Installation device and method for plastering wire mesh

Through the combination of horizontal storage cylinder, horizontal adjustment shaft mechanism, vertical frame mechanism and positioning box mechanism, combined with structural glue and cleaning components, the problem of uneven pasting of plastered steel wire mesh installation devices on the wall is solved, and the installation efficiency and Firmness enables efficient and accurate installation of plastered steel wire mesh.

CN118208018BActive Publication Date: 2024-12-27XINJIANG VITAL DEV & CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410469717.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-12-27
Estimated Expiration
2044-04-18

AI Technical Summary

Technical Problem

It is difficult for existing plastered steel wire mesh installation devices to quickly and accurately and evenly paste the thermal insulation nail hanging plates on the wall, resulting in low installation efficiency and poor firmness, especially when floating ash and impurities exist on the concrete wall.

Method used

The combination of horizontal housing cylinder, horizontal adjustment shaft mechanism, vertical frame mechanism and positioning box mechanism is adopted. Through the cooperation of structural glue and cleaning components, the insulation nail hanging plate is accurately pasted and wall cleaning is ensured to ensure its firm installation.

Benefits of technology

The rapid and accurate installation of plastered steel wire mesh is achieved, the installation efficiency and firmness are improved, the uniform distribution and firm adhesion of the insulation nail hanging pieces are ensured, and the labor intensity and construction time are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118208018B_ABST
    Figure CN118208018B_ABST
Patent Text Reader

Abstract

The present invention discloses an installation device and method for plastering steel wire mesh, wherein a horizontal adjustment shaft mechanism is rotatably arranged between the left and right side walls of the inner cavity of the horizontal accommodating cylinder, and a first placement box is fixedly arranged at the front end of the horizontal plate and located on the right side of the horizontal accommodating cylinder, and the present invention relates to the field of steel wire mesh installation technology. The installation device and method for plastering steel wire mesh, through the mutual cooperation between the horizontal accommodating cylinder, the horizontal adjustment shaft mechanism, the vertical frame mechanism, the vertical adjustment shaft mechanism and the positioning box mechanism, can quickly and accurately adjust the positions of multiple positioning box mechanisms between the concrete wall and the masonry wall, so that the multiple positioning box mechanisms are evenly distributed at the designated positions of the wall, and then multiple insulation nail hanging sheet mechanisms are placed in each positioning box mechanism in turn, so that the multiple insulation nail hanging sheet mechanisms can be quickly and evenly adhered to the designated positions of the wall, ensuring the firmness of the installation of the plastering steel wire mesh and high installation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel wire mesh installation, in particular to an installation device and method for a plastering steel wire mesh. Background Art

[0002] In traditional plastering construction, for the plastering on the surface where different material substrates meet, cement steel nails are often used to strengthen the measures to prevent cracking and improve the stability of the plastering. However, this fixing method has some problems, especially when fixing on concrete walls, it is necessary to use an electric hammer to drill holes and then fix them. The process is cumbersome, labor-intensive, labor-intensive and the construction efficiency is low. In order to solve these problems and improve the efficiency and stability of plastering construction, a plastering wire mesh installation device is introduced. This device can replace the traditional cement steel nail fixation through a new fixing method. When plastering the surface at the junction of different material substrates, a plurality of insulation nail hanging plates are usually used to connect the plastering wire mesh to the substrate to ensure the stability of the plastering and prevent cracking.

[0003] A wall plastering wire mesh fixing device disclosed in a patent application with reference publication number CN210067296U uses a thin nail sheet as a wire mesh fixing device and fixes it by pasting, which does not affect the wall plastering and has a good fixing effect. It is easy to bend when used, has a convenient operation method, is low in cost, can be operated by one person, reduces labor intensity, and speeds up construction efficiency.

[0004] Comprehensive analysis of the above reference patents shows the following defects:

[0005] The existing installation device and method for plastering wire mesh usually utilizes multiple insulation nail hanging plates to install the plastering wire mesh on the wall. However, it is difficult to quickly and accurately evenly stick the multiple insulation nail hanging plates on the designated positions of the wall, and the installation efficiency is low. In addition, since there may be floating dust and impurities on the wall, directly sticking the insulation nail hanging plates will result in weak firmness, thereby reducing the installation firmness of the plastering wire mesh. Therefore, it is necessary to provide a plastering wire mesh installation device and method to solve the above-mentioned technical problems. Summary of the invention

[0006] In view of the deficiencies in the prior art, the present invention provides an installation device and method for a plastering wire mesh, which solves the problem that the plastering wire mesh is usually installed on the wall using multiple insulation nail hanging plates, but it is difficult to quickly and accurately evenly stick the multiple insulation nail hanging plates on the designated positions of the wall, the installation efficiency is low, and since there may be floating dust and impurities on the wall, directly sticking the insulation nail hanging plates will result in weak firmness, thereby reducing the installation firmness of the plastering wire mesh.

[0007] To achieve the above purpose, the present invention is implemented through the following technical solutions: a plastering wire mesh installation device, comprising:

[0008] A horizontal plate is placed between the concrete wall and the masonry wall, a horizontal accommodating tube is fixedly arranged at the front end of the horizontal plate, a horizontal adjustment shaft mechanism is rotatably arranged between the left and right side walls of the inner cavity of the horizontal accommodating tube, a first placement box is fixedly arranged at the front end of the horizontal plate and located on the right side of the horizontal accommodating tube, a first worm for driving the horizontal adjustment shaft mechanism is rotatably arranged between the front and rear walls of the lower part of the inner cavity of the first placement box, a plurality of first scales are evenly arranged at the front end of the horizontal accommodating tube, and a long groove is opened at the bottom of the horizontal accommodating tube;

[0009] A plurality of vertical frame mechanisms are evenly arranged at the bottom of the horizontal adjustment shaft mechanism, and a vertical adjustment shaft mechanism is arranged in each of the vertical frame mechanisms. The vertical adjustment shaft mechanism is formed by proportionally reducing the horizontal adjustment shaft mechanism. A plurality of positioning box mechanisms are arranged on the right side from top to bottom of each of the vertical adjustment shaft mechanisms, and an insulation nail hanging sheet mechanism is arranged in each of the positioning box mechanisms. The insulation nail hanging sheet mechanism is used to install the plastering wire mesh, and the rear end of the insulation nail hanging sheet mechanism is adhered to the wall by structural adhesive. The horizontal accommodating cylinder, the horizontal adjustment shaft mechanism and the first worm are used to adjust the distance between the left and right adjacent positioning box mechanisms, and the vertical frame mechanism and the vertical adjustment shaft mechanism are used to adjust the distance between the upper and lower adjacent positioning box mechanisms, and the positioning box mechanism is used to clean the wall and press the insulation nail hanging sheet mechanism against the wall.

[0010] 4. The swiftly and minutely adjusting device for a wood-planer working table as claimed in claim 1, wherein said first, second with the first and second with the second movable part, are pivotally connected to each other with a bolt, and said bolt has a round shank to contact with said movable part.

[0011] Preferably, the vertical frame mechanism includes a vertical plate, a vertical accommodating tube is fixedly provided at the front end of the vertical plate, a plurality of second scales are evenly provided at the front end of the vertical accommodating tube, a through slot is opened on the right side of the vertical accommodating tube, a second placement box is fixedly provided at the front end of the vertical plate and located at the bottom of the vertical accommodating tube, a second worm is rotatably provided between the front and rear walls of the left part of the inner cavity of the second placement box, the front end of the first worm penetrates the front wall of the first placement box and the front end of the second worm penetrates the front wall of the second placement box, and a hand wheel is fixedly provided, a first sliding column is fixedly provided on the top of the vertical accommodating tube, a horizontal ring is fixedly sleeved on the outer wall of the first sliding column, the top of the first sliding column penetrates the long slot and is slidably connected in the corresponding first pitch variable slot, and the horizontal ring is located in the horizontal accommodating tube.

[0012] Preferably, the vertical adjustment shaft mechanism includes a second adjustment shaft, which is rotatably connected between the upper and lower walls of the inner cavity of the vertical accommodating cylinder, and a plurality of second variable pitch grooves are evenly arranged on the surface of the second adjustment shaft. A second worm gear is fixed to the bottom of the second adjustment shaft through a rotating shaft, and the second worm gear is rotatably connected between the upper and lower walls of the inner cavity of the second placing box, and the left side of the second worm gear is meshed with the right side of the second worm.

[0013] Preferably, each of the positioning box mechanisms includes a second slide post, a vertical sleeve ring is fixedly sleeved on the outer wall of the second slide post, the left end of the second slide post passes through the through slot and is slidably connected to the corresponding second variable pitch slide slot, the vertical sleeve ring is located in the vertical accommodating tube, and a positioning block is fixedly provided on the right end of the second slide post, a first accommodating cavity is opened in the middle of the positioning block, a second accommodating cavity is opened on the left and right parts of the positioning block, horizontal grooves are opened on the left and right sides of the upper part of the first accommodating cavity, a pressure maintaining assembly is arranged inside the first accommodating cavity, gear assemblies are rotatably arranged in the two second accommodating cavities, and two left-right symmetrical cleaning assemblies are arranged in the first accommodating cavity.

[0014] Preferably, the pressure-maintaining assembly includes a bearing plate, which is located in the first accommodating chamber, a square rod is fixedly provided at the front end of the bearing plate, the square rod slides through the front wall of the positioning block, a pull plate is fixedly provided at the front end of the square rod, a spring is sleeved on the outside of the square rod, the spring is fixedly connected between the front wall of the positioning block and the rear wall of the pull plate, a threaded rod is threadedly penetrated between the inside of the square rod and the pull plate, a pressure plate is rotatably provided at the rear end of the threaded rod, convex plates are fixedly provided on the upper parts of the left and right sides of the bearing plate, the convex plates slide through the corresponding transverse grooves, and a first rack is fixedly provided at the ends of the two convex plates away from each other, and the two first racks are symmetrical on the left and right.

[0015] Preferably, the gear assembly includes a vertical shaft, which is rotatably connected between the upper and lower walls of the second accommodating cavity, a first gear is fixedly sleeved in the middle of the outer wall of the vertical shaft, a second gear is fixedly sleeved on the upper part of the outer wall of the vertical shaft, and the second gear is meshed with the corresponding first rack.

[0016] Preferably, the cleaning assembly includes a second rack, which slides through the corresponding second accommodating cavity, the front end of the second rack is meshed with the rear end of the first gear, and a connecting rod is fixedly provided on the side of the rear end of the second rack close to the pressure plate, and a brush is fixedly provided on the rear end of the connecting rod.

[0017] Preferably, the insulation nail hanging plate mechanism includes an insulation nail hanging plate, which is located between two cleaning components, and two protrusions are fixedly provided on the left and right sides of the upper front end of the insulation nail hanging plate, an elastic pressure plate is arranged between the two protrusions on the left part through the rotation of the shaft rod, and a limiting shaft is fixedly arranged between the two protrusions on the right part, and a slot is provided on the side of the elastic pressure plate away from the shaft rod, which is used to connect with the limiting shaft to complete the locking of the position of the elastic pressure plate.

[0018] The present invention also provides an installation method for a plastering wire mesh installation device, using the plastering wire mesh installation device, the specific method comprises the following steps:

[0019] Step 1: Place the horizontal plate between the concrete wall and the masonry wall, and then use two screws to fix the horizontal plate on the wall. Then, turn the handwheel at the front end of the first worm to rotate the first worm, and the horizontal adjustment shaft mechanism rotates accordingly, and the plurality of vertical frame mechanisms move closer to or farther away from each other. During the process, observe the first scales corresponding to the plurality of vertical frame mechanisms. When the spacing between the plurality of vertical frame mechanisms reaches the required value, stop turning the handwheel at the front end of the first worm, and the spacing between the left and right adjacent positioning box mechanisms is adjusted.

[0020] Step 2: Then, use screws to fix each vertical frame mechanism on the wall, and then rotate each vertical adjustment shaft mechanism in turn, so that the upper and lower adjacent positioning box mechanisms move closer to or farther away from each other. When the distance between the upper and lower adjacent positioning box mechanisms reaches the required value, stop rotating the vertical adjustment shaft mechanism, and the distance between the upper and lower adjacent positioning box mechanisms is adjusted.

[0021] Step three, then place several insulation nail hanging sheet mechanisms in each positioning box mechanism in turn. Before each insulation nail hanging sheet mechanism is placed in the positioning box mechanism, first use the positioning box mechanism to clean the wall area to which the insulation nail hanging sheet mechanism is to be adhered, then apply structural adhesive to the rear end of the insulation nail hanging sheet mechanism and place it in the corresponding positioning box mechanism. The positioning box mechanism pushes the insulation nail hanging sheet mechanism toward the wall to make the insulation nail hanging sheet mechanism stick to the wall. After each insulation nail hanging sheet mechanism is stuck to the wall, remove each screw in turn, remove the horizontal plate and the vertical frame mechanism from the wall, leaving only the insulation nail hanging sheet mechanism on the wall, and then use each insulation nail hanging sheet mechanism to install the plastering wire mesh between the concrete wall and the masonry wall.

[0022] Beneficial Effects

[0023] The present invention provides a device and method for installing a plastering wire mesh. Compared with the prior art, it has the following beneficial effects:

[0024] 1. A device and method for installing a plastering wire mesh. Through the cooperation between a horizontal accommodating cylinder, a horizontal adjustment shaft mechanism, a vertical frame mechanism, a vertical adjustment shaft mechanism and a positioning box mechanism, the positions of multiple positioning box mechanisms can be quickly and accurately adjusted between a concrete wall surface and a masonry wall surface, so that the multiple positioning box mechanisms are evenly distributed at designated positions on the wall surface. After that, multiple insulation nail hanging sheet mechanisms are placed in each positioning box mechanism in turn, so that the multiple insulation nail hanging sheet mechanisms can be quickly and evenly adhered to designated positions on the wall surface, thereby ensuring the firmness of the installation of the plastering wire mesh and high installation efficiency.

[0025] 2. A device and method for installing a plastering wire mesh. Through the mutual cooperation among a first adjusting shaft, a first variable pitch slide groove, a second adjusting shaft and a second variable pitch slide groove, a plurality of positioning box mechanisms can be simultaneously moved in the left-right direction by simply rotating the hand wheel at the front end of the first worm gear, and the spacing adjustment between the left and right adjacent positioning box mechanisms can be completed quickly and accurately. A plurality of positioning box mechanisms can be simultaneously moved in the up-down direction by simply rotating the hand wheel at the front end of the second worm gear, and the spacing adjustment between the upper and lower adjacent positioning box mechanisms can be completed quickly and accurately. The spacing adjustment between the positioning box mechanisms is convenient and efficient, thereby improving the reliability and convenience of the device.

[0026] 3. An installation device and method for plastering wire mesh. Through the mutual cooperation between the positioning block, the pressure-maintaining component, the gear component and the cleaning component, a hand-held pull plate is used to pull the carrier plate back and forth in the front-to-back direction, and the first rack moves back and forth in the front-to-back direction accordingly. Under the action of the second gear and the first gear, the second rack moves back and forth in the left-to-right direction accordingly, that is, the brush moves back and forth in the left-to-right direction. During the process, the soft bristles at the rear end of the brush can gently clean the wall surface passing by, remove the floating dust and impurities on the wall surface, ensure the adhesion of the wall surface, and enable the insulation nail hanging sheet mechanism to be firmly attached to the wall surface through the structural adhesive.

[0027] 4. An installation device and method for plastering wire mesh, through the mutual cooperation between the bearing plate, the square rod, the threaded rod and the pressure plate, the left and right cleaning components are moved away from each other, and then the insulation nail hanging sheet mechanism is placed in the first accommodating cavity and located between the two cleaning components, and then the threaded rod is screwed to push the pressure plate backwards, so as to realize the process of pushing the insulation nail hanging sheet mechanism coated with structural adhesive to the wall, ensuring that the insulation nail hanging sheet mechanism can be smoothly and firmly attached to the wall.

[0028] 5. An installation device and method for plastering wire mesh, through the mutual cooperation between the insulation nail hanging piece, the protrusion, the elastic pressing piece and the limit shaft, after the insulation nail hanging piece is pasted on the wall, the plastering wire mesh is installed between a number of insulation nail hanging piece mechanisms, during which the corresponding steel wire on the plastering wire mesh is located between the insulation nail hanging piece and the elastic pressing piece, and then the elastic pressing piece is rotated to insert the right end of the elastic pressing piece between the rear end of the limit shaft and the front end of the insulation nail hanging piece, so that the slot and the limit shaft cooperate, so as to complete the locking of the position of the elastic pressing piece, that is, complete the limitation of the position of the corresponding steel wire on the plastering wire mesh, and realize the rapid installation of the plastering wire mesh. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A perspective view of the present invention;

[0030] Figure 2 It is a cross-sectional perspective view of the transverse accommodating cylinder of the present invention;

[0031] Figure 3 It is a first stereoscopic view of the transverse adjustment shaft mechanism of the present invention;

[0032] Figure 4 A second stereoscopic view of the transverse adjustment shaft mechanism of the present invention;

[0033] Figure 5 For the present invention Figure 2 A partial enlarged view of the middle A;

[0034] Figure 6 For the present invention Figure 2 A partial enlarged view of point B in the middle;

[0035] Figure 7 It is a schematic diagram of the connection state of the vertical frame mechanism and the positioning box mechanism of the present invention;

[0036] Figure 8 It is a sectional perspective view of the erection frame mechanism of the present invention;

[0037] Fig. 9 For the present invention Figure 8 A partial enlarged view of point C in the middle;

[0038] Fig.10 It is a schematic diagram of the separation state of the vertical frame mechanism, the vertical adjustment shaft mechanism and the positioning box mechanism of the present invention;

[0039] Fig.11 It is a schematic diagram of the connection state of the positioning box mechanism and the heat preservation nail hanging piece mechanism of the present invention;

[0040] Fig.12 It is a three-dimensional diagram of the first state of the positioning box mechanism of the present invention;

[0041] Fig.13 It is a stereoscopic diagram of the second state of the positioning box mechanism of the present invention;

[0042] Fig.14 It is an exploded view of the positioning box mechanism of the present invention;

[0043] Fig.15 It is a schematic diagram of the connection state of the pressure-maintaining component, the gear component and the cleaning component of the present invention;

[0044] Fig.16 It is a cutaway stereogram of the positioning block of the present invention;

[0045] Fig.17 It is a schematic diagram of the separation state of the pressure-maintaining component, the gear component and the cleaning component of the present invention;

[0046] Fig.18 is a three-dimensional diagram of the pressure-maintaining assembly of the present invention;

[0047] Fig.19 is an exploded view of the pressure-maintaining assembly of the present invention;

[0048] Fig. 20 It is a three-dimensional diagram of the heat preservation nail hanging sheet mechanism of the present invention.

[0049] In the figure: 1, horizontal plate; 2, horizontal accommodating cylinder; 3, horizontal adjustment shaft mechanism; 31, first adjustment shaft; 32, first pitch-changing slideway; 33, first worm gear; 4, first placement box; 5, first worm; 6, first scale; 7, vertical frame mechanism; 71, vertical plate; 72, vertical accommodating cylinder; 73, second scale; 74, through groove; 75, second placement box; 76, second worm; 77, first slide post; 8, vertical adjustment shaft mechanism; 81, second adjustment shaft; 82, second pitch-changing slideway; 83, second worm gear; 9, positioning box mechanism; 91, second slide post; 92, positioning block; 93, first A accommodating cavity; 94, a second accommodating cavity; 95, a transverse groove; 96, a pressure-maintaining assembly; 961, a bearing plate; 962, a square rod; 963, a pull plate; 964, a spring; 965, a threaded rod; 966, a pressure plate; 967, a convex plate; 968, a first rack; 97, a gear assembly; 971, a vertical axis; 972, a first gear; 973, a second gear; 98, a cleaning assembly; 981, a second rack; 982, a connecting rod; 983, a brush; 10, a heat-insulating nail hanging piece mechanism; 101, a heat-insulating nail hanging piece; 102, a convex block; 103, an elastic pressing piece; 104, a limiting axis. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] The present invention provides two technical solutions:

[0052] like Figure 1 and Figure 2 A first embodiment is shown: a mounting device for a plastering wire mesh, comprising:

[0053] A horizontal plate 1 is placed between a concrete wall and a masonry wall. A horizontal accommodating tube 2 is fixedly arranged at the front end of the horizontal plate 1. A horizontal adjustment shaft mechanism 3 is rotatably arranged between the left and right side walls of the inner cavity of the horizontal accommodating tube 2. A first placement box 4 is fixedly arranged at the front end of the horizontal plate 1 and located on the right side of the horizontal accommodating tube 2. A first worm 5 for driving the horizontal adjustment shaft mechanism 3 is rotatably arranged between the front and rear walls of the lower part of the inner cavity of the first placement box 4. A plurality of first scales 6 are evenly arranged at the front end of the horizontal accommodating tube 2. A long groove is opened at the bottom of the horizontal accommodating tube 2.

[0054] A plurality of vertical frame mechanisms 7 are evenly arranged at the bottom of the horizontal adjustment shaft mechanism 3, and a vertical adjustment shaft mechanism 8 is arranged in each vertical frame mechanism 7. The vertical adjustment shaft mechanism 8 is formed by proportionally reducing the horizontal adjustment shaft mechanism 3. A plurality of positioning box mechanisms 9 are arranged on the right side from top to bottom of each vertical adjustment shaft mechanism 8, and an insulation nail hanging sheet mechanism 10 is arranged in each positioning box mechanism 9. The insulation nail hanging sheet mechanism 10 is used to install the plastering wire mesh, and the rear end of the insulation nail hanging sheet mechanism 10 is adhered to the wall by structural adhesive. The horizontal accommodating tube 2, the horizontal adjustment shaft mechanism 3 and the first worm 5 are used to adjust the distance between the left and right adjacent positioning box mechanisms 9, and the vertical frame mechanism 7 and the vertical adjustment shaft mechanism 8 are used to adjust the distance between the upper and lower adjacent positioning box mechanisms 9. The positioning box mechanism 9 is used to clean the wall and press the insulation nail hanging sheet mechanism 10 against the wall.

[0055] Through the mutual cooperation among the horizontal accommodating tube 2, the horizontal adjustment axis mechanism 3, the vertical frame mechanism 7, the vertical adjustment axis mechanism 8 and the positioning box mechanism 9, the positions of multiple positioning box mechanisms 9 can be quickly and accurately adjusted between the concrete wall and the masonry wall, so that the multiple positioning box mechanisms 9 are evenly distributed at the designated positions of the wall. After that, multiple insulation nail hanging sheet mechanisms 10 are placed in each positioning box mechanism 9 in turn, and the multiple insulation nail hanging sheet mechanisms 10 can be quickly and evenly adhered to the designated positions of the wall, ensuring the firmness of the installation of the plastering wire mesh and high installation efficiency.

[0056] like Figures 3 to 20A second embodiment is shown, which mainly differs from the first embodiment in that: a mounting device for a plastering wire mesh, a horizontal adjustment shaft mechanism 3 includes a first adjustment shaft 31, the first adjustment shaft 31 is rotatably connected between the left and right side walls of the inner cavity of the horizontal accommodating tube 2, and a plurality of first variable pitch chute 32 are evenly opened on the surface of the first adjustment shaft 31, one end of the plurality of first variable pitch chute 32 is close to each other, and the other end is far away from each other, and the plurality of first variable pitch chute 32 extends from the center to both sides along the axial direction of the first adjustment shaft 31, and is symmetrically distributed on both sides of the first adjustment shaft 31, and the change spacing between each first variable pitch chute 32 is the same, and the number of the plurality of first variable pitch chute 32 is the same as the number of the plurality of vertical frame mechanisms 7. 2 comprises three parts, an annular groove located at the axial center of the first adjusting shaft 31 and a first spiral groove group and a second spiral groove group symmetrically distributed on both sides of the annular groove. The structures of the first spiral groove group and the second spiral groove group are completely the same. The first spiral groove group is composed of a plurality of spiral grooves. The right end of the first adjusting shaft 31 is fixedly provided with a first worm gear 33 through a rotating shaft. The first worm gear 33 is rotatably connected between the left and right side walls of the inner cavity of the first placing box 4. The bottom of the first worm gear 33 is meshed with the top of the first worm 5. The vertical frame mechanism 7 comprises a vertical plate 71. A vertical accommodating tube 72 is fixedly provided at the front end of the vertical plate 71. A plurality of second scales 73 are evenly provided at the front end of the vertical accommodating tube 72. A through groove 74 is provided on the right side of the vertical accommodating tube 72. The front end of the vertical plate 71 and the vertical accommodating tube 72 are located at the bottom of the vertical plate 71. A second placement box 75 is fixedly provided at the bottom of 72, and a second worm 76 is rotatably provided between the front and rear walls of the left inner cavity of the second placement box 75. The front end of the first worm 5 penetrates the front wall of the first placement box 4 and the front end of the second worm 76 penetrates the front wall of the second placement box 75, and a hand wheel is fixedly provided. A first slide column 77 is fixedly provided at the top of the vertical accommodating tube 72, and a horizontal sleeve is fixedly sleeved on the outer wall of the first slide column 77. The top of the first slide column 77 penetrates the long groove and is slidably connected in the corresponding first variable pitch slide groove 32. The horizontal sleeve is located in the horizontal accommodating tube 2. The vertical adjustment shaft mechanism 8 includes a second adjustment shaft 81, which is rotatably connected between the upper and lower walls of the inner cavity of the vertical accommodating tube 72, and the surface of the second adjustment shaft 81 is evenly provided with a plurality of second variable pitch slides. Slot 82, a second worm gear 83 is fixedly provided at the bottom of the second adjusting shaft 81 through a rotating shaft, and the second worm gear 83 is rotatably connected between the upper and lower walls of the inner cavity of the second placement box 75, and the left side of the second worm gear 83 is meshed with the right side of the second worm 76. Each positioning box mechanism 9 includes a second slide post 91, and a vertical sleeve ring is fixedly sleeved on the outer wall of the second slide post 91. The left end of the second slide post 91 passes through the through slot 74 and is slidably connected in the corresponding second variable pitch slide slot 82. The vertical sleeve ring is located in the vertical accommodating tube 72, and a positioning block 92 is fixedly provided at the right end of the second slide post 91. A first accommodating cavity 93 is opened in the middle of the positioning block 92, and a second accommodating cavity 94 is opened on the left and right parts of the positioning block 92. Horizontal grooves 95 are opened on the left and right sides of the upper part of the first accommodating cavity 93.A pressure-maintaining assembly 96 is provided inside the first accommodating chamber 93, a gear assembly 97 is rotatably provided in each of the two second accommodating chambers 94, two left-right symmetrical cleaning assemblies 98 are provided in the first accommodating chamber 93, the pressure-maintaining assembly 96 comprises a bearing plate 961, the bearing plate 961 is located in the first accommodating chamber 93, a square rod 962 is fixedly provided at the front end of the bearing plate 961, the square rod 962 slides through the front wall of the positioning block 92, a pull plate 963 is fixedly provided at the front end of the square rod 962, a spring 964 is provided on the outside of the square rod 962, and the spring 964 is fixedly connected to the A threaded rod 965 is connected between the front wall of the positioning block 92 and the rear wall of the pull plate 963, and a threaded rod 965 is threadedly penetrated between the square rod 962 and the inner part of the pull plate 963. A pressure plate 966 is rotatably provided at the rear end of the threaded rod 965. The upper parts of the left and right sides of the bearing plate 961 are fixedly provided with convex plates 967, and the convex plates 967 slide through the corresponding transverse grooves 95. The ends of the two convex plates 967 away from each other are fixedly provided with first racks 968, and the two first racks 968 are symmetrical on the left and right. The gear assembly 97 includes a vertical shaft 971, and the vertical shaft 971 is rotatably connected to the second accommodating cavity. 94, a first gear 972 is fixedly sleeved in the middle of the outer wall of the vertical shaft 971, a second gear 973 is fixedly sleeved on the upper part of the outer wall of the vertical shaft 971, the second gear 973 is meshed with the corresponding first rack 968, the cleaning assembly 98 includes a second rack 981, the second rack 981 slides through the corresponding second accommodating cavity 94, the front end of the second rack 981 is meshed with the rear end of the first gear 972, the rear end of the second rack 981 is fixedly provided with a connecting rod 982 near the side of the pressure plate 966, and the rear end of the connecting rod 982 is fixedly provided with Brush 983, insulation nail hanging piece mechanism 10 includes insulation nail hanging piece 101, insulation nail hanging piece 101 is located between two cleaning components 98, and two protrusions 102 are fixedly arranged on the left and right sides of the upper front end of insulation nail hanging piece 101, and an elastic pressing piece 103 is arranged between the two protrusions 102 on the left through the rotation of the shaft, and a limit shaft 104 is fixedly arranged between the two protrusions 102 on the right, and a card slot is provided on the side of the elastic pressing piece 103 away from the shaft, and the card slot is used to connect with the limit shaft 104 to complete the locking of the position of the elastic pressing piece 103. ,

[0057] Through the mutual cooperation among the first adjusting shaft 31, the first variable pitch slide groove 32, the second adjusting shaft 81 and the second variable pitch slide groove 82, it is only necessary to rotate the hand wheel at the front end of the first worm 5 to enable the plurality of positioning box mechanisms 9 to move simultaneously in the left-right direction, and quickly and accurately complete the adjustment of the spacing between the left and right adjacent positioning box mechanisms 9. It is only necessary to rotate the hand wheel at the front end of the second worm 76 to enable the plurality of positioning box mechanisms 9 to move simultaneously in the up-down direction, and quickly and accurately complete the adjustment of the spacing between the upper and lower adjacent positioning box mechanisms 9. The spacing adjustment between the positioning box mechanisms 9 is convenient and efficient, and the reliability and convenience of the device are improved. Through the cooperation among the positioning block 92, the pressure-maintaining assembly 96, the gear assembly 97 and the cleaning assembly 98, the hand-held pull plate 963 is used to pull the carrying plate 961 back and forth in the front-back direction, and the first rack 968 moves back and forth in the front-back direction accordingly. Under the action of the second gear 973 and the first gear 972, the second rack 981 moves back and forth in the left-right direction accordingly, that is, the brush 983 moves back and forth in the left-right direction. During the process, the soft bristles at the rear end of the brush 983 can gently clean the wall surface passing by, remove the floating dust and impurities on the wall surface, ensure the adhesion of the wall surface, and make the thermal insulation nail hanging machine The structure 10 can be firmly attached to the wall through the structural adhesive. The left and right cleaning components 98 are moved away from each other through the cooperation between the bearing plate 961, the square rod 962, the threaded rod 965 and the pressing plate 966. Then, the heat preservation nail hanging piece mechanism 10 is placed in the first accommodating cavity 93 and located between the two cleaning components 98. Then, the threaded rod 965 is screwed to push the pressing plate 966 backward to realize the process of pushing the heat preservation nail hanging piece mechanism 10 coated with the structural adhesive to the wall, ensuring that the heat preservation nail hanging piece mechanism 10 can be smoothly and firmly attached to the wall. Through the heat preservation nail hanging piece 101, the protrusion 102, the elastic pressing piece 10 3 and the limiting shaft 104 cooperate with each other, after the insulation nail hanging piece 101 is pasted on the wall, the plastering steel wire mesh is installed between the several insulation nail hanging piece mechanisms 10, during which the corresponding steel wire on the plastering steel wire mesh is located between the insulation nail hanging piece 101 and the elastic pressing piece 103, and then the elastic pressing piece 103 is rotated, and the right end of the elastic pressing piece 103 is inserted between the rear end of the limiting shaft 104 and the front end of the insulation nail hanging piece 101, so that the card slot and the limiting shaft 104 cooperate, the position of the elastic pressing piece 103 can be locked, that is, the position of the corresponding steel wire on the plastering steel wire mesh is limited, and the plastering steel wire mesh can be quickly installed.

[0058] The embodiment of the present invention further provides an installation method for a plastering wire mesh installation device, using the plastering wire mesh installation device, and the specific method includes the following steps:

[0059] Step 1, place the horizontal plate 1 between the concrete wall and the masonry wall, and then use two screws to fix the horizontal plate 1 on the wall, then turn the handwheel at the front end of the first worm 5 to rotate the first worm 5, and the first worm wheel 33 and the first adjusting shaft 31 rotate accordingly. Since the first sliding column 77 always slides along the corresponding first variable pitch slide groove 32, a plurality of first sliding columns 77 approach or move away from each other under the limiting action of the first variable pitch slide groove 32, and a plurality of vertical accommodating tubes 72 also approach or move away from each other accordingly. During the process, observe the first scale 6 corresponding to the vertical accommodating tube 72, wherein the rotation angle of the first adjusting shaft 31 is linearly related to the change spacing between adjacent vertical accommodating tubes 72. When the spacing between a plurality of vertical frame mechanisms 7 reaches the desired value, stop turning the handwheel at the front end of the first worm 5, and at this time, the spacing adjustment between the left and right adjacent positioning box mechanisms 9 is completed;

[0060] Step 2, then use screws to fix each vertical plate 71 on the wall, wherein the rear end of the vertical plate 71 contacts the wall, and then turn the handwheel at the front end of the second worm 76, the second worm wheel 83 and the second adjusting shaft 81 rotate accordingly, because the second slide post 91 always slides along the corresponding second variable pitch slide groove 82, a plurality of second slide posts 91 are moved closer to or away from each other under the limiting action of the second variable pitch slide groove 82, and the upper and lower adjacent positioning box mechanisms 9 are also moved closer to or away from each other accordingly, and the second scale 73 corresponding to the second slide post 91 is observed during the process, and when the spacing between the upper and lower adjacent positioning box mechanisms 9 reaches the required value, stop turning the handwheel at the front end of the second worm 76, at this time, the spacing adjustment between the upper and lower adjacent positioning box mechanisms 9 is completed, wherein the worm wheel and the worm have a self-locking function, and finally the spacing adjustment between the plurality of positioning box mechanisms 9 is completed, so that the plurality of positioning box mechanisms 9 are evenly distributed at the designated positions of the wall;

[0061] Step 3, then hold the pull plate 963 and pull the carrying plate 961 back and forth in the front and rear directions, and the first rack 968 moves back and forth in the front and rear directions accordingly. Under the action of the second gear 973 and the first gear 972, the second rack 981 moves back and forth in the left and right directions accordingly, that is, the brush 983 moves back and forth in the left and right directions. During the process, the soft bristles at the rear end of the brush 983 can gently clean the wall surface passing by, and remove the floating dust and impurities on the wall surface. After the cleaning is completed, the left and right cleaning components 98 are moved away from each other, and the insulation nail hanging sheet mechanism 10 coated with structural glue is placed in the first accommodating cavity 93 and located between the two cleaning components 98. Then, the threaded rod 965 is screwed to push the pressing plate 966 backwards to realize the process of pushing the insulation nail hanging sheet mechanism 10 to the wall surface, ensuring that the insulation nail hanging sheet mechanism 10 is smoothly and firmly attached to the wall surface. Similarly, the insulation nail hanging sheet mechanism 10 is placed in other positioning box mechanisms 9 in sequence. Finally, multiple insulation nail hanging sheet mechanisms 10 are evenly adhered to the designated positions of the wall. After each insulation nail hanging sheet mechanism 10 is pasted on the wall, each screw is removed in turn, and the horizontal plate 1 and the vertical frame mechanism 7 are removed from the wall, leaving only the insulation nail hanging sheet mechanism 10 on the wall, and then the plastering wire mesh is laid between the multiple insulation nail hanging sheet mechanisms 10. During the process, the corresponding steel wire on the plastering wire mesh is located between the insulation nail hanging sheet 101 and the elastic pressing sheet 103, and then rotated. Elastic pressing plate 103, insert the right end of the elastic pressing plate 103 between the rear end of the limiting shaft 104 and the front end of the insulation nail hanging plate 101, so that the slot cooperates with the limiting shaft 104, and the position of the elastic pressing plate 103 is locked, that is, the corresponding steel wire on the plastering wire mesh is pressed. Finally, several insulation nail hanging plate mechanisms 10 cooperate with each other to install the plastering wire mesh between the concrete wall and the masonry wall, so that the surface of the junction of the concrete wall and the masonry wall can be plastered later.

[0062] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0063] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A mounting device for plastering wire mesh, characterized in that: include: A horizontal plate is placed between the concrete wall and the masonry wall, a horizontal accommodating tube is fixedly arranged at the front end of the horizontal plate, a horizontal adjustment shaft mechanism is rotatably arranged between the left and right side walls of the inner cavity of the horizontal accommodating tube, a first placement box is fixedly arranged at the front end of the horizontal plate and located on the right side of the horizontal accommodating tube, a first worm for driving the horizontal adjustment shaft mechanism is rotatably arranged between the front and rear walls of the lower part of the inner cavity of the first placement box, a plurality of first scales are evenly arranged at the front end of the horizontal accommodating tube, and a long groove is opened at the bottom of the horizontal accommodating tube; A plurality of vertical frame mechanisms are evenly arranged at the bottom of the horizontal adjustment shaft mechanism, each of the vertical frame mechanisms is provided with a vertical adjustment shaft mechanism, the vertical adjustment shaft mechanism is formed by proportionally reducing the horizontal adjustment shaft mechanism, a plurality of positioning box mechanisms are provided on the right side of each of the vertical adjustment shaft mechanisms from top to bottom, each of the positioning box mechanisms is provided with an insulation nail hanging sheet mechanism, the insulation nail hanging sheet mechanism is used to install the plastering wire mesh, the rear end of the insulation nail hanging sheet mechanism is adhered to the wall surface by structural adhesive, the horizontal accommodating cylinder, the horizontal adjustment shaft mechanism and the first worm are used to adjust the spacing between the left and right adjacent positioning box mechanisms, the vertical frame mechanism and the vertical adjustment shaft mechanism are used to adjust the spacing between the upper and lower adjacent positioning box mechanisms, the positioning box mechanism is used to clean the wall surface and press the insulation nail hanging sheet mechanism against the wall surface; 4. The repairing kit for automotive dents, according to claim 1, wherein the first tool holder is an upper hand over the foot and the lower hand is a bottom face, and the two foot stands are connected with each other with a toothed structure. The toothed structure is made up of the first and second toothed structures. The toothed structure is made up of the first and second toothed structures. The toothed structure is made up of the first and second toothed structures. The vertical frame mechanism includes a vertical plate, a vertical accommodating tube is fixedly provided at the front end of the vertical plate, a plurality of second scales are evenly provided at the front end of the vertical accommodating tube, a through slot is opened on the right side of the vertical accommodating tube, a second placement box is fixedly provided at the front end of the vertical plate and located at the bottom of the vertical accommodating tube, a second worm is rotatably provided between the front and rear walls of the left part of the inner cavity of the second placement box, the front end of the first worm penetrates the front wall of the first placement box and the front end of the second worm penetrates the front wall of the second placement box, and a hand wheel is fixedly provided on the top of the vertical accommodating tube, a first sliding column is fixedly provided on the outer wall of the first sliding column, a horizontal sleeve is fixedly sleeved on the outer wall of the first sliding column, the top of the first sliding column penetrates the long slot and is slidably connected in the corresponding first pitch variable slot, and the horizontal sleeve is located in the horizontal accommodating tube; The vertical adjustment shaft mechanism includes a second adjustment shaft, the second adjustment shaft is rotatably connected between the upper and lower walls of the inner cavity of the vertical accommodating cylinder, a plurality of second variable pitch sliding grooves are evenly opened on the surface of the second adjustment shaft, a second worm gear is fixedly arranged at the bottom of the second adjustment shaft through a rotating shaft, the second worm gear is rotatably connected between the upper and lower walls of the inner cavity of the second placement box, and the left side of the second worm gear is meshed with the right side of the second worm; The cam is secured to the upper and lower surfaces of the second accommodating cylinder and is provided with a plurality of camshafts, each of which is connected to the second accommodating cylinder to lock the second accommodating cylinder. The cam is secured to the upper and lower surfaces of the second accommodating cylinder and is provided with a plurality of camshafts, each of which is connected to the second accommodating cylinder to lock the second accommodating cylinder. The pressure-maintaining assembly includes a bearing plate, the bearing plate is located in the first accommodating chamber, a square rod is fixedly provided at the front end of the bearing plate, the square rod slides through the front wall of the positioning block, a pull plate is fixedly provided at the front end of the square rod, a spring is sleeved on the outside of the square rod, the spring is fixedly connected between the front wall of the positioning block and the rear wall of the pull plate, a threaded rod is threadedly penetrated between the inside of the square rod and the pull plate, a pressure plate is rotatably provided at the rear end of the threaded rod, convex plates are fixedly provided on the upper parts of the left and right sides of the bearing plate, the convex plates slide through the corresponding transverse grooves, and the ends of the two convex plates away from each other are fixedly provided with first racks, and the two first racks are symmetrical on the left and right sides; The gear assembly comprises a vertical shaft, which is rotatably connected between the upper and lower walls of the second accommodating cavity, a first gear is fixedly sleeved in the middle of the outer wall of the vertical shaft, a second gear is fixedly sleeved on the upper part of the outer wall of the vertical shaft, and the second gear is meshed with the corresponding first rack; The cleaning assembly includes a second rack, which slides through the corresponding second accommodating cavity, the front end of the second rack is meshed with the rear end of the first gear, a connecting rod is fixedly provided on the side of the rear end of the second rack close to the pressure plate, and a brush is fixedly provided on the rear end of the connecting rod.

2. The installation device for plastering wire mesh according to claim 1, characterized in that: The insulation nail hanging plate mechanism includes an insulation nail hanging plate, and the insulation nail hanging plate is located between two cleaning components. Two protrusions are fixedly provided on the left and right sides of the upper front end of the insulation nail hanging plate. An elastic pressure plate is arranged between the two protrusions on the left side through the rotation of the shaft rod, and a limiting shaft is fixedly arranged between the two protrusions on the right side. A slot is provided on the side of the elastic pressure plate away from the shaft rod, and the slot is used to connect with the limiting shaft to complete the locking of the position of the elastic pressure plate.

3. A method for installing a mounting device for a plastering wire mesh, characterized in that: Using the installation device for plastering wire mesh as described in any one of claims 1-2, the method comprises the following steps: Step 1: Place the horizontal plate between the concrete wall and the masonry wall, and then use two screws to fix the horizontal plate on the wall. Then, turn the handwheel at the front end of the first worm to rotate the first worm, and the horizontal adjustment shaft mechanism rotates accordingly, and the plurality of vertical frame mechanisms move closer to or farther away from each other. During the process, observe the first scales corresponding to the plurality of vertical frame mechanisms. When the spacing between the plurality of vertical frame mechanisms reaches the required value, stop turning the handwheel at the front end of the first worm, and the spacing between the left and right adjacent positioning box mechanisms is adjusted. Step 2: Then, use screws to fix each vertical frame mechanism on the wall, and then rotate each vertical adjustment shaft mechanism in turn, so that the upper and lower adjacent positioning box mechanisms move closer to or farther away from each other. When the distance between the upper and lower adjacent positioning box mechanisms reaches the required value, stop rotating the vertical adjustment shaft mechanism, and the distance between the upper and lower adjacent positioning box mechanisms is adjusted. Step three, then place several insulation nail hanging sheet mechanisms in each positioning box mechanism in turn. Before each insulation nail hanging sheet mechanism is placed in the positioning box mechanism, first use the positioning box mechanism to clean the wall area to which the insulation nail hanging sheet mechanism is to be adhered, then apply structural adhesive to the rear end of the insulation nail hanging sheet mechanism and place it in the corresponding positioning box mechanism. The positioning box mechanism pushes the insulation nail hanging sheet mechanism toward the wall to make the insulation nail hanging sheet mechanism stick to the wall. After each insulation nail hanging sheet mechanism is stuck to the wall, remove each screw in turn, remove the horizontal plate and the vertical frame mechanism from the wall, leaving only the insulation nail hanging sheet mechanism on the wall, and then use each insulation nail hanging sheet mechanism to install the plastering wire mesh between the concrete wall and the masonry wall.