A hoisting construction method for an ultra-large UHPC curtain wall in a confined space

By using an overall hoisting method, the ultra-large UHPC curtain wall can be precisely installed in a confined space using hoisting frames and hoisting equipment. This solves the problems of construction errors and collisions that exist in traditional construction, and improves construction efficiency and aesthetics.

CN118164388BActive Publication Date: 2026-11-20THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410499200.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2026-11-20
Estimated Expiration
2044-04-24

AI Technical Summary

Technical Problem

Traditional techniques for hoisting ultra-large UHPC curtain walls in confined spaces have drawbacks such as long construction periods, difficulty in joint treatment, poor aesthetics, large construction errors, and the risk of collisions with surrounding structures during the hoisting process.

Method used

Using equipment such as hoisting frames, I-beams, channel steel, hand chain hoists, and electric hoists, the curtain wall is transported by a whole hoisting method using guide rails and winches. By combining the linkage of hand chain hoists and electric hoists, installation deviations are gradually adjusted to ensure that the curtain wall is hoisted without collision and installed accurately.

Benefits of technology

It enables the overall hoisting of ultra-large UHPC curtain walls in confined spaces, reducing construction errors, improving aesthetics and construction efficiency, reducing costs, ensuring safety and reliability, and shortening the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118164388B_ABST
    Figure CN118164388B_ABST
Patent Text Reader

Abstract

This invention discloses a method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space, comprising the following steps: S1, constructing a hoisting frame above the UHPC curtain wall and fixing three manual hoists and two electric hoists with steel wire ropes; S2, transporting the UHPC curtain wall plaque to the designated position using a winch; S3, welding connectors to the manual hoists at the rear of the UHPC curtain wall to the guide rails; S4, using the manual hoists at the rear of the UHPC curtain wall to pull the hoisting frame and activate them. S5. The UHPC curtain wall is gradually lifted to the designated position using hoists; S6. Three manual hoists are hung on the steel frame hanging points of the plaque, and the electric hoists are changed. The electric hoists are gradually unloaded, and the manual hoists are gradually loaded, moving the plaque inward as a whole. The installation deviation of the UHPC panels is adjusted using the manual hoists to make them perfectly fit the installation groove; S7. The plaque maintenance worker enters the interior to perform bolting and anti-corrosion work with the structural wall. This invention has low construction cost, short construction period, and good installation effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, and in particular to a method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space. Background Technology

[0002] Due to its superior durability, aesthetics, and plasticity compared to other curtain wall materials, ultra-high performance concrete (UHPC) panels are increasingly used in architectural landscaping. However, UHPC still has characteristics such as high density and susceptibility to edge damage. Traditional techniques for hoisting ultra-large UHPC curtain walls in confined spaces involve segmented hoisting and on-site splicing. This method results in long construction periods, difficult joint treatment, poor aesthetics, and unavoidable construction errors leading to a poor overall effect. Furthermore, the hoisting process is difficult and prone to collisions with surrounding structures. Therefore, this invention proposes a method for hoisting ultra-large UHPC curtain walls in confined spaces, eliminating the need for segmented construction and enabling the complete hoisting of the entire ultra-large UHPC curtain wall. Summary of the Invention

[0003] The purpose of this invention is to address the shortcomings of existing technologies by providing a method for hoisting and constructing ultra-large UHPC curtain walls in confined spaces, comprising the following steps: S1. Construct a hoisting frame above the UHPC curtain wall, including 4 columns. Each column is fixed to a structural beam. Weld I-beams to the top of the columns to serve as hoisting beams. Use steel wire ropes to fix 3 hand-operated hoists and 2 electric hoists to the hoisting beams. S2. After eliminating the step height using 14 I-beams, 28 channel steel is used as a guide rail. Six tank transport vehicles are set at the bottom of the UHPC curtain wall, and the UHPC curtain wall is transported to the designated position by a winch. S3. Weld connectors onto the guide rail to connect the hand-operated hoist pulling the rear of the UHPC curtain wall; S4. Using the manual hoist at the rear of the UHPC curtain wall, the two electric hoists of the linkage hoisting frame are gradually lifted to the designated position. S5. Hang the three hand chain hoists to the hanging points of the curtain wall back steel frame, and perform the hook replacement operation between the hand chain hoists and electric hoists. Gradually unload the electric hoists and gradually load the hand chain hoists, moving the entire curtain wall inward by 700mm. After the electric hoists are completely unloaded, cut the bottom tires and the steel bars of the electric hoist hanging points. At the same time, during the movement, use the manual hoists to adjust the installation deviation of the UHPC curtain wall so that it fits perfectly into the installation groove. S6. The maintenance workers will manually enter the interior through the signboard to carry out bolting and anti-corrosion work with the structural wall.

[0004] Preferably, in step S1, each column is fixed to the structural beam with 4 M20 chemical anchors and 20mm steel plates, and 100*100*8mm square tube crossbars and diagonal bars are provided on both sides and in the middle of the column.

[0005] Preferably, in step S3, three steel casters are welded to the bottom steel bars of the UHPC curtain wall, and the tire starting triangle is made of 14 channel steel.

[0006] Preferably, in step S3, the connector is a 10mm thick L-shaped corner bracket.

[0007] Compared with the prior art, the beneficial effects of the present invention are as follows: the ultra-large UHPC curtain wall of the present invention does not require segmented hoisting in confined spaces, but can be spliced ​​on site, ensuring the integrity of the ultra-large UHPC curtain block, reducing necessary construction errors caused by splicing, making it more aesthetically pleasing, and the construction process is more convenient, faster, safe and reliable. Moreover, compared with traditional construction methods, the construction cost is lower, the construction period is shorter and the installation effect is better. Attached Figure Description

[0008] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of the overall structure of the present invention.

[0009] Figure 2 This is a schematic diagram of the plaque placement structure of the present invention.

[0010] Figure 3 This is a schematic diagram of the electric hoist lifting and positioning structure of the present invention.

[0011] Figure 4 This is a schematic diagram of the hook-changing structure of the electric hoist of the present invention.

[0012] Figure 5 This is a schematic diagram of the cutting of the tire and the steel frame structure of the present invention.

[0013] Figure 6 This is a schematic diagram of the hoisting and positioning structure of the present invention.

[0014] Figure 7 This is a schematic diagram of the hoisting frame of the present invention.

[0015] Figure 8 This is a schematic diagram of the tail traction structure of the present invention.

[0016] Among them, 1-lifting frame; 6-winner; 7-steel frame hanging point; 8-UHPC curtain wall; 9-steel caster; 10-tail traction hand chain hoist; 11-triangular frame; 12-guide rail; 16-tank transport vehicle. Detailed Implementation

[0017] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings, but the scope of protection of the present invention is not limited to the embodiments described.

[0018] Reference Figures 1 to 8 This invention discloses a method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space, comprising the following steps: Step 1: First, install the hoisting frame 1 above the UHPC curtain wall 8; Four columns are installed using 100*100*8mm square tubing. Each column is fixed to the structural beam with four M20 chemical anchors and a 20mm steel plate. 100*100*8mm square tubing crossbars and diagonal braces are installed on both sides and in the middle of the columns to enhance the overall integrity of the hoisting frame. 400*142*10.5mm I-beams are welded to the top of the columns to serve as hoisting beams. Three manual hoists and two electric hoists are fixed to the steel beams using 20mm steel wire ropes.

[0019] Step 2: After eliminating the step height using 14 I-beams, 28 channel steel is used as guide rail 12. Six tank transport vehicles 16 are set at the bottom of the UHPC curtain wall, and the UHPC curtain wall is transported to the designated position by the traction of the winch 6.

[0020] Step 3: Weld three steel casters 9 to the bottom steel bars of the UHPC curtain wall, and make a tire starting triangle 11 using 14 channel steel. Weld 10mm thick L-shaped corner brackets to the guide rail for connecting the UHPC curtain wall tail pull hoist 10.

[0021] Step 4: Using the hand-operated hoist at the rear of the UHPC curtain wall, the two electric hoists of the linkage hoisting frame are gradually lifted to the designated position.

[0022] Step 5: Hang the three hand chain hoists at hanging point 7 of the curtain wall back steel frame, and perform hook switching operation between the hand chain hoists and electric hoists. Gradually unload the electric hoists and gradually load the hand chain hoists, moving the entire curtain wall inward by 700mm. After the electric hoists are completely unloaded, cut the bottom tires and the steel bars at the electric hoist hanging points. At the same time, during the movement, use the hand chain hoists to adjust the installation deviation of the UHPC curtain wall so that it fits perfectly into the installation groove.

[0023] Step 6: Manual personnel enter the interior through the inspection port on the signboard to perform bolting and anti-corrosion work with the structural wall.

[0024] This invention uses three hand-operated hoists and two electric hoists to switch hooks, allowing the UHPC curtain wall to be moved 700mm horizontally. This ensures that the UHPC curtain wall does not collide with the wall during hoisting. At the same time, the hand-operated hoists are used to adjust the installation position during the horizontal movement to ensure the installation effect.

[0025] This invention features three steel casters 9 at the rear, which replace the dragging friction during the lifting of the UHPC curtain wall by sliding the casters, thus reducing the stress on the UHPC curtain wall structure. At the same time, a tire launching frame is set at the rear to ensure that the steel frame supporting the UHPC curtain wall does not collide with the guide rail during the lifting process, thereby ensuring the safety of the UHPC curtain wall structure.

[0026] This invention features two hoists at the tail end for traction, which are linked with the top electric hoist to ensure that there is no swaying during the lifting process and to prevent collisions with buildings.

[0027] The present invention provides a method for hoisting and constructing ultra-large UHPC curtain walls in confined spaces. Ultra-large UHPC curtain walls do not need to be hoisted in sections in confined spaces. They can be spliced ​​on site, ensuring the integrity of the ultra-large UHPC curtain blocks, reducing necessary construction errors caused by splicing, making them more aesthetically pleasing, and making the construction process more convenient, faster, safe and reliable. Moreover, compared with traditional construction methods, the construction cost is lower, the construction period is shorter, and the installation effect is better.

[0028] As described above, although the invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the invention itself. Various changes in form and detail may be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims

1. A method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space, characterized in that, Includes the following steps: S1. Construct a hoisting frame above the UHPC curtain wall, including 4 columns. Each column is fixed to a structural beam. Weld I-beams to the top of the columns to serve as hoisting beams. Use steel wire ropes to fix 3 hand-operated hoists and 2 electric hoists to the hoisting beams. S2. After eliminating the step height using 14 I-beams, 28 channel steel is used as a guide rail. Six tank transport vehicles are set at the bottom of the UHPC curtain wall, and the UHPC curtain wall is transported to the designated position by a winch. S3. Weld connectors onto the guide rail to connect the hand-operated hoist pulling the rear of the UHPC curtain wall; S4. Using the manual hoist at the rear of the UHPC curtain wall, the two electric hoists of the linkage hoisting frame are gradually lifted to the designated position. S5. Hang the three hand chain hoists to the hanging points of the curtain wall back steel frame, and perform the hook replacement operation between the hand chain hoists and electric hoists. Gradually unload the electric hoists and gradually load the hand chain hoists, moving the entire curtain wall inward by 700mm. After the electric hoists are completely unloaded, cut the bottom tires and the steel bars of the electric hoist hanging points. At the same time, during the movement, use the hand chain hoists to adjust the installation deviation of the UHPC curtain wall so that it fits perfectly into the installation groove. S6. The maintenance workers will manually enter the interior through the signboard to carry out bolting and anti-corrosion work with the structural wall.

2. The method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space according to claim 1, characterized in that: In step S1, each column is fixed to the structural beam with 4 M20 chemical anchors and 20mm steel plates. 100*100*8mm square tube crossbars and diagonal braces are set on both sides and in the middle of the column.

3. The method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space according to claim 1, characterized in that: In step S3, three steel casters are welded to the bottom steel bars of the UHPC curtain wall, and a tire launching triangle is made of 14 channel steel.

4. The method for hoisting and constructing an ultra-large UHPC curtain wall in a confined space according to claim 1, characterized in that: In step S3, the connector is a 10mm thick L-shaped corner bracket.

Citation Information

Patent Citations

  • Curtain wall unit body hoisting system

    CN113401809A

  • Carrier for curtain-wall panel establishing use andcurtain-wall establishing method using the same

    KR1020040097542A