A method and system for replacing batteries of unmanned mine cars
By determining the timing of battery swapping based on the remaining power in unmanned mining trucks and building an intelligent battery swapping model, the problem of task interruption and stagnation caused by battery swapping in unmanned mining trucks has been solved, improving production efficiency and the cleanliness of battery swapping stations.
Patent Information
- Application Number
- CN202410420739.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-04-09
AI Technical Summary
The existing unmanned mining trucks' power supply system requires them to go to a battery swapping station to swap batteries when the main battery is depleted, causing task interruptions and stagnation, affecting production efficiency and the cleanliness of the battery swapping stations.
The system determines whether to proceed to a battery swapping station based on the remaining battery power of the unmanned mining truck. An intelligent battery swapping model is constructed to optimize task allocation and execution order, and a particle swarm optimization algorithm is used to optimize the task allocation scheme.
It improved production efficiency and operational continuity, reduced power consumption during battery swapping and cleaning costs at battery swapping stations, and optimized resource utilization.
Smart Images

Figure CN118205442B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of data processing, and in particular relates to a method and system for swapping batteries in unmanned mining trucks. Background Technology
[0002] Driverless mining trucks, as an application of automation technology in the mining and industrial sectors, hold significant importance and value. This is primarily because industrial environments such as mines often present hazardous factors like harmful gases, high temperatures, and high pressures. Driverless mining trucks can reduce the chances of personnel directly contacting these dangerous environments, thus improving safety. Furthermore, in the long term, the operating and maintenance costs of driverless mining trucks are relatively low, positively impacting the economic benefits of enterprises.
[0003] Currently, the power supply system of unmanned mining trucks is often equipped with two batteries. When the main battery is depleted, the current task is terminated, and the auxiliary battery powers the truck to the battery swapping station for a new battery. After the swap, the task resumes, causing interruptions and stagnation, which affects production efficiency and operational continuity. At the same time, the truck may be carrying cargo on its way to the battery swapping station, increasing power consumption during the journey, affecting the cleanliness of the battery swapping station, and increasing cleaning costs. Summary of the Invention
[0004] In view of the shortcomings of the prior art, the purpose of the invention is to provide a method and system for swapping batteries for unmanned mining trucks. The system determines whether to go to the battery swapping station for battery swapping only when a cargo-carrying task is completed, based on the current remaining battery power of the unmanned mining truck. This will not cause interruption or stagnation of the task, improve production efficiency and operational continuity. During the battery swapping process, the unmanned mining truck is in an unloaded state, reducing power consumption on the way, preventing cargo from being spilled at the battery swapping station, helping to keep the battery swapping station clean, and reducing the cleaning cost of the battery swapping station.
[0005] A first aspect of the present invention provides a battery swapping method for unmanned mining trucks, comprising: S1, acquire cargo loading task data; S2, in each loop, dispatch fully charged unmanned mining trucks from the battery swapping station to perform cargo-carrying tasks; when a cargo-carrying task is completed, determine whether the current remaining battery power of the unmanned mining truck is less than the battery replacement threshold; if so, create a new battery swapping task for the unmanned mining truck, control the unmanned mining truck to go to the battery swapping station for battery swapping, and start the next loop after fully charged departure; otherwise, continue to execute the next cargo-carrying task until the current remaining battery power is less than the battery replacement threshold. S3, building an intelligent battery swapping model; S4, Set constraints for the intelligent battery swapping model; S5, construct the busy objective function of the intelligent battery swapping model with the goal of minimizing task time only, and construct the idle objective function of the intelligent battery swapping model with the goals of minimizing both task time and energy consumption; S6. Calculate the mine's busyness based on the number of cargo-carrying tasks and the total weight of the cargo to be loaded. S7. When the mine's busyness level is greater than the preset busyness level, under the constraints of the above conditions, the execution vehicles and execution order of each of the cargo loading tasks and the battery swapping tasks are determined with the objective of minimizing the function value of the busyness objective function; when the mine's busyness level is less than the preset busyness level, under the constraints of the above conditions, the execution vehicles and execution order of each of the cargo loading tasks and the battery swapping tasks are determined with the objective of minimizing the function value of the idleness objective function.
[0006] A second aspect of the present invention provides an unmanned mining truck battery swapping system, comprising: a memory and one or more processors.
[0007] The memory stores one or more applications, which are adapted to be executed by one or more processors to implement the unmanned mining truck battery swapping method of the first aspect.
[0008] In a third aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, the computer program being loadable and executed by a processor for the battery swapping method for the unmanned mining truck of the first aspect.
[0009] The beneficial effects of this invention are as follows: (1) The method and system of the present invention determine whether to go to the battery swapping station for battery swapping only when a cargo-carrying task is completed, based on the current remaining power of the unmanned mining truck. This will not cause interruption or stagnation of the task, improve production efficiency and work continuity. During the battery swapping process, the unmanned mining truck is in an unloaded state, which reduces power consumption on the way, avoids cargo spilling on the battery swapping station, helps to keep the battery swapping station clean, and reduces the cleaning cost of the battery swapping station.
[0010] (2) The method and system of the present invention can intelligently determine which decision scheme to adopt based on the busyness of the mine to determine the execution mine car and execution order of each of the cargo-carrying tasks and the battery-swapping tasks. During busy periods, the system prioritizes the objective function of the task with the shortest time consumption to ensure efficient completion of the task. During idle periods, the system considers the objective function of the task with the shortest time consumption and the shortest energy consumption to further save resources and reduce energy consumption. Attached Figure Description
[0011] The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Throughout the drawings, the same reference numerals denote the same parts. It is obvious that the drawings described below are merely some embodiments of the present invention, and those skilled in the art can obtain other drawings based on these drawings.
[0012] Figure 1 This is a flowchart illustrating a method for swapping batteries in an unmanned mining truck, as provided in an embodiment of the present invention. Figure 2 This is a schematic diagram of the structure of an unmanned mining truck battery swapping system provided in an embodiment of the present invention. Detailed Implementation
[0013] To enable those skilled in the art to better understand the technical solutions in the embodiments of the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. It should be understood that these descriptions are merely exemplary and are not intended to limit the scope of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0014] Furthermore, descriptions of well-known structures and techniques are omitted in the following description to avoid unnecessarily obscuring the concepts disclosed in this invention.
[0015] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating orientation or positional relationships based on the orientation or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. The terms "installed," "connected," and "linked" should be interpreted broadly; for example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0016] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numerals in different drawings denote the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Rather, they are merely examples of methods and systems consistent with some aspects of the invention as detailed in the appended claims.
[0017] This invention proposes a battery swapping method and system for unmanned mining trucks. It addresses the problems of existing unmanned mining truck power supply systems, which often use two batteries. When the main battery runs out of power, the current task is terminated, and the auxiliary battery powers the truck to a battery swapping station for replacement. After the swap, the task resumes, leading to interruptions and stagnation, affecting production efficiency and operational continuity. Furthermore, the truck may be carrying cargo while traveling to the swapping station, increasing power consumption en route, affecting the cleanliness of the swapping station, and increasing cleaning costs.
[0018] Method Implementation Examples Reference manual attached Figure 1 The diagram shows a flowchart of a battery swapping method for an unmanned mining truck provided by an embodiment of the present invention.
[0019] This invention provides a method for swapping batteries in an unmanned mining truck, comprising: Specifically, the method includes steps S1 to S7.
[0020] S1, acquire cargo loading task data.
[0021] The cargo mission data includes cargo volume, starting point, ending point, estimated start time, and estimated end time.
[0022] S2, in each loop, dispatch fully charged unmanned mining trucks from the battery swapping station to perform cargo-carrying tasks. When a cargo-carrying task is completed, determine whether the current remaining battery power of the unmanned mining truck is less than the battery replacement threshold. If so, create a new battery swapping task for the unmanned mining truck, control the unmanned mining truck to go to the battery swapping station for battery swapping, and start the next loop after fully charging. Otherwise, continue to execute the next cargo-carrying task until the current remaining battery power is less than the battery replacement threshold.
[0023] Those skilled in the art can set the battery replacement threshold according to actual conditions, and this invention does not impose any limitations. Optionally, the battery replacement threshold represents whether the remaining power can support the execution of the next cargo-carrying task.
[0024] In this invention, the decision to go to the battery swapping station for battery swapping is made only when a cargo-carrying task is completed, based on the current remaining power of the unmanned mining truck. This will not cause interruption or stagnation of the task, improve production efficiency and operational continuity. During the battery swapping process, the unmanned mining truck is in an unloaded state, reducing power consumption on the way, preventing cargo from being spilled at the battery swapping station, helping to keep the battery swapping station clean, and reducing the cleaning cost of the battery swapping station.
[0025] S3, building an intelligent battery swapping model.
[0026] S4 sets constraints for the intelligent battery swapping model.
[0027] In one possible implementation, the constraints specifically include: Remaining power constraint is used to ensure that the unmanned mining truck has enough remaining power to return to the battery swapping station:
[0028] Where, η d η represents the electrical energy conversion efficiency. m The motor efficiency is represented by α, the electrical conversion factor is represented by m. k Let d represent the empty weight of the k-th driverless mining truck. j0 SOC represents the distance from the destination of the j-th cargo transport task to the battery swapping station. k This represents the remaining power of the k-th driverless mining truck.
[0029] The task execution uniqueness constraint is used to ensure that each task can only be executed by one driverless mining truck:
[0030] Where, x ik This represents the task allocation parameter value, indicating when the i-th cargo loading task is assigned to the k-th mining car for execution. ,otherwise K represents the total number of driverless mining trucks.
[0031] The mining trucks are subject to a unique constraint to ensure that each driverless mining truck can only perform one cargo-carrying task at a time:
[0032] Where N represents the total number of cargo missions.
[0033] The uniqueness constraint of execution order is used to ensure that there is only one possible execution order between two tasks:
[0034] Where, x ijkThis parameter value represents the execution order of the i-th and j-th cargo loading tasks. It indicates when the j-th cargo loading task is executed immediately after the i-th task. ,otherwise x jik This parameter value represents the execution order of the j-th and i-th cargo loading tasks. It indicates when the j-th cargo loading task is executed immediately followed by the i-th cargo loading task. ,otherwise .
[0035] To ensure a fully charged unmanned mining truck leaves the battery swapping station, it must do so.
[0036] Where, x 0ik This represents the parameter value for executing the i-th cargo loading task starting from the battery swapping station. ,otherwise .
[0037] Returning to the constraint of the battery swapping station, the unmanned mining trucks must eventually return to the battery swapping station:
[0038] Where, x i0k This represents the parameter value for returning to the battery swapping station after executing the i-th cargo loading task. ,otherwise .
[0039] S5 constructs a busy objective function for the intelligent battery swapping model with the goal of minimizing task time, and constructs an idle objective function for the intelligent battery swapping model with the goals of minimizing both task time and energy consumption.
[0040] In one possible implementation, the busy objective function is specifically:
[0041] Where F1() represents the busy objective function, X represents the task allocation scheme, which indicates the execution cars and execution order of each cargo loading task and battery swapping task, min represents taking the minimum value, max represents taking the maximum value, and t k T represents the total time taken for the k-th unmanned mining truck when all cargo-carrying tasks are completed, where K represents the total number of unmanned mining trucks. i Let represent the timeout time of the i-th cargo task, γ represent the timeout penalty coefficient, N represent the total number of cargo tasks, β1 represent the weight coefficient of the time-consuming item, and β2 represent the weight coefficient of the timeout penalty item.
[0042] Those skilled in the art can set the weight coefficient β1 of the time-consuming item and the weight coefficient β2 of the timeout penalty item according to the actual situation; this invention does not impose any limitations.
[0043] In this invention, optimizing the objective function makes the system more inclined to allocate tasks to mining trucks with shorter execution times, thereby minimizing the overall task execution time. This helps improve the operational and production efficiency of the mining farm and reduces idle time and task waiting time. The introduction of a timeout penalty effectively reduces the risk of task timeouts. The system tends to complete tasks as quickly as possible to avoid additional costs and risks caused by timeouts.
[0044] Furthermore, by constructing and minimizing the busy objective function, the task allocation and execution order of the mine can be optimized, efficiency can be improved, the risk of task timeout can be reduced, the utilization rate of mining trucks can be increased, and flexible optimization weight adjustment can be achieved, thereby improving the overall operating efficiency and economic benefits of the intelligent battery swapping system.
[0045] Optionally, the total time t for the k-th unmanned mining truck when all cargo-carrying tasks are completed is... k Specifically:
[0046] Where, d 0i d represents the distance from the starting point of the i-th cargo-carrying task originating from the battery swapping station. i d represents the distance from the start point to the end point of the i-th cargo loading task. ij Let d represent the distance from the end point of the i-th cargo task to the starting point of the j-th cargo task. j0 v represents the distance from the destination of the j-th cargo transport task to the battery swapping station. 1k Let v represent the speed of the k-th driverless mining truck when it is unloaded. 2k Let N represent the speed of the k-th driverless mining truck when it is carrying cargo, N represent the total number of cargo-carrying tasks, and K represent the total number of driverless mining trucks.
[0047] In this invention, factors such as speed, distance, and task execution sequence of mining trucks during task execution can be considered more comprehensively, and the total time spent by each mining truck can be evaluated more accurately. This helps the intelligent battery swapping system optimize task allocation and execution sequence, thereby improving the system's operating efficiency and the mine's production efficiency.
[0048] In one possible implementation, the idle objective function is specifically:
[0049] Where F2() represents the idle objective function, E k β3 represents the energy consumption of the k-th unmanned mining truck when all cargo-carrying tasks are completed, and β3 represents the weighting coefficient of the energy consumption term.
[0050] Those skilled in the art can set the weight coefficient β1 of the time consumption item, the weight coefficient β2 of the timeout penalty item, and the weight coefficient β3 of the energy consumption item according to the actual situation; this invention does not impose any limitations.
[0051] In this invention, by constructing an idle objective function, the system comprehensively considers task execution time, task timeout risk, and the energy consumption of the mining truck, making the intelligent battery swapping system more economical, efficient, environmentally friendly, and sustainable. This objective function design helps the system find a more economical and environmentally friendly optimal solution in task allocation and execution order, improving the overall efficiency and cost-effectiveness of the system.
[0052] Optionally, the energy consumption E of the k-th driverless mining truck when all cargo-carrying tasks are completed. k Specifically:
[0053] Among them, M i This represents the total weight of the cargo to be loaded for the i-th cargo loading task.
[0054] In this invention, the energy consumption calculation method can more comprehensively consider the energy consumption of the mining truck during the task execution process. It takes into account multiple factors such as empty truck weight, task distance, and task cargo weight, which helps the system select a more energy-efficient task execution scheme, save energy, reduce costs, and improve the system's operating efficiency and economic benefits.
[0055] S6 calculates the mine's busyness based on the number of cargo loading tasks and the total weight of the cargo to be loaded.
[0056] In one possible implementation, the calculation method for the busyness of the mine is as follows:
[0057] Where f represents the busy level, C represents the total number of cargo missions, and C j M represents the total number of emergency cargo delivery missions. t μ1 represents the weighting coefficient of the total number of cargo loading tasks, μ2 represents the weighting coefficient of the total number of emergency cargo loading tasks, and μ3 represents the weighting coefficient of the total weight of cargo to be loaded.
[0058] Optionally, a cargo loading task that is about to exceed its time limit can be defined as an emergency cargo loading task, or an emergency cargo loading task can be determined based on the nature of the customer and the urgency of the customer's need for the goods.
[0059] It's important to note that more cargo-carrying tasks mean more unmanned mining trucks are needed to perform them, thus the total number of tasks is closely related to the mine's workload. The presence of urgent tasks may require adjustments to the execution order of other tasks or increased resource allocation, indirectly affecting the mine's workload. A large amount of cargo awaiting loading may also mean longer task execution times, slower task completion speeds for mining trucks, and consequently, increased mine workload.
[0060] Those skilled in the art can set the weight coefficient μ1 for the total number of cargo loading tasks, the weight coefficient μ2 for the total number of emergency cargo loading tasks, and the weight coefficient μ3 for the total weight of cargo to be loaded according to the actual situation. This invention does not limit these settings.
[0061] In this invention, the method of calculating mine busyness can comprehensively consider multiple factors such as the number of tasks, the number of urgent tasks, and the total weight of cargo to be loaded, and calculate the mine busyness in a weighted manner. This helps managers to fully understand the working status of the mine, optimize task scheduling and resource allocation, and improve the mine's working efficiency and production benefits.
[0062] S7. When the mine's busy level is greater than the preset busy level, under the constraints, the execution of each cargo-carrying task and battery-swapping task is determined with the objective of minimizing the busy level objective function. When the mine's busy level is less than the preset busy level, under the constraints, the execution of each cargo-carrying task and battery-swapping task is determined with the objective of minimizing the idle level objective function.
[0063] Those skilled in the art can set the preset busy level according to the actual situation, and the present invention does not limit this.
[0064] In this invention, the system can intelligently determine which decision scheme to use to determine the execution of each cargo-carrying task and the battery-swapping task, as well as the execution order, based on the busyness of the mine. During busy periods, the system prioritizes the objective function of minimizing task time to ensure efficient task completion. During idle periods, the system considers the objective function of minimizing both task time and energy consumption to further save resources and reduce energy consumption.
[0065] In one possible implementation, determining the executing mining car and execution order for each cargo-carrying task and battery-swapping task specifically involves using an improved particle swarm optimization algorithm to determine the executing mining car and execution order for each cargo-carrying task and battery-swapping task.
[0066] Among them, Particle Swarm Optimization (PSO) is an optimization algorithm based on swarm intelligence. Inspired by the group behavior of flocks of birds or schools of fish, it finds the optimal solution by simulating the cooperation and information sharing of individuals in the group.
[0067] Specifically, traditional particle swarm optimization (PSO) algorithms suffer from a "clustering effect" during the search process, causing particles to tend to move towards local optima, potentially missing the global optimum and becoming trapped in local optima. The improved PSO algorithm proposed in this invention introduces crossover and mutation operations from genetic algorithms to address the problems of traditional PSO algorithms. The specific execution method is as follows: Initialize a particle swarm, which contains multiple particles. The position of each particle represents a feasible task allocation scheme.
[0068] The fitness function of the particle swarm is the reciprocal of either the busy objective function or the idle objective function.
[0069] Calculate the fitness value of each particle in the particle swarm.
[0070] Based on the fitness values of each particle, the optimal position of the individual particle and the global optimal position are determined.
[0071] Generate a random number and then combine the random number with the crossover probability p. e Compare the sizes; if the random number is less than the crossover probability p... e Then, the current particle's position is compared with its optimal position to update the current particle's position:
[0072] Among them, Y new Y represents the current particle's updated position, where Y represents the particle's original position, and r represents a random number between 0 and 1. best This represents the optimal position of an individual.
[0073] It should be noted that crossover operations allow new positions to potentially include a portion of an individual's optimal position, but are not entirely limited to it. This helps to escape local optima and explore a wider search space. Furthermore, crossover operations enable different particles to exchange information and experience, facilitating the dissemination and sharing of global information and improving the overall search capability of the swarm.
[0074] If the updated fitness value of the current particle is greater than the individual's best position, then the individual's best position is replaced by the current particle's position.
[0075] Wherein, the crossover probability P e Specifically:
[0076] Among them, P e P represents the crossover probability. e,max P represents the maximum crossover probability. e,min δ represents the minimum crossover probability, and δ represents the fitness value of the current particle. avg δ represents the average fitness value of the population. max This represents the maximum fitness value among the particles.
[0077] It should be noted that the crossover probability is adjusted based on the relationship between the current particle's fitness value and the population's average fitness value. When the current particle's fitness δ is higher than the population's average fitness δ... avg When the fitness δ is high, the crossover probability gradually decreases; conversely, when the fitness δ is below the average, the crossover probability gradually increases. The decrease in crossover probability as fitness increases allows for more exploration of the search space in the early stages of the algorithm, preventing premature entrapment in local optima. High-fit particles typically correspond to better solutions; reducing crossover operations between these particles helps preserve these excellent solutions while allowing lower-fit particles to explore more, increasing the algorithm's global search capability. By adaptively adjusting the crossover probability, the algorithm can employ different search strategies at different stages, more flexibly addressing complex optimization problems.
[0078] Continue generating a new random number, and then combine this random number with the crossover probability P. e Compare the sizes; if the random number is less than the crossover probability P... e Then, a cross operation is performed between the current particle's position and the global optimal position to update the current particle's position:
[0079] Among them, Y new Let Y represent the current particle's updated position, Y represent the particle's original position, r represent a random number between 0 and 1, and P represent the particle's position after the update. best This indicates the globally optimal position.
[0080] If the updated fitness value of the current particle is greater than the individual's best position, then the individual's best position is replaced by the current particle's position.
[0081] Continue generating a new random number, and then combine this random number with the mutation probability P. m Compare the magnitudes; if the random number is less than the mutation probability P... m Then, a mutation operation is performed on the current particle's position to update the current particle's position:
[0082] Among them, Y newY represents the current particle's updated position, where Y represents the particle's original position, and r represents a random number between 0 and 1. best Y represents the optimal position of an individual. worst This indicates the worst position of an individual.
[0083] In this invention, the mutation operation maintains the diversity of individuals in the population, which helps to avoid premature convergence and overfitting, making the algorithm more likely to find the global optimum. Introducing the mutation operation enhances the algorithm's ability to explore unknown spaces, increasing the scope and depth of the search space.
[0084] Wherein, the probability of variation P m Specifically:
[0085] Among them, P m P represents the probability of mutation. m,max P represents the maximum mutation probability. m,min δ represents the minimum mutation probability, and δ represents the fitness value of the current particle. avg δ represents the average fitness value of the population. max This represents the maximum fitness value among the particles.
[0086] It should be noted that the mutation probability is adjusted based on the relationship between the current particle's fitness value and the population's average fitness value. When the current particle's fitness δ is higher than the population's average fitness δ... avg When the fitness δ is below the average, the mutation probability gradually decreases; conversely, when the fitness δ is below the average, the mutation probability gradually increases. The decrease in mutation probability as fitness increases allows for more exploration of the search space in the early stages of the algorithm, avoiding premature entrapment in local optima. Particles with high fitness typically correspond to better solutions; reducing mutation operations between these particles helps preserve these excellent solutions while allowing particles with lower fitness to explore more, increasing the algorithm's global search capability. By adaptively adjusting the mutation probability, the algorithm can employ different search strategies at different stages, more flexibly addressing complex optimization problems.
[0087] If the updated fitness value of the current particle is greater than the individual's best position, then the individual's best position is replaced by the current particle's position.
[0088] Update the global optimal position.
[0089] Determine if the maximum number of iterations has been reached. If so, output the task allocation scheme represented by the position of the particle with the highest fitness value. Otherwise, return to continue iterating.
[0090] In this invention, the improved particle swarm optimization algorithm combines the advantages of both algorithms by introducing crossover and mutation operations from the genetic algorithm. This improves the diversity, efficiency, and global convergence of the search, making the algorithm more robust and applicable to different types of optimization problems.
[0091] The beneficial effects of this invention are as follows: (1) The method and system of the present invention determine whether to go to the battery swapping station for battery swapping only when a cargo-carrying task is completed, based on the current remaining power of the unmanned mining truck. This will not cause interruption or stagnation of the task, improve production efficiency and work continuity. During the battery swapping process, the unmanned mining truck is in an unloaded state, which reduces power consumption on the way, avoids cargo spilling on the battery swapping station, helps to keep the battery swapping station clean, and reduces the cleaning cost of the battery swapping station.
[0092] (2) The method and system of the present invention can intelligently determine which decision scheme to adopt based on the busyness of the mine to determine the execution mine car and execution order of each of the cargo-carrying tasks and the battery-swapping tasks. During busy periods, the system prioritizes the objective function of the task with the shortest time consumption to ensure efficient completion of the task. During idle periods, the system considers the objective function of the task with the shortest time consumption and the shortest energy consumption to further save resources and reduce energy consumption.
[0093] System Implementation Examples Reference manual attached Figure 2 The diagram shows a structural schematic of an unmanned mining truck battery swapping system provided in an embodiment of the present invention.
[0094] The present invention proposes an unmanned mining truck battery swapping system 30, comprising: a memory 303 and one or more processors 301.
[0095] The memory 303 stores one or more application programs, which are adapted to be executed by the one or more processors 301 to implement the unmanned mining truck battery swapping method described in the method embodiment.
[0096] The unmanned mining truck battery swapping system 30 includes a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, for example, via a bus 302.
[0097] The structure of the unmanned mining truck battery swapping system 30 does not constitute a limitation on the embodiments of the present invention.
[0098] The beneficial effects of this invention are as follows: (1) The method and system of the present invention determine whether to go to the battery swapping station for battery swapping only when a cargo-carrying task is completed, based on the current remaining power of the unmanned mining truck. This will not cause interruption or stagnation of the task, improve production efficiency and work continuity. During the battery swapping process, the unmanned mining truck is in an unloaded state, which reduces power consumption on the way, avoids cargo spilling on the battery swapping station, helps to keep the battery swapping station clean, and reduces the cleaning cost of the battery swapping station.
[0099] (2) The method and system of the present invention can intelligently determine which decision scheme to adopt based on the busyness of the mine to determine the execution mine car and execution order of each of the cargo-carrying tasks and the battery-swapping tasks. During busy periods, the system prioritizes the objective function of the task with the shortest time consumption to ensure efficient completion of the task. During idle periods, the system considers the objective function of the task with the shortest time consumption and the shortest energy consumption to further save resources and reduce energy consumption.
[0100] Processor 301 may be a CPU, a general-purpose processor, a DSP, an ASIC, an FPGA, or other programmable logic device, transistor logic device, hardware component, or any combination thereof. It may implement or execute the various exemplary logic blocks, modules, and circuits described in connection with this disclosure. Processor 301 may also be a combination that implements computational functions, such as including one or more microprocessor combinations, a combination of a DSP and a microprocessor, etc.
[0101] Bus 302 may include a pathway for transmitting information between the aforementioned components. Bus 302 may be a PCI bus or an EISA bus, etc. Bus 302 may be divided into address bus, data bus, control bus, etc. For ease of illustration, only one thick line is used to represent it in the figure, but this does not mean that there is only one bus or one type of bus.
[0102] The memory 303 may be a ROM or other type of static storage device capable of storing static information and instructions, RAM or other type of dynamic storage device capable of storing information and instructions, or it may be an EEPROM, CD-ROM or other optical disc storage, optical disc storage (including compressed optical discs, laser discs, optical discs, digital universal optical discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium capable of carrying or storing desired program code in the form of instructions or data structures and accessible by a computer, but is not limited thereto.
[0103] Computer-readable storage medium embodiments The present invention proposes a computer-readable storage medium having a computer program stored thereon, which can be loaded and executed by a processor for the unmanned mining truck battery swapping method described in the first aspect.
[0104] The applicant of this invention has provided a detailed description of the embodiments of the invention in conjunction with the accompanying drawings. However, those skilled in the art should understand that the above embodiments are merely preferred embodiments of the invention. The detailed description is only intended to help readers better understand the spirit of the invention and is not intended to limit the scope of protection of the invention. On the contrary, any improvements or modifications made based on the inventive spirit of the invention should fall within the scope of protection of the invention.
[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the embodiments of the present invention, and are not intended to limit them. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the protection scope of the present invention.
Claims
1. A method for swapping batteries in an unmanned mining truck, characterized in that, include: S1, acquire cargo loading task data; S2, in each cycle, dispatches fully charged unmanned mining trucks from the battery swapping station to perform cargo-carrying tasks; When a cargo-carrying task is completed, determine whether the current remaining battery power of the unmanned mining truck is less than the battery replacement threshold. If so, create a new battery replacement task for the unmanned mining truck, control the unmanned mining truck to go to the battery replacement station for battery replacement, and start the next cycle after the truck is fully charged. Otherwise, continue to execute the next cargo-carrying task until the current remaining battery power is less than the battery replacement threshold. S3, building an intelligent battery swapping model; S4, Set constraints for the intelligent battery swapping model; S5, construct the busy objective function of the intelligent battery swapping model with the goal of minimizing task time only, and construct the idle objective function of the intelligent battery swapping model with the goals of minimizing both task time and energy consumption; S6. Calculate the mine's busyness based on the number of cargo-carrying tasks and the total weight of the cargo to be loaded. S7. When the mine's busyness level is greater than the preset busyness level, under the constraints of the above conditions, the execution vehicles and execution order of each of the cargo loading tasks and the battery swapping tasks are determined with the goal of minimizing the function value of the busyness objective function; when the mine's busyness level is less than the preset busyness level, under the constraints of the above conditions, the execution vehicles and execution order of each of the cargo loading tasks and the battery swapping tasks are determined with the goal of minimizing the function value of the idleness objective function. The specific method for calculating the busyness of a mining farm is as follows: in, f Indicates the level of busyness. C Indicates the total number of cargo delivery missions. C j This indicates the total number of emergency cargo delivery missions. M t Indicates the total weight of the goods to be loaded. μ 1 represents the weighting coefficient of the total number of cargo missions. μ 2 represents the weighting coefficient for the total number of emergency cargo delivery missions. μ 3 represents the weighting coefficient of the total weight of the goods to be loaded.
2. The battery swapping method for unmanned mining trucks according to claim 1, characterized in that, The constraints specifically include: Remaining power constraint is used to ensure that the unmanned mining truck has enough remaining power to return to the battery swapping station; The task execution uniqueness constraint is used to ensure that each task can only be executed by one unmanned mining truck. The mining trucks are subject to a unique constraint to ensure that each driverless mining truck can only perform one cargo-carrying task at any given time. The uniqueness constraint of execution order is used to ensure that there is only one possible execution order between two tasks; To ensure that the fully charged unmanned mining trucks are kept within the battery swapping station, they must leave the station. Returning to the constraint of the battery swapping station, the unmanned mining trucks must eventually return to the battery swapping station.
3. The battery swapping method for unmanned mining trucks according to claim 2, characterized in that, The remaining power constraint is specifically as follows: in, η d Indicates electrical energy conversion efficiency. η m Indicates motor efficiency. α Indicates the electrical quantity conversion factor. m k Indicates the first k The empty weight of an unmanned mining truck d j0 Indicates the first j The distance from the destination of the cargo-carrying mission to the battery swapping station. SOC k Indicates the first k The remaining battery power of the driverless mining truck; The specific uniqueness constraint for task execution is as follows: in, x ik This indicates the task allocation parameter value, which will be the first... i The cargo loading task was assigned to the first k When a mining truck is in operation ,otherwise , K This indicates the total number of driverless mining trucks; The uniqueness constraint applied to the mining truck is specifically as follows: in, N Indicates the total number of cargo delivery missions; The uniqueness constraint of the execution order is specifically as follows: in, x ijk Indicates the first i Cargo loading mission and the first j The execution order parameter value for each cargo loading task, executing the first... i The cargo loading task was immediately followed by the execution of the first... j When carrying cargo ,otherwise ; x jik Indicates the first j Cargo loading mission and the first i The execution order parameter value for each cargo loading task, executing the first... j The cargo loading task was immediately followed by the execution of the first... i When carrying cargo ,otherwise ; The specific constraints for leaving the battery swapping station are as follows: in, x 0ik This indicates that the process starts from the battery swapping station. i The parameter values for the cargo-carrying task are executed from the battery swapping station. i When carrying cargo ,otherwise ; The specific constraint for returning to the battery swapping station is as follows: in, x i0k Indicates execution of the first i After completing the cargo loading task, return to the parameter values at the battery swapping station and execute the next step. i When returning to the battery swapping station after completing the cargo loading mission ,otherwise .
4. The battery swapping method for unmanned mining trucks according to claim 1, characterized in that, The busy objective function is specifically: in, F 1() represents the busy objective function. X This represents the task allocation scheme, which indicates the mining cars and execution order for each cargo loading and battery swapping task. `min` indicates taking the minimum value, and `max` indicates taking the maximum value. t k This indicates the time when all cargo loading tasks are completed. k The total time taken by each driverless mining truck K This indicates the total number of driverless mining trucks. T i Indicates the first i The timeout period for the cargo loading task. γ This represents the timeout penalty coefficient. N Indicates the total number of cargo delivery missions. β 1 indicates the weighting coefficient of the time-consuming item. β 2 represents the weighting coefficient of the timeout penalty.
5. The battery swapping method for unmanned mining trucks according to claim 4, characterized in that, When all cargo loading tasks are completed, the first k The total time for each driverless mining truck t k Specifically: in, d 0i This indicates that the process starts from the battery swapping station. i The distance from the starting point of the cargo-carrying mission. d i Indicates the first i The distance from the starting point to the destination of a cargo transport mission. d ij Indicates the first i The end point of the cargo loading mission to the first j The distance from the starting point of the cargo-carrying mission. d j0 Indicates the first j The distance from the destination of the cargo-carrying mission to the battery swapping station. v 1k Indicates the first k The speed of an unmanned mining truck when it is empty. v 2k Indicates the first k The speed of an unmanned mining truck when carrying goods N Indicates the total number of cargo delivery missions. K This represents the total number of driverless mining trucks.
6. The battery swapping method for unmanned mining trucks according to claim 1, characterized in that, The idle objective function is specifically: in, F 2() represents the idle objective function. E k This indicates the time when all cargo loading tasks are completed. k Energy consumption of an unmanned mining truck β 3 represents the weighting coefficient of the energy consumption item.
7. The battery swapping method for unmanned mining trucks according to claim 6, characterized in that, When all cargo loading tasks are completed, the first... k Energy consumption of an unmanned mining truck E k Specifically: in, M i Indicates the first i The total weight of the cargo to be loaded for the cargo-carrying task.
8. The battery swapping method for unmanned mining trucks according to claim 1, characterized in that, The specific steps for determining the executing mining vehicles and execution order for each of the cargo-carrying tasks and the battery-swapping tasks are as follows: the executing mining vehicles and execution order for each of the cargo-carrying tasks and the battery-swapping tasks are determined using an improved particle swarm optimization algorithm.
9. A battery swapping system for unmanned mining trucks, characterized in that, include: Memory and one or more processors; The memory stores one or more applications, which are adapted to be executed by the one or more processors to implement the unmanned mining truck battery swapping method according to any one of claims 1 to 8.
Citation Information
Patent Citations
Vehicle scheduling method and system based on industrial vehicle chain
CN114155735A
Battery scheduling method of battery swap station network considering green power consumption and computing equipment
CN117220269A