Water wall system and method of controlling the same

By adopting a feedback bypass water-cooled wall system in ultra-supercritical thermal power unit boilers and optimizing the working fluid flow path, the safety and economic issues of the boiler under extreme peak loads have been solved, achieving economical operation under high loads and safe operation under low loads.

CN118149355BActive Publication Date: 2026-11-24DONGFANG BOILER GROUP OF DONGFANG ELECTRIC CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410366209.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2026-11-24
Estimated Expiration
2044-03-28

AI Technical Summary

Technical Problem

Existing ultra-supercritical thermal power unit boilers cannot operate stably under lower peak loads, leading to increased costs for feedwater pump selection and operating power consumption, which affects the economic efficiency and safety of the unit.

Method used

The water-cooled wall system with feedback bypass is designed to optimize the flow path of the working fluid by controlling the opening and closing of the shut-off valves at high and low loads, thus ensuring full-load economy and safety under extreme peak load conditions.

Benefits of technology

It achieves safe operation of the boiler under extreme peak load of around 10%, while reducing the impact of increased water-cooled wall resistance at full load on the unit's economy, thus improving the unit's safety and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118149355B_ABST
    Figure CN118149355B_ABST
Patent Text Reader

Abstract

This invention relates to the field of boiler technology and discloses a water-cooled wall system and its control method. The system includes a spiral water-cooled wall, a vertical water-cooled wall, and an intermediate mixing header connected from top to bottom. The vertical water-cooled wall is located above the spiral water-cooled wall and is connected to the spiral water-cooled wall through the intermediate mixing header. This invention solves the problems of increased feedwater pump selection costs and operating power consumption, and the impact on unit safety and stability, existing in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of boiler technology, specifically a water-cooled wall system and its control method. Background Technology

[0002] Large-scale intermittent renewable energy sources, represented by wind power and photovoltaics, are accelerating the low-carbon transformation of the energy structure. However, the grid connection of large-scale renewable energy generation requires sufficient flexibility resources in the power system to ensure the safe operation of the power grid.

[0003] To enhance the absorption capacity of renewable energy, coal-fired power units with good peak-shaving potential are playing a crucial role as the basic regulating energy source in the power grid. With the vigorous promotion and development of new energy sources, the proportion of new energy connected to the grid will continue to increase in the future, and the current peak-shaving load of coal-fired power units may not be able to meet the requirements of the future new power system. To address the increased volatility and uncertainty brought about by the increased proportion of renewable energy generation, future coal-fired power units will need to handle lower and more extreme peak-shaving loads.

[0004] Currently, the boiler water-cooled walls of ultra-supercritical thermal power units that undertake deep peak shaving are basically all of the following structural types: lower spiral water-cooled wall + middle transition section mixed + upper vertical water-cooled wall.

[0005] In the spiral water-cooled wall region with higher heat load, internally threaded tubes are used. Compared with bare tubes, the critical mass flow rate of the water-cooled wall is lower, which can further reduce the direct current load. At the same time, the internally threaded tubes increase heat exchange inside the tube, which can effectively reduce the wall temperature and make the water-cooled wall safer.

[0006] According to research, the most advanced ultra-supercritical thermal power units can currently achieve a minimum load of approximately 20% to 25% for deep peak shaving. At this load, the boiler can operate in a dry state, with stable combustion and no overheating of the water-cooled walls without the need for auxiliary combustion. If the peak load is further reduced, the boiler will need to operate in a wet state, which will lead to increased coal consumption and prolonged wet operation will also affect the safety and stability of the unit.

[0007] When ultra-supercritical thermal power units are engaged in deep peak shaving, the boiler must maintain dry operation to ensure that the mass flow rate of the spiral water-cooled wall is not lower than the minimum mass flow rate G0 (unit: kg / (sm)). 2 If the water-cooled wall is designed based on the mass flow rate G0 of the spiral water-cooled wall during dry operation of the boiler at a 10% peak load, the mass flow rate of the spiral water-cooled wall will increase to about 10 times G0 at full load (about twice that of conventional projects). This will result in a significant increase in the water-cooled wall resistance at full load (for example, in a 1000MW project, it will increase by about 2.7MPa compared to conventional projects), leading to increased feedwater pump selection costs and operating power consumption, and a decrease in the unit's economic efficiency.

[0008] In summary, current ultra-supercritical thermal power unit boilers cannot meet the requirements for dry operation under future lower peak loads of 10%. If the boiler water-cooled wall is designed according to the 10% peak load (to ensure dry operation), it will lead to an increase in the resistance of the water-cooled wall at full load, which will result in an increase in the cost of selecting feedwater pumps and the power consumption of operation, and a decrease in the economic efficiency of the unit. Summary of the Invention

[0009] To overcome the shortcomings of existing technologies, this invention provides a water-cooled wall system and its control method, which solves the problems of increased cost of feedwater pump selection and operating power consumption, and impact on the safety and stability of the unit.

[0010] The technical solution adopted by the present invention to solve the above problems is:

[0011] A water-cooled wall system includes a spiral water-cooled wall, a vertical water-cooled wall, and an intermediate mixing manifold connected from top to bottom. The vertical water-cooled wall is located above the spiral water-cooled wall and is connected to the spiral water-cooled wall through the intermediate mixing manifold.

[0012] As a preferred technical solution, it also includes a lower spiral water-cooled wall header located below the spiral water-cooled wall and an upper spiral water-cooled wall header located above the spiral water-cooled wall, wherein the lower spiral water-cooled wall header, the spiral water-cooled wall, the upper spiral water-cooled wall header, and the intermediate mixing header are connected in sequence.

[0013] As a preferred technical solution, it also includes a centralized drain pipe distribution manifold located below the lower manifold of the spiral water-cooled wall, the lower manifold of the spiral water-cooled wall being connected to the centralized drain pipe distribution manifold, and the connecting pipes between the upper manifold of the spiral water-cooled wall and the intermediate mixing manifold, as well as the connecting pipes between the lower manifold of the spiral water-cooled wall and the centralized drain pipe distribution manifold.

[0014] As a preferred technical solution, it also includes a partition plate installed on the lower header and upper header of the spiral water-cooled wall, the partition plate dividing N water-cooled wall circuits, and also includes n first shut-off valves and Nn third shut-off valves. The first shut-off valves are installed on the connecting pipe from the upper header of the spiral water-cooled wall to the intermediate mixing header, and the third shut-off valves are installed on the connecting pipe from the centralized drain pipe distribution header to the lower header of the spiral water-cooled wall.

[0015] As a preferred technical solution, it also includes a feedback bypass connecting the upstream of the first shut-off valve and the downstream of the third shut-off valve, and a second shut-off valve located on the feedback bypass.

[0016] As a preferred technical solution, it also includes a lower header of the vertical water-cooled wall, an upper header of the vertical water-cooled wall, an intermediate mixing header, a lower header of the vertical water-cooled wall, and an upper header of the vertical water-cooled wall connected in sequence.

[0017] As a preferred technical solution, it also includes a water-cooled wall outlet mixing header located above the vertical water-cooled wall header, and the vertical water-cooled wall header is connected to the water-cooled wall outlet mixing header.

[0018] As a preferred technical solution, the spiral water-cooled wall is arranged on four sides: front wall, rear wall, left side, and right side.

[0019] In the control method of the water-cooled wall system, when operating under high load, the first and third shut-off valves are both open, the second shut-off valve is closed, and the working fluid, after exiting the distribution manifold of the centralized drain pipe, enters the lower manifold of the spiral water-cooled wall. After heat exchange through the spiral water-cooled wall, it is introduced into the upper manifold of the spiral water-cooled wall and then all flows into the intermediate mixing manifold. Herein, high load refers to the load exceeding the set maximum load threshold.

[0020] The control method for a water-cooled wall system, wherein during low-load operation, the first and third shut-off valves are closed, the second shut-off valve is open, and the working fluid is introduced into n water-cooled wall loops without a third shut-off valve to absorb heat, and then enters the remaining Nn water-cooled wall loops through the feedback bypass connection pipeline and the shut-off valve; wherein, low load refers to the load being lower than the set minimum load threshold.

[0021] Compared with the prior art, the present invention has the following advantages:

[0022] This invention can not only meet the safe operation requirements of boilers under extreme peak loads of about 10% in future thermal power units, but also eliminate the impact of increased resistance on the economic efficiency of the unit under full load. At the same time, it takes into account both the safety of boiler hydrodynamics under extreme peak loads and the economic efficiency of unit operation under full load. Attached Figure Description

[0023] Figure 1 This is one of the structural schematic diagrams of a water-cooled wall system according to the present invention;

[0024] Figure 2 for Figure 1 One of the magnified views of a section;

[0025] Figure 3 for Figure 1 The second enlarged view of a section;

[0026] Figure 4 This is a second schematic diagram of the structure of a water-cooled wall system according to the present invention;

[0027] Figure 5 for Figure 4 One of the magnified views of a section;

[0028] Figure 6 for Figure 4 The second enlarged view of a part.

[0029] The labels and their corresponding names in the attached diagram are as follows: 1. Spiral water-cooled wall, 2. Vertical water-cooled wall, 3. Intermediate mixing manifold, 4. Centralized drain pipe distribution manifold, 5. Lower spiral water-cooled wall manifold, 6. Upper spiral water-cooled wall manifold, 7. Water-cooled wall outlet mixing manifold, 8. Divider plate, 9. Lower vertical water-cooled wall manifold, 10. Upper vertical water-cooled wall manifold, 21. First electric shut-off valve, 22. Second electric shut-off valve, 23. Third electric shut-off valve. Detailed Implementation

[0030] The present invention will be further described in detail below with reference to the embodiments and accompanying drawings, but the embodiments of the present invention are not limited thereto.

[0031] Example 1

[0032] like Figures 1 to 6 As shown, in order to meet the dry-state operation of boilers under the more extreme peak load of about 10% for future thermal power units, improve the safety of low-load operation, and at the same time ensure that the water-cooled wall resistance will not increase and reduce the economic efficiency of the unit under full-load conditions, this invention adopts a design with feedback bypass on the spiral water-cooled wall of the ultra-supercritical pulverized coal boiler. This design can not only ensure the economic efficiency of the unit under full-load operation, but also meet the safe operation of the boiler under the extreme peak load of about 10%.

[0033] The boiler is an ultra-supercritical pulverized coal boiler for thermal power units. The water-cooled wall heating surface mainly consists of a lower spiral water-cooled wall 1 and an upper vertical water-cooled wall 2, wherein the spiral water-cooled wall adopts an internally threaded tube; the lower spiral water-cooled wall 1 and the upper vertical water-cooled wall 2 are connected by an intermediate mixing header 3.

[0034] The working fluid of the water-cooled wall enters the lower header 5 of the spiral water-cooled wall through the centralized drain pipe distribution header 4 and then enters the heating surface of the spiral water-cooled wall 1. The spiral water-cooled wall is arranged in four sections: front, rear, left, and right. After absorbing heat, the heating surface of the spiral water-cooled wall 1 flows through the upper header 6 into the intermediate mixing header 3 for mixing, then enters the upper vertical water-cooled wall 2 for heat absorption, and finally flows into the water-cooled wall outlet mixing header 7. It also includes the lower header 9 and the upper header 10 of the vertical water-cooled wall.

[0035] The lower manifold 5 and upper manifold 6 of the spiral water-cooled wall are divided into water-cooled wall loops by a partition plate 8 (assuming a total of N loops). Each loop is sequentially connected along the working fluid flow by a connecting pipe from the centralized drain pipe distribution manifold 4 to the lower manifold 5 of the spiral water-cooled wall, the lower manifold 5 of the spiral water-cooled wall, the spiral water-cooled wall 1, the upper manifold 6 of the spiral water-cooled wall, the connecting pipe from the upper manifold 6 of the spiral water-cooled wall to the intermediate mixing manifold 3, and the intermediate mixing manifold 3. A first shut-off valve 21 is installed on the connecting pipe from the upper manifold 6 of the spiral water-cooled wall to the intermediate mixing manifold 3 in the n loops. A third shut-off valve 23 is installed on the connecting pipe from the centralized drain pipe distribution manifold 4 to the lower manifold 5 of the spiral water-cooled wall in the remaining Nn loops. A feedback bypass is led upstream of the first shut-off valve 21 to the downstream of the third shut-off valve 23, and a second shut-off valve 22 is installed on the feedback bypass. The working fluid is fed back to the water-cooled wall on the same side. See Figure 1 Preferably, the first shut-off valve 21, the second shut-off valve 22, and the third shut-off valve 23 are electrically operated shut-off valves.

[0036] When the boiler is operating at high load, both the first shut-off valve 21 and the third shut-off valve 23 are open, while the second shut-off valve 22 is closed. The working fluid, after exiting the centralized drain pipe distribution header 4, enters the lower header 5 of the spiral water-cooled wall. After heat exchange through the spiral water-cooled wall 1, it is introduced into the upper header 6 of the spiral water-cooled wall, and then all of it flows into the intermediate mixing header 3 through the connecting pipe. The boiler operates at full load with a suitable mass flow rate and reasonable steam-water resistance, thus ensuring the unit's economic efficiency during high-load operation.

[0037] When the boiler is operating at low load, the first shut-off valve 21 and the third shut-off valve 23 are both closed, while the second shut-off valve 22 is open. The working fluid is introduced into n loops (i.e., loops without the third shut-off valve 23) to absorb heat. Before the first shut-off valve 21, the fluid passes through a feedback bypass connection pipe, then through shut-off valve 22, and enters the remaining Nn water-cooled wall loops. This increases the mass flow rate of the water-cooled walls during low load or even extreme peak load operation, ensuring the unit's safety during low load operation.

[0038] The above approach involves the working fluid absorbing heat only through a portion of the loop at low loads, then feeding back and absorbing heat again through other loops of the water-cooled wall on the same surface, thus increasing the mass flow rate. However, this may result in significant temperature variations across different walls. Therefore, another approach is proposed: the feedback working fluid is introduced into the water-cooled wall loops of adjacent walls for heat absorption, and so on. (See...) Figure 4 This can eliminate the deviation in outlet wall temperature of the spiral water-cooled wall to a certain extent.

[0039] When designing the boiler water-cooled wall, a suitable mass flow rate is selected under high load to ensure that it does not exceed the guaranteed value of the steam-water resistance of the water-cooled wall, thus ensuring the economic efficiency of the unit operation. Under low load operation or even 10% extreme peak load, the spiral water-cooled wall feedback bypass is activated to increase the mass flow rate of the water-cooled wall, ensuring the dry operation of the boiler and improving the safety of the unit operation.

[0040] Example 2

[0041] like Figures 1 to 6 As shown, as a further optimization of Embodiment 1, this embodiment also includes the following technical features based on Embodiment 1:

[0042] When selecting and designing the spiral water-cooled wall of a boiler, it is not necessary to deliberately increase the full-load mass flow rate to increase the low-load mass flow rate in order to ensure the safety of the unit operation at low load. Instead, select a suitable full-load mass flow rate to reduce steam-water resistance.

[0043] When the boiler is operating at high load, both the first shut-off valve 21 and the third shut-off valve 23 are open, while the second shut-off valve 22 is closed. The working fluid, after exiting the centralized drain pipe distribution header 4, enters the lower header 5 of the spiral water-cooled wall. After heat exchange through the spiral water-cooled wall 1, it is introduced into the upper header 6 of the spiral water-cooled wall, and then all of it flows into the intermediate mixing header 3 through the connecting pipe. The boiler operates at full load with a suitable mass flow rate and reasonable steam-water resistance, thus ensuring the unit's economic efficiency during high-load operation.

[0044] When the boiler is operating at low load, the first shut-off valve 21 and the third shut-off valve 23 are both closed, while the second shut-off valve 22 is open. The working fluid is introduced into n loops, meaning that the loop without the third shut-off valve 23 absorbs heat and then enters the remaining Nn water-cooled wall loops before the first shut-off valve 21 via the feedback bypass connection pipe and shut-off valve 22. This increases the mass flow rate of the water-cooled walls during low load or even extreme peak load operation, ensuring the safety of the unit during low load operation.

[0045] Selection of feedback bypass for spiral water-cooled wall: Figure 1 and Figure 4 This is just an illustration. It does not mean that the working fluid on one side of the spiral water-cooled wall is fed back to the other side of the loop. Instead, the working fluid in a portion of the loop is selected and led to another portion of the loop for heat absorption through a feedback bypass. This takes into account both safety under low load and economy under high load.

[0046] As described above, the present invention can be implemented well.

[0047] All features disclosed in all embodiments of this specification, or steps in all methods or processes implied in the disclosure, may be combined and / or extended or replaced in any way, except for mutually exclusive features and / or steps.

[0048] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Based on the technical essence of the present invention, any simple modifications, equivalent substitutions, and improvements made to the above embodiments within the spirit and principles of the present invention shall still fall within the protection scope of the present invention.

Claims

1. A water-cooled wall system characterized by, It includes a spiral water-cooled wall (1), a vertical water-cooled wall (2), and an intermediate mixing box (3) connected from top to bottom. The vertical water-cooled wall (2) is located above the spiral water-cooled wall (1) and is connected to the spiral water-cooled wall (1) through the intermediate mixing box (3). It also includes a lower spiral water-cooled wall header (5) located below the spiral water-cooled wall (1) and an upper spiral water-cooled wall header (6) located above the spiral water-cooled wall (1). The lower spiral water-cooled wall header (5), the spiral water-cooled wall (1), the upper spiral water-cooled wall header (6), and the intermediate mixing header (3) are connected in sequence. It also includes a centralized drain pipe distribution manifold (4) located below the lower manifold (5) of the spiral water-cooled wall. The lower manifold (5) of the spiral water-cooled wall is connected to the centralized drain pipe distribution manifold (4). The connecting pipe between the upper manifold (6) of the spiral water-cooled wall and the intermediate mixing manifold (3), and the connecting pipe between the lower manifold (5) of the spiral water-cooled wall and the centralized drain pipe distribution manifold (4) are connected. It also includes a partition plate (8) installed on the lower header (5) and upper header (6) of the spiral water-cooled wall. The partition plate (8) divides into N water-cooled wall circuits. It also includes n first shut-off valves (21) and Nn third shut-off valves (23). The first shut-off valves (21) are installed on the connecting pipe from the upper header (6) of the spiral water-cooled wall to the intermediate mixing header (3). The third shut-off valves (23) are installed on the connecting pipe from the centralized drain pipe distribution header (4) to the lower header (5) of the spiral water-cooled wall. It also includes a connecting feedback bypass, one end of which is located between the first shut-off valve (21) and the upper header (6) of the spiral water-cooled wall, and the other end of which is located between the third shut-off valve (23) and the lower header (5) of the spiral water-cooled wall. A second shut-off valve (22) is also provided on the feedback bypass.

2. A water wall system according to claim 1, wherein It also includes the lower header (9) of the vertical water-cooled wall, the upper header (10) of the vertical water-cooled wall, and the intermediate mixing header (3), the lower header (9) of the vertical water-cooled wall, and the upper header (10) of the vertical water-cooled wall connected in sequence.

3. A water wall system according to claim 2, wherein It also includes a water-cooled wall outlet mixing header (7) located above the vertical water-cooled wall upper header (10), and the vertical water-cooled wall upper header (10) is connected to the water-cooled wall outlet mixing header (7).

4. A water cooled wall system according to any one of claims 1 to 3, wherein The spiral water-cooled wall (1) is arranged in four sides: front wall, rear wall, left side and right side.

5. A method of controlling a water wall system according to any one of claims 1 to 3, characterized in that When operating under high load, the first shut-off valve (21) and the third shut-off valve (23) are both open, and the second shut-off valve (22) is closed. The working fluid comes out of the central drain pipe distribution manifold (4) and enters the lower manifold (5) of the spiral water-cooled wall. After heat exchange through the spiral water-cooled wall (1), it is introduced into the upper manifold (6) of the spiral water-cooled wall and then all flows into the intermediate mixing manifold (3). Here, high load refers to the load exceeding the set maximum load threshold.

6. A method of controlling a water wall system according to any one of claims 1 to 3, characterized in that When operating at low load, the first shut-off valve (21) and the third shut-off valve (23) are both closed, and the second shut-off valve (22) is open. The working fluid is introduced into n water-cooled wall circuits that do not have a third shut-off valve (23) to absorb heat, and then enters the remaining Nn water-cooled wall circuits through the feedback bypass connection pipeline and the shut-off valve (22). Here, low load refers to the load being lower than the set minimum load threshold.

Citation Information

Patent Citations

  • Boiler water cooling wall adapting to limit peak regulation and control method thereof

    CN117450496A