Test method, system and storage medium for cbtc system of rail vehicle

By directly upgrading the rail vehicle to FAM mode, the testing process of the CBTC system is simplified, solving the problems of high operational complexity and low testing efficiency in traditional methods, and achieving a more efficient and reliable testing process.

CN118226828BActive Publication Date: 2026-11-24BYD CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310899205.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-20
Publication Date
2026-11-24
Estimated Expiration
2043-07-20

AI Technical Summary

Technical Problem

Upgrading a traditional rail vehicle CBTC system to FAM mode requires multiple steps and judgment conditions, resulting in high operational complexity, low testing efficiency, and a high risk of errors.

Method used

This paper provides a CBTC system testing method for rail vehicles, which directly upgrades the rail vehicles to FAM mode, omitting the cumbersome steps of RM mode and CM mode. By obtaining the route to be tested, processing the logical section, calculating the initial positioning information and obtaining the movement authorization, the process is simplified and the operational reliability is improved.

Benefits of technology

It simplifies the upgrade process, reduces time and resource consumption, improves testing efficiency and operational reliability, and reduces the possibility of errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118226828B_ABST
    Figure CN118226828B_ABST
Patent Text Reader

Abstract

This invention discloses a testing method, system, and storage medium for a CBTC system of rail vehicles. The testing method includes: acquiring the route to be tested; if a previous route exists, determining the logical segment to be added within that previous route; processing the route containing the logical segment to be added; performing a vehicle addition operation within the logical segment to be added and calculating the initial positioning information of the added rail vehicle; determining the activation end of the rail vehicle based on the initial positioning information and the running direction of the route to be tested; performing a head-up screening of the rail vehicle based on the activation end; and obtaining movement authorization after successful head-up screening to upgrade the rail vehicle to FAM mode. This technical solution can directly upgrade rail vehicles to FAM mode during the vehicle addition process, simplifying the upgrade process, avoiding redundant steps and the problems they cause, and improving testing efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of rail vehicle control technology, and in particular to a test method, system, and storage medium for a rail vehicle's CBTC system. Background Technology

[0002] CBTC (Communication Based Train Control) is currently the mainstream rail vehicle control technology in the domestic and international rail transit industry. Before being put into operation, it requires extensive data and functional testing. Testing the CBTC system requires upgrading the rail vehicle to FAM (Fulfilled Automatic Train Control) mode. Specifically, this involves manually switching from a non-positioning RM (Restricted Manual Mode) to a positioning RM mode by controlling the rail vehicle to move through two transponders to achieve positioning. Registration with the ZC (Zone Controller) is then initiated. After successful registration with the ZC, it is determined whether the conditions for upgrading to CBTC control level are met. If the conditions are met, the system upgrades to CM (Coded Mode). Otherwise, it continues operating in the positioning RM mode. After upgrading to CM mode, it is necessary to determine whether the conditions for upgrading to FAM (Full Automatic Train Control) mode are met. If the conditions are met, the system can be upgraded to FAM mode. The traditional method of upgrading from vehicle addition to FAM mode has the following technical problems: The traditional upgrade method requires multiple steps and judgment conditions, including positioning upgrade, registration and ZC communication, and judgment of upgrade conditions, which increases the complexity of operation and the possibility of errors. It requires testers to have high operational skills and experience, and the testing efficiency is low. Summary of the Invention

[0003] This invention provides a testing method, system, and storage medium for a CBTC system of a rail vehicle to solve the aforementioned technical problems.

[0004] The first aspect of this invention provides a testing method for a CBTC system of a rail vehicle, comprising:

[0005] Obtain the route to be tested. If the route to be tested has a previous route, determine the logic segment to be added in the previous route.

[0006] Process the route where the logic section to be added is located;

[0007] The vehicle addition operation is performed in the logic section to be added, and the initial positioning information of the added rail vehicle is calculated;

[0008] Based on the initial positioning information and the running direction of the route to be tested, the activation end of the rail vehicle is determined;

[0009] The rail vehicle is screened by the activation terminal. After the rail vehicle is successfully screened, a movement authorization is obtained, and the rail vehicle is upgraded to FAM mode.

[0010] A second aspect of this application provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of the method described in the first aspect of this invention.

[0011] A third aspect of this application provides a test system for a CBTC system of a rail vehicle, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that the processor executes the computer program to implement the steps of the method described in the first aspect of the present invention.

[0012] The technical advantages of this invention are as follows: Compared to traditional upgrade methods, this technical solution can directly upgrade the rail vehicle to FAM mode during the vehicle addition process without going through the intermediate RM and CM modes. This eliminates cumbersome steps and operations, simplifies the process, avoids unnecessary steps and the problems they cause, reduces time and resource consumption, accelerates testing progress, and significantly improves testing efficiency. By omitting the CM mode upgrade step, the possibility of errors and mistakes during operation is also reduced, improving the reliability and stability of the operation. Attached Figure Description

[0013] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0014] Figure 1 This is a flowchart of a testing method for a CBTC system of a rail vehicle provided in Embodiment 1 of the present invention;

[0015] Figure 2 This is a schematic diagram of a route scenario in a test method for a CBTC system of a rail vehicle provided in Embodiment 3 of the present invention;

[0016] Figure 3 This is a flowchart of step S103 in a test method for a CBTC system of a rail vehicle provided in Embodiment 4 of the present invention;

[0017] Figure 4This is another flowchart of step S103 in the test method of a CBTC system for a rail vehicle provided in Embodiment 4 of the present invention;

[0018] Figure 5 This is another flowchart of step S103 in the test method of a CBTC system for a rail vehicle provided in Embodiment 4 of the present invention;

[0019] Figure 6 This is another flowchart of step S103 in the test method of a CBTC system for a rail vehicle provided in Embodiment 4 of the present invention;

[0020] Figure 7 This is a flowchart of step S104 in a test method for a CBTC system of a rail vehicle provided in Embodiment 5 of the present invention;

[0021] Figure 8 This is another flowchart of step S101 in the test method of a CBTC system for a rail vehicle provided in Embodiment 6 of the present invention;

[0022] Figure 9 This is another flowchart of step S102 in the test method of a CBTC system for a rail vehicle provided in Embodiment 7 of the present invention;

[0023] Figure 10 This is a flowchart of the test environment setup for a test method of a CBTC system for rail vehicles provided in Embodiment 8 of the present invention. Detailed Implementation

[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0025] It should be understood that the invention can be embodied in various forms and should not be construed as being limited to the embodiments set forth herein. Rather, providing these embodiments will make the disclosure thorough and complete, and will fully convey the scope of the invention to those skilled in the art. In the drawings, for clarity, the dimensions and relative dimensions of layers and regions may be exaggerated. The same reference numerals denote the same elements throughout.

[0026] It should be understood that when an element or layer is referred to as "on," "adjacent to," "connected to," or "coupled to" other elements or layers, it may be directly on, adjacent to, connected to, or coupled to other elements or layers, or there may be intervening elements or layers. Conversely, when an element is referred to as "directly on," "directly adjacent to," "directly connected to," or "directly coupled to" other elements or layers, there are no intervening elements or layers. It should be understood that although the terms first, second, third, etc., may be used to describe various elements, components, areas, layers, and / or portions, these elements, components, areas, layers, and / or portions should not be limited by these terms. These terms are only used to distinguish one element, component, area, layer, or portion from another element, component, area, layer, or portion. Therefore, without departing from the teachings of this invention, the first element, component, area, layer, or portion discussed below may be referred to as the second element, component, area, layer, or portion.

[0027] Spatial relation terms such as “below,” “under,” “below,” “under,” “above,” “above,” etc., are used herein for convenience of description to describe the relationship between one element or feature shown in the figure and other elements or features. It should be understood that, in addition to the orientation shown in the figure, spatial relation terms are intended to also include different orientations of the device in use and operation. For example, if the device in the figure is flipped, then the element or feature described as “below,” “under,” or “below” other elements or features will be oriented “above” other elements or features. Therefore, the exemplary terms “below” and “under” can include both above and below orientations. The device may be otherwise oriented (rotated 90 degrees or otherwise) and the spatial descriptive terms used herein will be interpreted accordingly.

[0028] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the invention. When used herein, the singular forms “a,” “an,” and “the” are also intended to include the plural forms unless the context clearly indicates otherwise. It should also be understood that the terms “comprising” and / or “including,” when used in this specification, identify the presence of the stated features, integers, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups. When used herein, the term “and / or” includes any and all combinations of the associated listed items.

[0029] To fully understand this invention, detailed structures and steps will be presented in the following description to illustrate the technical solution proposed by this invention. Preferred embodiments of the invention are described in detail below; however, in addition to these detailed descriptions, the invention may have other embodiments.

[0030] Example 1

[0031] Embodiment 1 of the present invention provides a testing method for a CBTC system of a rail vehicle, which solves the problems of low testing efficiency, limited vehicle addition positions, and high operational complexity in the prior art.

[0032] The technical solution provided in Embodiment 1 of the present invention, such as Figure 1 As shown, a testing method for a CBTC system of a rail vehicle is provided, including:

[0033] Step S101. Obtain the route to be tested. If there is a previous route for the route to be tested, determine the logic segment to be added in the previous route.

[0034] Step S102. Process the route where the logic section to be added is located.

[0035] Step S103. Perform the vehicle addition operation in the logic section to be added, and calculate the initial positioning information of the added rail vehicle.

[0036] Step S104. Determine the activation end of the rail vehicle based on the initial positioning information and the running direction of the route to be tested.

[0037] Step S105. Perform a head screening on the rail vehicle based on the activation terminal. After the head screening of the rail vehicle is successful, obtain the movement authorization to upgrade the rail vehicle to FAM mode.

[0038] In step S101, obtaining the route to be tested can be done by determining the target route that needs to be tested or verified based on test requirements and system planning. By using the system's signal logic relationships or configuration information, it is determined whether the starting point of the route to be tested is connected to other routes, thus determining whether a preceding route exists. When a preceding route exists, based on the route to be tested and the test requirements, a logical segment to be added is determined in the preceding route. The test requirements can include functional testing, performance testing, security testing, compatibility testing, and usability testing, etc. The logical segment to be added can be flexibly adjusted; it can be the platform location of the preceding route or the last logical segment of a physical segment of the preceding route.

[0039] In step S102, processing the route where the logical section of the car to be added is located refers to setting up signals and control equipment based on the route information of the logical section of the car to be added, so that the route where the logical section of the car to be added is in an operable and controllable state. The display status and logical relationship of the signals are determined to ensure that the rail vehicles can correctly detect and follow the signals' instructions during the car addition process.

[0040] In step S103, adding a vehicle to the logical section to be added refers to selecting a suitable location within that logical section, such as a platform location or a logical section within a physical area. It is crucial to ensure the addition location meets testing requirements and safety criteria. The rail vehicle is then moved to the designated location, ensuring accurate parking. The initial positioning information of the rail vehicle can be calculated by activating the VOBC (Vehicle On-board Controller) subsystem.

[0041] In step S104, the obtained initial positioning information is compared with the running direction of the route to be tested. The corresponding rail vehicle cab is activated according to the up or down running direction of the route to be tested, so as to ensure that the rail vehicle travels in the predetermined route direction during the test.

[0042] In step S105, a head-screening operation is performed on the activated end of the added rail vehicle. Through communication and data interaction with the system, movement authorization is obtained to ensure that the rail vehicle can operate according to the prescribed logic and safety requirements. The head-screening operation is a crucial function in the CBTC system, used to verify the position, operating status, and safety of the rail vehicle, and to ensure that the spacing and interaction between the rail vehicle and other rail vehicles and equipment during operation meet the prescribed requirements. After successful head-screening, movement authorization is obtained, and the rail vehicle can be upgraded to FAM mode, i.e., fully automated driverless mode, enabling it to operate independently and execute corresponding control logic within the CBTC system.

[0043] The technical advantages of Embodiment 1 of this invention are as follows: Compared to traditional upgrade methods, this technical solution can directly upgrade the rail vehicle to FAM mode during the vehicle addition process without going through the intermediate RM and CM modes. This simplifies the upgrade process, avoids redundant steps and the problems they cause, and improves testing efficiency. By omitting the CM mode upgrade step, the possibility of errors and mistakes during operation can be reduced, improving the reliability and stability of operation. Traditional vehicle addition methods typically select locations with continuous transponders and axle counters. In this technical solution, the vehicle addition location can be selected more flexibly according to testing needs. Vehicles can be added in sections or at platforms, meeting the requirements of different testing scenarios and needs. Through one-click upgrade to FAM mode and flexible vehicle addition location selection, this technical solution can omit cumbersome steps and operations, simplify the process, reduce time and resource consumption, accelerate testing progress, and significantly improve testing efficiency.

[0044] Example 2

[0045] Embodiment 2 of the present invention provides a sub-step of step S101 in Embodiment 1, specifically explaining the method of determining the logic segment to be added in the previous route in step S101.

[0046] The technical solution provided in Embodiment 2 of the present invention is based on the technical solution provided in Embodiment 1. Specifically, as an example of determining the logic segment to be added in step S101, determining the logic segment to be added in the previous route includes:

[0047] The platform location of the previous route is identified as the logical section for adding trains;

[0048] Alternatively, determine the last logical segment of the first physical segment of the previous route as the logical segment to be added to the vehicle;

[0049] Alternatively, determine the last logical segment of the last physical segment of the previous route as the logic segment to be added to the vehicle.

[0050] The process involves determining the starting signal or starting section of the route to be tested, typically the location connected to the preceding route. Based on the location of the starting signal or starting section, the route to be tested is determined, and consequently, the preceding route is identified. In one implementation, the corresponding platform location is located within the preceding route, which may be a specific physical or logical section. In another implementation, if the preceding route comprises multiple physical sections, and each physical section comprises multiple logical sections, the logical section of the first physical section or the last logical section of the last physical section is identified as the logical section to be added.

[0051] The technical advantages of this second embodiment are as follows: By selecting the platform location of the preceding route as the vehicle addition location, flexible selection is possible based on testing needs and specific circumstances. This allows for better adaptation to different testing scenarios and requirements, improving the controllability and adaptability of the testing plan. It helps to more accurately simulate the scenario of rail vehicles entering the station, including vehicle stopping, passenger boarding and alighting, and other operations. By adding the rail vehicle to the last logical segment of the physical section, it is possible to avoid rail vehicles sticking together on non-last logical segments. Sticking together refers to the inability of rail vehicles to separate properly during movement due to excessively tight contact between vehicles. By selecting the last logical segment for adding the vehicle, it is ensured that the rail vehicle only contacts the blank segment ahead, reducing the risk of sticking together. This helps to ensure the normal operation of the rail vehicle in the route and the safety of the system. In addition, selecting the last logical segment of the physical section for adding the vehicle simplifies the testing and verification process. It is not necessary to consider the specific location of the rail vehicle joining segment; simply adding the rail vehicle to the last logical segment is sufficient. This reduces the complexity and potential errors in the testing process, improving testing efficiency and reliability.

[0052] Example 3

[0053] Embodiment 3 of the present invention provides related sub-steps of step S102 in Embodiment 1, specifically explaining other methods of handling the logic section to be added in step S102 in the preceding route.

[0054] The technical solution provided in Embodiment 3 of the present invention, based on the technical solution provided in Embodiment 1, further includes the following steps before processing the route to be tested:

[0055] When there is a route on the path where the logic section to be added exists that requires the signal to be opened simultaneously, the route that requires the signal to be opened simultaneously shall be processed first.

[0056] In this context, "processing the route of the logical section to be added" refers to the processing of the route containing the logical section of the car to be added, enabling it to travel. In the CBTC system, a route is the path taken by rail vehicles, shunting locomotives, or trains from one location to another within a station. Processing a route includes setting up and controlling the route's signals, track circuits, switches, and other equipment to ensure that rail vehicles travel along the designated path.

[0057] This step specifically includes the following steps: First, determine the operating direction of the route containing the logic section to be added, i.e., the direction the railcars are traveling, in order to find a synchronous route in the same direction. Second, check the interlocking subsystem to see if there are signal conditions that require simultaneous opening of the current route. These signal conditions may be signals or other conditions that require simultaneous opening. If there are signal conditions that require simultaneous opening, process the route with the required signal conditions first, and then process the route containing the logic section to be added.

[0058] As an example, such as Figure 2 As shown, if the preceding route of the logic section to be added is S302-S202, and the interlocking table specifies that the signal for the S302-S202 route must be opened simultaneously is S202, and the route to which S202 belongs is S202-S102, then the S202-S102 route needs to be processed first. After processing the route S202-S102 which requires simultaneous opening, then process the preceding route S302-S202 of the logic section to be added. At this point, the signal of the starting signal S302 of the route S302-S202 will be opened.

[0059] The technical effect of Embodiment 3 of the present invention is that: by determining the direction of travel of the rail vehicle, the route to the logical section to be added can be found. When there are routes that must be opened at the same time, the routes that must be opened at the same time are processed first to ensure that the signal conditions are met, so as to ensure the normal processing of subsequent routes and the safe operation of the rail vehicle.

[0060] Example 4

[0061] Embodiment 4 of the present invention provides a sub-step of step S103 in Embodiment 1, specifically explaining the specific steps in step S103 of performing the vehicle addition operation in the logic section to be added and calculating the initial positioning information of the rail vehicle.

[0062] The first technical solution provided in Embodiment 4 of the present invention is based on the technical solution provided in Embodiment 1, such as... Figure 3 As shown, when the logic segment to be added is the last logic segment of the first physical segment of the previous route, the addition operation and its pre- and post-processing are performed in the logic segment to be added, including:

[0063] Step S401. Occupy the previous physical segment of the previous path.

[0064] Step S402. Add a vehicle to the logic section to be added.

[0065] Step S403. Clear the previous physical segment of the previous path.

[0066] The specific process of this technical solution is as follows: First, determine the preceding route of the route to be tested, i.e., the route where the starting point of the route to be tested is located. Before adding a train, the preceding physical section of the preceding route needs to be occupied to ensure the smooth operation of adding the train. Occupation refers to marking a section or equipment as occupied during operation, indicating that the section or equipment is being used or occupied, and other rail vehicles or operations cannot simultaneously use or enter that section or equipment. Occupation is usually an operation performed to ensure safety and avoid conflicts. After occupying the preceding physical section of the preceding route, the train addition operation is performed. The rail vehicle is added to the first physical section of the route to be tested. After adding the train, the preceding physical section of the preceding route needs to be cleared to release the section and ensure the continuity of rail vehicle operation. Clearing the preceding physical section of the preceding route must be performed according to the interlocking system regulations to ensure that safety conditions are met.

[0067] The technical effect of this first technical solution is as follows: Through the above steps, a train can be added to the first physical section of the preceding route of the route to be tested, and the preceding physical section of the preceding route can be cleared after the train addition is completed. This ensures the accuracy, safety, and continuity of train addition, and guarantees the smooth operation of rail vehicles.

[0068] The second technical solution provided in Embodiment 4 of the present invention is based on the technical solution provided in Embodiment 1, such as... Figure 4 As shown, when the logic segment to be added is the last logic segment of the last physical segment of the previous route, the addition operation and its pre- and post-processing are performed in the logic segment to be added, including:

[0069] Step S411. Occupy the previous physical segment of the previous path.

[0070] Step S412. Occupy the first physical segment within the previous path and clear the previous physical segment of the previous path.

[0071] Step S413. Occupy the second physical segment after the first physical segment, clear the first physical segment, and occupy the physical segments after clearing the first physical segment in sequence until the physical segment before the physical segment where the logic segment to be added is occupied is occupied.

[0072] Step S414. Add a vehicle to the logic section to be added.

[0073] Step S415. Clear the physical segment preceding the physical segment where the logic segment for pending vehicles is located.

[0074] Physical segment occupancy simulates a rail vehicle occupying a segment, placing that segment in an occupied state. Physical segment clearance simulates a rail vehicle leaving a segment, placing that segment in an idle state. Occupancy clearance satisfies the CI's three-point check. The three-point check uses the track circuits of three segments as unlocking conditions. Unlocking a segment requires checking not only that a rail vehicle has occupied and cleared the segment, but also that it has occupied and cleared the previous segment and entered the next segment. Only when a rail vehicle crosses the starting signal of the rail vehicle route and enters the route sequentially can the CI subsystem trigger normal route unlocking, using the segment-by-segment unlocking method.

[0075] The specific process of this technical solution two is as follows: When the logic segment to be added is not the first physical segment of the previous route, the preceding physical segment of the route containing the logic segment to be added is occupied, that is, the physical segment is placed in an occupied state, simulating the rail vehicle occupying the segment. Next, the first physical segment of the previous route is occupied, and the occupancy state is placed, simulating the rail vehicle occupying the segment. Then, the preceding physical segment of the previous route is cleared, that is, the occupancy state of the physical segment is removed, simulating the rail vehicle leaving the segment, making it in an idle state. Then, the second physical segment after the first physical segment is occupied, the first physical segment is cleared, and subsequent physical segments in the previous route are occupied and cleared in sequence to satisfy the three-point check condition of CI. That is, to ensure that the rail vehicle has occupied and cleared the preceding segment and entered the following segment, so as to ensure the normal unlocking of the route. By performing the occupation and clearing operations of physical segments in the above order until the physical segment preceding the logical segment containing the waiting car is occupied, the three-point check requirements of the CI subsystem can be satisfied, ensuring the normal unlocking of the route. After adding a car to the logical segment containing the waiting car, clearing the physical segment preceding the logical segment containing the waiting car can simulate the operation of the rail vehicle in the route, thus satisfying the triggering conditions for route unlocking.

[0076] The technical effect of this second technical solution is as follows: Through the above steps, additional trains can be added to the non-first physical section of the preceding route to be tested, and the relevant physical sections can be occupied and cleared in sequence. This ensures the accuracy, safety, and continuity of train additions, guaranteeing the smooth operation of rail vehicles.

[0077] The third technical solution provided in Embodiment 4 of the present invention is based on the technical solution provided in Embodiment 1, such as... Figure 5 As shown, the process of adding a vehicle and its pre- and post-processing in the logic section to be added includes:

[0078] Step S421. Determine the offset of the track vehicles based on the line information and the train formation information.

[0079] Step S422. When the length of the logic segment to be added is greater than the offset of the rail vehicle, add a car in the logic segment to be added.

[0080] Step S423. When the length of the logic segment to be added is not greater than the offset of the rail vehicle and there is a previous route in the same direction, add a rail vehicle in the previous route in the same direction and drive the rail vehicle to the front of the starting signal of the route to be tested.

[0081] Step S424. When the length of the logic segment to be added is not greater than the offset of the rail vehicle and there is no previous route in the same direction, stop the addition operation.

[0082] The process involves determining the offset of a railcar based on the track information and the train formation information. The offset refers to the positional deviation of a railcar relative to a reference point (e.g., the starting signal). The process then checks if the length of the logical section to be added is greater than the railcar's offset. If the logical section is greater, the next step continues; otherwise, the addition operation is stopped. If the logical section is greater than the offset, the addition operation is performed within that section. This involves adding a railcar and performing related shunting operations. If the logical section is not greater than the offset and there is a preceding route in the same direction, the addition operation is performed within that preceding route. This involves adding a railcar to the preceding route and driving it to the front of the starting signal of the route under test. If the logical section is not greater than the offset and there is no preceding route in the same direction, the addition operation is stopped.

[0083] The technical advantages of Embodiment 4 of this invention are as follows: The offset of the rail vehicles is determined based on the line information and the train formation information, allowing for the addition of additional trains according to specific circumstances. This enables reasonable arrangement of rail vehicle additions based on actual needs and conditions. When the length of the logical section to be added is greater than the offset of the rail vehicles, the addition operation is performed directly within that logical section, omitting intermediate steps and reducing operation time and complexity. This improves testing efficiency and reduces workload. When the length of the logical section to be added is not greater than the offset of the rail vehicles and there is a preceding route in the same direction, the rail vehicles are added to the preceding route and driven to the front of the starting signal of the route under test. This ensures that the rail vehicles enter the route under test in a predetermined order, meeting testing requirements and improving testing accuracy. Reasonable addition operations based on the rail vehicle offset and route conditions avoid unnecessary operational conflicts and safety hazards, ensuring safety and operational stability during the rail vehicle addition process.

[0084] The fourth technical solution provided in Embodiment 4 of the present invention, based on the technical solution provided in Embodiment 1, calculates the initial positioning information of the rail vehicle, including:

[0085] The initial positioning information of the rail vehicle is calculated based on the position, offset, and direction of travel of the logical segment to be added.

[0086] Based on the initial positioning information and the running direction of the route to be measured, the activation point of the rail vehicle is determined, including:

[0087] Step S431. Determine the running direction of the rail vehicle based on the initial positioning information.

[0088] Step S432. Use the driver's cab of the rail vehicle, whose running direction is consistent with the running direction of the route to be tested, as the activation end.

[0089] After the ATE (Automatic Trainer) initiates the VOBC (Vehicle Container Registry) subsystem, the VOBC subsystem receives information about the logical segments, offsets, and direction of travel from the ATE. Based on this information, the VOBC subsystem establishes a corresponding coordinate system. The logical segments and offsets indicate the position of the rail vehicle on the track, while the direction of travel determines the orientation of the coordinate system. Using this information, the VOBC subsystem calculates the initial positioning information of the rail vehicle, including its position, speed, and acceleration on the track. The ATE then sends an activation signal to the rail vehicle's cab, which can be used to activate either the front or rear cab. The direction of the route to be tested is determined based on the up and down directions of the current route, and then it is checked whether the direction of the activated cab matches the direction of the route to be tested. If they match, the next step continues. If they do not match, the other cab needs to be activated to ensure that the rail vehicle's direction of travel is consistent with the route to be tested.

[0090] The technical advantages of this fourth technical solution are as follows: Through the above steps, this solution achieves consistency in determining the active end driver's cab based on the up and down directions of the route, ensuring that the running direction of the rail vehicle is consistent with the direction of the route under test. The VOBC subsystem establishes a coordinate system based on the logical segment, offset, and running direction information sent by the ATE, and calculates the initial positioning information of the rail vehicle. This ensures the accuracy and reliability of the test and improves the performance of the rail vehicle control system.

[0091] Example 5

[0092] Embodiment 5 of the present invention provides a sub-step of step S104 in Embodiment 1, specifically explaining the method of obtaining movement authorization by performing head screening on the rail vehicle in step S104.

[0093] The technical solution provided in Embodiment 5 of the present invention is based on the technical solution provided in Embodiment 1, and the head screening method includes:

[0094] The head screen is set up by issuing a command to configure the head screen on the rail vehicle; or...

[0095] The first screening is completed by prompting the user to enter a preset number.

[0096] As an example, such as Figure 7 As shown, the process of obtaining movement authorization for rail vehicles through head screening includes:

[0097] Step S501. When the track where the rail vehicle is located supports the installation of a head screen, the head screen is completed by issuing a command to install a head screen on the rail vehicle.

[0098] Step S502. When the line where the rail vehicle is located does not support the setting of the head screen, enter the ZC subsystem running program interface and prompt the user to enter the preset number to complete the head screen.

[0099] In step S501, before performing the head screening, it is necessary to confirm whether the track supports the command to set head and tail screenings. If the track supports head screening, the corresponding control permissions must be obtained to ensure sufficient authority to execute track vehicle operations. After obtaining control permissions, the head screening can be completed by issuing a command to set the track vehicle head screening through the ATS (Automatic Train Supervision System). Through the above steps, the head screening operation can be completed by issuing a command to set the track vehicle head screening.

[0100] In step S502, if the line does not support the command to set head and tail screens, and the rail vehicle does not automatically complete the head screen, then the head screen is completed by inputting the number 3 in the ZC subsystem's running program interface through fault injection. The ZC subsystem updates the train's movement authorization information based on the signal openness information and sends the updated movement authorization information to the controlled vehicle. After obtaining MA, the upgrade to FAM mode is successful.

[0101] The technical advantages of Embodiment 5 of this invention are as follows: This technical solution considers two scenarios: one where the line supports the command to set head and tail screens, and another where the line does not support this. Therefore, it is applicable to different types of lines and systems. For lines that support head and tail screens, head screening can be completed by issuing commands; for lines that do not support this, head screening can be performed in the ZC subsystem through fault injection. This provides multiple options to address different situations and equipment conditions. By issuing commands or performing head screening in the ZC subsystem, head screening of rail vehicles can be completed quickly, reducing manual operation and time consumption. This technical solution considers the acquisition of control permissions, ensuring that operators have sufficient permissions to perform rail vehicle operations, increasing the controllability and safety of the operation. For lines that do not support head and tail screens, performing head screening by simulating fault injection in the ZC subsystem can simulate actual operational fault scenarios, helping to test and verify the robustness and coping capabilities of the system.

[0102] Example 6

[0103] Embodiment Six of the present invention provides relevant sub-steps of step S101 in Embodiment One, specifically explaining the processing method in step S101 when the path to be tested does not have a previous path.

[0104] The technical solution provided in Embodiment Six of the present invention, such as Figure 8As shown, the testing method for the CBTC system of rail vehicles also includes:

[0105] Step S601. When the route to be tested does not have a preceding route and the route to be tested has the attribute of turning out route, process the preceding route of the turning in route to be tested and perform the vehicle addition operation.

[0106] Step S602. The first end cab of the rail vehicle, whose running direction is consistent with the running direction of the turning route, is taken as the activation end.

[0107] Step S603. When the rail vehicle is driven by the first end cab to the front of the starting signal of the route to be tested, the first end cab and the second end cab are turned back, the control of the first end cab is stopped, and the second end cab is used as the active end.

[0108] The specific process of this technical solution is as follows: When there is no previous route for the route to be tested, it is necessary to check whether the route to be tested has the attribute of a turnout route. If the route to be tested has the attribute of a turnout route, proceed to the next step; otherwise, the vehicle addition operation cannot be performed. The turnout route of the route to be tested is temporarily regarded as a new route to be tested and used as the current operation object. The previous route of the turnout route is processed, and a rail vehicle is added within the previous route. The rail vehicle includes a first-end cab and a second-end cab. The first-end cab of the rail vehicle, whose running direction is the same as that from the turnout route to the route to be tested, is activated, and the rail vehicle is driven by the first-end cab to a position in front of the starting signal of the route to be tested, ensuring that the rail vehicle is ready to enter the route to be tested. When the rail vehicle has come to a complete stop, a turnback operation is performed, the control of the first-end cab is terminated, and the second-end cab is designated as the new activated end, marking the end of the vehicle addition process. After the addition of the vehicle is completed, the process ends, and the rail vehicle is now in front of the starting signal of the route to be tested, and the driver's cab has been switched and activated from the first driver's cab to the second driver's cab.

[0109] As an example, such as Figure 2 As shown, if the route to be tested is S306-S302, and there is no previous route, but route S306-S302 has the attribute of turning out route, then temporarily set the turning in route X303-X308 of the route to be tested as the input route, add a car in route X201-X303, then process route X303-X308 and drive the railcar to T308. After the railcar stops and is accurately stopped, switch to activate the other end of the driver's cab.

[0110] The technical effect of the solution provided in Embodiment Six is ​​as follows: By adding a vehicle to the turnaround route of the route under test, the addition operation can be performed even when the preceding route of the route under test does not exist, thus fully utilizing the turnaround route attribute of the route under test. This can address the need for adding vehicles under conditions of limited route resources or other constraints, maximizing the utilization of route resources. It also improves system availability and ensures the continuity and efficiency of rail vehicle operation.

[0111] Example 7

[0112] Embodiment 7 of the present invention provides related sub-steps of step S102 in Embodiment 1, specifically explaining the processing method in step S102 when the logic segment to be added is the platform position of the previous route.

[0113] The technical solution provided in Embodiment Six of the present invention, such as Figure 9 As shown, when the logic segment to be added is the platform location of the previous route, the addition operation is performed in the logic segment to be added, including:

[0114] Step S702. Obtain the running direction, platform position, and parking points on both sides of the previous route in the logic segment where the vehicle is located.

[0115] Step S702. When a rail vehicle needs to enter the station and stop, set the rail vehicle's loading position at the stopping point on the side facing the platform in the direction of travel.

[0116] Step S703. When the rail vehicle does not need to enter the station to stop, set the rail vehicle's loading position at the parking point on the side away from the platform in the direction of operation.

[0117] The specific working process of this embodiment seven is as follows: The test requirements determine the direction of travel of the route to be tested (e.g., from left to right is the downhill direction) and whether a rail vehicle needs to enter the station to stop. Based on the direction of travel of the route to be tested and the location of the stopping point, the offset of the rail vehicle when adding a car is adjusted. If the rail vehicle needs to enter the station to stop, the adding position of the rail vehicle is set at a stopping point on the side of the route heading towards the platform. If the rail vehicle does not need to enter the station, the adding position of the rail vehicle is set at a stopping point on the side of the route heading away from the platform.

[0118] The technical advantage of this embodiment seven is that by adjusting the offset during vehicle addition, the position of the rail vehicle can be controlled, thereby enabling control over whether the rail vehicle enters the station and stops. This can flexibly meet different testing requirements and verify the normal operation and performance of the signal system in different scenarios.

[0119] Example 8

[0120] Embodiment 8 of the present invention provides a testing method for a CBTC system of a rail vehicle, and realizes the construction of a test environment for the testing method.

[0121] like Figure 10 As shown, the testing method for a CBTC system of a rail vehicle provided in Embodiment 8 of the present invention further includes:

[0122] Step S801. Build an automated testing platform and put it into a pre-working state. The automated testing platform includes ATE simulation software, CI subsystem, ZC subsystem, VOBC subsystem and ATS subsystem.

[0123] Step S802. Start the ATE simulation software and establish connections with the ATS subsystem, CI subsystem, ZC subsystem, and VOBC subsystem;

[0124] Step S803. When there are remaining track vehicle number windows on the ATS subsystem, delete the number windows.

[0125] The specific working process of this embodiment eight is as follows: An automated testing platform is built, including the automated testing platform, ATE simulation software, CI subsystem, ZC subsystem, VOBC subsystem, and ATS subsystem. Engineering data such as electronic maps, interlocking tables, and code position sequence tables are prepared and converted into JSON format for automated testing. First, it is determined whether the VOBC subsystem, ZC subsystem, CI subsystem software, and ATE simulation environment are running. If any software or simulation environment is running, it needs to be shut down first to ensure environment cleanup and test preparation. The ATE environment is started and communication is established with the ATS subsystem via the WebSocket protocol. Communication between the ATE environment and the ATS subsystem is ensured to be normal for subsequent command issuance and operation simulation. The software of the ZC subsystem and CI subsystem is started, and the connection with the ATE environment is ensured to be normal. The ZC subsystem and CI subsystem can be operated through the automated testing platform to simulate behavior in the actual operating environment. The remaining train number windows on the ATS subsystem are checked. If any remain, they need to be deleted to ensure the test environment is clean and ready.

[0126] The technical advantages of this embodiment eight are as follows: By establishing an automated testing environment, automated testing of the signal system is achieved. This improves testing efficiency, reduces human error, and allows for repeated execution of test cases, enhancing test stability and consistency. Through communication and command issuance between the automated testing platform and the ATS server, the operation of the ATS-HMI interface is simulated. Various operational scenarios can be simulated during testing to verify the stability and correctness of the signal system under different operations. This technology can automatically perform preparatory work, such as environmental status checks, software startup and connection, and deletion of residual train number windows. This saves manpower and time costs and improves testing efficiency.

[0127] In one embodiment, a test system for a CBTC system of a rail vehicle is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that the processor implements the control method described in the above embodiment when executing the computer program.

[0128] In one embodiment, a computer-readable storage medium is provided, which stores a computer program that, when executed by a processor, implements the control method described above.

[0129] Those skilled in the art will understand that implementing all or part of the processes in the above embodiments can be accomplished by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, storage, databases, or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), dual data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), RAMbus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and RAMbus dynamic RAM (RDRAM), etc.

[0130] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is used as an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0131] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included within the protection scope of the present invention.

Claims

1. A testing method for a CBTC system of a rail vehicle, characterized in that, include: Obtain the route to be tested. When the route to be tested has a previous route, determine the logical segment to be added to the previous route. The logical segment to be added to the previous route can be the platform position of the previous route or the last logical segment of a physical segment of the previous route. Process the route where the logic section to be added is located; The vehicle addition operation is performed in the logic section to be added, and the initial positioning information of the added rail vehicle is calculated; Based on the initial positioning information and the running direction of the route to be tested, the activation end of the rail vehicle is determined; The rail vehicle is screened according to the activation terminal. After the rail vehicle is successfully screened, a movement authorization is obtained, and the rail vehicle is upgraded to FAM mode. The step of adding a vehicle before performing the vehicle addition operation in the logic section to be added includes: The offset of the rail vehicle is determined based on the route information and the train formation information. The process of adding a vehicle in the logic section to be added includes: When the length of the logic segment to be added is greater than the offset of the rail vehicle, a car addition operation is performed in the logic segment to be added. When the length of the logic segment to be added is not greater than the offset of the rail vehicle and there is a previous route in the same direction, add a car in the previous route in the same direction. When the length of the logic segment to be added is not greater than the offset of the rail vehicle and there is no previous route in the same direction, the addition operation is stopped.

2. The test method as described in claim 1, characterized in that, The step of determining the logic segment to be added in the preceding route includes: The platform location of the previous route is determined as the logical section where additional trains are to be added; Alternatively, the last logical segment of the first physical segment of the preceding route can be determined as the logical segment to be added to the vehicle; Alternatively, the last logical segment of the last physical segment of the previous route can be determined as the logic segment to be added to the vehicle.

3. The test method as described in claim 1, characterized in that, The route for processing the logic section containing the vehicle to be added also includes: When the route containing the logic section to be added has a route that requires signals to be opened simultaneously, the route that requires signals to be opened simultaneously shall be processed first.

4. The test method as described in claim 2, characterized in that, When the logic segment to be added is the platform location of the previous route, the operation of adding a car in the logic segment to be added includes: Obtain the running direction, platform location, and parking points on both sides of the platform location of the route where the logic section to be added is located; When the rail vehicle needs to enter the station and stop, the additional position of the rail vehicle is set at the stopping point on the side of the running direction towards the platform; When the rail vehicle does not need to stop at the station, the additional vehicle position is set at a parking point on the side away from the platform in the direction of travel.

5. The test method as described in claim 2, characterized in that, When the logic segment to be added is the last logic segment of the first physical segment of the previous route, the step of adding a vehicle before performing the vehicle addition operation in the logic segment to be added includes: Occupy the previous physical segment of the preceding path; After the vehicle addition operation is performed in the logic section to be added, the following is included: Clear the previous physical segment of the aforementioned path.

6. The test method as described in claim 2, characterized in that, When the logic segment to be added is the last logic segment of the last physical segment of the previous route, the step of adding a vehicle before performing the vehicle addition operation in the logic segment to be added includes: Occupy the previous physical segment of the preceding path; Occupy the first physical segment within the preceding path, and clear the preceding physical segment of the preceding path; Occupy the second physical segment after the first physical segment, clear the first physical segment, and then occupy and clear the physical segments after the first physical segment in sequence, until the physical segment before the physical segment where the logic segment to be added is located is occupied; After the vehicle addition operation is performed in the logic section to be added, the following is included: Clear the physical segment preceding the physical segment containing the logic segment to be added.

7. The test method as described in claim 1, characterized in that, The calculation of the initial positioning information of the rail vehicle includes: The initial positioning information of the rail vehicle is calculated based on the position, offset, and running direction of the logical segment to be added.

8. The test method as described in claim 1, characterized in that, The step of determining the activation point of the rail vehicle based on the initial positioning information and the running direction of the route to be tested includes: Based on the initial positioning information, the running direction of the rail vehicle is determined; The driver's cab of the rail vehicle, whose running direction is consistent with that of the route to be tested, is used as the activation terminal.

9. The test method as described in claim 1, characterized in that, The head screening method includes: The head screen is set up by issuing a command to configure the head screen on the rail vehicle; or... The first screening is completed by prompting the user to enter a preset number.

10. The test method as described in claim 1, characterized in that, The rail vehicle includes a first-end driver's cab and a second-end driver's cab, and the test method further includes: When the route to be tested does not have a preceding route and the route to be tested has the attribute of turning out route, process the preceding route of the turning in route to be tested and perform the vehicle addition operation; The first end cab of the rail vehicle, whose running direction is consistent with the running direction of the turning route, is taken as the activation end; When the rail vehicle is driven by the first end cab to the front of the starting signal of the route to be tested, a turnaround operation is performed on the first end cab and the second end cab, the control of the first end cab is stopped, and the second end cab is used as the active end.

11. The test method as described in claim 1, characterized in that, The testing method also includes: An automated testing platform is set up and put into a pre-operation state. The automated testing platform includes ATE simulation software, CI subsystem, ZC subsystem, VOBC subsystem and ATS subsystem. Start the ATE simulation software and establish connections with the ATS subsystem, the CI subsystem, the ZC subsystem, and the VOBC subsystem; When a railcar number window remains on the ATS subsystem, the railcar number window is deleted.

12. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method as described in any one of claims 1 to 11.

13. A test system for a CBTC system of a rail vehicle, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the method as described in any one of claims 1 to 11.

Citation Information

Patent Citations

  • Train awakening method and device and train dormancy method and device

    CN110015322A

  • Method and system for locally and manually screening upgraded trains

    CN110920692A