一种建筑模板生产系统

By designing a building formwork production system and adopting multi-layer conveying and precise positioning, the problems of inaccurate feeding and positioning in existing equipment have been solved, and efficient and automated production of formwork welding has been achieved.

CN118288045BActive Publication Date: 2026-07-17CHANGSHA ZHONGCHUANG HAITONG INTELLIGENT TECHNOLOGY CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHANGSHA ZHONGCHUANG HAITONG INTELLIGENT TECHNOLOGY CO LTD
Filing Date
2024-04-16
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing building formwork production equipment suffers from inaccurate feeding and positioning during the welding process, resulting in low welding efficiency and unstable quality.

Method used

A building formwork production system was designed, including multiple welding platforms, conveyor rollers and robots. It adopts a multi-layer conveying and precise positioning method to realize the automated welding of building formwork.

Benefits of technology

It has improved the production efficiency and quality stability of building formwork, and realized the continuous and automated production of formwork.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118288045B_ABST
    Figure CN118288045B_ABST
Patent Text Reader

Abstract

一种建筑模板生产系统,包括第一升降输送机(1),与第一升降输送机连接的前封板焊接平台(2),前封板给料机构(3),与前封板焊接平台连接的双层过渡输送辊道(4),与双层过渡输送辊道连接的后封板焊接平台(5),后封板给料机构(6),与后封板焊接平台连接的加强筋焊接站(7),与加强筋焊接站连接的第二升降输送机(8),与第二升降输送机连接的第二前封板焊接平台(9),第二前封板给料机构(10),与第二前封板焊接平台连接的第二双层过渡输送辊道(11),与第二双层过渡输送辊道连接的第二后封板焊接平台(12),第二后封板给料机构(13),与第二后封板焊接平台连接的第二加强筋焊接站(14),若干焊接机器人。