A control method of a coal gas transmission and distribution pipeline, the coal gas transmission and distribution pipeline, and a device
By determining the connection method in the gas transmission and distribution pipeline and automatically adjusting the opening of the reflux regulating valve and the inlet regulating valve, the problem of fixed connection methods in the existing technology is solved, enabling flexible adaptation to various application scenarios and improving reliability.
Patent Information
- Application Number
- CN202410461797.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-04-17
AI Technical Summary
The existing gas transmission and distribution pipelines have fixed connection methods, which cannot adapt to various application scenarios, and rely on manual valve adjustment control, resulting in poor reliability.
By determining the connection method based on pipeline design requirements and adjusting the opening of the backflow regulating valve and the machine-front regulating valve in the pressure pipeline, automated control can be achieved, avoiding human intervention.
This improves the flexibility and reliability of gas transmission and distribution pipelines, ensures precise control of valve opening, and enhances control accuracy.
Smart Images

Figure CN118208662B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of gas transmission and distribution technology, specifically to a control method for a gas transmission and distribution pipeline, a gas transmission and distribution pipeline, and equipment. Background Technology
[0002] In metallurgical enterprises, in order to meet the different requirements of different users for gas pressure and calorific value, the gas supply is generally carried out by a combination of blast furnace gas and coke oven gas, depending on the layout of the enterprise's pipeline network and the pressure of the gas source.
[0003] In related technologies, to control gas transmission and distribution pipelines, a calorific value index is typically used as the control basis to form a regulating system. When the calorific value changes, the output of the calorific value index regulator changes, acting on the actuator. Workers manually adjust the coke oven gas regulating valve to increase or decrease the amount of coke oven gas supplied, restoring the calorific value to the given value. During this process, if the pressure of the regulating system deviates from the given value, the pressure regulator output changes, requiring workers to manually adjust the blast furnace gas regulating valve to regulate the blast furnace gas flow rate. Because the flow rates of blast furnace gas and coke oven gas cannot maintain a given ratio, causing a change in pressure difference, workers must also manually adjust the coke oven gas regulating valve to adjust the coke oven gas flow rate until the pressure difference ratio returns to the original given value. In this method, the gas transmission and distribution pipeline connection is fixed, making it unsuitable for various application scenarios. Furthermore, the need for manual valve adjustment compromises the accuracy of valve control, thus reducing the reliability of the gas transmission and distribution pipeline. Summary of the Invention
[0004] In view of this, the present invention provides a control method, a gas transmission and distribution pipeline, and equipment for gas transmission and distribution pipelines, in order to solve the technical problems of fixed and unreliable connection methods in gas transmission and distribution pipelines.
[0005] In a first aspect, the present invention provides a control method for a gas transmission and distribution pipeline, applied to a gas transmission and distribution pipeline including: a pressure pipeline, a first mixing pipeline, a second mixing pipeline, a blast furnace gas branch pipe, and a coke oven gas branch pipe. The pressure pipeline includes: a reflux regulating valve and a machine-front regulating valve. The method includes: determining the connection method of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe based on pipeline design requirements; adjusting the reflux regulating valve to a first opening degree based on the connection method; determining the mixed gas pressure based on the first opening degree; and if the mixed gas pressure is equal to a preset pressure threshold, adjusting the machine-front regulating valve to a second opening degree based on the first opening degree.
[0006] In conjunction with the first aspect, in one possible implementation of the first aspect, the pressure line further includes a pressure line regulator, and the method further includes controlling the first opening to be fully open via the pressure line regulator in response to a system fault.
[0007] In conjunction with the first aspect, in one possible implementation of the first aspect, the first mixing pipeline includes: a first pressure regulator and a first pressure regulating valve, the method including: in response to a first opening being fully open, controlling the first pressure regulating valve to be fully closed via the first pressure regulator.
[0008] In conjunction with the first aspect, in one possible implementation of the first aspect, the second mixing pipeline includes: a second pressure regulator and a second pressure regulating valve, the method including: in response to the first pressure regulating valve being fully closed, controlling the second pressure regulating valve to be fully open via the second pressure regulator.
[0009] In conjunction with the first aspect, in one possible implementation of the first aspect, the first mixing pipeline includes a first flow orifice plate, a first pressure regulating valve, and a first pressure regulator; the second mixing pipeline includes a second pressure regulating valve and a second pressure regulator; the method further includes: determining a gas source adjustment method based on the first pressure regulator, and adjusting the opening of the first pressure regulating valve; determining a change method for the opening of the return regulating valve based on the first flow orifice plate, and adjusting the opening of the second pressure regulating valve through the second pressure regulator; and adjusting the return regulating valve in response to a change in the opening of the first pressure regulating valve and / or the second pressure regulating valve.
[0010] Secondly, the present invention provides a gas transmission and distribution pipeline, comprising: a blast furnace gas branch pipe, a coke oven gas branch pipe, a pressure pipeline, a first mixing pipeline, and a second mixing pipeline. The first mixing pipeline is connected to the blast furnace gas branch pipe and includes: a first pressure regulating valve, a first flow orifice plate and a first pressure regulator disposed on the inlet pipe of the first pressure regulating valve, wherein the inlet pipe of the first flow orifice plate is connected to the blast furnace gas branch pipe, and the outlet pipe of the first flow orifice plate is connected to the first pressure regulating valve. The first pressure regulator is used to adjust the opening degree of the first pressure regulating valve in response to the pressure of the outlet pipe of the first pressure regulating valve. The second mixing pipeline is connected to the coke oven gas branch pipe and includes: a second pressure regulating valve, a second flow orifice plate and a second pressure regulator disposed on the inlet pipe of the second pressure regulating valve, wherein the inlet pipe of the second flow orifice plate is connected to the coke oven gas branch pipe, and the outlet pipe of the second flow orifice plate is connected to the second pressure regulating valve. The second pressure regulator is used to adjust the opening of the second pressure regulating valve in response to the flow rate of the first flow orifice plate. The pressure pipeline is connected to the first mixing pipeline and / or the second mixing pipeline. The pressure pipeline includes a blower, a pre-blower regulating valve installed on the blower inlet pipeline, a return pipeline connected to the blower inlet pipeline and the blower outlet pipeline respectively, and a pressure pipeline regulator. A return regulating valve is installed on the return pipeline, and the pressure pipeline regulator is used to adjust the opening of the return regulating valve. The control unit is connected to the first pressure regulator, the second pressure regulator, and the pressure pipeline regulator respectively. The control unit is used to perform the following steps: based on the pipeline design requirements, determine the connection method of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe; based on the connection method, adjust the return regulating valve to the first opening; based on the first opening, determine the mixed gas pressure; if the mixed gas pressure is equal to a preset pressure threshold, based on the first opening, adjust the pre-blower regulating valve to the second opening.
[0011] In conjunction with the second aspect, in one possible implementation of the second aspect, the control unit is also used to control the opening of the reflux regulating valve to be fully open via the pressure line regulator in response to a system fault.
[0012] In conjunction with the second aspect, in one possible implementation of the second aspect, the control unit is further configured to control the first pressure regulating valve to be fully closed via the first pressure regulator in response to the opening of the reflux regulating valve being fully open.
[0013] In conjunction with the second aspect, in one possible implementation of the second aspect, the control unit is also configured to control the second pressure regulating valve to be fully open via the second pressure regulator in response to the first pressure regulating valve being fully closed.
[0014] Thirdly, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to perform the control method for the gas transmission and distribution pipeline described in the first aspect or any corresponding embodiment thereof.
[0015] The technical solution of this invention has the following advantages:
[0016] This invention provides a control method, pipeline, and equipment for a gas transmission and distribution pipeline. The method determines the connection method of the gas transmission and distribution pipeline based on pipeline design requirements. Then, based on the determined connection method, it adjusts the reflux regulating valve in the pressure pipeline to a first opening degree and the pre-machine regulating valve to a second opening degree. In this process, the connection method of the gas transmission and distribution pipeline, determined based on pipeline design requirements, allows for flexible configuration of the pipeline, adapting to different application scenarios according to different connection methods, thus enhancing the flexibility of the transmission and distribution pipeline. Furthermore, by adjusting the reflux regulating valve in the pressure pipeline to the first opening degree and the pre-machine regulating valve to the second opening degree, the opening degree of the valves in the transmission and distribution pipeline is precisely controlled, further improving the reliability of the gas transmission and distribution pipeline, avoiding human intervention, and improving the accuracy of gas transmission and distribution pipeline control. Attached Figure Description
[0017] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0018] Figure 1 This is a schematic flowchart of a control method for a gas transmission and distribution pipeline provided according to an embodiment of the present invention;
[0019] Figure 2 This is a schematic diagram of the structure of a gas transmission and distribution pipeline according to an embodiment of the present invention;
[0020] Figure 3 This is a schematic diagram of another gas transmission and distribution pipeline provided according to an embodiment of the present invention;
[0021] Figure 4 This is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention;
[0022] Explanation of reference numerals in the attached figures:
[0023] 1-Blast furnace gas main pipe; 2-Blast furnace gas branch pipe; 3-Pre-machine regulating valve; 4-Blower;
[0024] 5-Return regulating valve; 6-Pressure line regulator; 7-First flow orifice plate;
[0025] 8-First pressure regulating valve; 9-First pressure regulator; 10-Coke oven gas main pipe;
[0026] 11-Coke oven gas branch pipe; 12-Second flow orifice plate; 13-Second pressure regulating valve;
[0027] 14-Second pressure regulator; 15-Gas mixing pipeline; 201-Pressure pipeline;
[0028] 202 - Pressure pipeline; 203 - First mixing pipeline; 204 - Second mixing pipeline. Detailed Implementation
[0029] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0030] According to an embodiment of the present invention, a control method for a gas transmission and distribution pipeline is provided. It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions. Furthermore, although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in a different order than that shown here.
[0031] This embodiment provides a control method for a gas transmission and distribution pipeline, such as... Figure 1 As shown, the method includes the following steps:
[0032] S101. Based on the pipeline design requirements, determine the connection methods for the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe.
[0033] Specifically, determining the connection method for the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe based on pipeline design requirements refers to either pressurizing the blast furnace gas and coke oven gas before mixing or mixing them before pressurizing, depending on the different pipeline design requirements. The pipeline design requirements refer to selecting a gas pressurization station to meet the user's pressure requirements for the mixed gas. Based on these requirements, the connection methods include: the first connection method for the gas transmission and distribution pipeline and the second connection method for the gas transmission and distribution pipeline.
[0034] The first connection method for gas transmission and distribution pipelines refers to situations where, if the distance between blast furnace gas branch pipes or coke oven gas branch pipes is long, the gas source pressure in the blast furnace gas branch pipes or coke oven gas branch pipes is insufficient, or the pressure in one or all of the blast furnace gas branch pipes or coke oven gas branch pipes has not reached the mixing pressure, then pressurization is performed before mixing. Specifically, the pipeline with insufficient gas source pressure is connected to the pressure pipeline. In the direction of the outlet pipeline of the corresponding pressure pipeline, the inlet pipeline of the first mixing pipeline is connected to the outlet pipeline of the pressure pipeline installed on the corresponding blast furnace gas branch pipe, and the inlet pipeline of the second mixing pipeline is connected to the outlet pipeline of the pressure pipeline installed on the corresponding coke oven gas branch pipe. Figure 2 As shown, a pressure pipeline 201 and a first mixing pipeline 203 are sequentially installed on the blast furnace gas branch pipe 2 connected to the blast furnace gas main pipe 1, and a pressure pipeline 202 and a second mixing pipeline 204 are sequentially installed on the coke oven gas branch pipe 11 connected to the coke oven gas main pipe 10. It should be understood that this arrangement is for ease of illustration of the pipeline connections. Figure 2 The situation shown is that both the blast furnace gas branch pipe 2 and the coke oven gas branch pipe 11 are pressurized first. If the pressure of either pipe reaches the mixing pressure, then the corresponding branch does not need to be installed with a pressure pipe.
[0035] The second connection method for the gas transmission and distribution pipeline refers to mixing the gas first and then pressurizing it if the gas mixing pipeline 15 has pressure requirements or is far from the gas user. Specifically, the inlet pipe of the first mixing pipeline is connected to the blast furnace gas branch pipe, the inlet pipe of the second mixing pipeline is connected to the coke oven gas branch pipe, and the outlet pipe of the first mixing pipeline is connected to the outlet pipe of the second mixing pipeline to achieve mixing of blast furnace gas and coke oven gas, and then connected to the inlet pipe of the pressure pipeline after mixing. Figure 3 As shown, a first mixing pipeline 203 is installed on the blast furnace gas branch pipe 2, and a second mixing pipeline 204 is installed on the coke oven gas branch pipe 11. After the blast furnace gas and coke oven gas are mixed, they are connected to the pressure pipeline 201.
[0036] S102. Based on the connection method, adjust the reflux regulating valve to the first opening degree.
[0037] Specifically, based on the connection method, adjusting the return flow regulating valve to the first opening degree means that after determining the connection method, the blower starts normally, gradually increasing the opening degree of the inlet regulating valve to increase the blower load, while simultaneously gradually decreasing the opening degree of the return flow regulating valve to the first opening degree. For example... Figure 2 As shown, the opening degree of the pre-machine regulating valve 3 and the return regulating valve 5 in the pressure pipeline 201 installed on the blast furnace gas branch pipe 2 and the pressure pipeline 202 installed on the coke oven gas branch pipe 11 is adjusted respectively, or as shown in the figure. Figure 3 As shown, the opening degree of the pre-machine regulating valve 3 and the return regulating valve 5 in the pressure pipeline 201 connected to the gas mixing pipeline 15 is adjusted respectively.
[0038] S103. Determine the mixed gas pressure based on the first opening degree.
[0039] Specifically, determining the mixed gas pressure based on the first opening degree means that as the opening of the reflux regulating valve gradually decreases, the pressure on the outlet pipeline of the pressure pipeline gradually increases. This pressure is then detected by a detection device to determine the mixed gas pressure in the pipeline, thus providing a data basis for subsequent judgments on whether the mixed gas pressure equals the preset pressure. Here, the first opening degree refers to the corresponding opening degree of the reflux regulating valve when the mixed gas pressure is at the preset pressure. For example... Figure 2 , Figure 3 As shown, the detection device is installed at the gas mixing pipeline 15, so as the first opening gradually decreases, the pressure of the mixed gas is determined in real time.
[0040] S104. If the mixed gas pressure is equal to the preset pressure threshold, adjust the regulating valve in front of the machine to the second opening degree based on the first opening degree.
[0041] Specifically, "mixed gas pressure equal to the preset pressure threshold" means that the mixed gas pressure is equal to and stable with the preset pressure threshold. Adjusting the pre-blown regulating valve to the second opening based on the first opening degree means adjusting the opening of the pre-blown regulating valve to the second opening degree according to the opening degree of the return regulating valve, thereby ensuring the blower meets the preset operating load, typically between 15% and 20%, to guarantee economical operation of the pressure pipeline. The second opening degree refers to the corresponding opening degree of the pre-blown regulating valve when the return regulating valve is at the first opening degree and the blower meets the preset operating load. It should be understood that a larger opening degree of the pre-blown regulating valve results in more air entering the blower; conversely, a larger opening degree of the return regulating valve results in less air entering the blower.
[0042] This invention provides a control method, pipeline, and equipment for a gas transmission and distribution pipeline. The method determines the connection method of the gas transmission and distribution pipeline based on pipeline design requirements. Then, within this determined connection method, it adjusts the reflux regulating valve in the pressure pipeline to a first opening degree and the pre-machine regulating valve to a second opening degree. This process, based on the pipeline design requirements, allows for flexible configuration of the gas transmission and distribution pipeline, adapting to different application scenarios and enhancing its flexibility. Furthermore, by adjusting the reflux regulating valve in the pressure pipeline to the first opening degree and the pre-machine regulating valve to the second opening degree, precise control of the valve openings in the transmission and distribution pipeline is achieved, further improving the reliability of the gas transmission and distribution pipeline, avoiding human intervention, and enhancing the accuracy of the pipeline control.
[0043] This embodiment provides a gas transmission and distribution pipeline, which includes: blast furnace gas branch pipes, coke oven gas branch pipes, pressure pipelines, a first mixing pipeline, and a second mixing pipeline, wherein...
[0044] The first mixing pipeline is connected to the blast furnace gas branch pipe. The first mixing pipeline includes: a first pressure regulating valve, a first flow orifice plate and a first pressure regulator installed on the inlet pipe of the first pressure regulating valve, wherein the inlet pipe of the first flow orifice plate is connected to the blast furnace gas branch pipe, the outlet pipe of the first flow orifice plate is connected to the first pressure regulating valve, and the first pressure regulator is used to adjust the opening degree of the first pressure regulating valve in response to the pressure of the outlet pipe of the first pressure regulating valve.
[0045] The second mixing pipeline is connected to the coke oven gas branch pipe. The second mixing pipeline includes: a second pressure regulating valve, a second flow orifice plate and a second pressure regulator installed on the inlet pipe of the second pressure regulating valve, wherein the inlet pipe of the second flow orifice plate is connected to the coke oven gas branch pipe, the outlet pipe of the second flow orifice plate is connected to the second pressure regulating valve, and the second pressure regulator is used to adjust the opening degree of the second pressure regulating valve in response to the flow of the first flow orifice plate.
[0046] The pressure pipeline is connected to the first mixing pipeline and / or the second mixing pipeline. The pressure pipeline includes a blower, a pre-machine regulating valve installed on the blower inlet pipeline, a return pipeline connected to the blower inlet pipeline and the blower outlet pipeline respectively, and a pressure pipeline regulator. The return pipeline is equipped with a return regulating valve, and the pressure pipeline regulator is used to adjust the opening degree of the return regulating valve.
[0047] The control unit is connected to the first pressure regulator, the second pressure regulator, and the pressure line regulator, and is used to perform the following steps:
[0048] Based on the pipeline design requirements, determine the connection methods for the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe; based on the connection methods, adjust the reflux regulating valve to the first opening degree; based on the first opening degree, determine the mixed gas pressure; if the mixed gas pressure is equal to the preset pressure threshold, based on the first opening degree, adjust the inlet regulating valve to the second opening degree.
[0049] Specifically, such as Figure 2 , Figure 3 As shown, two exemplary gas transmission and distribution pipelines are illustrated, wherein, Figure 2 The diagram shows the first connection method for a gas transmission and distribution pipeline. Figure 3 The diagram shows a second connection method for the gas transmission and distribution pipeline. In this method, the pressure pipeline is connected to either the first or second mixing pipeline, which is considered the first connection method. Furthermore, one of the blast furnace gas branch pipes 2 or coke oven gas branch pipes 11 does not require pressurization. The connection method of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe can be determined based on the pipeline design requirements.
[0050] It should be understood that, for ease of explanation, the following embodiments will all adopt the following approach: Figure 2 The gas transmission and distribution pipeline with the first connection method shown will be described. Figure 2 The gas transmission and distribution pipelines with the first connection method shown are based on the same principle as those with the second connection method, as well as other gas transmission and distribution pipelines with the first connection method, and will not be described again.
[0051] In one alternative embodiment, the pressure line further includes a pressure line regulator, and the method further includes controlling a first opening to be fully open via the pressure line regulator in response to a system failure.
[0052] In one alternative implementation, the control unit is also configured to, in response to a system failure, control the opening of the reflux regulating valve to be fully open via a pressure line regulator.
[0053] Specifically, system failure refers to a disruption in the gas supply, a power outage in the instrument system, or other malfunctions, such as... Figure 2 As shown, the pressure regulators 6 in pressure lines 201 and 202 control the opening of the return regulating valve 5 to be fully open, thereby preventing the air supply from the front regulating valve 3 to the blower 4 from being insufficient when the corresponding air supply is insufficient, thus preventing the blower 4 from surging.
[0054] In one alternative embodiment, the first mixing line includes a first pressure regulator and a first pressure regulating valve, the method including: in response to a first opening being fully open, controlling the first pressure regulating valve to be fully closed via the first pressure regulator.
[0055] In one alternative embodiment, the control unit is further configured to control the first pressure regulating valve to be fully closed via the first pressure regulator in response to the reflux regulating valve being fully open.
[0056] Specifically, in practical applications, the gas pressure in the blast furnace gas branch pipe is higher than that in the coke oven gas branch pipe. Furthermore, since the first mixing pipeline is connected to the second mixing pipeline, and the reflux regulating valve in the pressure pipeline is fully open, there is a possibility that gas from the blast furnace gas branch pipe may flow back into the coke oven gas branch pipe, causing the coke oven gas users on the main coke oven gas pipeline to shut off. Therefore, to avoid this situation, the first pressure regulating valve is controlled to be fully closed via the first pressure regulator. For example... Figure 2 As shown, the first pressure regulator 9 acts on the first pressure regulating valve 8, so that the opening of the first pressure regulating valve 8 is fully closed, to prevent the blast furnace gas branch pipe 2 from flowing back into the coke oven gas branch pipe 11 through the gas mixing pipe 15, which would cause the coke oven gas users on the coke oven gas main pipe 10 to go out.
[0057] In one alternative embodiment, the second mixing line includes a second pressure regulator and a second pressure regulating valve, the method including: in response to the first pressure regulating valve being fully closed, controlling the second pressure regulating valve to be fully open via the second pressure regulator.
[0058] In one alternative embodiment, the control unit is further configured to control the second pressure regulating valve to be fully open via the second pressure regulator in response to the first pressure regulating valve being fully closed.
[0059] Specifically, because the first pressure regulating valve is fully closed, the gas source in the blast furnace gas branch pipe cannot enter the gas mixing pipeline. To prevent negative pressure from forming in the gas mixing pipeline, the second pressure regulator controls the second pressure regulating valve to be fully open, allowing the gas in the coke oven gas branch pipe to enter the mixed gas pipeline. For example... Figure 2 As shown, the second pressure regulator 14 acts on the second pressure regulating valve 13 to make the second pressure regulating valve fully open, thereby allowing the gas in the coke oven gas branch pipe 11 to enter the gas mixing pipe 15, thus preventing the formation of negative pressure in the gas mixing pipe 15.
[0060] In one optional embodiment, the first mixing pipeline includes a first flow orifice plate, a first pressure regulating valve, and a first pressure regulator; the second mixing pipeline includes a second pressure regulating valve and a second pressure regulator; the method further includes: determining a gas source adjustment method based on the first pressure regulator and adjusting the opening of the first pressure regulating valve; determining a change method for the opening of the return regulating valve based on the first flow orifice plate and adjusting the opening of the second pressure regulating valve through the second pressure regulator; and adjusting the return regulating valve in response to a change in the opening of the first pressure regulating valve and / or the second pressure regulating valve.
[0061] Specifically, the gas source adjustment method refers to adjusting the gas supply through the blast furnace gas branch pipe and / or coke oven gas branch pipe, thereby increasing or decreasing the gas supply. The principle behind increasing and decreasing the gas supply is the same; the difference lies in the adjustment method of the valve opening and the opposite change in the flow rate of the orifice plate. The following examples illustrate this using the method of decreasing the gas supply, and the method of increasing the gas supply will not be elaborated upon further.
[0062] Specifically, such as Figure 2As shown, when the gas supply decreases, the pressure of the mixed gas deviates from the preset pressure threshold. The output of the first pressure regulator 9 changes, acting on the first pressure regulating valve 8, causing the opening of the first pressure regulating valve 8 to decrease. At the same time, the pressure in the pressure circuit 201 increases, causing the output of the pressure pipeline regulator 6 in the pressure pipeline 201 to change, acting on the return regulating valve 5, causing the opening of the return regulating valve 5 to increase, thus reducing the gas flow in the blast furnace gas branch pipe 2. At this time, due to the decrease in the gas flow in the blast furnace gas branch pipe 2, the flow detected by the first flow orifice plate 7 decreases, causing the output of the second pressure regulator 14 connected to the first flow orifice plate 7 to change, acting on the second pressure regulating valve 13, causing the opening of the second pressure regulating valve 13 to decrease, until the flow on the first flow orifice plate 7 reaches a new equilibrium, that is, satisfying the original flow ratio of the blast furnace gas branch pipe 2 and the coke oven gas branch pipe 11. Simultaneously, the pressure in pressure pipeline 202 increases, causing a change in the output of pressure regulator 6 in pressure pipeline 202. This changes the output of regulator 5, which in turn increases the opening of reflux regulator 5, reducing the gas flow rate in coke oven gas branch pipe 11. During this process, both the first pressure regulating valve 8 and the second pressure regulating valve 13 decrease their openings. However, the flow ratio between blast furnace gas branch pipe 2 and coke oven gas branch pipe 11 remains unchanged. Thus, by adjusting the openings of the first pressure regulating valve, the second pressure regulating valve, and the reflux regulating valve, the flow ratio of the gas transmission and distribution pipeline remains constant despite changes in the gas source volume, maintaining the normal operation of the pipeline.
[0063] This invention also provides a computer device; please refer to [link / reference]. Figure 4 . Figure 4 This is a schematic diagram of the structure of a computer device provided in an optional embodiment of the present invention, such as... Figure 4 As shown, the computer device includes one or more processors 301, memory 302, and interfaces for connecting the components, including high-speed interfaces and low-speed interfaces. The components communicate with each other via different buses and can be mounted on a common motherboard or otherwise installed as needed. The processors can process instructions executed within the computer device, including instructions stored in or on memory to display graphical information of a GUI on external input / output devices (such as display devices coupled to the interfaces). In some alternative implementations, multiple processors and / or multiple buses can be used with multiple memories and multiple memory modules, if desired. Similarly, multiple computer devices can be connected, each providing some of the necessary operations (e.g., as a server array, a group of blade servers, or a multiprocessor system). Figure 4 Take processor 301 as an example.
[0064] Processor 301 may be a central processing unit, a network processor, or a combination thereof. Processor 301 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit (ASIC), a programmable logic device (PLD), or a combination thereof. The programmable logic device may be a complex programmable logic device (CAMP), a field-programmable gate array (FPGA), a general-purpose array logic (GDA), or any combination thereof.
[0065] The memory 302 stores instructions executable by at least one processor 301 to cause the at least one processor 301 to perform the method shown in the above embodiments.
[0066] Memory 302 may include a program storage area and a data storage area. The program storage area may store the operating system and applications required for at least one function; the data storage area may store data created based on the use of the computer device. Furthermore, memory 302 may include high-speed random access memory and may also include non-transitory memory, such as at least one disk storage device, flash memory device, or other non-transitory solid-state storage device. In some alternative embodiments, memory 302 may optionally include memory remotely located relative to processor 301, and this remote memory may be connected to the computer device via a network. Examples of such networks include, but are not limited to, the Internet, intranets, local area networks, mobile communication networks, and combinations thereof.
[0067] The memory 302 may include volatile memory, such as random access memory; the memory may also include non-volatile memory, such as flash memory, hard disk or solid-state drive; the memory 302 may also include combinations of the above types of memory. The computer device also includes a communication interface 303 for communicating with other devices or communication networks.
[0068] This invention also provides a computer-readable storage medium. The methods described above according to embodiments of the invention can be implemented in hardware or firmware, or implemented as computer code that can be recorded on a storage medium, or implemented as computer code downloaded via a network and originally stored on a remote storage medium or a non-transitory machine-readable storage medium and then stored on a local storage medium. Thus, the methods described herein can be processed by software stored on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. The storage medium can be a magnetic disk, optical disk, read-only memory, random access memory, flash memory, hard disk, or solid-state drive, etc.; further, the storage medium can also include combinations of the above types of memory. It is understood that computers, processors, microprocessor controllers, or programmable hardware include storage components capable of storing or receiving software or computer code, which, when accessed and executed by the computer, processor, or hardware, implements the methods shown in the above embodiments.
[0069] Although embodiments of the invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations all fall within the scope defined by the appended claims.
Claims
1. A coal gas distribution pipeline, characterized by, The gas transmission and distribution pipeline includes: blast furnace gas branch pipes, coke oven gas branch pipes, pressure pipelines, a first mixing pipeline, and a second mixing pipeline, wherein... The first mixing pipeline is connected to the blast furnace gas branch pipe. The first mixing pipeline includes: a first pressure regulating valve, a first flow orifice plate and a first pressure regulator provided on the inlet pipe of the first pressure regulating valve, wherein the inlet pipe of the first flow orifice plate is connected to the blast furnace gas branch pipe, the outlet pipe of the first flow orifice plate is connected to the first pressure regulating valve, and the first pressure regulator is used to adjust the opening degree of the first pressure regulating valve in response to the pressure of the outlet pipe of the first pressure regulating valve. The second mixing pipeline is connected to the coke oven gas branch pipe. The second mixing pipeline includes: a second pressure regulating valve, a second flow orifice plate and a second pressure regulator installed on the inlet pipe of the second pressure regulating valve, wherein the inlet pipe of the second flow orifice plate is connected to the coke oven gas branch pipe, the outlet pipe of the second flow orifice plate is connected to the second pressure regulating valve, and the second pressure regulator is used to adjust the opening degree of the second pressure regulating valve in response to the flow of the first flow orifice plate. The pressure pipeline is connected to the first mixing pipeline and the second mixing pipeline. The pressure pipeline includes a blower, a machine regulating valve installed on the blower inlet pipeline, a return pipeline connected to the blower inlet pipeline and the blower outlet pipeline respectively, and a pressure pipeline regulator. The return pipeline is equipped with a return regulating valve, and the pressure pipeline regulator is used to adjust the opening degree of the return regulating valve. A control unit, connected to the first pressure regulator, the second pressure regulator, and the pressure line regulator, is used to perform the following steps: Based on pipeline design requirements, the connection methods of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe are determined. Based on the connection method, adjust the reflux regulating valve to the first opening degree; Based on the first opening degree, determine the mixed gas pressure; If the pressure of the mixed gas is equal to a preset pressure threshold, the regulating valve in front of the machine is adjusted to a second opening based on the first opening. The control unit is also configured to, in response to a system fault, control the opening of the reflux regulating valve to be fully open via the pressure line regulator; The control unit is also configured to, in response to the reflux regulating valve being fully open, control the first pressure regulating valve to be fully closed via the first pressure regulator; The control unit is also configured to, in response to the first pressure regulating valve being fully closed, control the second pressure regulating valve to be fully open via the second pressure regulator; The connection methods include: a first connection method consisting of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe, which involves pressurization followed by mixing; and a second connection method consisting of the pressure pipeline, the first mixing pipeline, the second mixing pipeline, the blast furnace gas branch pipe, and the coke oven gas branch pipe, which involves mixing followed by pressurization.
2. A gas distribution pipeline as claimed in claim 1, wherein The control unit is also used for: Based on the first pressure regulator, determine the gas source adjustment method and adjust the opening of the first pressure regulating valve; Based on the first flow orifice plate, the method of changing the opening of the reflux regulating valve is determined, and the opening of the second pressure regulating valve is adjusted through the second pressure regulator; The reflux regulating valve is adjusted in response to a change in the opening of the first pressure regulating valve and / or the second pressure regulating valve.