A device for manufacturing a prestressed fiber mesh reinforced concrete composite board

By combining the initial tensioning device and the force gauge, uniform tensioning of the fiber woven mesh was achieved during the prestressing process, solving the problem of uneven fiber bundle deformation and improving the mechanical properties and manufacturing efficiency of the composite board.

CN118305890BActive Publication Date: 2026-11-24HUNAN UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410375052.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2026-11-24
Estimated Expiration
2044-03-29

AI Technical Summary

Technical Problem

In the existing technology, the fiber woven mesh deforms unevenly and is subjected to unequal forces during the application of prestress, resulting in uncontrollable initial pretension of the fiber bundles and affecting the overall performance of the composite board.

Method used

An initial tensioning device and a force gauge are used to adjust the initial tension force in real time. Each fiber bundle is precisely tensioned through the initial tensioning device, and the force value is adjusted before uniform tensioning to ensure the uniformity of the initial force of each fiber bundle. Strong adhesive is used to bond the fiber woven mesh to the wedge clamp to ensure the uniformity of the tensioning process.

Benefits of technology

Uniform tensioning of the fiber woven mesh was achieved, which improved the overall mechanical properties and manufacturing efficiency of the composite board and ensured the consistency and accuracy of the prestress application level of the fiber bundles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118305890B_ABST
    Figure CN118305890B_ABST
Patent Text Reader

Abstract

This invention discloses a device for preparing prestressed fiber-woven mesh reinforced concrete composite panels, comprising a box-shaped base, an initial tensioning device, a tensioning device, a pouring platform, a fixing device, and a rolling device. The initial tensioning device is bolted to the baffle of the box-shaped base. The tensioning device includes an anchoring steel plate, a U-shaped guide frame, a sliding anchoring frame, a wedge clamp, and a threaded tie rod. Tensile the threaded tie rod to drive the sliding anchoring frame to slide within the U-shaped guide frame. The fixing device is bolted to the box-shaped base. The rolling device is fixed to the outside of the fixing device, with two rollers embedded in the roller frame. The pouring platform is located between the tensioning device and the fixing device, with two equal-length angle steels symmetrically connected to both sides of the steel plate support. This invention achieves controllable initial tension of the fiber bundles by setting an initial tensioning device, and then uses a wedge clamp for uniform tensioning. This device can solve the problem of uneven prestress in each fiber bundle and improve the overall prestress level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of construction, and particularly relates to a device for preparing a prestressed fiber woven mesh reinforced concrete composite panel. Background Technology

[0002] Fiber woven mesh composite panels utilize prestressing technology, which not only fully utilizes the material's performance but also improves the frictional bond between the fiber woven mesh and the concrete matrix compared to unstressed composite panels, thus enhancing the interfacial properties between the two. Simultaneously, applying prestress can delay cracking in the composite panel, increase its crack load, and make the cracks finer, thereby improving the panel's crack resistance, impermeability, and corrosion resistance.

[0003] To achieve uniform tension of the fiber bundles, existing patents employ a prestressing method where each bundle is individually anchored and pre-tensioned before being uniformly tensioned. A significant drawback of this method is the uncontrollable initial pre-tension force of each bundle, leading to inconsistent initial stress on the fiber bundles before uniform tensioning. This results in inconsistent pre-tension even after tensioning, and may even cause significant differences in the pre-tension force. In conclusion, achieving uniform and controllable deformation of each fiber bundle within a fiber woven mesh remains a challenge at present. Summary of the Invention

[0004] To address the aforementioned problems, this invention provides a device for preparing prestressed woven mesh reinforced concrete composite panels. By setting an initial tensioning device to precisely tension each fiber bundle and adjusting the initial tension force in real time using a force gauge, and then performing uniform tensioning after the initial tension force is consistent, this invention effectively solves the problems of uneven deformation and unequal stress during the application of prestress in the fiber woven mesh, thereby improving the overall tension level of the fiber woven mesh.

[0005] To achieve the above-mentioned technical effects, the technical solution of the present invention is as follows:

[0006] A device for preparing a prestressed fiber woven mesh reinforced concrete composite panel includes a box-shaped base, an initial tensioning device, a tensioning device, a pouring platform, a fixing device, and a rolling device. The initial tensioning device includes a steel frame, perforated angle steel, hooked screw rod, pulley rod, and equipped with a force gauge and fixed pulley. The steel frame is fixed to the box-shaped base at the tensioning end. The tensioning device includes an anchoring steel plate, a U-shaped guide frame, a sliding anchoring frame, wedge clamps, and threaded tie rods. The anchoring steel plate is connected to the box-shaped base by high-strength bolts. The anchoring frame passes through the U-shaped guide frame, which is also connected to the box-shaped base by bolts. Then, the anchoring steel plate is connected to the sliding anchoring frame by threaded tie rods. The sliding anchoring frame has wedge holes on both sides at its end, and two wedge clamps are inserted into the holes. The casting platform includes a support frame, a steel plate base, and two angle steels. The steel plate base and the two angle steels are connected at both ends by bolts. The fixing device includes a perforated anchoring steel plate and two wedge clamps. The wedge clamps pass through the perforated anchoring steel plate, and the perforated anchoring steel plate is bolted to the box-shaped base. The rolling device includes a roller frame and two rollers. The roller frame is bolted to a box-shaped base, and the upper and lower rollers are embedded in the grooves of the roller frame.

[0007] Furthermore, the initial tensioning device is fixed to the tensioning end by pre-tightening bolts. Holes are drilled on the upper part of the box-shaped base and the baffle, and a nut matching the hole diameter is welded to the edge of each hole. The bolts are then tightened to the angle steel on the lower side of the steel frame to restrict the movement of the steel frame. When the initial tensioning device is pushed to the baffle, the steel frame is fixed by pre-tightening bolts to prevent shaking during the initial tensioning operation, thereby ensuring the accuracy of the initial tension application and the preparation efficiency. After the initial pre-tension is fully applied, the thin rope at the end of the fiber bundle is cut, and the initial tensioning device is removed without affecting the application of subsequent tension forces.

[0008] Furthermore, five perforated angle steels are fixed to the outer side of the steel frame in the initial tensioning device. Each hole is into which a hooked screw rod is inserted. Only one end of each hooked screw rod is connected to a hook, with one end of the hook located inside the initial tensioning device and connected to a force gauge. The other end is screwed into an adjusting nut. Five pulley rods are inserted into the inner side of the steel frame and secured with nuts. Each pulley rod is fitted with a fixed pulley of equal number to each layer of tensioned fiber bundles. The center-to-center distance between the holes in the perforated angle steels and the center-to-center distance between the fixed pulleys are equal to the spacing between the tensioned fiber bundles in the fiber woven mesh. Since one end of the hooked screw rod is connected to a force gauge, and the force gauge is attached to a thin rope, which passes through the corresponding fixed pulley and around the positioning rod to connect to the tensioned carbon fiber bundle, turning the adjusting nut causes the hooked screw rod to move outward, thus tensioning the carbon fiber bundle. The real-time initial force value can be viewed using the force gauge; turning stops when the target initial value is reached.

[0009] Furthermore, layered steel sheets are placed between the upper and lower wedge-shaped clamps, positioned between the woven mesh layers. These steel sheets, the woven mesh, and the upper and lower wedge-shaped clamps are bonded together using strong adhesive. The thickness of the layered steel sheets is equal to the interlayer spacing of the woven mesh surface. Placing steel sheets between the fiber woven mesh layers ensures that each layer of woven mesh is bonded to a steel sheet. The steel sheets are then fixed in position to the wedge-shaped clamps via bolts through round holes at their ends, ensuring that the fiber woven mesh in the middle and at the top and bottom edges has the same tensile deformation, guaranteeing the uniformity of each fiber bundle during tensioning. Bolting the upper and lower wedge-shaped clamps to the steel sheets prevents misalignment during tensioning, again aiming to ensure the uniformity of stress on each layer of fiber woven mesh during tensioning.

[0010] Furthermore, an elongated hole is drilled at each end of the steel plate along its length in the casting platform. Four bolts are inserted into the round holes at the ends of the angle steel and the elongated holes on the steel plate, respectively, and nuts are screwed into the bottom for pre-tightening. The angle steel serves as a baffle for the casting substrate and is connected by bolts to facilitate adjustment of the composite plate width and subsequent disassembly. This method is applicable to the preparation of composite plates with different width requirements. After curing, the bolts at the ends are loosened, and the inside of the angle steel is tapped with a hammer to remove the two angle steels, allowing the completed composite plate to be easily removed.

[0011] The present invention has the following advantages:

[0012] First, an initial stress of equal magnitude is applied to each fiber bundle using an initial tensioning device, and the initial force value can be adjusted in real time using a force gauge. Then, strong adhesive is used to anchor the fiber woven mesh to the wedge-shaped clamps, achieving uniform tensioning. This method can improve the level of prestress application to the fiber woven mesh, improve the accuracy and uniformity of the tension stress of each fiber bundle, thereby improving the overall mechanical properties of the fiber woven mesh reinforced concrete composite panel. In addition, the preparation device is easy to operate and has high preparation efficiency. Attached Figure Description

[0013] Figure 1 A schematic diagram of the functional areas of the device for preparing prestressed fiber-woven mesh reinforced concrete composite panels;

[0014] Figure 2 A schematic diagram of the device for preparing prestressed fiber woven mesh reinforced concrete composite panels;

[0015] Figure 3 A three-dimensional schematic diagram of a U-shaped guide frame;

[0016] Figure 4 A three-dimensional schematic diagram showing the relationship between the sliding anchor frame and the wedge-shaped clamp structure;

[0017] Figure 5 This is a side view of the connection between the sliding anchor frame and the U-shaped guide frame;

[0018] Figure 6 This is a three-dimensional schematic diagram of the initial tensioning device;

[0019] Figure 7 A side view showing the structural relationship between the anchoring end wedge clamp, the layered steel sheets, and the fiber woven mesh;

[0020] Figure 8 A top view of the bolted connection at the end of the wedge clamp;

[0021] Figure 9 This is a side view of the initial tensioning device in operation.

[0022] Figure 10 This is a side view of the pouring platform;

[0023] Figure 11 This is a three-dimensional schematic diagram of the rolling device.

[0024] In the attached diagram: 01-Pouring platform, 02-Initial tensioning device, 03-Tensioning device, 04-Fixing device, 05-Rolling device, 1-Box-type base, 2-Anchoring steel plate, 3-U-shaped guide frame, 4-Sliding anchoring frame, 5-Steel frame, 6-Perforated angle steel, 7-Hooked screw, 8-Wedge clamp, 9-Angle steel, 10-Layered steel sheet, 11-Anchoring steel sheet, 12-Pulley hanging rod, 13-Roller frame, 14-Roller, 15-Positioning rotating rod, 16-Adjusting rod, 17-Anchoring steel plate, 18-Fixing device anchoring frame, 19-Threaded tie rod, 20-Force gauge, 21-Fixed pulley, 22-Fiber woven mesh, 23-Screw, 24-Baffle, 25-Bolt, 26-Support frame, 27-Steel plate base. Detailed Implementation

[0025] The technical solution of the present invention will be specifically described below through specific embodiments and in conjunction with the accompanying drawings.

[0026] Example 1

[0027] Step 1: Secure the anchoring steel plate 2 to the box-type base 1 using six high-strength bolts. Then, insert the sliding anchor frame 4 into the U-shaped guide frame 3, and then secure the U-shaped guide frame 3 to the box-type base 1 with four bolts. Next, insert the threaded tie rod 19 sequentially into the round holes of the anchoring steel plate 2 and the sliding anchor frame 4. The outermost part of the threaded tie rod 19 is fitted with a through-shaft hydraulic jack, a pad, and two high-strength nuts; the innermost part is fitted with a through-shaft force sensor and two high-strength nuts. The sensor is connected to a display instrument. Insert the upper and lower wedge-shaped clamps 8 into the irregularly shaped holes of the sliding anchor frame 4.

[0028] Step 2: Connect the two angle steels 9 on the casting platform to the steel plate support 27 through the round holes at the ends. The distance between the two angle steels 9 can be adjusted according to the width requirements of the composite plate.

[0029] Step 3: Use six high-strength bolts to fix the anchor frame 18 of the fixing device to the box-shaped base 1, and insert the upper and lower wedge-shaped clamps 8 into the irregular holes. In addition, use bolts to connect and fix the two roller frames 13 to the box-shaped base 1, and insert the two rollers 14 into the grooves of the roller frames 13 one after the other, and fix the ends of the rollers 14 with nuts.

[0030] Step 4: Push the steel frame 5 from the outside to the baffle 24 of the box-shaped base 1, and use bolts 25 to tighten and fix the steel frame 5 to the tensioning end. After fixing, fix five perforated angle steels 6 to the outside of the steel frame 5 with bolts, and then insert five pulley rods 12 on the inside. Each pulley rod 12 has 20 fixed pulleys 21, and both ends of the pulley rod 12 are fixed with nuts. Then, insert a hooked screw 7 into each hole of the perforated angle steel 6, with the hook end facing inward and an adjusting nut fitted on the outside of each, ensuring the uniformity of the position of the hooked screws 7. The hook of each hooked screw 7 should be connected to a force gauge with a range greater than the initial target value.

[0031] The method of using the above device is as follows:

[0032] (1) First, impregnate the ends of the fiber woven mesh with adhesive. Impregnate a certain length of one end with strong adhesive and attach two anchor steel plates, aligning the holes of the anchor steel plates. Then, tie a sufficient length of thin rope to each fiber bundle at the other end, with the binding position more than 30mm away from the end. Then, use strong adhesive to bond the rope to the fiber bundle together to prevent damage at the binding point during rope tensioning. Complete the impregnation of the target number of layers of woven mesh according to this step, and wait for the strong adhesive at the ends to fully cure.

[0033] (2) Impregnate the middle part of each layer of woven mesh with high-performance adhesive. The length of this part is from the wedge clamp at the tensioning end to the anchor steel plate of the fixing device, to obtain the impregnated fiber woven mesh.

[0034] (3) Roll the impregnated fiber woven mesh using a rolling device to ensure that the high-performance adhesive penetrates into the fiber bundles. After rolling, use bolts to connect the layered steel plates on one side of the fiber woven mesh to the wedge clamps of the fixing device. The thin rope at the other end will pass around the positioning rotating rod, through the fixed pulley, and connect to the force gauge in the initial tensioning device. The tensioning function of the rope is achieved by turning the adjusting nut on the outside. Stop the operation when the force gauge reading reaches the target initial force value of the fiber bundle. Use this method to maintain a uniform initial tension force in the fiber bundles of each layer of the fiber woven mesh. After the initial tensioning of each layer of the woven mesh is completed, apply strong adhesive to the fiber bundles on the wedge clamps on the lower side of the tensioning end to bond and anchor the fiber bundles to the wedge clamps. Then place a layer of layered steel plates, keeping the holes aligned with the holes of the wedge clamps. Continue to repeat this step until the initial tensioning of the target number of woven mesh layers is completed. Then, embed the upper wedge clamps into the tensioning frame. Finally, use bolts to connect the upper and lower wedge clamps to all the layered steel plates.

[0035] (4) After the strong glue at the wedge clamp has cured, cut the thin rope and then use the through-shaft hydraulic jack to drive the threaded tie rod. The threaded tie rod drives the sliding anchor frame to slide in the U-shaped guide frame, thereby driving the wedge clamp to move in the tensioning direction, thus achieving the effect of tensioning the fiber woven net.

[0036] (5) Check the real-time tension load value through the through-shaft tension sensor instrument. When the target load reaches 50%, stabilize for 1-2 minutes and observe whether there is fiber breakage. Then load to 75% of the target load and check the fiber breakage again. Finally, tension to the target load and tighten the nuts in the anchor steel plate after the force stabilizes. Then unload.

[0037] (6) Pour the concrete substrate. After the substrate has been cured, cut the fiber mesh at both ends, loosen the connecting bolts between the support platform and the angle steel, and knock the angle steel from the side. Then the prestressed fiber mesh reinforced concrete composite panel can be taken out.

[0038] The above is only one specific implementation method of the present invention, but the design concept of the present invention is not limited thereto. Any non-substantial modifications made to the present invention using this concept shall be considered as infringing the protection scope of the present invention.

Claims

1. A device for preparing a prestressed fiber-woven mesh reinforced concrete composite panel, characterized in that, The system includes a box-type base (1), an initial tensioning device (02), a tensioning device (03), a pouring platform (01), a fixing device (04), and a rolling device (05). The initial tensioning device (02) includes a steel frame (5), perforated angle steel (6), hooked screws (7), a pulley hanger (12), and a dynamometer and a fixed pulley. The steel frame (5) is fixed on the box-type base (1) at the tensioning end. Five perforated angle steels (6) are fixed at one end of the initial tensioning device (02), with a hooked screw (7) inserted into each hole. The other end is fixed with five pulley rods (12), each pulley rod (12) is inserted into a fixed pulley (21) of the same number as each layer of tensioned fiber bundles; the center-to-center distance between the holes in the perforated angle steel (6) and the center-to-center distance between the fixed pulleys (21) are equal to the distance between the tensioned fiber bundles in the fiber woven mesh (22); the hooked screw (7) is connected to a hook at only one end, one end of which is located inside the initial tensioning device (02) and connected to a force gauge (20); the other end is screwed into an adjusting nut; the tensioning device (03) includes anchoring The steel plate (2), U-shaped guide frame (3), sliding anchor frame (4), and wedge clamps (8) are used. The anchor steel plate (2) is connected to the box base (1) by high-strength bolts. The anchor frame (4) is inserted into the U-shaped guide frame (3). The U-shaped guide frame is connected to the box base (1) by bolts. Then, the anchor steel plate (2) and the sliding anchor frame (4) are connected by threaded tie rods (19). The sliding anchor frame (4) has wedge holes on both sides at its ends. The upper and lower wedge clamps (8) are inserted into the holes. The pouring platform (01) includes a support frame ( 26) The steel plate base (27) and two angle steels (9) are connected at both ends by bolts; the fixing device (04) includes a perforated anchor steel plate and two wedge clamps (8), the wedge clamps (8) are inserted into the perforated anchor steel plate, and the perforated anchor steel plate is bolted to the box base (1); the rolling device includes a roller frame (13) and two rollers (14), the roller frame (13) is bolted to the box base (1), and the upper and lower rollers (14) are embedded in the groove of the roller frame (13).

2. The apparatus for preparing prestressed fiber woven mesh reinforced concrete composite panels as described in claim 1, characterized in that, The initial tensioning device (02) is placed outside the baffles (24) on both sides of the box-shaped base (1) and fixed to the tensioning end by pressing the bottom angle steel of the initial tensioning device (02) with bolts (25).

3. The apparatus for preparing prestressed fiber woven mesh reinforced concrete composite panels as described in claim 1, characterized in that, A layered steel sheet (10) is provided between the upper and lower two wedge-shaped clamps (8). The layered steel sheet (10) is placed between the fiber woven mesh layers, and the thickness of the layered steel sheet is the spacing between the layers on the surface of the woven mesh.

4. The apparatus for preparing prestressed fiber woven mesh reinforced concrete composite panels as described in claim 3, characterized in that, The wedge clamp (8) and the layered steel sheet (10) each have two round holes at both ends, and then the upper wedge clamp (8), the middle layered steel sheet (10) and the lower wedge clamp (8) are connected by bolts at the ends.

5. The apparatus for preparing prestressed fiber woven mesh reinforced concrete composite panels as described in claim 1, characterized in that, The steel plate support (27) has an elongated hole at each end along its length. Bolts pass through the round hole at the end of the angle steel (9) and the elongated hole at the end of the steel plate support (27) to fix the angle steel (9) onto the steel plate support (27).

Citation Information

Patent Citations

  • Manufacturing method of fiber woven mesh reinforced concrete composite board

    CN113459274A

  • Preimpregnation device for high-temperature release glass fiber cloth

    CN117702391A

  • Device for applying prestress on loop-type composite fiber cloth

    CN201581645U