Correcting device and method for deformation of shield tail of shield machine
By combining a modular circular support frame and jacks, the deformation of the shield tail of the tunnel boring machine was corrected across the entire cross-section, solving the problems of cumbersome operation and long construction period in the existing technology, and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202410580243.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-05-11
AI Technical Summary
In existing technologies, when the tail of a tunnel boring machine deforms, the correction operation is cumbersome and inflexible, resulting in a long construction period and high risks. In particular, it is impossible to achieve full-section correction when the entire structure is deformed.
The system employs a modular circular support frame and jacks. By distributing the jacks circumferentially along the circular support frame, the system can achieve full-section correction of the shield tail shell, avoiding frequent changes in position.
It simplifies the operation process, improves the flexibility and efficiency of construction, reduces construction risks, shortens the construction cycle, and avoids secondary deformation of the shield tail shell.
Smart Images

Figure CN118287542B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel construction technology, and in particular to a device and method for correcting deformation of the shield tail of a tunnel boring machine. Background Technology
[0002] Currently, tunnel boring machine (TBM) technology has been applied to the construction of most tunnel projects in cities. In practice, due to geological conditions, equipment performance, construction environment, and operational factors, the tail of a thin-walled, circular-ring TBM may experience severe plastic deformation. Furthermore, since the interior of the TBM tail is the area for segment installation, deformation can directly lead to the designed gap between the tail shell and the segments being too small or too large in certain locations. If the gap is too small, it will cause friction between the segments and the tail wire brush, shortening the brush's lifespan, affecting the segment assembly quality, and easily leading to segment cracking and damage. If the gap is too large, it will affect the sealing performance of the wire brush, allowing external water, soil, and mud to enter the tail, affecting construction progress. In the most severe cases, excessive tail deformation can directly prevent segment installation, leading to construction stoppage and ground subsidence, among other serious hazards.
[0003] In related technologies, when the tail of a tunnel boring machine (TBM) shield deforms, a steel support frame is erected at a localized location inside the tail. This support frame is typically welded to the tail, and a hydraulic jack lifting device is then installed on it. A high-temperature heating torch is used to heat the shield body, and the jacks are slowly pushed to correct the deformed area. However, this method is only suitable for correcting localized deformation. After correcting one point, the support frame needs to be repositioned to continue correcting the next point until the roundness of the entire tail shield is within acceptable limits. Each repositioning of the support frame requires re-positioning and welding, and the weld seams need to be cut and ground smooth after correction. This process is cumbersome and inflexible. Especially when the entire tail of the TBM deforms, there are many points requiring correction in the circumferential direction. Using the aforementioned method of sequential local correction would result in a long construction period and high construction risks. Summary of the Invention
[0004] The purpose of this invention is to provide a correction device and method for the deformation of the shield tail of a tunnel boring machine, which can achieve the correction of the entire cross section of the shield tail shell without frequently changing the position of the correction device.
[0005] To achieve this objective, the present invention adopts the following technical solution:
[0006] In a first aspect, the present invention provides a device for correcting deformation of the shield tail of a tunnel boring machine (TBM), used to correct the deformation of the shield tail shell of the TBM, comprising:
[0007] A circular support frame is disposed in the tail shield shell and includes several support frame blocks. The several support frame blocks can be detachably spliced to form a ring. The ring and the tail shield shell are coaxially arranged. Several clearance holes are opened on the outer peripheral wall of the circular support frame. The several clearance holes are arranged at intervals along the circumference of the circular support frame.
[0008] Each of the clearance holes is equipped with at least one jack, which can apply force toward the inner wall of the tail shield shell under the support of the annular support frame.
[0009] Preferably, the support frame segment includes an inner arc plate, an outer arc plate, and two end panels. The axes of the inner arc plate and the outer arc plate coincide. The two end panels are connected between the inner arc plate and the outer arc plate. Adjacent support frame segments are connected through the two end panels. The bottom of the jack is installed on the inner arc plate. The clearance hole is provided on the outer arc plate. The jack can be accommodated between the inner arc plate and the outer arc plate.
[0010] Preferably, the jack is movable relative to the inner arc plate along the axial direction of the annular support frame.
[0011] Preferably, the clearance hole is an oblong hole, the length direction of which is parallel to the axial direction of the annular support frame, the width of which is greater than the size of the force-applying end of the jack, and the jack can move along the length direction of the oblong hole within the length range of the oblong hole.
[0012] Preferably, the support frame block further includes two connecting panels, which are disposed at both ends of the support frame block along its axial direction. Multiple reinforcing ribs are fixedly connected between the two connecting panels, and at least one jack is provided between two adjacent reinforcing ribs.
[0013] Preferably, along the axial direction of the annular support frame, there is a gap between the inner arc plate and the connecting panel, and the size of the gap is larger than the size of the jack.
[0014] Preferably, a lifting head is fixed on the side of the inner arc plate opposite to the outer arc plate.
[0015] Preferably, the outer diameter of the annular support frame is equal to the outer diameter of the first annular segment in the tail shield shell, and the inner diameter of the annular support frame is equal to the inner diameter of the first annular segment; or, the outer diameter of the annular support frame is smaller than the outer diameter of the first annular segment, and the inner diameter of the annular support frame is smaller than the inner diameter of the first annular segment.
[0016] Secondly, the present invention provides a method for correcting the deformation of the shield tail of a tunnel boring machine, employing the shield tail deformation correction device described in the first aspect, comprising the following steps:
[0017] S1. Measure the entire cross section of the shield tail shell to obtain the overall deformation of the shield tail shell, and determine the operating parameters of the shield tail deformation correction device based on the overall deformation.
[0018] S2. Install the support frame blocks with jacks in sequence inside the shield tail shell until the assembly of the shield tail deformation correction device is completed.
[0019] S3. Based on the pre-confirmed operating parameters of the shield tail deformation correction device, start the jacks and apply force to the inner wall of the shield tail shell until the first round of correction and adjustment of the shield tail shell along its own circumference is completed.
[0020] S4. Re-measure the entire cross-section of the shield tail shell to confirm the deformation value of the shield tail shell after the first round of correction and adjustment. Adjust the operating parameters of the shield tail deformation correction device in the next round of correction based on the data, and carry out the next round of correction and adjustment of the shield tail shell.
[0021] S5. Repeat steps S3 to S4 until the cross-sectional shape of the tail shell is corrected to a complete circle.
[0022] Preferably, step S3 includes: for locations where the actual gap between the outer peripheral wall of the annular support frame and the inner wall of the tail shield shell is smaller than the theoretical gap, the force-applying end of the jack extends out through the clearance hole and applies force to the inner wall of the tail shield shell; for locations where the actual gap between the outer peripheral wall of the annular support frame and the inner wall of the tail shield shell is larger than the theoretical gap, the force-applying end of the jack is fully retracted and not loaded.
[0023] The beneficial effects of this invention are:
[0024] The shield tail deformation correction device and method provided by this invention adopts a modular circular support frame. Jacks are installed on the circular support frame and spaced circumferentially. With this configuration, firstly, after the shield tail deformation correction device is installed, several jacks can be used to lift and correct various points on the circumference of the shield tail shell. The extension of each jack can be adjusted according to the deformation at the corresponding position on the shield tail shell to achieve correction of the entire cross-sectional shape of the shield tail shell. This eliminates the need for frequent disassembly and reassembly of the circular support frame for multiple local corrections, making the operation simple and highly flexible, which helps shorten the construction cycle and reduce construction risks. Secondly, the circular support frame no longer needs to be welded and fixed to the shield tail shell, avoiding the problem of irregular deformation of the shield tail shell caused by the reaction force after the jacks are pushed out. Furthermore, the modular design of the circular support frame facilitates quick installation and disassembly, and its shape also ensures that it does not interfere with equipment such as the segment assembly machine inside the shield tail, making its application highly flexible. Attached Figure Description
[0025] Figure 1 This is a side view of the device for correcting the deformation of the shield tail of a tunnel boring machine, provided in an embodiment of the present invention, installed inside the deformed shield tail shell.
[0026] Figure 2 This is a frontal schematic diagram of the shield tail deformation correction device provided in an embodiment of the present invention installed inside the deformed shield tail shell;
[0027] Figure 3 This is a frontal schematic diagram of the shield tail deformation correction device provided in this embodiment of the invention after the shield tail shell has been corrected.
[0028] Figure 4 This is a three-dimensional structural schematic diagram of the shield tail deformation correction device provided in an embodiment of the present invention;
[0029] Figure 5 This is a schematic diagram of a support frame segment of the shield tail deformation correction device provided in an embodiment of the present invention;
[0030] Figure 6 This is a structural schematic diagram of another view of a support frame segment of the shield tail deformation correction device provided in an embodiment of the present invention;
[0031] Figure 7 This is an enlarged schematic diagram of a portion of the shield tail shell before correction, provided in an embodiment of the present invention;
[0032] Figure 8 This is an enlarged schematic diagram of a portion of the shield tail shell after correction, provided in an embodiment of the present invention.
[0033] In the picture:
[0034] 1. Circular support frame; 11. Support frame segments; 111. Inner arc plate; 112. Outer arc plate; 113. End panel; 114. Connecting panel; 12. Clearance hole; 13. Reinforcing rib plate;
[0035] 2. Jack; 21. Jack No. 1; 22. Jack No. 2; 23. Jack No. 3; 24. Jack No. 4; 25. Jack No. 5; 26. Jack No. 6;
[0036] 3. Lifting head;
[0037] 100. Shield tail shell; 110. Steel wire brush;
[0038] 200. First ring segment;
[0039] 300. Correction device for shield tail deformation of tunnel boring machine;
[0040] 400. Segment assembly machine. Detailed Implementation
[0041] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.
[0042] In the description of this invention, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0043] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0044] In the description of this embodiment, the terms "upper," "lower," "right," etc., refer to the orientation or positional relationship shown in the accompanying drawings. They are used only for ease of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention. In addition, the terms "first" and "second" are used only for distinction in description and have no special meaning.
[0045] like Figures 1-6 As shown, this application embodiment provides a shield tail deformation correction device 300 for correcting the deformation of the shield tail shell 100 of the shield machine. The first ring segment 200 is located on the side of the shield tail shell 100 opposite to the tunneling direction of the shield machine. The first ring segment 200 is partially located inside the shield tail shell 100. The shield tail deformation correction device 300 is disposed at an adjacent position of the first ring segment 200 along the tunneling direction and is disposed inside the shield tail shell 100.
[0046] by Figure 1 Taking the orientation as an example, it can be understood that the tunneling direction of the tunnel boring machine is from right to left, and the assembly direction of the tunnel segments is consistent with the tunneling direction of the tunnel boring machine, which is to assemble them sequentially from right to left. The first ring segment 200 refers to the leftmost complete ring segment assembled before the tail shell 100 needs to be corrected. When the tail shell 100 deforms, the gap between the first ring segment 200 and the tail shell 100 will change. Along the circumference of the first ring segment 200, the gap between the first ring segment 200 and the tail shell 100 will be too small in some positions and too large in others. This will affect the assembly of the next ring segment to the left of the first ring segment 200. Therefore, it is necessary to readjust the cross-sectional shape of the tail shell 100 to a complete circle by using the tunnel boring machine tail deformation correction device 300.
[0047] The shield tail deformation correction device 300 of the tunnel boring machine includes a circular support frame 1 and jacks 2. The circular support frame 1 is disposed in the shield tail shell 100 and includes several support frame blocks 11. The several support frame blocks 11 can be detachably spliced to form a ring. The ring and the shield tail shell 100 are coaxially arranged. Several clearance holes 12 are opened on the outer peripheral wall of the circular support frame 1. The clearance holes 12 are arranged at intervals along the circumference of the circular support frame 1. Each clearance hole 12 is equipped with at least one jack 2. The jack 2 can apply force towards the inner wall of the shield tail shell 100 under the support of the circular support frame 1. When the jack 2 is a hydraulic jack, the force-applying end of the jack 2 is a piston rod for transmitting hydraulic force. After the piston rod is fully extended, it exceeds the outer diameter of the tunnel segment by 40mm to 60mm based on the theoretical outer diameter of the tunnel segment, which can meet the adjustment range of 30mm to 50mm for the shield tail gap. Several jacks 2 can be evenly arranged along the circumference of the circular support frame 1. Their number can be flexibly adjusted according to the actual size of the circular support frame 1. In order to ensure the straightening accuracy, the distance between two adjacent jacks 2 in the circumferential direction should not be greater than 800mm.
[0048] In practice, several support frames equipped with jacks 2 are first assembled into blocks 11. The resulting circular support frame 1 is arranged adjacent to the first ring segment 200 and located inside the tail shield shell 100. When correcting the deformed tail shield shell 100, each jack 2 arranged circumferentially on the circular support frame 1 can act independently. That is, at locations where the gap between the first ring segment 200 and the tail shield shell 100 is too small, one or more jacks 2 at that location extend from the clearance hole 12 to lift the inner wall of the tail shield shell 100, thereby increasing the gap between the first ring segment 200 and the tail shield shell 100 at that location. The extension amount of each jack 2 can be determined according to the deformation of each lifting point on the tail shield shell 100. Conversely, at locations where the gap is too large, no lifting force is required from the jacks 2, and the jacks 2 can be fully retracted, with the force-applying end not extending.
[0049] Several support frame blocks 11 can be transported to the interior of the tail shield shell 100 via a segment transport system, and then assembled by a segment assembly machine 400. For example, the annular support frame 1 may include 6 to 7 support frame blocks 11. Since segment blocks are generally divided into unequal sections, the support frame blocks 11 in this embodiment can adopt the same section form and number as the segments. Of course, the support frame blocks 11 can also adopt an equal section form and number; no specific limitation is made here.
[0050] The shield tail deformation correction device 300 provided in this application embodiment adopts a modular circular support frame 1. Jacks 2 are installed on the circular support frame 1 and spaced circumferentially. With this configuration, after the shield tail deformation correction device 300 is installed, the jacks 2 can be used to lift and correct various points on the circumference of the shield tail shell 100. The extension of each jack 2 can be adjusted according to the deformation at the corresponding position of the shield tail shell 100 to achieve the correction of the entire cross-sectional shape of the shield tail shell 100. The circular support frame 1 does not require frequent disassembly and reassembly for multiple local adjustments, making the operation simple and highly flexible, which helps to shorten the construction cycle and reduce construction risks. Secondly, the circular support frame 1 no longer needs to be welded and fixed to the shield tail shell 100, avoiding the problem of irregular deformation of the shield tail shell 100 caused by the reaction force after the jack 2 is pushed out. Furthermore, the circular support frame 1 can be assembled, which facilitates quick installation and disassembly. The shape of the circular support frame 1 also helps to ensure that it does not interfere with equipment such as the segment assembly machine 400 inside the shield tail, making its application very flexible.
[0051] like Figure 1 and Figure 7 As shown, in some embodiments, the outer diameter of the annular support frame 1 is equal to the outer diameter of the first annular tube segment 200, and the inner diameter of the annular support frame 1 is equal to the inner diameter of the first annular tube segment 200; or, the outer diameter of the annular support frame 1 is smaller than the outer diameter of the first annular tube segment 200, and the inner diameter of the annular support frame 1 is smaller than the inner diameter of the first annular tube segment 200.
[0052] With this configuration, the radial dimension of the annular support frame 1 will never exceed the radial dimension of the first annular tube 200. In this way, even if the gap between the first annular tube 200 and the tail shield 100 is too small, the annular support frame 1 will not come into contact with or squeeze the tail shield 100, thus preventing the tail shield 100 from undergoing secondary deformation due to the excessive size of the annular support frame 1.
[0053] Optionally, such as Figure 1 and Figure 7 As shown, along the tunneling direction of the tunnel boring machine, the assembled annular support frame 1 and the first ring segment 200 are closely attached to each other. The width of the annular support frame 1 along its own axial direction is less than or equal to the ring width of the first ring segment 200. In this way, the first ring segment 200 can provide a certain amount of resistance to the annular support frame 1, which is beneficial to improving the stability of the annular support frame 1 to a certain extent.
[0054] like Figure 5 and Figure 6As shown, in some embodiments, each support frame block 11 includes an inner arc plate 111, an outer arc plate 112, and two end panels 113. The axes of the inner arc plate 111 and the outer arc plate 112 coincide, and the two end panels 113 are connected between the inner arc plate 111 and the outer arc plate 112. Two adjacent support frame blocks 11 are connected through the two end panels 113. The bottom of the jack 2 is installed on the inner arc plate 111, and the clearance hole 12 is provided on the outer arc plate 112. The jack 2 can be accommodated between the inner arc plate 111 and the outer arc plate 112, that is, the distance between the inner arc plate 111 and the outer arc plate 112 is greater than the size of the jack 2 in its fully retracted state.
[0055] With this configuration, the jack 2 can be placed inside the annular support frame 1, making the overall structure of the annular support frame 1 more compact. The two end panels 113 of two adjacent support frame blocks 11 can be connected by bolts. This threaded connection has high strength, is easy to install and disassemble, and repeated disassembly will not affect the connection strength.
[0056] Optionally, the end panel 113 can be welded between the inner arc plate 111 and the outer arc plate 112.
[0057] Specifically, such as Figure 6 As shown, a lifting head 3 is fixed on the side of the inner arc plate 111 opposite to the outer arc plate 112. The lifting head 3 can be welded to the inner arc plate 111 to facilitate the lifting of the support frame segments 11 by the segment assembly machine 400 during assembly and disassembly.
[0058] Furthermore, the lifting head 3 can be located at the center of its own circumference on the inner arc plate 111, which is beneficial to improving the balance and stability of the support frame block 11 during lifting.
[0059] Preferably, the jack 2 is movable relative to the inner arc plate 111 along the axial direction of the annular support frame 1.
[0060] With this setup, once the jack 2 has corrected the first point on the shield tail shell 100, the jack 2 can be moved a certain distance along the axis to correct the second point that is nearby, without having to move the circular support frame 1, making the overall correction device more flexible.
[0061] The jack 2 can move axially along the annular support frame 1 on the inner arc plate 111 via hydraulic cylinder drive, motor drive, or other means. The specific configuration can be determined according to the actual situation, as long as it can achieve linear reciprocating movement of the jack 2. It should be noted that both of these drive transmission methods are mature existing technologies in this field, and their specific working principles will not be elaborated here.
[0062] It is understandable that when the deformation area on the tail shell 100 is large, and moving the jack 2 alone cannot meet the correction requirements, the user can choose to move the entire annular support frame 1.
[0063] Furthermore, such as Figure 5 As shown, the clearance hole 12 is an oblong hole, with its length parallel to the axial direction of the annular support frame 1. The width of the oblong hole is greater than the size of the force-applying end of the jack 2, allowing the jack 2 to move within the length range of the oblong hole. For example, the length of the oblong hole is selected to be 100–500 mm. This design restricts the movement of the jack 2 to the length range of the oblong hole, ensuring that the jack 2 can smoothly extend from the clearance hole 12 after each movement, thus improving the overall reliability of the device.
[0064] like Figure 5 and Figure 6 As shown, in some embodiments, the support frame block 11 further includes two connecting panels 114, which are disposed at both ends of the support frame block 11 along the axial direction. The two connecting panels 114 are the front and rear panels along the axial direction. A plurality of reinforcing ribs 13 are fixedly connected between the two connecting panels 114, and at least one jack 2 is located between two adjacent reinforcing ribs 13. The distance between two adjacent reinforcing ribs 13 is greater than the size of the jack 2 to ensure that while the overall structural strength is improved by the reinforcing ribs 13, the normal operation of the jack 2 is not interfered with.
[0065] Preferably, each jack 2 has a reinforcing rib plate 13 on both sides. Since the inner arc plate 111 of the jack 2 will bear the reaction force during the lifting process, the reinforcing rib plate 13 on both sides of each jack 2 can further enhance the structural strength and avoid local deformation.
[0066] Furthermore, multiple reinforcing ribs 13 can be welded together with the inner arc plate 111 to improve the stability of the inner arc plate 111, thereby enhancing the load-bearing capacity of the inner arc plate 111 to withstand the reaction force of the jack 2.
[0067] like Figure 6 As shown, in some embodiments, along the axial direction of the annular support frame 1, there is a gap between the inner arc plate 111 and the connecting panel 114, and the size of the gap is larger than the size of the jack 2. This arrangement ensures that there is a certain distance between the inner arc plate 111 and the front and rear panels, allowing for convenient maintenance and replacement of the jack 2 inside the annular support frame 1 through the gap.
[0068] This application embodiment also provides a method for correcting the deformation of the shield tail of a tunnel boring machine, using the aforementioned shield tail deformation correction device 300, and includes the following steps:
[0069] S1. Perform full-section measurement on the tail shell 100 to obtain the overall deformation of the tail shell 100, and determine the operating parameters of the shield tail deformation correction device 300 based on the overall deformation. Specifically, when performing full-section measurement on the tail shell 100, measuring tools such as total station, laser tracker and 3D scanner can be used. The operating parameters of the shield tail deformation correction device 300 include, but are not limited to, loading point, loading pressure and loading stroke. These parameters can be obtained through finite element structural simulation calculation. The above measuring tools and calculation methods are conventional devices and methods in this field, and their specific structures and principles will not be described in detail here.
[0070] S2. Install the support frame blocks 11 with jacks 2 in sequence inside the shield tail shell 100 until the assembly of the shield tail deformation correction device 300 is completed.
[0071] S3. According to the pre-confirmed operating parameters of the shield tail deformation correction device 300, start the jack 2 and make the jack 2 apply force towards the inner wall of the shield tail shell 100 until the first round of correction adjustment of the shield tail shell 100 along its own circumference is completed.
[0072] S4. Remeasure the entire cross section of the shield tail shell 100 to confirm the deformation value of the shield tail shell 100 after the first round of correction and adjustment. Adjust the operating parameters of the shield tail deformation correction device 300 in the next round of correction based on the data, and carry out the next round of correction and adjustment of the shield tail shell 100.
[0073] S5. Repeat steps S3 to S4 until the cross-sectional shape of the tail shell 100 is corrected to a complete circle.
[0074] In order to facilitate the measurement of the overall deformation of the tail shell 100 and the subsequent assembly of the shield tail deformation correction device 300, before step S1, the shield machine propulsion cylinder is fully extended, so that the first ring segment 200 installed in a complete ring moves relative to the tail wire brush 110, making room for the internal space of the tail shell 100.
[0075] In specific implementation step S2, the support frame segment 11 equipped with jacks 2 can be transported sequentially to the inside of the shield tail shell 100 through the segment transportation system; then, the segment assembly machine 400 installs the bottom support frame segment 11 first in a bottom-to-top order, preferably installing the support frame segment 11 close to the first ring segment 200 along the tunneling direction of the tunnel boring machine; then, the remaining support frame segments 11 are installed sequentially until the assembly of the shield tail deformation correction device 300 is completed; specifically, for example, when installing the lower left support frame segment 11, the two end panels 113 of the lower left support frame segment 11 and the bottom support frame segment 11 that are in contact with each other are bolted together, and the remaining support frame segments 11 are assembled and connected sequentially in the same way.
[0076] After the cross-sectional shape of the tail shield shell 100 is corrected to a complete circle, each support frame segment 11 is dismantled sequentially by the segment assembly machine 400, and the dismantled support frame segments 11 are transported out of the tail shield shell 100 by the segment transport system. The segment transport system and the segment assembly machine 400 are conventional devices in this field, and their specific structures and working principles will not be described in detail here.
[0077] Preferably, step S3 includes: for positions where the actual gap between the outer peripheral wall of the annular support frame 1 and the inner wall of the tail shield 100 is smaller than the theoretical gap, the force-applying end of the jack 2 extends out from the clearance hole 12 and applies force to the inner wall of the tail shield 100; for positions where the actual gap between the outer peripheral wall of the annular support frame 1 and the inner wall of the tail shield 100 is larger than the theoretical gap, the force-applying end of the jack 2 is fully retracted and not loaded.
[0078] To clearly describe the above-mentioned correction process, the following example illustrates the case where the shield tail shell 100 deforms from a complete circle to a transverse elliptical shape. Figure 2 As shown, at this time, the shield tail shell 100 is deformed into a horizontal elliptical shape. The gap between the upper and lower points of the shield tail shell 100 is the smallest, and the gap gradually increases along the circumferential direction from the upper and lower points until the gap on the left and right sides is the largest.
[0079] At this point, first confirm the loading points. For jack 2 where the actual gap is smaller than the theoretical gap, it needs to be extended; for jack 2 where the actual gap is larger than the theoretical gap, it should be fully retracted and not extended. For the transversely elliptical shield tail shell 100, first load jacks 21 and 22 at the smallest symmetrical gap positions, with a loading stroke not exceeding 10mm; then load jacks 23, 24, 25, and 26 at the second smallest symmetrical gap positions, with a loading stroke not exceeding 10mm. The above steps can be repeated, sequentially loading jacks 2 at positions where the actual gap is smaller than the theoretical gap to increase the original actual gap (e.g., ...). Figures 7 to 8(as shown), until a round of adjustments is completed.
[0080] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation of the present invention. Those skilled in the art will be able to make various obvious changes, readjustments, and substitutions without departing from the scope of protection of the present invention. It is neither necessary nor possible to exhaustively describe all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A device for correcting deformation of the shield tail of a tunnel boring machine, characterized in that, For correcting deformation of the tail shell (100) of the tunnel boring machine, including: A circular support frame (1) is disposed in the tail shield shell (100) and includes several support frame blocks (11). The several support frame blocks (11) can be detachably spliced to form a ring. The ring and the tail shield shell (100) are coaxially arranged. Several clearance holes (12) are opened on the outer peripheral wall of the circular support frame (1). The several clearance holes (12) are spaced apart along the circumference of the circular support frame (1). Jacks (2), each of the clearance holes (12) is equipped with at least one of the jacks (2), the jacks (2) being able to apply force toward the inner wall of the shield tail shell (100) under the support of the annular support frame (1); The support frame block (11) includes an inner arc plate (111), an outer arc plate (112), and two end plates (113). The axes of the inner arc plate (111) and the outer arc plate (112) coincide. The two end plates (113) are connected between the inner arc plate (111) and the outer arc plate (112). Two adjacent support frame blocks (11) are connected through the two end plates (113). The bottom of the jack (2) is installed on the inner arc plate (111). The clearance hole (12) is provided on the outer arc plate (112). The jack (2) can be accommodated between the inner arc plate (111) and the outer arc plate (112). The jack (2) is capable of moving relative to the inner arc plate (111) along the axial direction of the annular support frame (1); The clearance hole (12) is a waist-shaped hole. The length direction of the waist-shaped hole is parallel to the axial direction of the annular support frame (1). The width of the waist-shaped hole is greater than the force-applying end of the jack (2). The jack (2) can move along the length direction of the waist-shaped hole within the length range of the waist-shaped hole.
2. The device for correcting shield tail deformation of a tunnel boring machine according to claim 1, characterized in that, The support frame block (11) also includes two connecting panels (114), which are located at both ends of the support frame block (11) in the axial direction. Multiple reinforcing ribs (13) are fixedly connected between the two connecting panels (114), and at least one jack (2) is located between two adjacent reinforcing ribs (13).
3. The device for correcting shield tail deformation of a tunnel boring machine according to claim 2, characterized in that, Along the axial direction of the annular support frame (1), there is a gap between the inner arc plate (111) and the connecting panel (114), and the size of the gap is larger than the size of the jack (2).
4. The device for correcting shield tail deformation of a tunnel boring machine according to claim 1, characterized in that, The inner arc plate (111) is fixed with a lifting head (3) on the side opposite to the outer arc plate (112).
5. The device for correcting shield tail deformation of a tunnel boring machine according to any one of claims 1 to 4, characterized in that, The outer diameter of the annular support frame (1) is equal to the outer diameter of the first annular segment (200) in the tail shell (100), and the inner diameter of the annular support frame (1) is equal to the inner diameter of the first annular segment (200); or, the outer diameter of the annular support frame (1) is smaller than the outer diameter of the first annular segment (200), and the inner diameter of the annular support frame (1) is smaller than the inner diameter of the first annular segment (200).
6. A method for correcting deformation of the shield tail of a tunnel boring machine, characterized in that, The method of using the shield tail deformation correction device (300) according to any one of claims 1 to 5 includes the following steps: S1. Measure the entire cross section of the tail shell (100) to obtain the overall deformation of the tail shell (100), and determine the operating parameters of the shield machine tail deformation correction device (300) based on the overall deformation. S2. Install the support frame blocks (11) with jacks (2) in sequence inside the shield tail shell (100) until the assembly of the shield tail deformation correction device (300) is completed. S3. According to the pre-confirmed operating parameters of the shield tail deformation correction device (300), start the jack (2) so that the jack (2) applies force towards the inner wall of the shield tail shell (100) until the first round of correction adjustment of the shield tail shell (100) along its own circumference is completed. S4. Re-measure the entire cross section of the shield tail shell (100) to confirm the deformation value of the shield tail shell (100) after the first round of correction and adjustment. Adjust the operating parameters of the shield tail deformation correction device (300) in the next round of correction based on the data, and carry out the next round of correction and adjustment of the shield tail shell (100). S5. Repeat steps S3 to S4 until the cross-sectional shape of the tail shell (100) is corrected to a complete circle.
7. The method for correcting shield tail deformation of a tunnel boring machine according to claim 6, characterized in that, Step S3 includes: When the actual gap between the outer peripheral wall of the annular support frame (1) and the inner wall of the tail shield shell (100) is smaller than the theoretical gap, the force-applying end of the jack (2) extends out from the clearance hole (12) and applies force to the inner wall of the tail shield shell (100); when the actual gap between the outer peripheral wall of the annular support frame (1) and the inner wall of the tail shield shell (100) is larger than the theoretical gap, the force-applying end of the jack (2) is fully retracted and not loaded.