A device and method for recycling of a main reinforcement of a retaining pile

By using the inner sleeve fracturing component and the splitting engraving knife structure, the problem of the main reinforcement of the retaining pile is solved, the main reinforcement is reused, and construction costs and carbon emissions are reduced.

CN118241647BActive Publication Date: 2026-11-24CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410359490.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2026-11-24
Estimated Expiration
2044-03-27

AI Technical Summary

Technical Problem

The main reinforcement bars of the retaining piles are buried deep underground after construction, which causes waste of resources and environmental pollution, and existing technologies make it difficult to effectively recycle and reuse them.

Method used

The inner sleeve fracture component and the splitting knife structure are used to destroy the inner sleeve by rotating the main steel bar, so as to realize the recycling of the main steel bar, avoid tension, and ensure the strength of the steel bar.

Benefits of technology

This enabled the recycling of the main reinforcing bars in the retaining piles, reducing material costs, increasing the number of times the reinforcing bars could be reused, and reducing carbon emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118241647B_ABST
    Figure CN118241647B_ABST
Patent Text Reader

Abstract

A device and method for recycling the main reinforcement bars of retaining piles are disclosed. The device includes an inner sleeve, an outer sleeve assembly, an inner sleeve cracking component, and the main reinforcement bars. The outer sleeve assembly includes an outer sleeve, and the inner sleeve has a smaller diameter at one end than the other. A pre-fabricated crack is present at the smaller end, and the inner sleeve penetrates the outer sleeve. The inner sleeve cracking component includes a first screw, a second screw, two cracking knives, and a connecting sleeve. The first screw's movement direction is controlled by a groove at the end of the main reinforcement bar and a guide hole. Rotating the main reinforcement bar pushes the first screw to rotate, thereby driving the second screw to rotate. The connecting sleeve drives the cracking knives to move along the cracking knives' limiting grooves, thereby destroying the inner sleeve. This recyclable main reinforcement bar device of the present invention enables the recycling of the main reinforcement bars of retaining piles and avoids applying tension to the reinforcement bars, thus ensuring the strength of the recycled main reinforcement bars and increasing the number of times the main reinforcement bars can be reused. This is of great significance for reducing construction costs and carbon emissions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel and underground engineering technology, specifically relating to a device and method for recovering the main reinforcement of retaining piles. Background Technology

[0002] Retaining pile structures are essential for the construction of underground structures in high-rise buildings, subway launching and receiving shafts, and cut-and-cover subways. These retaining piles often serve as temporary support structures, playing a crucial role. However, once other structural work is completed, they lose their support function. The large amount of reinforcing steel within the piles, deeply buried underground, results in significant waste and may also pollute the underground environment, impacting the use of adjacent land. Given the numerous construction projects currently underway, the overall amount of resource waste is substantial. Therefore, to reduce steel waste, a device for recycling the main reinforcing bars of retaining piles has been invented. This device allows for the recycling and reuse of the main reinforcing bars, reducing steel waste. The recycling process avoids applying tension to the reinforcing bars, thus ensuring their strength and increasing their reusability. This is significant for reducing construction costs and carbon emissions. Summary of the Invention

[0003] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A device for recovering the main reinforcement of retaining piles includes an inner sleeve, an outer sleeve assembly, an inner sleeve cracking component, and the main reinforcement. The outer sleeve assembly includes an outer sleeve, and the inner sleeve has a smaller diameter at one end than at the other end. A pre-made crack is provided on the smaller end, and the inner sleeve passes through the outer sleeve. The inner sleeve cracking component includes a first screw, a second screw, two splitting cutters, and a connecting sleeve. The first screw controls the direction of movement through a groove at the end of the main reinforcement and a first screw guide hole. Rotating the main reinforcement pushes the first screw to rotate, thereby driving the second screw to rotate. The connecting sleeve drives the splitting cutters to move along the splitting cutter limiting groove, thereby destroying the inner sleeve.

[0004] Further optimization includes a fixing pin and a grout stop cap. The fixing pin engages with a fixing groove on the inner sleeve to fix the inner sleeve and the outer sleeve. The grout stop cap is located at one end of the outer sleeve and is threaded to the outer sleeve. The inner diameter of the grout stop cap is larger than the outer diameter of the main reinforcing bar so that a PVC pipe can be fitted around the main reinforcing bar and then pass into the inner sleeve.

[0005] Further optimization involves providing internal threads on the inner wall of the inner sleeve and external threads on the outer periphery of the main reinforcing bar, with the inner sleeve being threadedly connected to the main reinforcing bar.

[0006] Further optimization involves symmetrically fixing two splitting blades to the opening edge of the connecting sleeve, which is installed from one side of the grout stop cover into the inside of the outer sleeve.

[0007] Further optimization involves threading one end of the first screw to the second screw, and inserting the other end into the outer sleeve and fixing it to the main rib.

[0008] Further optimization involves placing the second screw inside the connecting sleeve and connecting it via a thread.

[0009] Further optimization involves setting both the first screw guide hole and the splitting cutter limiting groove inside the outer sleeve. The splitting cutter limiting groove is set along the axial direction of the outer sleeve, and the width of the splitting cutter limiting groove is greater than the thickness of the splitting cutter, allowing the splitting cutter to pass through.

[0010] A method for using a device that enables the recovery of the main reinforcement bars of retaining piles is as follows: the device is connected to the main reinforcement bars and the bottom connecting bars of the reinforcing cage. After the concrete is poured and solidified, the pile head is broken. The main reinforcement bars are rotated to drive the inner sleeve to rotate. At the same time, the pre-fabricated cracks expand, pushing the first screw to rotate, which in turn drives the second screw to rotate. This causes the splitting knife connecting sleeve to drive the splitting knife to move along the splitting knife limiting groove, ultimately destroying the inner sleeve.

[0011] The beneficial effects of this invention are as follows: 1. This device can realize the recycling of the main reinforcement of the retaining pile steel cage, solving the problems of non-recyclable retaining pile steel and high construction material costs. 2. This device recovers the main reinforcing bars of the steel cage by rotating the main reinforcing bars, thereby destroying the constraint structure inside the device and ensuring the strength of the recovered reinforcing bars, thus enabling the reinforcing bars to be reused multiple times. 3. The internal sleeve cracking structure of the device ensures the destructive effect of the inner sleeve through the two functions of pre-made cracks and splitting cutters, thereby achieving a high success rate in the recovery of the main reinforcement of the steel cage. In summary, the recyclable main reinforcement device of the present invention can realize the recycling of the main reinforcement of retaining piles and avoid applying tension to the reinforcement, thereby ensuring the strength of the recycled main reinforcement and increasing the number of times the main reinforcement can be reused. This is of great significance for reducing construction costs and carbon emissions. Attached Figure Description

[0012] Figure 1 Main reinforcement recycling device; Figure 2 Cross-sectional view of the main reinforcement recycling device; Figure 3 Exploded view of the main reinforcement recycling device; Figure 4 Diagram of the internal sleeve fracture structure; Figure 5 This is an exploded view of the structure that caused the crack in the inner sleeve. Figure 6 Cross-sectional view of the outer casing of the main reinforcement recycling device; Figure descriptions: 1. Bottom connecting bar of the reinforcing cage; 2. Outer sleeve; 3. Main reinforcing bar; 4. Groove at the end of the main reinforcing bar; 5. Fixing pin; 6. Inner sleeve; 7. First screw; 8. Second screw; 9. Connecting sleeve; 10. Crack-splitting knife limiting groove; 11. Crack-splitting knife; 12. Grout stop cap; 13. Inner thread of the inner sleeve; 14. Pre-cast crack; 15. Main reinforcing bar thread; 16. Fixing groove of the inner sleeve; 17. External thread of the second screw; 18. Internal thread of the second screw; 19. Internal thread of the connecting sleeve; 20. Guide hole of the first screw. Detailed Implementation

[0013] To better understand the above-mentioned objectives, features, and advantages of the present invention, the present invention will be described in detail below with reference to specific embodiments. The following embodiments are implemented based on the technical solutions of the present invention, and provide detailed implementation methods and specific operation processes. However, the present invention can also be implemented in other ways different from those described herein, so the scope of protection of the present invention is not limited to the following embodiments.

[0014] A device for recycling the main reinforcement of retaining piles includes an inner sleeve, an outer sleeve assembly, an inner sleeve cracking assembly, and main reinforcement bars. The device uses an inner sleeve cracking method to achieve recycling and reuse of the main reinforcement bars of the retaining piles. The inner sleeve is broken by a splitting knife 11 by rotating the main reinforcement bars 3, thereby achieving recycling of the main reinforcement bars 3 and reducing material costs.

[0015] The outer sleeve assembly includes an outer sleeve, a fixing pin 5, and a grout stop cap 12. One end of the inner sleeve 6 has a smaller diameter than the other end. The smaller end has a pre-fabricated crack 14, and the inner sleeve 6 passes through the outer sleeve 6. Its function is to cause one end of the pre-fabricated crack 14 to expand when the main reinforcement bar 3 of the steel cage is rotated. On the one hand, this can intensify the extension of the crack to the other end, and on the other hand, it can make it easier for the splitting cutter 11 to break the inner sleeve 6 along the pre-fabricated crack. Through these two functions, the inner sleeve 6 is easier to break, ensuring the recycling effect of the main reinforcement bar 3 of the steel cage. The fixing pin 5 cooperates with the fixing groove 16 set on the inner sleeve 6 to fix the inner sleeve 6 and the outer sleeve 2, thereby preventing the inner sleeve 6 from separating from the outer sleeve 2 during the hoisting of the steel cage. The grout stop cap 12 is set at one end of the outer sleeve 2 and is connected to the outer sleeve by a thread. The inner diameter of the grout stop cap 12 is larger than the diameter of the main reinforcement bar 3, so that the main reinforcement bar 3 can pass into the inner sleeve 6.

[0016] The inner sleeve fracturing assembly includes a first screw 7, a second screw 8, two splitting blades 11, and a connecting sleeve 9. One end of the first screw 7 is connected to the internal thread 18 of the second screw via an external thread, and the other end passes into the outer sleeve 2 and is fixedly connected to the main reinforcing bar 3. The second screw 8 is disposed in the connecting sleeve 9 and is connected to the internal thread 19 of the connecting sleeve via an external thread 17 of the second screw. The first screw guide hole 20 and the splitting blade limiting groove 10 are both disposed in the inner cavity of the outer sleeve 2. The splitting blade limiting groove 10 is arranged along the axial direction of the outer sleeve 2, and the width of the splitting blade limiting groove 10 is greater than the thickness of the splitting blade 11, so as to allow the splitting blade 11 to pass through.

[0017] The inner sleeve 6 is connected to the main bar thread 15 of the main bar 3 through the inner thread 13 of the inner sleeve. The presence of the precast crack 14 makes the inner sleeve 6 easier to break, thus allowing the main bar 3 to be successfully recovered.

[0018] A method for using a device that enables the recovery of main reinforcement bars in retaining piles, specifically as follows: First, connect the device to the main reinforcing bar 3 and the bottom connecting bar 1 of the reinforcing cage. Cover the main reinforcing bar 3 with a PVC protective pipe to prevent grout from entering during the pouring process. After the reinforcing cage is tied, hoisting and pouring of retaining piles are carried out. After the concrete solidifies, the pile head is broken. By rotating the main reinforcing bar 3, the end with the pre-made crack 14 can be expanded, and at the same time, the first screw 7 is pushed to rotate, which in turn drives the second screw 8 to rotate. This causes the connecting sleeve 9 to drive the splitting cutter 11 to move along the splitting cutter limiting groove 10, which eventually destroys the inner sleeve 6, so that the main reinforcing bar 3 loses the constraint of the inner sleeve 6, and the main reinforcing bar 3 can be successfully recovered.

[0019] This invention enables the recycling of the main reinforcement bars of retaining piles and avoids applying tension to the reinforcement bars, thereby ensuring the strength of the recycled main reinforcement bars and increasing the number of times the main reinforcement bars can be reused. This is of great significance for reducing construction costs and carbon emissions.

[0020] The foregoing has shown and described the main features, usage methods, basic principles, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention based on actual circumstances without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.

Claims

1. A device capable of achieving the recycling of the main reinforcement of a containment pile, characterized in that, The system includes an inner sleeve (6), an outer sleeve assembly, an inner sleeve cracking component, and a main reinforcing bar (3). The outer sleeve assembly includes an outer sleeve (2). One end of the inner sleeve (6) has a smaller diameter than the other end, and a pre-fabricated crack (14) is provided on the smaller end. The inner sleeve (6) penetrates into the outer sleeve (2). The inner sleeve cracking component includes a first screw (7), a second screw (8), two splitting cutters (11), and a connecting sleeve (9). The first screw (7) controls the main reinforcing bar through a groove (4) at the end of the main reinforcing bar and a first screw guide hole (20). Controlling the direction of movement, rotating the main reinforcing bar (3) pushes the first screw (7) to rotate, thereby driving the second screw (8) to rotate. The connecting sleeve (9) drives the splitting cutter (11) to move along the splitting cutter limiting groove (10), thereby destroying the inner sleeve (6). The inner wall of the inner sleeve (6) is provided with internal threads, and the outer circumference of the main reinforcing bar (3) is provided with external threads. The inner sleeve (6) is threadedly connected to the main reinforcing bar (3). The two splitting cutters (11) are symmetrically fixedly installed at the opening edge of the connecting sleeve (9). The connecting sleeve (9) from The grout stop cap (12) is installed on one side and enters the inner cavity of the outer sleeve (2). One end of the first screw (7) is threadedly connected to the second screw (8), and the other end is inserted into the outer sleeve (2) and fixedly connected to the main reinforcing bar (3). The second screw (8) is set in the connecting sleeve (9) and is threadedly connected. The guide hole (20) of the first screw and the cleaving knife limiting groove (10) are both set in the inner cavity of the outer sleeve (2). The cleaving knife limiting groove (10) is set along the axial direction of the outer sleeve (2), and the width of the cleaving knife limiting groove (10) is greater than the cleaving knife. The thickness of the blade (11) is for the cleaving blade (11) to pass through; the outer sleeve assembly also includes a fixing pin (5) and a grout stop cover (12). The fixing pin (5) cooperates with the fixing groove (16) set on the inner sleeve (6) to fix the inner sleeve (6) and the outer sleeve (2). The grout stop cover (12) is set at one end of the outer sleeve (2) and is connected to the outer sleeve by a thread. The inner diameter of the grout stop cover (12) is larger than the outer diameter of the main reinforcing bar (3) so that the main reinforcing bar (3) can be fitted with a PVC pipe and then pass into the inner sleeve (6).

2. The use of a device that enables the recycling of the main reinforcement of a containment pile according to claim 1, characterized in that, The specific method is as follows: connect the device to the main reinforcing bar (3) and the bottom connecting bar of the reinforcing cage. After the concrete is poured and solidified, break the pile head, rotate the main reinforcing bar (3) to drive the inner sleeve (6) to rotate, and at the same time, the precast crack (14) expands, pushing the first screw (7) to rotate, and then driving the second screw (8) to rotate, so that the connecting sleeve (9) connected to the splitting knife (11) drives the splitting knife (11) to move along the splitting knife limiting groove (10), and finally destroy the inner sleeve (6).

Citation Information

Patent Citations

  • Shockproof anchor bolt

    CN114321125A

  • Main reinforcement anchoring part of prestressed support pile capable of recycling main reinforcement

    CN117468445A