Fabricated grid raft foundation and construction method

By using the vertical baffles and connecting components of the prefabricated grid raft foundation, the problems of low construction efficiency and quality in existing raft foundation technologies are solved, achieving efficient and stable connection and waterproofing effects.

CN118187124BActive Publication Date: 2026-11-24SHANDONG SANJIAN CONSTR ENG +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410590052.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2026-11-24
Estimated Expiration
2044-05-13

AI Technical Summary

Technical Problem

In existing precast raft foundation construction, the raft slab layout efficiency is low, the on-site connection is complicated, and quality problems such as raft slab displacement and concrete leakage are easily caused.

Method used

The prefabricated grid raft foundation is adopted, and the raft strips and raft blocks are connected by vertical baffles and connecting components to form a grid structure. The quick connection is achieved by using components such as connecting rods, nuts and clamps. Combined with water-stop steel plates to prevent water seepage, the cast-in-place slabs are formed by the skip-pour casting method.

Benefits of technology

It improved construction efficiency, reduced labor requirements, ensured the stability and strength of the connection, avoided joint misalignment and concrete leakage, and improved construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118187124B_ABST
    Figure CN118187124B_ABST
Patent Text Reader

Abstract

This invention discloses a prefabricated grid raft foundation and its construction method, relating to the field of raft foundation construction technology. It includes cast-in-place slabs, prefabricated raft strips, and raft blocks. The raft strips are arranged along the longitudinal and transverse directions around the raft blocks, with pouring channels spaced between the perimeter of the raft blocks and the ends of the raft strips. Vertical baffles are installed at the ends of the raft strips and vertical baffles are installed on the raft blocks. Vertical baffles one and two block one block one of the pouring channels. Vertical baffles two and one are connected by connecting components, facilitating rapid positioning and arrangement of the raft strips and raft blocks. The pouring channels are connected around the center of the raft blocks in a regular windmill shape. The grid area formed by the raft blocks and raft strips, along with the pouring channels, is poured in stages to create cast-in-place slabs, forming a spliced ​​raft foundation. The pouring strength at the intersection of the front and rear sections after staged pouring is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of raft foundation construction technology, and in particular to a prefabricated grid raft foundation and its construction method. Background Technology

[0002] Precast raft foundations involve disassembling a monolithic cast-in-place raft foundation into several small components. These components are manufactured in a factory, transported to the construction site, and assembled. Concrete is poured at the joints to connect the components into a single raft foundation. This method offers high on-site construction efficiency and has become an important trend in building engineering. However, current precast raft foundation construction relies heavily on manual labor to hoist precast raft slabs to their designated positions and align adjacent slabs. This process is labor-intensive, inconvenient, and inefficient. Furthermore, improper jointing at the joints can lead to concrete leakage and joint misalignment, resulting in water seepage and other quality problems later on. Therefore, developing a precast grid raft foundation is of great significance to building construction engineering. Summary of the Invention

[0003] The present invention aims to overcome the shortcomings of the existing technology and provide a prefabricated grid raft foundation and construction method, which solves the problems of low construction efficiency of raft slab arrangement, complex on-site connection of raft slabs, and easy displacement of raft slabs after on-site pouring in existing prefabricated raft foundations.

[0004] The technical solution adopted by this invention to solve its technical problem is: A prefabricated grid raft foundation includes cast-in-place slabs, precast raft strips, and raft blocks. The raft strips are arranged along the longitudinal and transverse directions around the raft blocks, with casting channels spaced between the perimeter of the raft blocks and the ends of the raft strips. A vertical baffle is provided on one side of the end of the raft strip, and a second vertical baffle is provided around the perimeter of the raft blocks. The second vertical baffle and the first vertical baffle are connected by a connecting component, so that the second vertical baffle and the first vertical baffle block block one end of the casting channel. The grid area enclosed by the raft blocks and raft strips and the casting channel are formed by skip-casting to create cast-in-place slabs. The four corners of the cast-in-place slabs are arranged in a regular windmill shape around the connecting raft blocks.

[0005] Furthermore, the side of the raft slab strip is provided with reinforcing bars, which are tied to the reinforcing cage of the cast-in-place slab.

[0006] Furthermore, the connecting assembly includes a connecting rod and a nut; the connecting rod has a threaded portion in the middle; the threaded portion passes through the first vertical baffle and the second vertical baffle, and the nuts are screwed into both ends of the threaded portion to make the first vertical baffle and the second vertical baffle tightly connected.

[0007] Furthermore, the connecting assembly includes a clamp and a tie rod; both the raft block and the raft strip have outward reinforcing bars on their opposing sides, and the two ends of the tie rod are respectively hinged to the clamps, which are connected to the outward reinforcing bars and the connecting rod respectively.

[0008] Furthermore, the connecting rod comprises two independent rod sections, the ends of which are coaxially connected in series via hand-tightened threaded sleeves; both extended ends of the connecting rod sections are provided with short shafts, and the connecting assembly also includes a sleeve, which slidably fits onto the short shafts, with a stop block threadedly connected to the outer end of the short shafts; the sleeve is hinged to a clamp two via a pull rod, and the clamp two is connected to the side ribs of the raft slab strip.

[0009] Furthermore, the upper and lower sides of the sleeve are symmetrically hinged to the second clamp; the connecting assembly includes a swing arm whose end is perpendicularly connected to the connecting rod, and the short shaft is connected parallel to the connecting rod at the other end of the swing arm.

[0010] Furthermore, the contact surface between the sleeve and the stop is a conical surface.

[0011] Furthermore, the connecting assembly includes a cross clamp that connects two overlapping connecting rods.

[0012] Furthermore, a water-stop steel plate is provided around the center of the raft slab strip and the raft slab block. The water-stop steel plate is welded to the vertical baffle plate 1 and the vertical baffle plate 2. A part of the water-stop steel plate is cast and embedded in the concrete. The extended part of the water-stop steel plate is cast and embedded in the cast-in-place slab.

[0013] This application also provides a construction method for a prefabricated grid raft foundation, including the following steps: S1, First, the foundation cushion layer is poured; raft blocks and raft strips are transported to the construction site; S2. Hoist the raft block into position according to the preset location. Then, hoist the raft strip to one side above the raft block. After the vertical baffles at both ends of the raft strip contact and limit the position with the vertical baffles on the raft block, lower the raft strip vertically into place, so that the raft block and the raft strip form a grid with pouring channels. S3. Use the connecting rod and nut to connect vertical baffle one and vertical baffle two, blocking one end of the pouring channel; S4. Put the sleeve into the short shaft of the extended end of the connecting rod, tighten the stop block, and use clamp two to connect the raft plate strip's ribs; connect the two connecting rods by hand-tightening the threaded sleeve to make the stop block and sleeve tightly connected. S5. Tie the reinforcing bars of the raft slab strips to the reinforcing bars in the cast-in-place slab; use the skip-casting method to cast the grid area and casting channel enclosed by the raft slab blocks and raft slab strips to form the cast-in-place slab, and finally connect the precast raft slab strips and raft slab blocks into a whole; S6. Curing.

[0014] The present invention has the following beneficial effects: 1. The present invention provides an assembled grid raft foundation, which includes prefabricated raft strips and prefabricated raft blocks; the raft strips are arranged around the raft blocks along the longitudinal and transverse directions, a first vertical baffle and a second vertical baffle are arranged between the ends of the raft strips and the raft blocks, and pouring channels are reserved between the peripheries of the raft blocks and the ends of the raft strips; the first vertical baffle and the second vertical baffle block one end of each pouring channel; cast-in-place slabs are formed by the alternate pouring of the grid areas enclosed by the raft blocks and the raft strips and the pouring channels; the first vertical baffle and the second vertical baffle play a role in positioning and restraining, so there is no need to excessively adjust the raft strips and the raft blocks, which improves construction efficiency and construction quality and saves a large amount of labor; meanwhile, the connecting components connect the raft blocks and the raft strips in series to form a enclosure for the cast-in-place slabs, the corners of the cast-in-place slabs are arranged around the connecting raft blocks in a windmill shape to form an assembled raft foundation, which effectively improves the pouring strength at the intersection of the previous and subsequent bins after the alternate pouring, and avoids the problems of concrete slurry leakage and joint offset during on-site pouring of existing prefabricated rafts.

[0015] 2. The connecting component includes a connecting rod and a first hoop; the connecting rod passes through the first vertical baffle and the second vertical baffle and is locked by a nut, which is simple to operate and has high construction efficiency; one first hoop clamps the connecting rod, the other first hoop clamps the extended steel bars of the raft block and the raft strip, and the two first hoops are connected by a pull rod; the first vertical baffle, the second vertical baffle, the connecting rod and the first hoops form a multi-point connection structure between the raft strip and the raft block, which reduces the influence of joint offset between the previous and subsequent bins and improves the strength of the cast-in-place raft.

[0016] 3. The connecting rod is two rod sections coaxially connected by a hand-screwed thread sleeve; the outer ends of the two connecting rods are sleeved with sleeves through short shafts, the sleeves are hinged with second hoops through pull rods, and the second hoops are connected with the side protruding steel bars of the raft strip; the total length of the connecting rod is shortened by the hand-screwed thread sleeve, and the stoppers at the outer ends of the short shafts pull the sleeves toward each other, so that the connecting rod is tightly connected with the side protruding steel bars of the raft strip; when the concrete of the cast-in-place slab shrinks, the raft strips around the raft blocks are connected in series through the connecting rods, which effectively resists deformation, avoids the offset of alternate pouring joints, and ensures the pouring quality.

[0017] 4. A swing rod is connected between the short shaft and the connecting rod, and the short shaft, the swing rod and the connecting rod form an "n" shape; the short shaft can drive the sleeve to rotate around the connecting rod, so that the sleeve is adjusted to the middle position of the upper and lower layers of protruding steel bars of the raft strip, and two sets of second hoops can be connected through one sleeve at the same time, which improves the connection strength between the connecting rod and the protruding steel bars of the raft strip, thereby improving the overall strength of the raft.

[0018] 5. Water stop steel plates are arranged in the middle of the peripheries of the raft strips and the raft blocks, which effectively blocks water from seeping along the joint gaps of the cast-in-place slabs and plays a role in cutting off the water seepage path. Description of the Drawings

[0019] The invention will be further described below with reference to the accompanying drawings: Figure 1 This is a schematic diagram of the planar structure of the present invention; Figure 2 for Figure 1 Enlarged view of a section at point C; Figure 3 This is a three-dimensional structural diagram of the raft plate strip, raft plate block, and connecting components of the present invention; Figure 4 for Figure 2 Enlarged view of a section at point D; Figure 5 for Figure 4 Sectional view at point AA; Figure 6 This is a schematic diagram of the installation of the water-stop steel plate of the present invention; Figure 7 for Figure 6 Sectional view at point BB.

[0020] In the diagram, 1. Cast-in-place slab; 2. Raft foundation strip; 21. Outward reinforcing bar; 3. Raft foundation block; 4. Pouring channel; 5. Vertical baffle one; 6. Vertical baffle two; 7. Connecting assembly; 71. Connecting rod; 72. Nut; 73. Clamp one; 74. Hand-tightened threaded sleeve; 75. Sleeve; 76. Stop block; 77. Clamp two; 78. Swing rod; 79. Cross pipe clamp; 8. Waterstop steel plate. Detailed Implementation

[0021] To make the objectives, features, and advantages of the present invention more apparent and understandable, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the specific embodiments.

[0022] like Figure 1-3 As shown, the present invention provides a prefabricated grid raft foundation, including cast-in-place slabs 1, prefabricated raft strips 2, and raft blocks 3; the raft strips 2 are arranged along the longitudinal and transverse directions around the raft blocks 3, and the raft blocks 3 and the raft strips 2 form a cross grid; the raft blocks 3 and the ends of the raft strips 2 are spaced apart by pouring channels 4; a vertical baffle 5 is provided on one side of the end of the raft strip 2, and a vertical baffle 6 is provided around the raft blocks 3, the vertical baffle 6 and the vertical baffle 5 are connected by a connecting component 7, so that the vertical baffle 6 and the vertical baffle 5 block one end of the pouring channel 4; the grid area formed by the raft blocks 3 and the raft strips 2 and the pouring channel 4 are poured in a skip-pour manner to form the cast-in-place slab 1, and the four corners of the cast-in-place slab 1 are arranged in a regular windmill shape around the raft blocks 3, that is, the pouring channel 4 is connected around the center of the raft blocks 3 to form a regular windmill shape; The cast-in-place slab 1, poured in a skip-pour configuration, is arranged in a windmill shape, clockwise or counterclockwise, surrounding the connecting raft foundation block 3. The concrete in the pouring channel 4 forms outward protrusions at the four corners of the cast-in-place slab 1, so that the four corners of the cast-in-place slab 1 are tightly connected with the adjacent raft foundation block 3 and raft foundation strip 2, forming an integral raft foundation. Preferably, the periphery of the grid area located at the edge is formed by connecting the raft foundation strip 2 with the side template, thus forming the boundary of the edge cast-in-place slab 1.

[0023] In actual construction, the raft foundation block 3 is first hoisted to the predetermined position, and then the raft foundation strip 2 is hoisted between the two raft foundation blocks 3. During the process of the raft foundation strip 2 falling into place, the vertical baffles 5 at both ends of the raft foundation strip 2 are made to fit tightly against the corresponding vertical baffles 6. The vertical baffles 5 and 6 play a role in positioning and constraining the direction and position of the raft foundation strip 2, which is conducive to the accurate placement of the raft foundation strip 2. There is no need to adjust the alignment of the raft foundation strip 2 with the raft foundation block 3 too much, resulting in high construction efficiency.

[0024] Specifically, vertical baffle 1 5 and vertical baffle 2 6 can be prefabricated in the factory as a single piece; or connecting steel plates can be pre-embedded in the raft slab strip 2 and raft slab block 3, and vertical baffle 1 5 and vertical baffle 2 6 can be installed on site by bolts.

[0025] The side of the raft slab strip 2 is provided with reinforcing bars, which are tied to the steel cage of the cast-in-place slab 1.

[0026] like Figure 5 As shown, the connecting assembly 7 includes a connecting rod 71 and a nut 72; the connecting rod 71 has a threaded part in the middle, and the vertical baffle 5 and the vertical baffle 6 have corresponding through holes; the threaded part passes through the vertical baffle 5 and the vertical baffle 6, and the nuts 72 are screwed on both ends of the threaded part to make the vertical baffle 5 and the vertical baffle 6 fit tightly together.

[0027] like Figure 5 As shown, the connecting component 7 includes a clamp 73 and a tie rod. Both the raft slab block 3 and the raft slab strip 2 have outward-extending reinforcing bars 21 on their opposing sides. The two ends of the tie rod are hinged to clamps 73, and the two clamps 73 are connected to the outward-extending reinforcing bars 21 and the connecting rod 71, respectively. The clamps 73 are hand-tightened for quick connection. Since the vertical baffle 5 is located on one side of the end of the raft slab strip 2, the connection between one side of the raft slab strip 2 and the raft slab block 3 is completed by connecting the vertical baffle 5 and the vertical baffle 6 through nuts 72. The other side of the raft slab strip 2 is connected to the raft slab block 3 through clamps 73 and the tie rod. The raft slab strip 2 and the raft slab block 3 rely on multi-point fixed connections, resulting in good raft slab connection stability, resistance to deformation, and improved strength of the cast-in-place raft slab.

[0028] like Figure 4 , 5As shown, the connecting rod 71 comprises two independent rod segments, each of which is provided with a short shaft at its outward extending end, and the ends of the two connecting rod segments 71 are coaxially connected in series by a hand-tightened threaded sleeve 74. It can be understood that the first vertical baffle 5 and the second vertical baffle 6 can be connected to one of the connecting rod segments 71; the outward extending ends of the two connecting rod segments 71 respectively extend to the raft strip 2 on the corresponding side.

[0029] The connection assembly 7 further comprises a sleeve 75, which is slidably sleeved on the short shaft, and a stop block 76 is threadedly connected to the outer end of the short shaft; the stop block 76 is used to prevent the sleeve 75 from sliding off outward; the sleeve 75 is hingedly connected to a second hoop 77 through a tie rod, and the second hoop 77 is connected to the side exposed reinforcement of the raft strip 2.

[0030] The second hoop 77 adopts a hand-tightened form for quick connection; it can be understood that by tightening the hand-tightened threaded sleeve 74, the two connecting rod segments 71 can pull the stop blocks 76 at both ends closer, the stop blocks 76 drive the sleeve 75, and the second hoop 77 restricts the sleeve 75 under the constraint of the exposed reinforcement, so that the sleeve 75 is tightly pressed against the stop block 76; with this design, the raft strips 2 in the longitudinal and transverse directions of the raft block 3 are connected in series by the two connecting rod segments 71 to form a continuous whole; meanwhile, in cooperation with the connection function of the first vertical baffle 5 and the second vertical baffle 6, the connecting rod 71 plays a role in connecting the raft block 3 with the surrounding raft strips 2, and the connection structure is stable and reliable.

[0031] It can be understood that after the installation of the connection assembly 7 is completed, the cast-in-place slab 1 is poured in a skip mode, the connecting rod 71 plays a role in reinforcing the connection between adjacent cast-in-place slabs 1, and when the concrete of the cast-in-place slab 1 shrinks, the sleeve 75 and the stop block 76 are always tightly connected, providing a reliable connection for the raft.

[0032] As Figure 4 shown, the second hoop 77 is symmetrically hinged to the upper and lower sides of the sleeve 75. Preferably, the second hoop 77 is a plurality of hoops with the same structure connected in series and supported side by side, so the second hoop 77 can be connected in series with a plurality of exposed reinforcements on the same layer, with stable connection.

[0033] The connection assembly 7 comprises a swing rod 78 whose end is perpendicularly connected to the connecting rod 71, and the short shaft is connected to the other end of the swing rod 78 in parallel with the connecting rod 71. It can be understood that the two sets of short shafts, the swing rods 78 and the connecting rod 71 form an "n" shape, the short shafts can rotate around the circumference of the connecting rod 71, and after the short shafts rotate, the sleeve 75 can be positioned in the middle of the upper and lower layers of exposed reinforcements, and the sleeve 75 drives the second hoop 77 to adjust its position, so that the second hoop 77 can be reliably connected to exposed reinforcements of different heights, with good adaptability, and the situation that normal connection cannot be performed due to misalignment of prefabricated exposed reinforcements is avoided.

[0034] Preferably, the contact surface between the sleeve 75 and the stop block 76 is a conical surface. Under the tensioning action of the hand-tightened threaded sleeve 74, the conical surface structure makes the connection between the sleeve 75 and the stop block 76 tighter, further improving the connection effect.

[0035] like Figure 4 As shown, the connecting component 7 includes a cross clamp 79, which connects two overlapping connecting rods 71. After the connecting rods 71 ​​are installed, the cross clamp 79 connects adjacent connecting rods 71, so that the four connecting rods 71 ​​around the raft block 3 are connected into an integral structure. The longitudinal and transverse raft strips 2 are subjected to mutual force, which improves the connection stability when the cast-in-place slab 1 is poured in a skip-stage manner.

[0036] like Figure 6 , 7 As shown, water-stop steel plates 8 are installed around the center of the raft slab strips 2 and raft slab blocks 3. The water-stop steel plates 8 are welded to vertical baffles 5 and 6, with a portion of the water-stop steel plates 8 embedded in the concrete; the extended portion of the water-stop steel plates 8 is embedded in the cast-in-place slab 1. Specifically, when the water-stop steel plates 8 encounter the vertical baffles 5 and 6 at the four corners of the raft slab block 3, they are bent upwards to fit against the baffles 5 and 6, and then welded together. There are sufficient gaps between the water-stop steel plates 8 between the raft slab strips 2 and raft slab blocks 3. By installing the water-stop steel plates 8, water is effectively prevented from seeping along the joint gaps of the cast-in-place slab 1, thus cutting off the water seepage path.

[0037] Based on the aforementioned prefabricated grid raft foundation, this application also provides a construction method for a prefabricated grid raft foundation, comprising the following steps: S1. First, the foundation cushion layer is poured and treated; transport raft slab blocks 3 and raft slab strips 2 to the construction site; S2. Hoist the raft block 3 to the preset position and place it. Then, hoist the raft strip 2 to the top of one side of the raft block 3. After the vertical baffle 5 at both ends of the raft strip 2 contacts and limits the vertical baffle 6 on the raft block 3, lower the raft strip 2 vertically into place so that the raft block 3 and the raft strip 2 form a grid with the pouring channel 4. S3. Use connecting rod 71 and nut 72 to connect vertical baffle 1 5 and vertical baffle 2 6 to block one end of the pouring channel 4; S4. Insert the sleeve 75 into the short shaft of the extended end of the connecting rod 71, tighten the stop block 76, and use the clamp 2 77 to connect the spur bar 2; connect the two connecting rods 71 ​​by hand-tightening the threaded sleeve 74, so that the stop block 76 and the sleeve 75 are tightly connected. S5. Tie the reinforcing bars of the raft slab strip 2 to the reinforcing bars in the cast-in-place slab 1; use the skip-casting method to cast the grid area and casting channel 4 of the raft slab block 3 and the raft slab strip 2 to form the cast-in-place slab 1, and finally connect the precast raft slab strip 2 and raft slab block 3 into a whole; S6. Curing.

[0038] In the description of this invention, the terms "upper," "lower," "front," "back," "left," "right," "top," "bottom," "vertical," and "horizontal," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are merely terms used to facilitate the description of this invention and do not imply that this invention must be constructed or operated in a specific orientation, nor do they specifically refer to any component or element. They should not be construed as limitations on this invention.

[0039] In this invention, the terms "connected" and "connected" should be interpreted broadly. For example, they can refer to a connection or a detachable connection; they can refer to a direct connection or an indirect connection through an intermediate component. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0040] The embodiments of the present invention are only a part of the embodiments, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application. This specification describes the implementation methods only for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

Claims

1. A fabricated grid raft foundation, characterized by, The application relates to a raft slab structure, which comprises cast-in-place slab blocks (1), prefabricated raft slab strips (2) and raft slab blocks (3); the raft slab strips (2) are arranged around the raft slab blocks (3) along the longitudinal and transverse directions, the four sides of the raft slab blocks (3) are spaced apart from the ends of the raft slab strips (2) to form pouring channels (4); vertical baffle one (5) is arranged on one side of the end of the raft slab strip (2), vertical baffle two (6) is arranged around the four sides of the raft slab block (3), the vertical baffle two (6) is connected with the vertical baffle one (5) through a connecting assembly (7), the vertical baffle two (6) and the vertical baffle one (5) block one end of the pouring channel (4); the grid area surrounded by the raft slab block (3) and the raft slab strip (2) and the pouring channel (4) are poured to form the cast-in-place slab blocks (1); the four corners of the cast-in-place slab blocks (1) are regularly arranged in the form of a windmill around the connecting raft slab blocks (3); the connecting assembly (7) comprises a connecting rod (71) and a nut (72); a threaded portion is arranged in the middle of the connecting rod (71); the threaded portion penetrates through the vertical baffle one (5) and the vertical baffle two (6), and the two ends of the threaded portion are screwed with the nut (72) to tightly connect the vertical baffle one (5) and the vertical baffle two (6); the connecting assembly (7) comprises a hoop one (73) and a pull rod; the raft slab block (3) and the raft slab strip (2) are provided with outward extending steel bars (21) on the opposite sides; the two ends of the pull rod are respectively hinged with the hoop one (73), and the two hoop ones (73) are respectively connected with the outward extending steel bars (21) and the connecting rod (71); the connecting rod (71) comprises two independent rod sections, the ends of the two rod sections are coaxially connected through a hand-tightened threaded sleeve (74), and the outward extending ends of the two rod sections are respectively provided with short shafts; the connecting assembly (7) further comprises a sleeve (75), the sleeve (75) is slidably sleeved with the short shafts, and the outer ends of the short shafts are threadedly connected with stop blocks (76); the sleeve (75) is hingedly connected with a hoop two (77) through the pull rod, and the hoop two (77) is connected with the side portion of the raft slab strip (2).

2. A fabricated grid raft foundation as claimed in claim 1, wherein, The side portion of the raft slab strip (2) is provided with a side portion, and the side portion is tied with the reinforcement cage of the cast-in-place slab block (1).

3. A fabricated grillage raft foundation as claimed in claim 1, wherein, The upper and lower sides of the sleeve (75) are symmetrically hinged with the hoop two (77); the connecting assembly (7) comprises a swing rod (78) which is perpendicularly connected with the connecting rod (71) at one end, and the short shaft is parallelly connected with the connecting rod (71) at the other end of the swing rod (78).

4. A fabricated grillage raft foundation as claimed in claim 1, wherein, The contact surface between the sleeve (75) and the stop block (76) is a tapered surface.

5. A fabricated grillage raft foundation as claimed in claim 1, wherein, The connecting assembly (7) comprises a cross pipe clamp (79) which connects two connecting rods (71) which are longitudinally and transversely overlapped.

6. A fabricated grillage raft foundation as claimed in claim 1, wherein, The four sides of the raft slab strip (2) and the raft slab block (3) are provided with water stop steel plates (8) in the middle portions, the water stop steel plates (8) are welded with the vertical baffle one (5) and the vertical baffle two (6), and a part of the water stop steel plates (8) is poured and buried in concrete; the outward extending part of the water stop steel plates (8) is poured and buried in the cast-in-place slab blocks (1).

7. A method of constructing a fabricated grid raft foundation as claimed in claim 1, wherein, The application further discloses a raft slab structure construction method, which comprises the following steps: S1, first, the foundation cushion is poured and treated; the raft slab blocks (3) and the raft slab strips (2) are transported to the construction site; S2. Hoist the raft block (3) and position it in the preset position. Then, hoist the raft strip (2) to the top of one side of the raft block (3). After the vertical baffles (5) at both ends of the raft strip (2) contact and limit the vertical baffles (6) on the raft block (3), lower the raft strip (2) vertically into place so that the raft block (3) and the raft strip (2) form a grid with a pouring channel (4). S3. Use the connecting rod (71) and nut (72) to connect the vertical baffle one (5) and the vertical baffle two (6) to block one end of the pouring channel (4); S4. Insert the sleeve (75) into the short shaft of the extended end of the connecting rod (71), tighten the stop block (76), and use the clamp two (77) to connect the spur bar (2); connect the two connecting rods (71) by hand-tightening the threaded sleeve (74) so ​​that the stop block (76) and the sleeve (75) are tightly connected. S5. Tie the reinforcing bars of the raft slab strip (2) to the reinforcing bars in the cast-in-place slab (1); The grid area and casting channel (4) formed by the raft slab block (3) and the raft slab strip (2) are cast using the skip casting method to form the cast-in-place slab (1). Finally, the prefabricated raft slab strip (2) and raft slab block (3) are connected as a whole. S6. Maintenance.

Citation Information

Patent Citations

  • Prefabricated box foundation adopting zoned assembly

    CN108331001A

  • Large-area concrete skip construction method

    CN114961263A

  • Prefabricated assembled raft foundation

    CN207934054U