Rectangular cast-in-place pile construction equipment and pile forming method thereof

By using rectangular cast-in-place pile construction equipment, combined with BeiDou information technology and intelligent sensing system, the problems of low quality and efficiency in mechanical excavation of rectangular piles have been solved, achieving high-quality and high-precision rectangular pile drilling, which is applicable to a variety of engineering fields.

CN118127997BActive Publication Date: 2026-11-24CHINA RAILWAY FIFTH SURVEY & DESIGN INST GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410320118.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2026-11-24
Estimated Expiration
2044-03-20

AI Technical Summary

Technical Problem

Existing mechanical excavation construction for rectangular piles suffers from difficulties in ensuring construction quality and efficiency, prolonged exposure of the soil around the pile, significant ground disturbance, and a lack of unified standards and equipment, posing a risk of borehole collapse, especially in weak strata and areas with high groundwater levels.

Method used

The rectangular cast-in-place pile construction equipment includes a walking mechanism, main support, plane displacement mechanism, excavation system, rectangular frame drill bit, and wall protection feeding mechanism. Combined with Beidou information technology and intelligent sensing system, it realizes intelligent mechanical hole forming and support, adapts to various geological environments, reduces the labor intensity of workers, and improves the quality and efficiency of hole forming.

Benefits of technology

It achieves high-quality, high-precision rectangular pile drilling, reduces construction risks, adapts to various geological environments, and improves construction efficiency. It is applicable to the construction of rectangular cast-in-place piles in railway, highway, underground, and mining engineering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118127997B_ABST
    Figure CN118127997B_ABST
Patent Text Reader

Abstract

This application provides a rectangular cast-in-place pile construction equipment and a pile forming method thereof. The equipment includes: a walking mechanism, a main support, a planar displacement mechanism, an excavation system, a rectangular frame drill bit, and a wall-supporting feed mechanism. The main support is connected to the walking mechanism and can move forward, backward, left, and right via the walking mechanism. The planar displacement mechanism is disposed on the main support. The excavation system includes a tunneling mechanism and a telescopic mechanism. One end of the telescopic mechanism is connected to the planar displacement mechanism, and the other end of the telescopic mechanism is connected to the tunneling mechanism. A rectangular wall-supporting assembly is disposed between the frame drill bit and the planar displacement mechanism. The rectangular frame drill bit encloses and forms a cavity. The rectangular frame drill bit has protruding teeth around its circumference away from the main support. The tunneling mechanism is located within the cavity and is fixed to the rectangular frame drill bit during tunneling operations. The rectangular cast-in-place pile construction equipment and method of this application achieve high-precision, intelligent mechanical hole forming and support, can adapt to various strata, solves the problem of rectangular pile forming, and improves the quality and efficiency of pile forming.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of engineering machinery technology, specifically to a rectangular cast-in-place pile construction equipment and a pile forming method thereof. Background Technology

[0002] In recent years, with the rapid development of modern infrastructure construction in my country, many high-speed railways, highways, energy and water pipelines need to cross geologically challenging areas such as landslide-prone areas. Furthermore, due to the frequent occurrence of geological disasters, infrastructure operating in mountainous areas also faces the threat of slope sliding. To effectively prevent and manage landslides, eliminate or mitigate their potential hazards, and ensure the safety of people's lives and property and the strategic security of infrastructure, reasonable measures must be taken to stop their sliding and eliminate their impact. Currently, widely used landslide treatment measures mainly include anti-slide retaining walls, anti-slide piles, prestressed anchor cable anti-slide piles, prestressed anchor cable frames, or ground beams. Anti-slide piles are the most commonly used treatment measure due to their advantages such as high anti-slide capacity, good support effect, minimal disturbance to the stability of the landslide body, and flexible pile placement.

[0003] Anti-slide piles have circular and rectangular cross-sectional shapes. Research on the stress characteristics of these two cross-sectional shapes shows that circular cross-section anti-slide piles consist of a combined arch, while rectangular cross-section anti-slide piles consist of a friction arch and a supporting arch. Through comparison of the soil arch zone, the anti-slide effect of circular cross-section anti-slide piles is worse than that of rectangular cross-section piles. Under the same cross-sectional area, the bending coefficient of circular cross-section anti-slide piles is smaller than that of rectangular cross-section piles. Therefore, rectangular piles are superior to circular anti-slide piles in terms of anti-slide mechanical properties.

[0004] Currently, the construction of rectangular pile holes is divided into manual excavation and mechanical excavation. Manual excavation can ensure construction quality, but it faces significant construction risks. In special circumstances such as weak strata, fractured zones, groundwater outbursts, and the accumulation of hazardous gases, manual excavation can easily threaten the lives of excavation personnel. Mechanical excavation of rectangular piles currently lacks unified standards and equipment. It mainly employs methods such as percussion excavation, rotary drilling, and milling, involving multiple sections and combinations of excavation within the cross-section before finishing with rectangular frame molds. This approach makes it difficult to guarantee both construction quality and efficiency, and the soil around the pile remains exposed for a long time, failing to provide timely support, resulting in weak connections between excavation and support.

[0005] There are currently many problems with the mechanical excavation of rectangular piles. For example, the impact or blasting drilling methods provided in related technologies cause significant disturbance to the original strata during the pile formation process. Moreover, the lack of timely follow-up in support and slag removal can easily lead to hole collapse and sediment at the bottom of the hole, affecting the quality of the pile and causing significant disturbance to the strata. The integrated drill bit drilling method provided in related technologies is mainly used for excavating square pile foundations. It is not efficient for excavating rectangular pile foundations. At the same time, since it mainly uses rotary drilling, it has poor adaptability to changes in strata. The multi-circle combined drilling combined with rectangular trimming drilling method provided in related technologies mainly uses multiple rotary drilling assemblies of different diameters to form holes, and then uses a rectangular drill bit of the same size as the pile foundation cross-section to trim the holes. The construction efficiency is low, and because multiple combined holes are constructed in succession, support is not timely, the strata are greatly disturbed, and the risk of hole collapse is high. The milling drilling method provided in related technologies achieves rectangular hole formation by swinging or translating multiple milling assemblies horizontally and vertically. Because it uses a spiral toothed belt milling wheel set, the equipment drive system and supporting system are relatively large, resulting in higher construction costs. It is more suitable for large vertical shafts and large cross-section pile foundations, and its ability to sense and adapt in advance during the tunneling process is poor. Summary of the Invention

[0006] To address one of the aforementioned technical deficiencies, this application provides a rectangular cast-in-place pile construction equipment and a pile formation method thereof.

[0007] According to a first aspect of the embodiments of this application, a rectangular cast-in-place pile construction device is provided, comprising: Footsteps; A main support, which is connected to the foot, and can move forward, backward, left, and right through the foot; A planar displacement mechanism is disposed on the main support; An excavation system, comprising a tunneling mechanism and a telescopic mechanism, wherein one end of the telescopic mechanism is connected to the planar displacement mechanism and the other end of the telescopic mechanism is connected to the tunneling mechanism; A rectangular frame drill bit is provided, and a rectangular wall-protecting assembly is provided between the frame drill bit and the planar displacement mechanism. The rectangular frame drill bit encloses and forms a cavity. The rectangular frame drill bit is provided with protruding teeth around its port opposite to the main support. The tunneling mechanism is located in the cavity and is fixed to the rectangular frame drill bit during tunneling operations. A wall-feeding mechanism is connected to the planar shifting mechanism and is used to push in the rectangular wall assembly.

[0008] Optionally, the tunneling mechanism includes: A track frame, which connects the telescopic mechanism and the rectangular frame drill bit respectively; The tunneling track is connected to the track frame and is located on a plane perpendicular to the telescopic mechanism; A tunneling machine assembly is mounted on the tunneling track and is movable along the tunneling track.

[0009] Optionally, the tunneling track extends multiple times around the telescopic mechanism, with the inner end of the tunneling track close to the telescopic mechanism and the outer end of the tunneling track away from the telescopic mechanism.

[0010] Optionally, the tunneling track extends in a spiral shape in a plane perpendicular to the telescopic mechanism; The cross-section of the tunneling track is I-shaped.

[0011] Optionally, the track frame includes multiple rods, with the first ends of each rod connected to form the central part of the track frame, and the second ends of each rod separated for connecting a rectangular frame drill bit; The central part is connected to the telescopic mechanism; All the rods are located in the same plane, and the tunneling track is connected to each of the rods.

[0012] Optionally, the telescopic mechanism and the central portion are hinged together.

[0013] Optionally, the inner wall of the rectangular frame drill bit is provided with a fixing plate; The rod extends to one side of the fixing plate along the thickness direction; A fixing pin passes through the rod and the fixing plate to connect and fix the rod and the fixing plate.

[0014] Optionally, the tunneling machine assembly includes a main unit, a cutterhead, a muck removal system, and a traveling mechanism; The tunneling cutterhead, muck removal system, and traveling mechanism are all connected to the main unit; The walking mechanism is movably connected to the tunneling track.

[0015] Optionally, the host includes a housing; The housing has a cavity, and the tunneling cutterhead is disposed in the housing; The slag discharge system includes a slag discharge pipe and a connecting seat. The connecting seat is connected to the housing, and the slag discharge pipe is connected to the connecting seat. The connecting seat has a communicating cavity that connects the slag discharge pipe and the cavity.

[0016] Optionally, the connecting seat is rotatably connected to the housing, and the axis of rotation of the connecting seat is parallel to the telescopic mechanism.

[0017] Optionally, the walking mechanism includes two side structure groups; The two side structure groups are spaced apart; Each of the side structure groups includes a support frame, a drive wheel group, and a driven wheel group. The support frame is connected to the main unit, and the drive wheel group and the driven wheel group are both disposed on the support frame. The two side structures are respectively disposed on both sides of the tunneling track along the width direction. The drive wheel set and the driven wheel assembly are located on the upper and lower sides of the tunneling track, and both the drive wheel set and the driven wheel assembly are in rolling contact with the tunneling track.

[0018] Optionally, the tunneling machine assembly includes an advanced detection and sensing terminal, which is disposed on the main unit; The advanced detection and sensing terminal is used to detect information about the bottom soil layer.

[0019] Optionally, an inclination detection device may be provided on the rectangular frame drill bit and / or the telescopic mechanism.

[0020] Optional features also include lock lug guards; The lock-mouth protective wall is fixedly installed; The locking guard is used to be fitted onto the outside of the rectangular guard assembly; The wall-feeding mechanism pushes the rectangular wall-feeding assembly to move along the locking wall.

[0021] Optionally, the main support has a top frame, a bottom frame, and a column connecting the top frame and the bottom frame; The bottom frame is connected to the gait; The planar displacement mechanism is disposed on the top frame, and the planar displacement mechanism has a displacement seat; Both the telescopic mechanism and the protective wall feeding mechanism are connected to the shifting seat.

[0022] Optionally, the top frame has a first directional beam and a second directional beam, the first directional beam and the second directional beam being perpendicular to each other; The planar displacement mechanism includes a movable frame connected to the first direction beam, the movable frame being movable along the first direction beam, and the movable frame extending along a second direction; The shifting seat is connected to the movable frame, and the shifting seat can translate along the movable frame.

[0023] Optionally, a first BeiDou positioning terminal is installed on the main support, a second BeiDou positioning terminal is installed on the movable frame, and a third BeiDou positioning terminal is installed on the shifting seat.

[0024] Optionally, it also includes multiple walking devices that constitute the gait, each of which is movably connected to a corresponding guide rail; The traveling device has a lifting mechanism; The main support is connected to the lifting mechanism, and each of the lifting mechanisms can move up and down to level the main support.

[0025] According to a second aspect of the embodiments of this application, a pile-forming method using rectangular cast-in-place pile construction equipment is provided, comprising the following steps: Step S1: Level the main support and lower the rectangular frame drill bit and excavation system; Step S2: The excavation system performs the excavation operation and excavates to the set depth; Step S3: Press in a rectangular wall protection component. The wall protection feeding mechanism pushes the rectangular frame drill bit downward by pushing in the rectangular wall protection component. Step S4: Determine whether the excavation has reached the design elevation of the pile foundation. If the result is yes, proceed to step S5; otherwise, proceed to step S2. Step S5: The excavation system performs the hole cleaning task; Step S6: Disconnect the tunneling mechanism from the rectangular frame drill bit, retract the telescopic mechanism, and recover the tunneling mechanism; Step S7: Lower the steel cage into the pile hole and pour concrete; Step S8: Pile construction completed.

[0026] By adopting the above technical solution, this application has the following beneficial effects: The rectangular cast-in-place pile construction equipment and method disclosed in this application integrates BeiDou next-generation information technology and intelligent sensing systems, realizing intelligent mechanical drilling and support, as well as high-quality and high-precision parameter control. It is adaptable to various geological environments, reduces the labor intensity of workers, and improves the quality of rectangular pile drilling and excavation efficiency. It can be used for the construction of rectangular cast-in-place piles for anti-slide piles, pile-slab walls, and bridge pile foundations in railway and highway engineering; shaft construction in underground large-space development projects, underground transportation projects, and mining engineering; and also for the construction of low-clearance rectangular cast-in-place piles with limited construction clearance, possessing broad market application prospects. Attached Figure Description

[0027] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 A schematic diagram of the overall structure of the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 2 A partial structural schematic diagram of the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 3A schematic diagram of the cooperative structure of the rectangular frame drill bit, telescopic mechanism and tunneling mechanism of the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 4 A schematic diagram of the cooperation structure between the tunneling track and the tunneling machine assembly of the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 5 for Figure 4 Top view; Figure 6 A schematic diagram of the tunneling machine assembly of the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 7 A schematic diagram of the cooperative structure of the rectangular retaining wall component and the interlocking retaining wall in the rectangular cast-in-place pile construction equipment provided in the embodiments of this application; Figure 8 This is a schematic diagram of the cooperative structure of the rectangular retaining wall assembly, the rectangular frame drill bit, and the interlocking retaining wall in the rectangular cast-in-place pile construction equipment provided in the embodiments of this application.

[0028] Reference numerals: 1. Positioning and leveling system; 11. First direction beam; 121. Movable frame; 13. Shifting seat; 141. First Beidou positioning terminal; 142. Second Beidou positioning terminal; 143. Third Beidou positioning terminal; 15. Second direction beam; 2. Walking posture adjustment system; 22. Lifting mechanism; 3. Telescopic mechanism; 31. Multi-stage telescopic hydraulic rod; 32. Intelligent inclinometer device; 4. Wall protection feed mechanism; 41. Hydraulic push rod; 42. Clamp; 5. Rectangular frame drill bit; 51. 52. Side plate; 6. Inclinometer; 7. Track frame; 8. Rod; 9. Fixing plate; 10. Fixing pin; 11. Tunneling track; 12. Starting section; 13. Ending section; 14. Tunneling machine assembly; 15. Housing; 16. Tunneling cutterhead; 17. Connecting seat; 18. Slag discharge pipe; 19. Advanced detection and sensing terminal; 10. Tunneling machine front-end control center; 11. Drive wheel assembly; 12. Driven wheel assembly; 13. Support frame; 14. Imaging terminal; 15. Rectangular retaining wall assembly; 16. Locking retaining wall. Detailed Implementation

[0029] To make the technical solutions and advantages of the embodiments of this application clearer, the exemplary embodiments of this application will be described in further detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not an exhaustive list of all embodiments. It should be noted that, unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other.

[0030] In the description of this application and its embodiments, it should be understood that the terms "top", "bottom", "height", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.

[0031] In this application and its embodiments, unless otherwise expressly specified and limited, the terms "set," "install," "connect," "link," "fix," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a communication connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0032] In this application and its embodiments, unless otherwise expressly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0033] In the process of developing this application, the inventors discovered that in related technologies, the drilling of rectangular piles is divided into manual excavation and mechanical excavation. Manual excavation can ensure construction quality, but it faces significant construction risks. When encountering weak strata, fractured zones, groundwater outbursts, or accumulation of hazardous gases, manual excavation can easily threaten the lives of excavation personnel. Currently, mechanical excavation of rectangular piles lacks unified standards and equipment. It mainly uses methods such as percussion, rotary drilling, and milling, requiring multiple sections and combinations of construction within the cross-section before being trimmed and shaped using a rectangular frame mold. This makes it difficult to guarantee construction quality and efficiency, and the soil around the pile is exposed for a long time, making timely support impossible and resulting in weak excavation-support connections.

[0034] For the above issues, please refer to Figures 1 to 8As shown in the embodiment of this application, a rectangular cast-in-place pile construction equipment is provided, including: a positioning and leveling system 1, a walking and posture adjustment system 2, a rectangular frame drill bit 5, a wall protection feeding mechanism 4, and an excavation system. The positioning and leveling system 1 includes a main support and a planar displacement mechanism. The walking and posture adjustment system 2 includes a walking mechanism, and the main support is connected to the walking mechanism. The main support can move forward, backward, left, and right through the walking mechanism to adjust its position. The planar displacement mechanism is set on the main support. The excavation system includes a tunneling mechanism and a telescopic mechanism 3. The telescopic mechanism 3 can be a multi-stage telescopic hydraulic rod 31. One end of the telescopic mechanism 3 is connected to the planar displacement mechanism, and the other end of the telescopic mechanism 3 is connected to the tunneling mechanism. A rectangular wall protection assembly 9 is set between the rectangular frame drill bit 5 and the planar displacement mechanism. The rectangular frame drill bit 5 encloses a cavity, and the rectangular frame drill bit 5 has protruding teeth around its circumference away from the main support. The tunneling mechanism is located in the cavity and is fixed to the rectangular frame drill bit 5 during tunneling. The wall protection feeding mechanism 4 is connected to the planar displacement mechanism on the main support and is used to push the rectangular wall protection assembly 9. The planar displacement mechanism can drive the wall protection feeding mechanism 4 and the telescopic mechanism to move and adjust their positions in the horizontal plane.

[0035] The rectangular cast-in-place pile construction equipment and method disclosed in this application integrates BeiDou next-generation information technology and intelligent sensing systems, realizing intelligent mechanical drilling and support, as well as high-quality and high-precision parameter control. It is adaptable to various geological environments, reduces the labor intensity of workers, and improves the quality of rectangular pile drilling and excavation efficiency. It can be used for the construction of rectangular cast-in-place piles for anti-slide piles, pile-slab walls, and bridge pile foundations in railway and highway engineering; shaft construction in underground large-space development projects, underground transportation projects, and mining engineering; and also for the construction of low-clearance rectangular cast-in-place piles with limited construction clearance, possessing broad market application prospects.

[0036] The rectangular frame drill bit 5 may include four side plates 51, which are connected end to end to form a rectangular shell structure. The lower edges of the four side plates 51 of the rectangular frame drill bit 5 are provided with protruding teeth, which can help ensure the rectangular cross-sectional shape during soil cutting and trimming, and provide initial protection of the soil around the pile after the pile hole is exposed.

[0037] The rectangular retaining wall assembly 9 can include multiple prefabricated rectangular retaining wall units stacked sequentially along the height of the pile hole. By assembling these prefabricated rectangular retaining wall units, integrated excavation and protection construction can be achieved, reducing construction disturbance. The prefabricated rectangular retaining wall units can be thin-walled structures, with upper and lower rectangular retaining wall units spliced ​​together. The rectangular retaining wall units can be made of high-strength prefabricated thin concrete slabs or PVC panels, providing initial support for rectangular hole formation, preventing hole collapse and reducing disturbance to the soil around the pile.

[0038] The top of the ground pile is supported by prefabricated rectangular retaining wall units for segmented jacking. Its penetration is synchronized with the underground rectangular frame drill bit 5, realizing the integration of excavation and support, shortening the exposure time of the free face, avoiding stratum loss and solving the disturbance problems of the pile tip, the soil around the pile and the weak structural surface.

[0039] See Figure 1 and Figure 2 As shown, the wall-feeding mechanism 4 includes a hydraulic push rod 41 and a clamp 42. The hydraulic push rod 41 is rigidly connected to a planar displacement mechanism on the main support, and the clamp 42 is connected to the hydraulic push rod 41. The clamp 42 is used to clamp the topmost prefabricated rectangular wall unit. Power is applied through the hydraulic push rod 41 to drive the rectangular wall assembly 9 to push vertically downward along the inner wall of the lock-type wall 10.

[0040] In terms of integrated excavation and support, by closely following the vertical advance of the toothed rectangular frame drill bit 5, the prefabricated rectangular retaining wall unit at the top of the pile is continuously pushed into the locking retaining wall 10 through the retaining wall feeding mechanism 4, realizing continuous operation of excavation and support, avoiding hole collapse, reducing disturbance of the soil around the pile, especially in the construction of anti-slide piles, which is of great significance for maintaining the stability of sensitive landslide strata in the construction site during the construction period and reducing construction risks.

[0041] See some possible implementations. Figures 3 to 5 As shown, the tunneling mechanism includes: a track frame 6, a tunneling track 7, and a tunneling machine assembly 8. The track frame 6 is connected to the telescopic mechanism 3 and the rectangular frame drill bit 5, respectively. The tunneling track 7 is connected to the track frame 6 and is located on a plane perpendicular to the telescopic mechanism 3. The tunneling machine assembly 8 is mounted on the tunneling track 7 and can move along the tunneling track 7.

[0042] The track frame 6 is roughly horizontal, allowing the tunneling machine assembly 8 to move along the tunneling track 7 to excavate one layer of core soil and rock. After excavation at the current height is completed, the telescopic mechanism 3 and the wall-feeding mechanism can drive the rectangular frame drill bit 5 and the tunneling mechanism to continue moving downwards to facilitate the excavation of the next layer of core soil and rock.

[0043] In some possible implementations, the tunneling track 7 can extend multiple times around the telescopic mechanism 3, with the inner end of the tunneling track 7 close to the telescopic mechanism 3 and the outer end of the tunneling track 7 away from the telescopic mechanism 3. The tunneling track 7 extends in a curved manner within the same plane, and the tunneling machine assembly 8 can move back and forth along the tunneling track 7. After the tunneling machine assembly 8 has traveled a complete path along the tunneling track 7, the excavation of one layer of soil and rock can be completed.

[0044] The tunneling track 7 extends spirally within the plane of the vertical telescopic mechanism 3, covering the entire cross-section of the hole to be excavated. The cross-section of the tunneling track 7 is I-shaped. The tunneling machine assembly 8 is connected to the tunneling track 7 and can travel along it.

[0045] In this embodiment, the tunneling track 7 extends in a spiral shape within the plane of the vertical telescopic mechanism 3. The tunneling machine assembly 8 can accurately complete the excavation of one layer of soil by traveling along the tunneling track 7, which can reduce over-excavation and under-excavation and achieve uniformity of the rectangular cross-sectional shape of the entire pile body from top to bottom.

[0046] See Figure 4 As shown, the tunneling track 7 can be an I-beam steel rail, integrally bent or assembled in sections according to the rectangular cross-sectional dimensions, mainly providing guide rails and a bearing platform for the tunneling machine assembly 8. Through continuous excavation by the tunneling machine assembly 8 from the starting section 71 to the ending section 72 of the tunneling track 7, continuous layered excavation of the rectangular pile core soil can be achieved. This embodiment of the application achieves standard rectangular hole formation by setting the tunneling track 7, which conforms to the rectangular cross-section of the pile foundation, and the small, suspended-rail tunneling machine assembly 8, ensuring the uniformity of the pile cross-sectional shape, solving the problem of pile foundation cross-sectional consistency, and exhibiting strong structural applicability and high reusability.

[0047] See some possible implementations. Figure 3 As shown, the track frame 6 includes multiple rods 61, the first ends of each rod 61 are connected to form the central part of the track frame 6, the second ends of each rod 61 are separated and used to connect the rectangular frame drill bit 5, the central part is connected to the telescopic mechanism 3, each rod 61 is located in the same plane, and the tunneling track 7 is connected to each rod 61.

[0048] The track frame 6 may include four rods 61, forming a cross-shaped structure. The ends of the four rods 61 are respectively connected to the inner walls of the four corners of the rectangular frame drill bit 5. The connection structure between the track frame 6 and the rectangular frame drill bit 5 has good stability. Each loop of the spiral tunneling track 7 is connected to one of the four rods 61. The tunneling track 7 and the rods 61 can be fixed by welding, snap-fitting, or fasteners.

[0049] In some possible implementations, the telescopic mechanism 3 is hinged to the central portion. The telescopic mechanism 3 may include a multi-stage telescopic hydraulic rod 31, the bottom end of which is connected to the center of the cross-shaped track frame 6. When subjected to external force, the track frame 6 will adaptively tilt relative to the telescopic mechanism 3, which can buffer the impact and avoid damage. At the same time, the hinged connection between the telescopic mechanism 3 and the central portion also facilitates the tilting and deformation of the track frame 6 and the rectangular frame drill bit 5 after separation, which is conducive to the excavation system smoothly removing the rectangular frame drill bit 5 and moving it along the rectangular retaining wall assembly 9 for removal.

[0050] See some possible implementations. Figure 3As shown, the inner wall of the rectangular frame drill bit 5 is provided with a fixing plate 62, the rod 61 extends to one side of the fixing plate 62 along the thickness direction, and the fixing pin 63 passes through the rod 61 and the fixing plate 62 to connect and fix the rod 61 and the fixing plate 62.

[0051] The fixing plate 62 can be installed at the corner formed between two adjacent side plates 51 of the rectangular frame drill bit 5. Two fixing plates 62 can be installed at each corner of the rectangular frame drill bit 5, with the two fixing plates 62 spaced apart. The end of the rod body 61 can be inserted between the two fixing plates 62, and the fixing pin 63 is installed through the two fixing plates and the rod body 61. After the pile driver drills the hole to the design elevation and cleans the hole, the track frame 6, the tunneling track 7, and the tunneling machine assembly 8 can be lifted out as a whole by removing the fixing plates 62 and the fixing pins 63, which is convenient for multiple reuses.

[0052] See some possible implementations. Figure 4 and Figure 6 As shown, the tunneling machine assembly 8 includes a main unit, a cutterhead 82, a muck removal system, and a traveling mechanism. The cutterhead 82, the muck removal system, and the traveling mechanism are all connected to the main unit, and the traveling mechanism is movably connected to the tunneling track 7. The movement of the traveling mechanism along the tunneling track 7 can drive the movement of other structures. The main unit and the cutterhead 82 excavate in layers along the tunneling track 7, and the muck removal system discharges muck synchronously through the muck removal pipe 84. The tunneling machine assembly 8 excavates from the starting section 71 of the tunneling track 7 to the ending section 72 of the tunneling track 7, and then the traveling mechanism returns to the starting section 71 of the tunneling track 7 to prepare for the next layer of excavation.

[0053] See some possible implementations. Figure 6 As shown, the main unit may include a housing 81, the housing 81 having a cavity, a tunneling cutterhead 82 disposed on the housing 81, and a slag discharge system including a slag discharge pipe 84 and a connecting seat 83. The connecting seat 83 is connected to the housing 81, the slag discharge pipe 84 is connected to the connecting seat 83, and the connecting seat 83 has a communicating cavity that connects the slag discharge pipe 84 and the cavity.

[0054] The broken rock and soil from the cutterhead 82 enters the cavity inside the shell 81, and then, under negative pressure, enters the slag discharge pipe 84 through the connecting cavity, and is subsequently discharged to the outside of the pile hole through the slag discharge pipe 84. The connecting seat 83 and the shell 81 are rotatably connected, and the rotation axis of the connecting seat 83 is parallel to the telescopic mechanism 3. The end of the slag discharge pipe 84 is rotatably connected to the connecting seat 83, and the rotation axis of the end of the connecting seat 83 and the rotation axis of the slag discharge pipe 84 can be perpendicular to each other. Both can rotate along their respective rotation axes, facilitating the slag discharge operation performed by the tunneling machine assembly 8 at various points on the tunneling track 7.

[0055] See Figure 6As shown, the tunneling machine assembly 8 may also include an imaging terminal 90, which can be connected to the advanced detection and sensing terminal 85. The imaging terminal 90 can monitor the sediment at the bottom of the pile and detect the splicing quality of the rectangular retaining wall assembly 9.

[0056] The rectangular cast-in-place pile construction equipment provided in this application embodiment can perform hole cleaning operations after the excavation reaches the designed elevation of the pile foundation. The imaging terminal 90 can monitor the cleaning of the pile bottom sediment in real time, which can realize refined hole cleaning of the pile bottom before the pile foundation is poured, and improve the pile quality.

[0057] See some possible implementations. Figure 6 As shown, the traveling mechanism includes two side structure groups, which are spaced apart. Each side structure group includes a support frame 89, a drive wheel set 87, and a driven wheel set 88. The support frame 89 is connected to the main unit, and the drive wheel set 87 and driven wheel set 88 are both located on the support frame 89. The two side structures are located on both sides of the tunneling track 7 along the width direction. The drive wheel set 87 and driven wheel set 88 are located on the upper and lower sides of the tunneling track 7, and both are in rolling contact with the tunneling track 7. The tunneling track 7 can be I-shaped, and includes an upper flange, a lower flange, and a web connecting the upper and lower flanges. The drive wheel set 87 and driven wheel set 88 can be located on both sides of the lower flange along the thickness direction, and are respectively in close contact with the surface of the lower flange, providing forward propulsion for excavation.

[0058] See some possible implementations. Figure 6 As shown, the tunneling machine assembly 8 includes an advanced detection and sensing terminal 85, which is installed on the main unit and is used to detect information about the bottom soil layers. The advanced detection and sensing terminal 85 can detect the lower strata and interfaces in advance, enabling adaptive adjustment of the drilling parameters of the drill bit. The advanced detection and sensing terminal 85 may include radar, capable of detecting changes in the underlying soil layer. Regarding adaptive operation during construction, by installing the advanced detection and sensing terminal 85 and the tunneling machine front-end control center 86 on the tunneling machine assembly 8, advanced acquisition and analysis of strata data can be performed, feeding back to the tunneling machine control system for real-time intelligent servo adjustments to adapt to excavation of different soil and rock layers, thereby improving construction efficiency.

[0059] This embodiment of the application sets up an advanced detection and sensing terminal 85 and a tunneling machine front-end control center 86 at the front end of the tunneling machine assembly 8. The advanced detection and sensing terminal 85 can perform advanced geological prediction of the soil and rock properties and structural surfaces of the underlying pre-excavated strata, acquire geological parameters, and transmit them back to the tunneling machine front-end control center 86. Based on the comparison between the strata parameters and the preset parameters of the tunneling machine, the tunneling machine front-end control center 86 controls the tunneling machine to servo adjust various excavation parameters, including the drill bit rotation speed, drill bit inclination angle, forward speed of the cutterhead 82, horizontal angle of the cutterhead 82, and vertical inclination angle of the cutterhead 82, achieving intelligent adaptive construction of the excavation system. In addition, the imaging terminal 90 integrated with the advanced detection and sensing terminal 85 can also monitor the exposed surface of the pile foundation excavation during the excavation process, assisting in the judgment of strata changes and groundwater conditions.

[0060] See some possible implementations. Figure 3 As shown, an inclination detection device is installed on the rectangular frame drill bit 5 and / or the telescopic mechanism 3.

[0061] The inclination detection device installed on the inner wall of the rectangular frame drill bit 5 can be an inclinometer 52, and the inclination detection device installed in the hydraulic rods of the multi-stage telescopic hydraulic rod 31 of the telescopic mechanism 3 can be an intelligent inclinometer 32. The inclination detection device can realize real-time monitoring of verticality, and through the Beidou attitude adjustment system installed on the main support, it can control the X-axis, Y-axis movement and Z-axis extension and retraction of each hydraulic rod of the pile driver, so as to adjust the verticality during the hole forming process. At the same time, the inclination detection device on the inner wall of the rectangular frame drill bit 5 can be permanently left at the bottom of the pile body. After the pile is formed, it can monitor the bottom deformation of the pile foundation in real time, which can be used to judge the health status of the pile foundation during its service life. It can realize multi-source fusion rectangular hole forming verticality and deformation monitoring based on the Beidou navigation system.

[0062] See some possible implementations. Figure 1 , Figure 7 and Figure 8 As shown, the rectangular cast-in-place pile construction equipment also includes a locking retaining wall 10, which is fixedly installed and used to be fitted on the outside of the rectangular retaining wall assembly 9. The retaining wall feeding mechanism 4 pushes the rectangular retaining wall assembly 9 to move along the locking retaining wall 10.

[0063] The locking retaining wall 10 can be a cast-in-place or precast concrete rectangular frame structure, mainly used to protect the pile head position, facilitate the fixing of the pile position and provide a guide groove for the 9-section assembly and jacking of the precast rectangular retaining wall components.

[0064] In some possible implementations, the main support has a top frame, a bottom frame, and columns connecting the top and bottom frames. The bottom frame is directly or indirectly connected to the support. A planar displacement mechanism is disposed on the top frame. The planar displacement mechanism has a displacement seat 13, and the telescopic mechanism 3 and the wall-feeding mechanism 4 are both connected to the displacement seat 13. Movement of the displacement seat 13 can drive the telescopic mechanism 3 and the wall-feeding mechanism 4 to move accordingly.

[0065] See Figure 1 and Figure 2 As shown, the top frame can be a rectangular frame, including two first-direction beams 11 and two second-direction beams 15. The two second-direction beams 15 are respectively located at both ends of the first-direction beams 11 and connected to the two first-direction beams 11. The first-direction beams 11 and the second-direction beams 15 are perpendicular to each other. The planar displacement mechanism includes a movable frame 121, which is connected to the first-direction beams 11 and can move along the first-direction beams 11. The movable frame 121 extends along the second direction, and a displacement seat 13 is connected to the movable frame 121 and can translate along the movable frame 121. The movable frame 121 may include two first-direction moving platforms spaced apart. The displacement seat 13 mentioned above can be understood as a second-direction moving platform. The two first-direction moving platforms are spaced apart, and their two ends are respectively connected to the two first-direction beams 11. The two ends of the first-direction moving platforms can cooperate with the first-direction beams 11 through a gear transmission mechanism to realize first-direction movement. The two ends of the second-direction moving platforms can cooperate with the first-direction moving platforms through a gear transmission mechanism to realize second-direction movement. The position adjustment and verticality control of the underground excavation section of the piling machine are achieved by using the first and second directional moving platforms together.

[0066] In some possible implementations, the rectangular cast-in-place pile construction equipment also includes multiple traveling devices forming a walking mechanism. Each traveling device is movably connected to a corresponding guide rail. Each traveling device has a lifting mechanism 22, and the main support is connected to the lifting mechanism 22. Each lifting mechanism 22 can move up and down independently to level the main support. A first Beidou positioning terminal 141 is installed on the main support, a second Beidou positioning terminal 142 is installed on the movable frame 121, and a third Beidou positioning terminal 143 is installed on the shifting seat 13. The attitude of the main support is monitored by each positioning terminal, and the data is fed back to the traveling device, which then positions and levels the main support. The traveling device can adjust the position and correct the attitude of the main support based on the planar and vertical positional relationship of the three Beidou positioning terminals. The three Beidou positioning terminals can monitor the attitude and pile position of the construction equipment in real time and can feed back the attitude data to the control system of the construction equipment. This allows the traveling device and other mechanisms to adjust the attitude and position of the construction equipment, achieving real-time optimal maintenance of the pile driver's attitude before and during construction.

[0067] This application also provides a pile-forming method for rectangular cast-in-place pile construction equipment, including the following steps: Step S1: Level the main support and lower the rectangular frame drill bit 5 and the excavation system; Before step S1, a preparation process is included, which includes setting out the pile positions to facilitate the construction of the interlocking retaining wall 10 for the pile foundation and to reinforce and protect the pile head. A rotary drilling rig is used to cut a groove at one corner of the rectangular pile cross-section (the projected position of the starting section 71 of the tunneling track 7), extending through the entire pile length, to provide an initial excavation cut for each layer of layered excavation. The interlocking section is excavated to form a hole, constructing the starting space for the excavation system. The main support and traveling device are positioned, and the attitude of the top frame is monitored through three Beidou positioning terminals. The data is fed back to the traveling device to achieve the positioning and leveling of the main support. After that, the rectangular frame drill bit 5 and the excavation system can be lowered.

[0068] Step S2: The excavation system performs the excavation operation and excavates to the set depth; In step S2, after the advanced detection and sensing terminal 85 and imaging terminal 90 collect the stratum data, they feed it back to the front-end control center 86 of the tunneling machine for data processing. Then, based on big data and expert system analysis, the construction parameters of the tunneling machine are obtained. The main unit and the tunneling cutterhead 82 excavate layer by layer along the tunneling track 7. The slag removal system and slag removal pipe 84 simultaneously remove slag. The excavation starts from the starting section 71 of the tunneling track 7 and ends at the ending section 72. Then, the small overhead rail tunneling machine assembly 8 returns to the starting section 71 of the tunneling track 7 to prepare for the next layer of excavation.

[0069] During the excavation process, the tilt detection devices installed on the rectangular frame drill bit 5 and / or the telescopic mechanism 3 acquire real-time verticality data of the borehole and the wall, respectively, and feed this data back to the front control center 86 of the tunneling machine. After data processing, the verticality control data is fed back to the main support and the traveling device. The planar displacement mechanism realizes the position adjustment of the underground excavation part of the pile driver, as well as the real-time maintenance of the verticality of the borehole and the wall. Among them, the tilt detection device on the telescopic mechanism 3 can be an intelligent inclinometer 32, and the tilt detection device on the rectangular frame drill bit 5 can be an inclinometer 52.

[0070] Step S3: Press in a rectangular wall protection assembly. The wall protection feeding mechanism 4 pushes the rectangular frame drill bit 5 downward through the push-in rectangular frame drill bit 5. After the rail-mounted mini tunneling machine assembly 8 excavates one layer, the hydraulic push rod 41 and caliper 42 push the prefabricated rectangular retaining wall assembly 9 vertically downward along the inner side of the lock retaining wall 10. The multi-stage telescopic hydraulic rod 31 of the telescopic mechanism 3 pushes downward simultaneously. The synchronous action of the two allows the rail-mounted mini tunneling machine assembly 8 to enter the next layer cutting for continued excavation. At the same time, the toothed rectangular frame drill bit 5 can provide timely support for the free face of the stratum around the pile, realizing integrated excavation and support construction.

[0071] Step S4: Determine whether the excavation has reached the design elevation of the pile foundation. If the result is yes, proceed to step S5; otherwise, proceed to step S2. Step S5: The excavation system performs the hole cleaning task; After the excavation reaches the designed elevation of the pile foundation, the slag removal system and slag removal pipe 84 continue to perform hole cleaning operations. The imaging terminal 90 monitors the cleaning of the sediment at the bottom of the pile in real time. After the hole is cleaned, the fixing plate 62 and fixing pin 63 are released from their constraints, and the excavation system can be used for recovery operations.

[0072] Step S6: Disconnect the tunneling mechanism from the rectangular frame drill bit 5, retract the telescopic mechanism 3, and recover the tunneling mechanism; In this step, the fixing plate 62 and fixing pin 63 are released from their constraints. During the excavation system recovery process, the imaging terminal 90 inspects the overall quality of the pile wall jacking installation.

[0073] Step S7: Lower the steel cage into the pile hole and pour concrete; In this step, the steel cage is lowered and concrete is poured. The permanent rectangular frame drill bit 5 and the built-in tilt detection device are used to monitor the pile foundation posture in real time, which can provide data support for the later deformation assessment of the pile foundation.

[0074] Step S8: Pile construction completed.

[0075] The rectangular cast-in-place pile construction equipment and its pile-forming method provided in this application embodiment realize high-precision intelligent mechanical drilling and integrated support for rectangular cast-in-place piles by integrating Beidou next-generation information technology. Besides its application in anti-slide pile construction, it can also be used for rectangular cast-in-place pile construction in railway and highway engineering for pile-slab walls and bridge pile foundations, rectangular cast-in-place pile foundation construction in building engineering, and shaft construction in underground large-space development projects, underground transportation projects, and mining engineering. Due to the low height of the ground portion of the pile driver equipment, it can also be used for low-clearance rectangular cast-in-place pile construction where construction clearance is limited. Furthermore, by changing the arrangement shape of the tunneling track 7 according to specific actual working conditions, it can also be flexibly used for the construction of circular and other irregular cross-section pile foundations, demonstrating broad market application prospects.

[0076] The foregoing disclosure provides many different embodiments or examples for implementing different structures of this application. To simplify the disclosure, specific examples of components and arrangements are described above. Of course, these are merely examples and are not intended to limit the scope of this application. Furthermore, reference numerals and / or letters may be repeated in different examples; such repetition is for simplification and clarity and does not in itself indicate a relationship between the various embodiments and / or arrangements discussed. In addition, examples of various specific processes and materials are provided in this application, but those skilled in the art will recognize the application of other processes and / or the use of other materials.

[0077] Although preferred embodiments of this application have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of this application.

[0078] Obviously, those skilled in the art can make various modifications and variations to this application without departing from the spirit and scope of this application. Therefore, if such modifications and variations fall within the scope of the claims of this application and their equivalents, this application also intends to include such modifications and variations.

Claims

1. A rectangular cast-in-place pile construction equipment, characterized in that, include: Footsteps; A main support, which is connected to the strut and can move forward, backward, left, and right through the strut; A planar displacement mechanism is disposed on the main support; An excavation system, comprising a tunneling mechanism and a telescopic mechanism, wherein one end of the telescopic mechanism is connected to the planar displacement mechanism and the other end of the telescopic mechanism is connected to the tunneling mechanism; A rectangular frame drill bit is provided, and a rectangular wall-protecting assembly is provided between the frame drill bit and the planar displacement mechanism. The rectangular frame drill bit encloses and forms a cavity. The rectangular frame drill bit is provided with protruding teeth around its port opposite to the main support. The tunneling mechanism is located in the cavity and is fixed to the rectangular frame drill bit during tunneling operations. A wall-feeding mechanism is connected to the planar shifting mechanism and is used to push forward the rectangular wall assembly; The tunneling mechanism includes: A track frame, which connects the telescopic mechanism and the rectangular frame drill bit respectively; The tunneling track is connected to the track frame and is located on a plane perpendicular to the telescopic mechanism; The tunneling machine assembly is located on the tunneling track and can move along the tunneling track. It uses a rotary drilling rig to create a groove at the projection position of the starting section of the tunneling track at one corner of the rectangular pile cross-section, penetrating the entire pile length, to provide an initial tunneling cut for each layer of layered excavation.

2. The rectangular cast-in-place pile construction equipment according to claim 1, characterized in that, The tunneling track extends circumferentially around the telescopic mechanism multiple times, with the inner end of the tunneling track close to the telescopic mechanism and the outer end of the tunneling track away from the telescopic mechanism.

3. The rectangular cast-in-place pile construction equipment according to claim 2, characterized in that, The tunneling track extends in a spiral shape in a plane perpendicular to the telescopic mechanism; The cross-section of the tunneling track is I-shaped.

4. The rectangular cast-in-place pile construction equipment according to claim 1, characterized in that, The track frame includes multiple rods, the first ends of which are connected to form the central part of the track frame, and the second ends of which are separated to connect a rectangular frame drill bit. The central part is connected to the telescopic mechanism; All the rods are located in the same plane, and the tunneling track is connected to each of the rods.

5. The rectangular cast-in-place pile construction equipment according to claim 4, characterized in that, The telescopic mechanism is hinged to the central part.

6. The rectangular cast-in-place pile construction equipment according to claim 4, characterized in that, The inner wall of the rectangular frame drill bit is provided with a fixing plate; The rod extends to one side of the fixing plate along the thickness direction; A fixing pin passes through the rod and the fixing plate to connect and fix the rod and the fixing plate.

7. The rectangular cast-in-place pile construction equipment according to claim 1, characterized in that, The tunneling machine assembly includes a main unit, a tunneling cutterhead, a muck removal system, and a traveling mechanism; The tunneling cutterhead, muck removal system, and traveling mechanism are all connected to the main unit; The walking mechanism is movably connected to the tunneling track.

8. The rectangular cast-in-place pile construction equipment according to claim 7, characterized in that, The host includes a housing; The housing has a cavity, and the tunneling cutterhead is disposed in the housing; The slag discharge system includes a slag discharge pipe and a connecting seat. The connecting seat is connected to the housing, and the slag discharge pipe is connected to the connecting seat. The connecting seat has a communicating cavity that connects the slag discharge pipe and the cavity.

9. The rectangular cast-in-place pile construction equipment according to claim 8, characterized in that, The connecting seat is rotatably connected to the housing, and the axis of rotation of the connecting seat is parallel to the telescopic mechanism.

10. The rectangular cast-in-place pile construction equipment according to claim 7, characterized in that, The walking mechanism includes two side structure groups; The two side structure groups are spaced apart; Each of the side structure groups includes a support frame, a drive wheel group, and a driven wheel group. The support frame is connected to the main unit, and the drive wheel group and the driven wheel group are both disposed on the support frame. The two side structures are respectively disposed on both sides of the tunneling track along the width direction. The drive wheel set and the driven wheel assembly are located on the upper and lower sides of the tunneling track, and both the drive wheel set and the driven wheel assembly are in rolling contact with the tunneling track.

11. The rectangular cast-in-place pile construction equipment according to claim 7, characterized in that, The tunneling machine assembly includes an advanced detection and sensing terminal, which is installed on the main unit; The advanced detection and sensing terminal is used to detect information about the bottom soil layer.

12. The rectangular cast-in-place pile construction equipment according to claim 1, characterized in that, An inclination detection device is provided on the rectangular frame drill bit and / or the telescopic mechanism.

13. The rectangular cast-in-place pile construction equipment according to any one of claims 1-12, characterized in that, It also includes the lock flange; The lock-mouth protective wall is fixedly installed; The locking guard is used to be fitted onto the outside of the rectangular guard assembly; The wall-feeding mechanism pushes the rectangular wall-feeding assembly to move along the locking wall.

14. The rectangular cast-in-place pile construction equipment according to any one of claims 1-12, characterized in that, The main support has a top frame, a bottom frame, and columns connecting the top frame and the bottom frame; The bottom frame is connected to the gait; The planar displacement mechanism is disposed on the top frame, and the planar displacement mechanism has a displacement seat; Both the telescopic mechanism and the protective wall feeding mechanism are connected to the shifting seat.

15. The rectangular cast-in-place pile construction equipment according to claim 14, characterized in that, The top frame has a first directional beam and a second directional beam, the first directional beam and the second directional beam being perpendicular to each other; The planar displacement mechanism includes a movable frame connected to the first direction beam, the movable frame being movable along the first direction beam, and the movable frame extending along a second direction; The shifting seat is connected to the movable frame, and the shifting seat can translate along the movable frame.

16. The rectangular cast-in-place pile construction equipment according to claim 15, characterized in that, The main support is equipped with a first Beidou positioning terminal, the movable frame is equipped with a second Beidou positioning terminal, and the shifting seat is equipped with a third Beidou positioning terminal.

17. The rectangular cast-in-place pile construction equipment according to any one of claims 1-12, characterized in that, It also includes multiple walking devices that constitute the gait, each of which is movably connected to a corresponding guide rail; The traveling device has a lifting mechanism; The main support is connected to the lifting mechanism, and each of the lifting mechanisms can move up and down to level the main support.

18. A pile-forming method for a rectangular cast-in-place pile construction equipment as described in any one of claims 1-17, characterized in that, Includes the following steps: Step S1: Level the main support and lower the rectangular frame drill bit and excavation system; Step S2: The excavation system performs the excavation operation and excavates to the set depth; Step S3: Press in a rectangular wall protection component. The wall protection feeding mechanism pushes the rectangular frame drill bit downward by pushing in the rectangular wall protection component. Step S4: Determine whether the excavation has reached the design elevation of the pile foundation. If the result is yes, proceed to step S5; otherwise, proceed to step S2. Step S5: The excavation system performs the hole cleaning task; Step S6: Disconnect the tunneling mechanism from the rectangular frame drill bit, retract the telescopic mechanism, and recover the tunneling mechanism; Step S7: Lower the steel cage into the pile hole and pour concrete; Step S8: Pile construction completed.

Citation Information

Patent Citations

  • Vertical combined type tunneling system

    CN109356521A

  • Mechanical hole forming method for step-by-step drilling and digging of rectangular anti-slide pile with horizontal cantilever

    CN117072060A