A test method for filling completeness of a bridge pile karst cave section support capsule
By combining cross-hole CT imaging and cross-hole radar detection with infrared rangefinders and pressure transmitters, the problem of incomplete filling of the support bladder was solved, enabling real-time monitoring of the support bladder and control of construction progress, thus reducing construction costs.
Patent Information
- Application Number
- CN202410575975.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-05-10
AI Technical Summary
The existing support cells cannot monitor in real time whether the support cells in the karst cave section are completely filled during the concrete pouring and pile formation process, resulting in uncontrollable grouting volume, high construction costs, and impact on construction progress.
The location and size of the karst caves were accurately determined by cross-hole CT imaging and cross-hole radar detection. The filling status of the support chamber was monitored by infrared rangefinders and early warning devices. The integrity and pressure of the support chamber were judged in real time by pressure transmitters and alarms to ensure the control of the concrete pouring progress.
It enables real-time monitoring of the filling status of the support bladder, avoiding uncontrollable grouting volume due to support bladder damage, reducing construction costs, and ensuring the smooth progress of construction.
Smart Images

Figure CN118273395B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of karst cave testing technology, and in particular to a testing method for ensuring the complete filling of the support bladder in a karst cave section of a bridge pile. Background Technology
[0002] During the construction of cast-in-place piles in karst areas such as Guangdong, Guangxi, Yunnan, Guizhou and Sichuan, the complex and hidden geological conditions, strong connectivity of underground caves and fragile ecological environment make it difficult to treat karst foundations, difficult to conduct surveys and designs, and uncontrollable grouting volume, resulting in strong environmental disturbance to the project.
[0003] Bag pile construction technology is a new construction process that combines layered grouting technology for soft soil with geotextiles. It uses layered grouting technology to inject concrete grout into the bladder of a semi-flexible support structure pre-embedded in the karst section of the bridge pile. The bladder is usually formed by geotextile bags, thereby forming a cylindrical or gourd-shaped pile to achieve the purpose of plugging leakage and reinforcing the soil.
[0004] When the existing support cells are used for concrete pouring and pile forming, it is impossible to monitor whether the support cells in the karst cave section are completely filled. If the support cells are damaged by sharp objects or ruptured due to excessive grouting, the construction progress cannot be grasped in time, resulting in uncontrollable grouting volume, high construction costs, and impact on construction progress. Summary of the Invention
[0005] The purpose of this invention is to provide a test method for the complete filling of the support capsule in the karst section of a bridge pile. This method can monitor in real time whether the support capsule in the karst section is completely filled, and understand the concrete pouring progress in a timely manner. It avoids the problems of uncontrollable grouting volume, high construction costs, and impact on construction progress caused by damage to the support capsule.
[0006] To achieve the above objectives, the present invention provides a test method for ensuring the complete filling of the support cavities in the karst section of a bridge pile, comprising the following steps: S1. Determine the location and size of the cave; S2. Based on the location and size of the karst cave determined in step S1, select the material for making the support bladder. S3. Assemble the support bag with the steel cage; S4. The steel cage is hoisted and lowered. S5. Use filling equipment to fill concrete into the support bladder; S6. Monitor whether the support capsules in the karst cave section are completely filled; In step S1, the location and size of the karst caves in the bridge pile section are accurately determined using cross-hole CT imaging and cross-hole radar detection methods. Specifically, the cross-hole CT imaging method involves: Two boreholes are used, and a fan-shaped receiving method with one transmitter and multiple receivers is adopted. After excitation at several points, a dense ray network is formed in the observation area. In addition, more than three exploration holes are set within the diameter of the borehole pile to accurately determine the location and size of the karst cave and ensure that the support bladder effectively covers the karst cave. The cross-hole radar detection method involves placing a transmitting antenna and a receiving antenna in two boreholes respectively for detection. In cross-hole mode, the transmitting antenna and the receiving antenna are arranged in different boreholes. Ideally, the two boreholes are in the same two-dimensional plane, and the medium to be investigated is located between the two boreholes. In step S3, the support cell is completely encased in the outside of the steel cage, and widening stirrups are welded at the positions of the steel cage corresponding to the upper and lower ends of the support cell's coverage area, and the support cell is fixed with carabiner hooks. Based on the location and size of the karst cave determined in step S1, mark the upper and lower endpoints of the karst cave location on the support capsule with a red marker. According to the soil stratification inside the karst cave, install infrared rangefinders and early warning devices at the corresponding stratification locations outside the support capsule, and install pressure transmitters and alarms at the middle position between two adjacent infrared rangefinders. In step S6, after the support capsule of the karst cave section is filled with concrete, the system monitors whether the support capsule is completely filled. An infrared rangefinder is used to determine whether the support capsule is close to the inner wall of the karst cave. When the support capsule is in contact with the inner wall of the karst cave, it indicates that the concrete filling is complete, and the warning device issues an alert. If the warning device does not issue an alert, it indicates that the karst cave section is not completely filled. After local grouting, the system monitors again until the warning device issues an alert signal, indicating that the filling is complete. The pressure of the support chamber in the karst cave section is determined by a pressure transmitter. When the support chamber leaks, the internal pressure decreases and the alarm sounds.
[0007] Preferably, in step S4, the steel cage is hoisted using a spreader-type gantry crane. A spreader-type gantry crane is selected at the top of the steel cage, and another gantry crane is set at one-third of the distance from the bottom of the steel cage. During the lowering and hoisting process of the steel cage, contact with the hole wall is avoided. After the steel cage is installed, the pile center is located using a string line method.
[0008] Preferably, in step S5, concrete is filled into the support cell using a filling device, specifically as follows: S51. Place the guide pipe in the center of the borehole and suspend it by a concrete pouring support. The concrete pouring support is made of steel. Place the funnel for pouring concrete on the top of the guide pipe. A tight water-tight device must be installed at the bottom of the funnel. The distance between the bottom of the guide pipe and the bottom of the hole should be controlled at 30-40cm. S52. Concrete is centrally mixed at a batching plant and poured using a tremie pipe. The volume of concrete filled each time is determined by a funnel, and the elevation of the concrete surface of the cast-in-place pile is measured after each pour.
[0009] Therefore, the present invention employs the above-mentioned test method for ensuring the complete filling of the support cavities in bridge pile karst sections, and the beneficial effects are as follows: (1) This invention utilizes cross-hole CT imaging to accurately determine the location and size of the karst cave in the bridge pile section, and sets up more than 3 exploration holes within the diameter of the drilled pile position, which can accurately determine the location and size of the karst cave and ensure that the support bladder can effectively cover the karst cave.
[0010] (2) The present invention installs an infrared rangefinder and an early warning device at the center of the upper and lower ends of the support bag and at a quarter of the distance from the upper and lower ends, respectively, and installs a pressure transmitter and an alarm device at the middle of two adjacent infrared rangefinders. This can effectively monitor the pressure inside the support bag of the karst section. Once the bag is completely filled or damaged, the situation can be understood immediately through the display and control device, so as to avoid increasing construction costs and affecting the construction progress.
[0011] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0012] Figure 1 This is an overall flowchart of an embodiment of the test method for the complete filling of the support cavities in the karst section of a bridge pile according to the present invention; Figure 2 This is a schematic diagram of a cross-hole CT imaging method for on-site investigation, representing an embodiment of the test method for ensuring complete filling of the support cavities in the karst section of a bridge pile according to the present invention. Figure 3 This is an embodiment of the test method for testing the complete filling of the support sac in the karst section of a bridge pile according to the present invention, which shows the maximum tensile stress of the support sac. Figure 4 This is a schematic diagram of the support cell thickness design in an embodiment of the test method for the complete filling of the support cell in the karst section of a bridge pile according to the present invention. Figure 5 This is a schematic diagram of the internal pressure of the support bladder in the karst section of a bridge pile according to an embodiment of the test method for testing the complete filling of the support bladder in the karst section of the present invention. Figure 6 This is a schematic diagram of the grouting process in an embodiment of the test method for the complete filling of the support cavities in the karst section of a bridge pile according to the present invention. Figure 7 This is a comparison chart of the theoretical and actual grouting volumes in an embodiment of the test method for the complete filling of the support cavities in the karst section of a bridge pile according to the present invention. Figure 8This is a schematic diagram of the cross-hole radar detection method for on-site investigation, which is an embodiment of the test method for the complete filling of the support cavities in the karst section of a bridge pile according to the present invention.
[0013] Figure Labels 1. Pipe pile; 2. Miscellaneous fill; 3. Seismic source controller; 4. Electric spark source; 5. Silty clay; 6. Gravelly soil; 7. Strongly weathered mudstone; 8. Seismograph; 9. Silty clay; 10. Detector chain; 11. Excitation hole; 12. Receiving hole; 13. Weakly weathered mudstone; 14. First cable trolley; 15. Second cable trolley; 16. Acquisition processor; 17. Signal acquisition connection; 18. Wellhead pulley; 19. Receiving signal transmission cable; 20. Transmitting probe cable rope; 21. Receiving probe; 22. Transmitting probe; 23. Upper transmitting antenna; 24. Lower transmitting antenna; 25. Receiving antenna; 26. Lower antenna counterweight; 27. Receiving borehole; 28. Transmitting borehole. Detailed Implementation
[0014] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.
[0015] Unless otherwise defined, the technical or scientific terms used in this invention shall have the ordinary meaning as understood by one of ordinary skill in the art to which this invention pertains.
[0016] like Figure 1 As shown, a test method for ensuring the complete filling of the support cavities in bridge pile karst sections includes the following steps: S1. Determine the location and size of the cave using trans-hole CT imaging; like Figure 2 As shown, the vegetation layer in a certain area, from the surface downwards, includes: miscellaneous fill 2, silty clay 9, silty clay 5, gravelly soil 6, strongly weathered mudstone 7, and weakly weathered mudstone 13. The location and size of the karst cave section of the bridge pile were accurately determined using the cross-hole CT imaging method. The cross-hole CT imaging method uses two boreholes and adopts a fan-shaped receiving method with one transmitter and multiple receivers. After the source controller 3 in the excitation borehole 11 controls the electric spark source 4 to perform multi-point excitation (electric spark or explosive), a dense ray network is formed in the observation area. The dense rays basically completely cover the area between the two boreholes.
[0017] The detector chain 10 in the receiving hole 12 forms a hydrophone chain. The propagation time of each ray seismic wave received by the seismograph 8 is uniquely determined. Then, according to the density of the rays and the imaging accuracy requirements, the observation range is divided into imaging units. Generally, dense soil has a higher wave velocity, while loose and broken soil has a lower wave velocity. The low-velocity units in the soil are anomalous bodies relative to the surrounding normal soil.
[0018] When a ray passes through it, it will generate a time difference in seismic wave propagation, but it is difficult to determine the location of anomalies using the time difference generated by a single ray. When a dense network of intersecting rays is used, it will exert a strong spatial constraint on the anomalous geological body, and the location and shape of the anomalous body can be accurately obtained by using appropriate inversion methods.
[0019] like Figure 8 As shown, the cross-hole detection method involves placing transmitting antennas 25 in two boreholes, transmitting borehole 28 and receiving borehole 27, respectively, for detection. The transmitting antennas include an upper transmitting antenna 23 and a lower transmitting antenna 24. In the cross-hole mode, the transmitting and receiving antennas are arranged in different boreholes. To reduce the influence of geometric position, the two boreholes are preferably located in the same two-dimensional plane, and the medium to be investigated is located between the two boreholes, thus achieving higher precision and accuracy.
[0020] In addition, during engineering surveys, at least three survey holes should be set within the diameter of the bored pipe pile 1 to accurately determine the location and size of the karst cave or soil cave, and to ensure that the geomembrane bag effectively covers the karst cave or soil cave.
[0021] S2. Based on the location and dimensions of the karst cave determined in step S1, the support capsule is made of a single piece of semi-flexible material. A comparison between the maximum tensile stress value of the semi-flexible material calculated using thin-walled cylindrical theory and the numerical simulation value reveals that the numerical simulation shows stress concentration at the bottom of the karst cave, with the maximum tensile stress... The simulation results are larger than the theoretical calculations, and the gravity of the slurry at the bulge further increases the tensile stress in the bladder. Table 1 shows the comparison between the theoretical calculations and the numerical simulation results: Table 1
[0022] like Figure 3 As shown, based on the fitting results, the maximum tensile stress of the semi-flexible material is... The result should be corrected by multiplying the theoretical calculation of the thin-walled cylinder by a safety factor of k=1.4. (1) in, The value represents the circumferential stress of the support capsule, p is the pressure inside the cave, r is the inner diameter of the support capsule, and t is the thickness of the support capsule.
[0023] The thickness t of the support capsule is determined through theoretical calculation, using the following formula: (2) in, This indicates the density of the semi-flexible material. The value represents gravitational acceleration, h represents the liquid level height, the length of the support bag is 1.05 times the length of the wrapping, and the diameter of the support bag is 1.1 times the pile diameter.
[0024] like Figure 4 As shown in (b), the tensile stress of the support bladder decreases as the height h above the liquid surface decreases, which is derived from formula (2). = The thickness t of the support capsule can gradually decrease from bottom to top, such as... Figure 4 As shown in (a), it can be considered as a combination of segments, that is The present invention uses polyvinylidene fluoride to make an integrally molded support bag.
[0025] S3. Assemble the support capsule with the reinforcing cage. The installation position of the support capsule should be determined by the location and size of the karst cave at the test pile determined by the cross-hole CT scan, as well as the type of pile foundation. A suitable installation scheme should be selected, which is generally divided into partial installation and full-coverage installation.
[0026] This invention employs a partial installation scheme, installing support bags (membrane bags) in other rock strata below the bottom of the soil layer and above the bearing stratum. The bearing stratum should have a minimum rock penetration depth of 3 meters to meet the requirements of pile foundation compressive strength, tensile strength, and bearing capacity. When using a full-coverage installation scheme, the support bags (membrane bags) near the karst cave should be appropriately reinforced. Additionally, holes should be made at the bottom of the membrane bag sleeve, or geotextile should be used as the bottom to prevent excessive buoyancy that could prevent the membrane bag from being lowered.
[0027] After determining the installation plan, weld and install widened stirrups at the corresponding reinforcement cage positions at the upper and lower ends of the support cell's enclosure area. The stirrups are made of welded steel bars, and their dimensions should allow sufficient clearance for the concrete cover layer of the pile body. When fully enclosing the support cell within the reinforcement cage for partial installation, the stirrups should be welded 0.5-1m above and below the corresponding karst cave location on the reinforcement cage to prevent displacement or deformation of the support cell, which could affect the pile formation effect. After welding the steel stirrups to the reinforcement cage, use carabiners to hook the stirrups and support cell onto the reinforcement cage, and use steel wire for additional fixation if necessary.
[0028] Based on the location and size of the karst cave determined in step S1, mark the upper and lower endpoints of the karst cave location on the support capsule with a red marker. According to the soil stratification inside the karst cave, install infrared rangefinders and early warning devices at corresponding positions on the outside of the support capsule. Install a pressure transmitter and an alarm at the middle position between two adjacent infrared rangefinders. The infrared rangefinders, early warning devices, pressure transmitters, and alarms are all connected to an external display and control instrument.
[0029] S4. The steel cage is hoisted and lowered. The steel reinforcement cage is hoisted using a spreader-type scaffold to prevent unevenness and deformation due to tightening. A spreader-type scaffold is selected at the top of the steel reinforcement cage, and another scaffold is set at one-third of the distance from the bottom of the steel reinforcement cage. If any obstruction is encountered during the lowering and hoisting of the steel reinforcement cage, the lowering is stopped, the cause is identified and dealt with. It is strictly forbidden to lift and drop the cage from a high position or to force it to be lowered, so as to avoid contact with the borehole wall and damage to the support cage. After the steel reinforcement cage is installed, the pile center is located using a string line method. Four positioning bars are symmetrically set every 2m on the pile foundation steel reinforcement cage and evenly distributed around the pile foundation reinforcing bars.
[0030] S5. Use filling equipment to fill concrete into the support cell, specifically: S51. Place the guide pipe in the center of the borehole and suspend it using a concrete pouring support made of structural steel. Place the funnel for pouring concrete on top of the guide pipe, and ensure a tight watertight seal at the bottom of the funnel.
[0031] Before pouring concrete, a lifting test must be conducted to ensure that the lifting capacity of the guide pipe is compatible with the total weight and frictional resistance of the entire guide pipe after it is filled with concrete, and that there is a certain safety margin. The distance between the bottom of the guide pipe and the bottom of the hole should be controlled at 30-40cm to ensure that the water-stopping ball or other water-stopping material can be smoothly discharged outside the pipe after falling to the bottom of the guide pipe.
[0032] S52. Concrete is centrally mixed at a batching plant and poured using a tremie pipe. It is transported to the site by concrete trucks. The volume of concrete for each filling is determined by a funnel, and the elevation of the concrete surface of the cast-in-place pile is measured after each pour.
[0033] This invention takes a project in Guizhou as an example. Table 1 below shows the comparison between the actual drilling conditions and the theoretical drilling conditions: Table 1 Test Piling
[0034] Table 2 below shows the comparison results of the rise in concrete level during actual concrete grout filling: Table 2 Comparison of Concrete Liquid Level Rise Height
[0035] As can be seen from Table 1, when the actual drilled pile length and diameter are the same as the surveyed pile length and diameter, the actual karst cave range of 8m-14.3m is much larger than the surveyed karst cave range of 11m-13m. This can easily lead to uncontrollable concrete filling volume and increased construction costs.
[0036] As shown in Table 2, the actual rise in liquid level is basically consistent with the theoretical rise (lateral deformation at the karst cave will increase the volume of filling concrete), but the fifth truckload accumulated 56m of concrete. 3When the concrete was being poured, the support capsule ruptured, causing significant losses. Simply comparing the actual rise in concrete level with the theoretical rise in concrete level is insufficient to accurately determine the filling status of the support capsule.
[0037] S6. After the support capsule in the karst cave section is filled with concrete, the present invention monitors whether the support capsule in the karst cave section is completely filled. In step S3, an infrared rangefinder and an early warning device have been installed on the support capsule for each layer according to the soil stratification inside the karst cave. The infrared rangefinder is used to determine whether the support capsule in the karst cave section is close to the inner wall of the karst cave. When the support capsule is in contact with the inner wall of the karst cave, the switch is turned on, indicating that the concrete filling is complete. The sound and numerical signals are issued through the early warning device to issue an early warning. The pressure of the support capsule in the karst cave section is determined by the pressure transmitter. When the support capsule leaks, the pressure inside the support capsule decreases, and the alarm is triggered.
[0038] like Figure 5 As shown, the pressure inside the support capsule of the karst cave section is monitored to determine whether it is filled. The threshold of the pressure transmitter is preset through the display controller. As the concrete is filled, the wall of the support capsule of the karst cave section will generate a certain mechanical strength to resist the pressure brought by the concrete. The display controller receives the pressure signal inside the support capsule of the karst cave section fed back by the pressure transmitter. The overall internal pressure gradually increases. For example, the pressure in the middle section of the support capsule of the karst cave section is higher than the pressure at the upper and lower 1 / 4, the pressure at the lower 1 / 4 is lower than the pressure at the upper 1 / 4, and the pressure at the upper 1 / 4 is lower than the pressure in the middle section.
[0039] If the support capsule of the karst cave section is not damaged, in one scenario, when the infrared rangefinder detects that the support capsule of the karst cave section is in contact with the inner wall of the karst cave, the alarm will sound, indicating that the concrete filling is complete and filling will stop. If the alarm does not sound in some sections of the karst cave section, it indicates that the filling of that section is incomplete. After local grouting, monitoring will be carried out again until the alarm sounds, indicating that the filling is complete. In another scenario, when the pressure value reaches the preset value, the alarm will sound immediately, the pressure transmitter will feed back the pressure signal inside the support capsule, and the current pressure value will be displayed on the display controller, stopping the filling of concrete.
[0040] The method provided by this invention is used to monitor over-grouting in a project within a certain area, such as... Figure 6 The diagonal lines in the diagram represent the first goaf, and the rhombuses represent the second goaf. Figure 6 (a) When the third grouting truck is displayed, the grouting area is at the lower end of the first goaf, and the grouting volume is 30m³. 3 ; Figure 6 (b) When the grouting is shown as the fifth truckload, the grouting area is at the upper end of the first goaf, and the grouting volume is 48m³. 3 ; Figure 6 (c) When the grouting is shown as the eleventh truckload, the grouting area is at the lower end of the second goaf, and the grouting volume is 102m³.3 ; Figure 6 (d) When the grouting is the thirteenth batch, the grouting area is at the upper end of the second goaf, and the grouting volume is 119m³. 3 , Figure 6 (e) shows that the grouting reached the top of the pile when the seventeenth truck was used, at which point the total grouting volume was 159m³. 3 Therefore, a comparison between the theoretical and actual volumes of concrete yields the following results: Figure 7 The results show that the total grouting volume after concrete pouring was 159m³. 3 .
[0041] The formula for calculating grouting volume is based on the theoretical formula: ,in, d The pile diameter is 2.2m. h With a grouting height of 37m, the theoretical grouting volume is 145m³. 3 The calculated over-pouring coefficient is 1.1. During the construction of cast-in-place piles, the over-pouring coefficient should usually be less than 1.2. The method provided by this invention meets the requirements and has little impact on the bearing capacity and stability of the cast-in-place piles. It improves the qualification rate of concrete cast-in-place piles while reducing the waste of concrete resources.
[0042] Once the support structure of the karst cave section is damaged, i.e. the overfilling coefficient is too large, the support structure loses its ability to "resist pressure", indicating that the support structure has ruptured. The pressure transmitter will report a decrease in the internal pressure of the support structure. At this time, the pressure transmitter will report a decrease in the internal pressure of the support structure, and the alarm will be triggered immediately to stop filling and take corresponding measures to avoid overfilling of concrete, which would increase construction costs and affect the construction progress.
[0043] Therefore, the present invention adopts the above-mentioned test method for the complete filling of the support cavities in the karst section of bridge piles, which can monitor in real time whether the support cavities in the karst section are completely filled, grasp the concrete pouring progress at the first time, and avoid the problems of uncontrollable grouting volume, high construction cost, and impact on construction progress caused by damage to the support cavities.
[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.
Claims
1. A test method for ensuring the complete filling of the support cavities in bridge pile karst sections, characterized in that, Includes the following steps: S1. Determine the location and size of the cave; S2. Based on the location and size of the karst cave determined in step S1, select the material for making the support bladder. S3. Assemble the support bag with the steel cage; S4. The steel cage is hoisted and lowered. S5. Use filling equipment to fill concrete into the support bladder; S6. Monitor whether the support capsules in the karst cave section are completely filled; In step S1, the location and size of the karst caves in the bridge pile section are accurately determined using cross-hole CT imaging and cross-hole radar detection methods. Specifically, the cross-hole CT imaging method involves: Two boreholes are used, and a fan-shaped receiving method with one transmitter and multiple receivers is adopted. After excitation at several points, a dense ray network is formed in the observation area. In addition, more than three exploration holes are set within the diameter of the borehole pile to accurately determine the location and size of the karst cave and ensure that the support bladder effectively covers the karst cave. The cross-hole radar detection method involves placing a transmitting antenna and a receiving antenna in two boreholes respectively for detection. In cross-hole mode, the transmitting antenna and the receiving antenna are arranged in different boreholes. Ideally, the two boreholes are in the same two-dimensional plane, and the medium to be investigated is located between the two boreholes. In step S3, the support cell is completely encased in the outside of the steel cage, and widening stirrups are welded at the positions of the steel cage corresponding to the upper and lower ends of the support cell's coverage area, and the support cell is fixed with carabiner hooks. Based on the location and size of the karst cave determined in step S1, mark the upper and lower endpoints of the karst cave location on the support capsule with a red marker. According to the soil stratification inside the karst cave, install infrared rangefinders and early warning devices at the corresponding stratification locations outside the support capsule, and install pressure transmitters and alarms at the middle position between two adjacent infrared rangefinders. In step S6, after the support capsule of the karst cave section is filled with concrete, the system monitors whether the support capsule is completely filled. An infrared rangefinder is used to determine whether the support capsule is close to the inner wall of the karst cave. When the support capsule is in contact with the inner wall of the karst cave, it indicates that the concrete filling is complete, and the warning device issues an alert. If the warning device does not issue an alert, it indicates that the karst cave section is not completely filled. After local grouting, the system monitors again until the warning device issues an alert signal, indicating that the filling is complete. The pressure of the support chamber in the karst cave section is determined by a pressure transmitter. When the support chamber leaks, the internal pressure decreases and the alarm sounds.
2. The test method for ensuring the complete filling of the support cavities in the karst section of a bridge pile according to claim 1, characterized in that: In step S4, the steel cage is hoisted using a spreader-type gantry. A spreader-type gantry is selected at the top of the steel cage, and another gantry is set at one-third of the distance from the bottom of the steel cage. During the lowering and hoisting process, the steel cage should avoid touching the hole wall. After the steel cage is installed, the pile center is located using a string line method.
3. The test method for ensuring the complete filling of the support cavities in the karst section of a bridge pile according to claim 1, characterized in that, In step S5, concrete is filled into the support cell using a filling device, specifically as follows: S51. Place the guide pipe in the center of the borehole and suspend it by a concrete pouring support. The concrete pouring support is made of steel. Place the funnel for pouring concrete on the top of the guide pipe. A tight water-tight device must be installed at the bottom of the funnel. The distance between the bottom of the guide pipe and the bottom of the hole should be controlled at 30-40cm. S52. Concrete is centrally mixed at a batching plant and poured using a tremie pipe. The volume of concrete filled each time is determined by a funnel, and the elevation of the concrete surface of the cast-in-place pile is measured after each pour.
Citation Information
Patent Citations
Karst detection device and karst detection method for tunnel construction
CN114200542A
Karst area foundation design method and system based on comprehensive geophysical prospecting
CN115032713A