper transverse reinforcement into the notch. Fix the clamp to one upper transverse reinforcement and place the alignment rod directly below it. Spacing the clamp and the scale plate apart, rotate the upper transverse reinforcement in one direction until the alignment rod is between the near-notch side baseline and the far-notch side baseline of the baseline group located below the notch. Push one upper transverse reinforcement inward to the limit position so that the hook is against the upper higher longitudinal reinforcement. Rotate one upper transverse reinforcement in the other direction until the alignment rod is directly below it so that the hook of one upper transverse reinforcement is hooked into the lower limit groove. Remove the clamp from one upper transverse reinforcement and remove the alignment plate from the transverse through-hole. The transverse reinforcement is inserted from the side where the lower longitudinal reinforcement is located on the upper side, and the hook head abuts against the lower reinforcement on the upper side. The hook head on the other upper transverse reinforcement is directly below the other upper transverse reinforcement. The scale plate is rotated 180° to fix one upper transverse reinforcement and then fixed on the port of the transverse bridge through hole, so that the other upper transverse reinforcement passes through the notch. The clamp is fixed on the other upper transverse reinforcement and the comparison rod is located directly below the other upper transverse reinforcement. The clamp is spaced apart from the scale plate. Rotate the upper transverse reinforcement in one direction until the comparison rod is located between the near-notch side baseline and the far-notch side baseline of the baseline group located below the notch. Push the other upper transverse reinforcement inward to the limit position so that the hook head is on the upper longitudinal reinforcement on the upper side. Rotate the upper transverse reinforcement in the other direction until the comparison rod is directly above the upper transverse reinforcement so that the hook head of the other upper transverse reinforcement is hooked in the upper limit groove. Remove the clamp from the other upper transverse reinforcement and remove the comparison plate from the transverse bridge through hole. Two tie rods are inserted into two venting channels from one end of the transverse bridge towards the through-hole with the cutter facing inwards. A protective membrane sleeve is then fitted over two upper transverse reinforcing bars and two tie rods. Two more tie rods are inserted into two venting channels from the other end of the transverse bridge towards the through-hole with the cutter facing inwards. Another protective membrane sleeve is fitted over two upper transverse reinforcing bars and two tie rods. The cutter is positioned outside the inner end of the protective membrane sleeve. When pouring the transverse diaphragm concrete, the concrete flows from between the protective membrane sleeve and the transverse bridge towards the through-hole. As the concrete flows out of the through-hole, the tie rods are pulled outwards simultaneously. The cutter remains inside the concrete, allowing it to cut through the protective membrane sleeve and expel the concrete, thus increasing venting and improving the density of the concrete in the transverse bridge towards the through-hole. After pouring, the two ends of the upper transverse reinforcing bars are connected to the two ends of a power source to create a short circuit and heat up, melting the protective membrane sleeve. This prevents the membrane sleeve from causing poor pouring results for the concrete and upper transverse reinforcing bars.
Claims
1. A method for installing T-beam diaphragm coarse steel bars, the T-beam comprising a middle beam extending in the longitudinal direction of the bridge and a top beam connected to the upper end of the middle beam, the top beam extending out of the middle beam in the transverse direction of the bridge, the middle beam being provided with a plurality of diaphragms distributed in the longitudinal direction of the bridge on both sides of the middle beam, the middle beam comprising a middle beam steel bar framework and middle beam concrete cast in the middle beam steel bar framework, the diaphragm comprising a diaphragm steel bar framework and diaphragm concrete cast in the diaphragm steel bar framework, the diaphragm steel bar framework being connected with the middle beam steel bar framework, the middle beam concrete being cast with the diaphragm concrete, the diaphragms on both sides of the middle beam being aligned one by one in correspondence, characterized in that, It also includes a diaphragm casting mold for casting the diaphragms one-to-one. The diaphragm reinforcement skeleton includes a plurality of lower transverse reinforcement bars extending along the transverse bridge direction. One end of the lower transverse reinforcement bars of the diaphragms located on both sides of the intermediate beam and aligned is connected together, and the other end extends out of the diaphragm casting mold. The diaphragm casting mold is provided with a lower transverse reinforcement bar positioning mechanism. The lower transverse reinforcement bar positioning mechanism includes a fixed connecting plate, a movable connecting plate, and a threaded tensioning rod with one end fixed to the fixed connecting plate. The fixed connecting plate is fixed to the diaphragm casting mold. The other end of the threaded tensioning rod passes through the movable connecting plate and is threadedly connected to a locking nut. The movable connecting plate is provided with a plurality of positioning cylinders for positioning. The process of installing the lower transverse reinforcement is as follows: When installing the lower transverse reinforcement, the lower transverse reinforcement passes through the fixed connecting plate and is then inserted one-to-one into the positioning cylinder. Then, the locking nut is rotated to press the movable connecting plate against the end of the lower transverse reinforcement, thereby achieving reliable positioning. The transverse diaphragm reinforcement skeleton includes several upper transverse reinforcements extending in the transverse direction. The upper transverse reinforcements of the transverse diaphragms located on both sides of the intermediate beam and aligned are connected together, so that the transverse diaphragms are distributed one-to-one aligned on both sides of the intermediate beam. The transverse diaphragm reinforcement skeleton includes several upper transverse reinforcements extending in the transverse direction. The upper transverse reinforcements of the transverse diaphragms located on both sides of the intermediate beam and aligned are connected together. During the pouring of the intermediate beam, a space is provided for the upper transverse reinforcements... The diaphragm concrete is poured into the transverse through-hole of the bridge through-hole and cast together with the intermediate beam concrete. The intermediate beam reinforcement skeleton includes two lower longitudinal reinforcement bars exposed on the lower side of the transverse through-hole, extending longitudinally along the bridge direction, forming a lower limiting groove between the two lower longitudinal reinforcement bars. The upper transverse reinforcement bars are provided with hooks that hook into the lower limiting groove. It also includes an isolation membrane sleeve. Two transverse reinforcement bars are inserted into one of the transverse through-holes. The two transverse reinforcement bars can be inserted into the isolation membrane sleeve at the same time. Two ventilation channels are formed between the transverse reinforcement bars and the isolation membrane sleeve. Tie rods are inserted into the ventilation channels. The inner end of the tie rods is provided with a cutter for cutting the isolation membrane sleeve. During the pouring of the transverse diaphragm... First, the horizontal reinforcing bars are inserted into the transverse through-hole and the hooks are engaged in the limiting groove. The two tie rods are then inserted one by one into the two upper and lower grooves formed by the two horizontal reinforcing bars. Then, the isolation membrane sleeve is put on the horizontal reinforcing bars and the tie rods until the isolation membrane sleeve reaches the lower longitudinal reinforcing bar. The cutter is located outside the inner end of the isolation membrane sleeve. When pouring the transverse diaphragm concrete, the concrete flows from between the isolation membrane sleeve and the transverse through-hole into the transverse through-hole. As the concrete flows out of the transverse through-hole, the tie rods are pulled outward simultaneously. The cutter is always kept inside the concrete, so that the cutter cuts the isolation membrane sleeve and releases the gas in the concrete. After the pouring is completed, the two ends of the horizontal reinforcing bars are connected to the two ends of the power supply to generate a short circuit and heat up, which melts the isolation membrane sleeve. 2. The method for installing thick steel bars in the transverse diaphragm of a T-beam according to claim 1, characterized in that, A connecting threaded sleeve is fixed on the fixed connecting plate, and the threaded tensioning rod is threadedly connected inside the connecting threaded sleeve and fixed together with the fixed connecting plate.
3. The method for installing thick steel bars in the transverse diaphragm of a T-beam according to claim 1, characterized in that, The intermediate beam reinforcement cage also includes two upper longitudinal reinforcement bars exposed on the upper side of the transverse through-hole, extending along the longitudinal direction of the bridge, so that an upper limit groove is formed between the two upper longitudinal reinforcement bars, and the lower hook head on one upper transverse reinforcement bar is hooked into the lower limit groove, and the lower hook head on the other upper transverse reinforcement bar is hooked into the upper limit groove.
4. The method for installing thick steel bars in the transverse diaphragm of a T-beam according to claim 3, characterized in that, It also includes a rebar assembly locator, wherein one of the two lower longitudinal rebars extends upward beyond the other lower longitudinal rebar. The rebar assembly locator includes a clamp for fixing to the transverse rebar, a comparison rod connected to the clamp, and a scale plate with an elastic connecting seat. The elastic connecting seat is used to insert into the transverse through hole to fix the scale plate at the end of the transverse through hole. The scale plate has a limiting notch for the upper transverse rebar to pass through and two sets of reference lines located on the upper and lower sides of the limiting notch. The reference line sets include a reference line near the notch side and a reference line far from the notch side. When the scale plate is fixed in the transverse through hole by the elastic connecting seat, the reference line set located below the notch... The highest point of the lower longitudinal reinforcement on the near-notch side is on the same horizontal plane as the highest point of the lower longitudinal reinforcement on the upper side; the highest point of the lower longitudinal reinforcement on the far-notch side is on the same horizontal plane as the highest point of the lower longitudinal reinforcement on the upper side. The process of inserting the transverse reinforcement into the transverse through-hole is as follows: insert a transverse reinforcement from the side where the lower longitudinal reinforcement on the upper side is located until the hook abuts against the lower reinforcement on the upper side. The hook on one transverse reinforcement is directly below it. Fix the scale plate to the port of the transverse through-hole, insert one transverse reinforcement into the notch, fix the clamp to one transverse reinforcement, and position the alignment rod directly below the transverse reinforcement. The clamp and scale plate are spaced apart. Rotate the transverse reinforcement in one direction to the alignment rod. Between the near-notch side baseline and the far-notch side baseline of the baseline group below the notch, push a horizontal rebar inward to its limit position so that the hook head is aligned with the upper high lower longitudinal rebar. Rotate a horizontal rebar in the other direction until the comparison rod is directly below the horizontal rebar so that the hook head of one horizontal rebar hooks into the lower limit groove. Remove the clamp from one horizontal rebar and remove the comparison plate from the transverse bridge into the through hole. Insert another horizontal rebar from the side where the lower longitudinal rebar is located on the upper side until the hook head abuts against the lower rebar on the upper side. The hook head on one horizontal rebar is directly below the other horizontal rebar. When fixing the scale plate to an upper transverse rebar, rotate it 180°. Fix the crossbar to the port of the transverse bridge through hole, so that another transverse steel bar passes through the notch. Fix the clamp to the other transverse steel bar and the comparison rod is located directly below the other transverse steel bar. The clamp is spaced apart from the scale plate. Rotate the transverse steel bar in one direction until the comparison rod is located between the near-notch side baseline and the far-notch side baseline of the baseline group below the notch. Push the other transverse steel bar inward to the limit position so that the hook head is on the lower longitudinal steel bar higher than the upper side. Rotate the transverse steel bar in the other direction until the comparison rod is directly above the transverse steel bar so that the hook head of the other transverse steel bar is hooked in the upper limit groove. Remove the clamp from the other transverse steel bar and remove the comparison rod from the transverse bridge through hole.
5. The method for installing thick steel bars in the transverse diaphragm of a T-beam according to claim 1, characterized in that, It also includes a diaphragm casting mold for casting diaphragms. The diaphragm casting mold includes a bottom template, two side templates distributed along the longitudinal bridge direction and connected at the lower end to the bottom template, and an end template that connects one end of the two side templates together. The inner surface of the end template is provided with positioning through holes, and the transverse reinforcing bars pass through the positioning through holes.
6. The method for installing thick steel bars in the transverse diaphragm of a T-beam according to claim 5, characterized in that, The inner surface of the end template is fixed with a protruding post, the positioning through hole passes through the protruding post, the upper transverse steel bar is located only inside the protruding post, and the distance between the end face of the upper transverse steel bar and the inner surface of the end template is more than 2 cm.
Citation Information
Patent Citations
Reinforcing and rapid connecting structure and method for reinforcing steel bars of reinforced concrete column and reinforced concrete beam
CN113756433A
Adjustable type T roof beam cross slab steel bar locating frame
CN208733472U
T-beam diaphragm plate pouring formwork structure
CN222275267U
T-beam diaphragm thick steel bar positioning device
CN222412633U
