T-beam prefabrication pedestal and construction process of T-beam
By designing a T-beam prefabrication platform and adopting a rigid movable plate and rigid roller structure, the platform can be moved to different construction areas, solving the platform occupation problem, reducing costs and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202410113772.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-01-26
AI Technical Summary
Precast T-beams require a large number of supports, increasing the number of supports needed and leading to high production costs.
Design a T-beam prefabrication platform, including an I-beam base, I-beam reinforcing bars, a walking mechanism, and a construction platform. It adopts a rigid moving plate and rigid roller structure, and connects the formwork assembly area, rebar binding area, concrete pouring area, and curing area through a walking track, reducing the occupation of the walking mechanism.
The number of pedestals required was reduced, the manufacturing cost of T-beams was lowered, construction efficiency and quality were improved, concrete leakage was avoided, and the use of large hoisting equipment was reduced.
Smart Images

Figure CN118288410B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of precast beam construction technology, specifically relating to a T-beam precast platform and a T-beam construction process. Background Technology
[0002] Precast T-beam bridges, due to their factory production and erection using bridge-building equipment, offer advantages such as high safety, ease of operation, controllable quality, and low cost, and are widely used in the construction of multi-span beam bridges. Currently, precast T-beams are typically produced using the post-tensioning method, which involves completing processes such as rebar tying, formwork installation, concrete pouring, and prestressing on a platform at the beam fabrication yard, followed by hoisting and erection. All of these production processes must be completed on the platform, and the platform design on-site is often based on the span and bottom width of the T-beam to determine the platform dimensions and structural requirements. Common precast T-beams have spans of 20m, 30m, 40m, and 50m, with corresponding bottom widths of different sizes. The usual practice is to set up a corresponding beam-making platform for each span type of beam. This layout requires a sufficiently large beam-making site and enough platforms to meet the precasting needs of T-beams of different spans. Since precast T-beams are made by pouring concrete, after the concrete is poured, it is necessary to wait for the concrete to fully solidify and reach the preset strength before it can be transported and stored. The construction cycle is long, and the efficiency is low when using a fixed platform to make them. Therefore, some movable platforms have appeared on the market. The platform can be moved by the rolling of the rollers driven by the motor, so as to move the precast T-beams. This allows the precast T-beams to be moved out of the construction area, making it easier to use the new platform to make precast T-beams in the construction area, which greatly improves construction efficiency. Although the pedestal has been moved out of the construction area, the precast T-beams cannot be detached from the pedestal in time because the concrete has not yet reached the preset strength. As a result, the precast T-beams occupy a lot of pedestals. Furthermore, since each pedestal has a motor for driving movement, the manufacturing cost of a single pedestal is high. Occupying multiple pedestals with movement functions will increase the number of pedestals required, thereby increasing the production cost of precast T-beams. Summary of the Invention
[0003] To address the issue that precast T-beams require a large number of supports, increasing the number of supports needed and thus raising production costs, this invention aims to provide a precast T-beam support and a construction process for T-beams to solve the aforementioned problems.
[0004] To achieve the above objectives, the present invention provides the following technical solution: a T-beam prefabrication platform, comprising two I-beam bases, multiple I-beam reinforcing rods connected to the two I-beam bases, multiple traveling mechanisms for moving the I-beam bases, and a construction platform for fabricating T-beams, wherein the multiple traveling mechanisms are fixedly connected to the two I-beam bases, and the construction platform is mounted on the multiple I-beam reinforcing rods; The construction platform includes a rigid pad, a rigid movable plate, multiple rigid rollers, and multiple I-beam support legs. The rigid pad is fixedly mounted on the side of the multiple I-beam reinforcing rods away from the I-beam bases. The rigid pad has multiple grooves, and the multiple rigid rollers are rotatably mounted in the multiple grooves, with the sides of the multiple rigid rollers extending out of the groove openings. The rigid movable plate is slidably mounted above the rigid pad and the multiple rigid rollers, and is in rolling connection with the multiple rigid rollers. The multiple I-beam support legs are fixedly mounted on both sides of the bottom of the rigid movable plate, so that the multiple I-beam support legs are located on both sides of the rigid pad, the multiple I-beam reinforcing rods, the two I-beam bases, and the multiple traveling mechanisms.
[0005] In a preferred embodiment, the groove has an arc-shaped cross-section, and the center of the groove's cross-section is located in the middle of the rigid pad.
[0006] In a preferred embodiment, positioning holes are provided at the four corners of the rigid movable plate, and limiting holes are provided at the four corners of the rigid pad. The multiple limiting holes are aligned with the multiple positioning holes, and a rigid pin is inserted into each of the multiple positioning holes. One end of the rigid pin is inserted into the limiting hole aligned with it.
[0007] In a preferred embodiment, fixing holes are provided at both ends of the upper surface of the rigid movable plate, and the fixing holes are located on the center line of the rigid movable plate.
[0008] In a preferred embodiment, channel steel is symmetrically arranged on the two side walls of the rigid movable plate, and an elastic band for sealing leaks is snapped into the channel steel.
[0009] A construction process for T-beams, applicable to a precast T-beam platform, characterized by comprising the following steps: S1: Arrange the platform walking track so that the platform walking track can connect the formwork assembly area, the rebar binding area, the concrete pouring area, the concrete curing area and the T-beam storage area, and the walking track must be straight. S2: Move the platform to the formwork assembly area via the walking track, and assemble the concrete pouring formwork on the rigid moving plate on the platform; S3: Move the platform to the rebar binding area via the travel track, bind the rebar on the platform and the concrete pouring formwork, and arrange the prestressed ducts. S4: Move the platform to the concrete pouring area via the traveling mechanism, and pour concrete into the concrete pouring formwork. When pouring concrete, a vibrator is needed to compact the concrete to ensure that there are no air bubbles in the concrete. S5: Move the platform to the concrete curing area via the walking mechanism to cure the concrete. Moisturizing treatment is required for the concrete. S6: Move the pedestal to the T-beam storage area using the moving mechanism.
[0010] In a preferred embodiment, during step S2, when assembling the concrete pouring formwork, the concrete side formwork located on both sides of the rigid movable plate needs to contact the elastic band and compress the elastic band, and leak-proof measures need to be taken at the joints of multiple concrete formworks.
[0011] In a preferred embodiment, in step S3, after the reinforcing bars are tied, the reinforcing bars need to be moved to the formwork assembly area via a platform. In the formwork assembly area, the concrete side formwork is replaced, the concrete inner formwork and the concrete end formwork are installed, and the connection between the concrete inner formwork and the concrete end formwork is sealed. Then, the assembled concrete formwork is moved to the reinforcing bar tying area via a platform, and the reinforcing bars at the top of the concrete inner formwork are tied.
[0012] In a preferred embodiment, in step S6, after moving the T-beam to the T-beam storage area, it is necessary to separate the rigid moving plate from the I-beam base. The specific steps for separation include: S601: After the platform moves to the T-beam storage area via the travel track, place square timber on both sides of the travel track so that the square timber is directly below multiple I-beam support legs and the top of the square timber can contact the bottom of the I-beam support legs. It is necessary to ensure that the I-beam support legs are located at the center of the square timber. S602: Connect the fixing holes on the rigid moving plate to the ground anchor through steel cables, and ensure that the steel cables are taut; S603: Remove the rigid pin from the limiting hole and the positioning hole; S604: The walking mechanism drives the I-beam base, I-beam reinforcing rod and rigid pad to move, so that the rigid moving plate moves relative to the rigid pad through the rigid roller, ensuring that the rigid moving plate stands upright on the square timber after separating from the rigid pad.
[0013] In a preferred embodiment, after the rigid movable plate and the rigid base plate are separated in step S604, a rigid movable plate for re-construction needs to be installed on the rigid base plate. The specific steps for installing the rigid movable plate include: S100: Use a small crane to lift the rigid moving plate onto the rigid pad, so that the bottom of the rigid moving plate can contact multiple rigid rollers; S200: Push the rigid moving plate so that the rigid moving plate can move on the rigid pad through multiple rigid rollers, ensuring that the positioning holes on the rigid moving plate can be aligned with the limiting holes on the rigid pad; S300: Insert the rigid pin into the positioning hole and the corresponding limiting hole.
[0014] Compared with the prior art, the beneficial effects of the present invention are: This T-beam prefabrication platform and T-beam construction process, by setting up a rigid moving plate, allows T-beams to be fabricated on the rigid moving plate. Pushing the moving plate allows it to be separated from the base plate, making it easy to add a new moving plate to the base plate for fabricating T-beams. This avoids the T-beams occupying the space of the I-beam base with the traveling mechanism, reduces the number of I-beam bases with the traveling mechanism, lowers the investment cost, and thus reduces the manufacturing cost of the T-beams. This T-beam precast platform and T-beam construction process involves setting up channel steel and installing elastic bands inside the channel steel. When assembling the side formwork, the side formwork can contact the elastic bands and compress them, so that the elastic bands can achieve a sealing and leak-stopping effect, preventing concrete leakage and ensuring the construction quality of the T-beams. This new T-beam prefabrication platform and T-beam construction process allows the platform to be moved to all construction areas by laying a traveling track to the formwork assembly area, rebar binding area, concrete pouring area, concrete curing area, and T-beam storage area. This enables all construction processes to be carried out on the moving platform, avoiding the need for large gantry cranes to lift the rebar cages and T-beams, thus reducing construction costs. Attached Figure Description
[0015] Figure 1 This is a construction flowchart of a T-beam construction process proposed in this invention; Figure 2 This is a schematic diagram of the overall structure of a T-beam prefabrication platform proposed in this invention; Figure 3 This is a partial structural schematic diagram of a T-beam prefabrication platform proposed in this invention; Figure 4 This is a schematic diagram of the rigid pad in a T-beam prefabrication platform proposed in this invention; Figure 5 This is a partial cross-sectional structural diagram of the pad plate in a T-beam prefabrication platform proposed in this invention.
[0016] In the diagram: 1. I-beam base; 2. I-beam reinforcing bar; 3. Walking mechanism; 4. Construction platform; 401. Rigid pad; 402. Rigid moving plate; 403. Rigid roller; 404. I-beam support leg; 405. Groove; 5. Positioning hole; 6. Limiting hole; 7. Rigid pin; 8. Fixing hole; 9. Channel steel; 10. Elastic band. Detailed Implementation
[0017] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0018] For examples, please refer to Figure 1-5 This invention provides a T-beam prefabrication platform and a construction process for T-beams, including two I-beam bases 1, multiple I-beam reinforcing rods 2 connected to the two I-beam bases 1, multiple traveling mechanisms 3 for moving the I-beam bases 1, and a construction platform 4 for fabricating T-beams. The multiple traveling mechanisms 3 are all fixedly connected to the two I-beam bases 1, and the construction platform 4 is set on the multiple I-beam reinforcing rods 2. The traveling mechanism 3 consists of a drive motor and rollers. The drive motor and rollers are both installed on the I-beam bases 1. By starting and stopping the drive motor, the rollers are rotated or stopped, thereby achieving the effect of moving the I-beam bases 1 and achieving a braking effect. In this embodiment, please refer to Figure 1-5The construction platform 4 includes a rigid pad 401, a rigid movable plate 402, multiple rigid rollers 403, and multiple I-beam support legs 404. The rigid pad 401 is fixedly installed on the side of the multiple I-beam reinforcing rods 2 away from the I-beam base 1. Multiple grooves 405 are formed on the rigid pad 401. The multiple rigid rollers 403 are rotatably installed in the multiple grooves 405, and the sides of the multiple rigid rollers 403 rotatably extend out of the openings of the grooves 405. The rigid movable plate 402 is slidably installed above the rigid pad 401 and the multiple rigid rollers 403, and the rigid movable plate 402 is tumbledly connected to the multiple rigid rollers 403. The multiple I-beam support legs 404 are fixedly installed on the rigid movable plate. On both sides of the bottom of 402, multiple I-beam support legs 404 are located on both sides of the rigid pad 401, multiple I-beam reinforcing rods 2, two I-beam bases 1, and multiple traveling mechanisms 3. This allows for the construction of T-beams on the rigid moving plate 402. After construction is completed, the rigid moving plate 402 is pushed so that it can move on the rigid pad 401 via the rigid rollers 403, allowing the T-beams to separate from the traveling mechanisms 3, reducing the occupancy of the traveling mechanisms 3 and lowering the operating cost. The rigid pad 401, rigid moving plate 402, multiple rigid rollers 403, multiple I-beam support legs 404, and rollers are all rigid and have high strength, which can improve the load-bearing capacity. The cross-section of the groove 405 is arc-shaped, and the center of the cross-section of the groove 405 is located in the middle of the rigid pad 401, so that the rigid roller 403 can always rotate within the groove 405, which can prevent the rigid roller 403 from leaving the groove 405 and improve stability and safety. The rigid movable plate 402 has positioning holes 5 at each of its four corners, and the rigid pad 401 has limiting holes 6 at each of its four corners. The limiting holes 6 are aligned with the positioning holes 5, and a rigid pin 7 is inserted into each of the positioning holes 5. One end of the rigid pin 7 is inserted into the limiting hole 6 aligned with it. The rigid pin 7 can fix the rigid movable plate 402, so that the rigid movable plate 402 can be connected with the rigid pad 401 as one unit, which prevents the rigid movable plate 402 from moving during the fabrication of the T-beam, thus improving safety and stability. The rigid movable plate 402 has fixing holes 8 at both ends on its upper surface. The fixing holes 8 are located on the center line of the rigid movable plate 402. The rigid movable plate 402 can be fixed through the fixing holes 8 to prevent it from moving and to facilitate the separation of the rigid movable plate 402 from the rigid pad 401, thus improving convenience. In addition, the fixing holes 8 are located on the center line of the rigid movable plate 402 to ensure the balance of forces on the rigid movable plate 402 and to prevent the rigid movable plate 402 from tilting and getting stuck. In this embodiment, please refer to Figure 2The rigid movable plate 402 has symmetrical channel steels 9 on its two side walls. An elastic band 10 for sealing is snapped into the channel steel 9, so that the side mold can contact the elastic band 10 and squeeze the elastic band 10 to achieve the effect of sealing and sealing. For a construction process of a T-beam, please refer to [link / reference]. Figure 1 This method is applicable to a T-beam precast platform and includes the following steps: S1: Arrange the platform's traveling track so that it can connect the formwork assembly area, rebar binding area, concrete pouring area, concrete curing area, and T-beam storage area. It is necessary to ensure that the traveling track is straight to improve the stability of the platform and prevent the T-beam from tipping over. S2: Move the platform to the formwork assembly area via the walking track, and assemble the concrete pouring formwork on the rigid movable plate 402 on the platform; S3: Move the platform to the rebar binding area via the travel track, bind the rebar on the platform and the concrete pouring formwork, and arrange the prestressed ducts. S4: Move the platform to the concrete pouring area via the walking mechanism 3, and pour concrete into the concrete pouring formwork. When pouring concrete, a vibrator is needed to compact the concrete to ensure that there are no air bubbles in the concrete and to avoid honeycomb inside the concrete. S5: Move the platform to the concrete curing area via the walking mechanism 3 to cure the concrete. The concrete needs to be moisturized to prevent cracking. S6: Move the pedestal to the T-beam storage area using the moving mechanism; In step S2, when assembling the concrete pouring formwork, the concrete side formwork located on both sides of the rigid movable plate 402 needs to contact the elastic band 10 and squeeze the elastic band 10. In addition, the connection points of multiple concrete formworks need to be sealed with leak-proof measures. Cotton cloth, foam, rubber, wood or other boards can be used for sealing. In step S3, after the reinforcing bars are tied, they need to be moved to the formwork assembly area via a platform. The concrete side formwork is replaced in the formwork assembly area. The concrete pouring formwork consists of a reinforcing bar slab and a concrete slab. The reinforcing bar slab is assembled in the formwork assembly area for tying the reinforcing bars. After the reinforcing bars are tied, the formwork is assembled a second time, that is, the concrete slab is assembled, which is mainly used for pouring concrete. The inner concrete formwork and the end concrete formwork are installed, and the connection between the inner concrete formwork and the end concrete formwork is sealed. Then, the assembled concrete formwork is moved to the reinforcing bar tying area via a platform, and the reinforcing bars at the top of the inner concrete formwork are tied. In step S6, after moving the T-beam to the T-beam storage area, it is necessary to separate the rigid moving plate 402 from the I-beam base 1. The specific steps for separation include: S601: After the platform moves to the T-beam storage area via the travel track, square timbers are placed on both sides of the travel track so that the square timbers are directly below the multiple I-beam support legs 404, and the top of the square timbers can contact the bottom of the I-beam support legs 404. It is necessary to ensure that the I-beam support legs 404 are located in the center of the square timbers to prevent the square timbers from tilting to the side and to improve safety and stability. S602: Connect the fixing hole 8 on the rigid moving plate 402 to the ground anchor through a steel cable, and ensure that the steel cable is taut. The ground anchor can limit the rigid moving plate 402 and prevent it from moving with the walking mechanism 3. S603: Remove the rigid pin 7 from the limiting hole 6 and the positioning hole 5; S604: The walking mechanism 3 drives the I-beam base 1, the I-beam reinforcing rod 2 and the rigid pad 401 to move, so that the rigid moving plate 402 moves relative to the rigid pad 401 through the rigid roller 403, ensuring that the rigid moving plate 402 stands on the square timber after separating from the rigid pad 401. In step S604, after the rigid movable plate 402 is separated from the rigid pad 401, a rigid movable plate 402 for re-construction needs to be installed on the rigid pad 401. The specific steps for installing the rigid movable plate 402 include: S100: Use a small crane to lift the rigid moving plate 402 onto the rigid pad 401 so that the bottom of the rigid moving plate 402 can contact the multiple rigid rollers 403. S200: Push the rigid moving plate 402 so that the rigid moving plate 402 can move on the rigid pad 401 through multiple rigid rollers 403, ensuring that the positioning hole 5 on the rigid moving plate 402 can be aligned with the limiting hole 6 on the rigid pad 401. S300: Insert the rigid pin 7 into the positioning hole 5 and the corresponding limiting hole 6.
[0019] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A T-beam prefabrication pedestal, characterized in that: The utility model provides a T -shaped beam construction platform, including two I -beam base (1), with two I -beam base (1) a plurality of I -beam reinforcing rod (2), a plurality of for driving I -beam base (1) moves a plurality of walking mechanism (3) and is used for making T -shaped beam's construction platform (4), a plurality of walking mechanism (3) all with two I -beam base (1) fixed connection, construction platform (4) sets up on a plurality of I -beam reinforcing rod (2), The construction platform (4) includes a steel base plate (401), a steel movable plate (402), a plurality of steel rollers (403), and a plurality of I-beam support legs (404). The steel base plate (401) is fixedly arranged on the side of the plurality of I-beam reinforcing rods (2) away from the I-beam base (1). A plurality of grooves (405) are formed in the steel base plate (401). A plurality of steel rollers (403) are rotatably arranged in the grooves (405), respectively. The side surfaces of the steel rollers (403) extend out of the openings of the grooves (405). The steel movable plate (402) is slidably arranged above the steel base plate (401) and the plurality of steel rollers (403). The steel movable plate (402) is in rolling connection with the plurality of steel rollers (403). The plurality of I-beam support legs (404) are fixedly arranged on both sides of the bottom of the steel movable plate (402), so that the plurality of I-beam support legs (404) are located on both sides of the steel base plate (401), the plurality of I-beam reinforcing rods (2), the two I-beam bases (1), and the plurality of walking mechanisms (3). Positioning holes (5) are formed at the four corners of the steel movable plate (402). Limiting holes (6) are formed at the four corners of the steel base plate (401). The plurality of limiting holes (6) are aligned with the plurality of positioning holes (5), respectively. Steel pins (7) are inserted into the plurality of positioning holes (5).
2. The prefabricated T-beam pedestal according to claim 1, characterized in that: The cross section of the groove (405) is arc-shaped, and the center of the cross section of the groove (405) is located in the middle of the steel base plate (401).
3. The prefabricated T-beam pedestal according to claim 1, characterized in that: Fixing holes (8) are formed at the two ends of the upper surface of the steel movable plate (402). The fixing holes (8) are located on the center line of the steel movable plate (402).
4. The prefabricated T-beam pedestal according to claim 1, characterized in that: Groove steels (9) are symmetrically arranged on the two side walls of the steel movable plate (402). Elastic bands (10) for plugging are clamped in the groove steels (9).
5. A construction process of a T-beam, suitable for a T-beam prefabrication pedestal according to any one of claims 1-4, characterized in that, The utility model includes the following steps: S1: arranging the pedestal walking track so that the pedestal walking track can connect the formwork assembly area, the steel bar binding area, the concrete pouring area, the concrete curing area, and the T-shaped beam storage area. It is necessary to ensure that the walking track is a straight line. S2: moving the pedestal to the formwork assembly area through the walking track, and assembling the concrete pouring formwork on the steel movable plate (402) of the pedestal. S3: moving the pedestal to the steel bar binding area through the walking track, binding the steel bar on the pedestal and the concrete pouring formwork, and arranging the prestressed pipe. S4: Move the platform to the concrete pouring area through the walking mechanism (3), pour concrete in the concrete pouring template, and use a vibrator to compact the concrete to ensure that there are no air bubbles in the concrete. S5: Move the platform to the concrete curing area via the walking mechanism (3) to maintain the concrete. The concrete needs to be moisturized. S6: Move the platform to the T-beam storage area using the moving mechanism; In step S6, after moving the T-beam to the T-beam storage area, the rigid moving plate (402) needs to be separated from the I-beam base (1). The specific steps for separation include: S601: After the platform moves to the T-beam storage area via the travel track, square timbers are placed on both sides of the travel track so that the square timbers are directly below multiple I-beam support legs (404) and the top of the square timbers can contact the bottom of the I-beam support legs (404). It is necessary to ensure that the I-beam support legs (404) are located at the center of the square timbers. S602: Connect the fixing holes (8) on the rigid moving plate (402) to the ground anchor through steel cables, and ensure that the steel cables are in a taut state; S603: Remove the rigid pin (7) from the limiting hole (6) and the positioning hole (5); S604: The walking mechanism (3) drives the I-beam base (1), the I-beam reinforcing rod (2) and the rigid pad (401) to move, so that the rigid moving plate (402) moves relative to the rigid pad (401) through the rigid roller (403), ensuring that the rigid moving plate (402) stands on the square timber after separating from the rigid pad (401); In step S604, after the rigid movable plate is separated from the rigid base plate, a rigid movable plate for re-construction needs to be installed on the rigid base plate. The specific steps for installing the rigid movable plate include: S100: Use a small crane to lift the rigid moving plate (402) onto the rigid pad (401) so that the bottom of the rigid moving plate (402) can contact multiple rigid rollers (403); S200: Push the rigid moving plate (402) so that the rigid moving plate (402) can move on the rigid pad (401) through multiple rigid rollers (403) to ensure that the positioning hole (5) on the rigid moving plate (402) can be aligned with the limiting hole (6) on the rigid pad (401); S300: Insert the rigid pin (7) into the positioning hole (5) and the aligning limiting hole (6).
6. The construction process of a T-shaped beam according to claim 5, characterized in that: In step S2, when assembling the concrete pouring formwork, the concrete side formwork located on both sides of the rigid movable plate (402) needs to contact the elastic band (10) and squeeze the elastic band (10), and the connection of multiple concrete formworks needs to be sealed.
7. The construction process of a T-shaped beam according to claim 5, characterized in that: In step S3, after the reinforcement is tied, it is necessary to move the reinforcement to the formwork assembly area via the platform. In the formwork assembly area, the concrete side formwork is replaced, the concrete inner formwork and the concrete end formwork are installed, and the connection between the concrete inner formwork and the concrete end formwork is sealed. Then, the assembled concrete formwork is moved to the reinforcement tying area via the platform, and the reinforcement at the top of the concrete inner formwork is tied.
Citation Information
Patent Citations
Movable pedestal formwork system for precast beam and construction field area of movable pedestal formwork system
CN211806822U
Box girder pedestal capable of walking automatically
CN218255830U