AI Technical Summary

Technical Problem

Existing rockburst early warning methods only focus on scalar information of microseismic parameters and fail to effectively combine the spatial structure of tunnels, resulting in low early warning accuracy.

Method used

Microseismic sensors are deployed at different cross sections of the tunnel to obtain vector parameters of microseismic events. By calculating the azimuth and dip angles of the rock mass fracture surface, the microseismic parameters are projected onto the free surface of the tunnel and combined with the tunnel's spatial structure for early warning analysis.

Benefits of technology

It improves the spatiotemporal accuracy of rockburst early warning, enhances the ability to predict the time and location of rockbursts, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118259355B_ABST
    Figure CN118259355B_ABST
Patent Text Reader

Abstract

This invention discloses a tunnel rockburst early warning method and system based on a comprehensive rock mass fracture mechanism. It utilizes a microseismic sensor array suitable for on-site monitoring, connecting all sensors to a microseismic monitoring system for real-time monitoring. The method calculates microseismic parameters such as source location, radiated energy, and apparent volume; it calculates the source mechanism of the microseismic event and, based on the source mechanism solution, calculates the normal vector of the rock mass fracture surface; by using the relationship between the normal vector of the rock mass fracture surface and the normal vector of the tunnel free face, the microseismic parameters are projected onto the tunnel free face, and rockburst early warning analysis is performed based on the projected microseismic parameters. Early warning based on the projected parameters improves the accuracy of spatiotemporal rockburst early warning.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Method for distinguishing position of rockburst risk on deep buried tunnel section

    CN103953392A

  • Early warning method of mine ground pressure disaster

    CN109595036A