A highway structure and method of paving
By installing arched frames and reinforcing bars in highways to distribute pressure, and combining this with a drainage system to collect and evaporate rainwater, the problems of road surface depressions and low rainwater utilization have been solved, improving the durability of the road structure and the impact resistance of the guardrails.
Patent Information
- Application Number
- CN202410469181.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-04-18
AI Technical Summary
Modern highway surfaces are prone to indentation due to vehicle traffic, causing rainwater to accumulate and spread, reducing rainwater utilization, affecting road structure, and increasing repair frequency.
Arched frames and reinforcing bars are installed in the highway structure to distribute road surface pressure. Rainwater is collected by combining drainage ditches, water storage tanks and water pipes. The water storage tanks are used to evaporate rainwater to increase road surface wetness. The guardrail connecting rods and spring system are used to improve impact resistance.
It improves rainwater utilization, reduces road surface cracking and damage, enhances road surface load-bearing capacity and guardrail stability, and extends the service life of guardrail components.
Smart Images

Figure CN118360834B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of road paving technology, and in particular to a highway structure and paving method. Background Technology
[0002] Modern roads are infrastructure that provides passage for various trackless vehicles and pedestrians. Based on their usage characteristics, they are divided into highways, urban roads, rural roads, factory and mining roads, forestry roads, examination roads, competition roads, automobile testing roads, workshop access roads, and school roads, etc.
[0003] However, the road surface still has the following problems: it is prone to sinking due to the impact of passing vehicles. When this happens, rainwater will accumulate over time, which not only reduces the utilization rate of rainwater, but also causes the sinking area to spread and crack outwards, thus affecting the road structure and vehicle traffic. Summary of the Invention
[0004] To enhance the drainage effect and rainwater utilization of highway structures, this application provides a highway structure and paving method.
[0005] In a first aspect, this application provides a highway structure, which adopts the following technical solution: A highway structure comprises, from bottom to top, a base layer, a lower base layer, an upper base layer, and a surface layer. Multiple seepage holes are formed on both sides of the surface layer along the length of the highway. A drainage ditch is formed in the upper base layer directly below the seepage holes, extending along the length of the highway. Drainage pipes are installed on both sides of the lower base layer. An arched frame is fixed inside the upper base layer, positioned between two drainage ditches. Reinforcing ribs are horizontally fixed on the arched frame. Multiple leakage holes are formed at the bottom of the drainage ditches, spaced apart along the length of the highway. A water guide pipe is fixedly connected to each leakage hole. A water storage tank is fixedly connected to the end of the water guide pipe away from the drainage ditch, with the top of the water storage tank missing. A baffle is slidably connected to the bottom of the drainage ditch, sliding towards or away from the leakage holes. A screw assembly for controlling the sliding of the baffle is provided at the drainage ditch.
[0006] By adopting the above technical solution, the highway is first laid in the following order from bottom to top: base course, lower base course, upper base course, and surface course. Since the upper base course is generally a concrete layer, multiple arched frames are fixed side-by-side within the concrete layer during its laying. Reinforcing bars are then fixed to these arched frames. When vehicles pass over the highway, the arched frames can distribute some of the pressure on the road surface and transfer the pressure to the ground level through the arched frames and reinforcing bars. This effectively reinforces the road surface and reduces the likelihood of damage. Furthermore, conventional drainage systems on highways utilize... The road surface is curved, with a higher center and lower sides. Rainwater is first drained into drainage ditches on both sides, and then discharged through drainage pipes into specially excavated pits for infiltration. At this point, drainage holes are opened at the bottom of the drainage ditches. Some of the rainwater flows through the drainage pipes into a water storage tank for collection, while the remaining water is drained away through the drainage ditches. The water in the storage tank is temporarily stored. The storage tank has no top cover, so it can evaporate later when the weather is dry, increasing the road surface moisture, reducing road surface cracking, reducing the need for road repairs, improving rainwater utilization efficiency, and increasing the efficiency of road traffic.
[0007] Optionally, the lead screw assembly includes a bidirectional screw and a guide rod, and two baffles are provided. One end of the baffle is threadedly connected to the bidirectional screw, and the other end passes through the guide rod and is slidably connected to the guide rod. The two baffles are arranged symmetrically along the center line of the bidirectional screw, and a water level sensor is fixed inside the water storage tank.
[0008] By adopting the above technical solution, the rainwater flowing into the drainage ditch will first flow into the water storage tank. When the water level sensor in the water storage tank detects that the water level has reached a certain level, it will start the bidirectional screw to rotate, thereby driving the baffle to block the leakage hole, so that all the excess rainwater can be discharged through the drainage ditch, thereby reducing the excessive overflow of rainwater at the water storage tank.
[0009] Optionally, the water storage tank includes an outer tank and an inner tank. The outer tank is hollow inside, and the inner tank is disposed inside the outer tank and slidably connected to the outer tank. The sliding direction of the inner tank is towards or away from the outer tank.
[0010] By adopting the above technical solution, after a certain amount of water is collected in the water storage tank, the inner tank can be raised when the weather is dry, so that the inner tank is closer to the road surface. Since the top of the water storage tank is missing a cover, the rainwater can be directly evaporated, improving the evaporation efficiency, reducing road surface cracking and damage, and also improving the utilization efficiency of rainwater.
[0011] Optionally, a groove is provided on the outer wall of the inner tub, a sealing ring is fixed on the inner wall of the groove, a water passage hole is provided in the groove, and a through-pipe hole is provided on the side wall of the outer tub, through which the water guide pipe passes and is fixedly connected to the outer tub.
[0012] By adopting the above technical solution, when the inner tub moves vertically relative to the outer tub, the outlet of the water guide pipe is always located in the groove. The sealing ring in the groove can increase the sealing of the outlet of the water guide pipe, thereby preventing water from leaking out of the water guide pipe.
[0013] Optionally, the bottom of the arched frame is vertically fixed with multiple support columns, which are spaced apart along the length and width of the road, respectively.
[0014] By adopting the above technical solution, the support column can provide support for the arch frame and can decompose part of the pressure borne by the arch frame and transfer it below the road surface, thereby improving the road surface support.
[0015] Optionally, a guardrail is vertically fixed to the side of the highway, and a corrugated pad is fixed to the side of the guardrail facing the road surface. A connecting rod is provided on the guardrail, and the connecting rod passes through the corrugated pad and the side wall of the guardrail and enters the interior of the guardrail. A spring is provided on the connecting rod, one end of which is fixed to the corrugated pad and the other end is fixed to the side wall of the guardrail. A connecting component for connecting with the side wall of the guardrail is provided at the end of the connecting rod that enters the guardrail.
[0016] By adopting the above technical solution, if a vehicle traveling on the highway hits the guardrail, it will first hit the corrugated pad layer of the guardrail. The connecting rod on the corrugated pad layer passes through the spring and the internal fixation. In this way, the spring will increase the cushioning force of the corrugated pad layer on the vehicle, and the force of the spring to return to its original length will also increase the restoring force of the corrugated pad layer.
[0017] Optionally, the connecting assembly includes a double-sided rack, a first gear, a second gear, a first rack, and a second rack. The double-sided rack is fixedly connected to the connecting rod. The first gear and the second gear are respectively disposed on both sides of the double-sided rack and mesh with the double-sided rack. The first rack is disposed on the side of the first gear away from the double-sided rack and meshes with the first gear. The second rack is disposed on the side of the second gear away from the double-sided rack and meshes with the second gear. The first rack and the second rack are centrally symmetrically arranged around the center point of the double-sided rack. A connector is fixed to the end of the first rack and the second rack near the side wall of the guardrail, and the connector is fixedly connected to the side wall of the guardrail.
[0018] By adopting the above technical solution, after being impacted, the connecting rod is pushed away from the road surface, and at the same time, it pushes the racks on both sides to move. When the racks on both sides move, they mesh with the first gear and the second gear on both sides respectively. During the process of the first gear and the second gear meshing with the racks on both sides respectively, they can drive the racks on both sides to have the desired movement. At this time, the connecting parts on the racks on both sides will exert a pulling force on the two side walls of the guardrail from opposite directions. At this time, the two forces cancel each other out and collide, which can make the guardrail more firmly fixed on the road surface.
[0019] Optionally, a push rod is fixed to the end of the double-sided rack away from the connecting rod, and a buffer is provided at the end of the push rod away from the double-sided rack to provide cushioning for the push rod.
[0020] By adopting the above technical solution, when the push rod abuts against the buffer, the force of the push rod moving forward can be slowed down, which can reduce the deformation force of the spring and increase the service life of the spring.
[0021] Optionally, the buffer component includes a buffer block and a connecting rod. The connecting rod is fixedly connected to the guardrail. Two buffer blocks are provided, and each buffer block is fixedly connected to the connecting rod. The two buffer blocks are arranged symmetrically along the center line of the connecting rod. The side of the two buffer blocks that is close to each other is set as a chamfer. When the push rod abuts against the chamfer of the two buffer blocks, the two buffer blocks move to the side that is far away from each other.
[0022] By adopting the above technical solution, when the push rod comes into contact with the buffer block, because the buffer block is a beveled surface, it can not only slow down the forward movement of the push rod, but also tend to rebound. At this time, the force of the buffer block on the push rod's rebound can share part of the spring's recovery force, thereby allowing the wave pad layer to recover more quickly, improving efficiency and increasing the service life of the spring.
[0023] Secondly, this application provides a method for paving a highway structure, employing the following technical solution: A highway structure and paving method, comprising the following steps: S1. First, lay the highway in the order of base course, lower base course, upper base course and surface course from bottom to top. Fix multiple arched frames at intervals along the length of the highway on the upper base course. Set reinforcing bars on the arched frames and fix multiple pillars at the bottom of the arched frames. S2. Drainage ditches are dug on both sides of the highway. Water pipes are fixedly connected to the bottom of the drainage ditches. A water storage tank is fixedly connected to the end of the water pipe away from the drainage ditch. The water storage tanks and support pillars are interspersed at intervals. S3. Vertical guardrails are fixed on the side of the highway, and corrugated bedding is fixed on the side of the guardrail facing the road surface. Connecting rods are installed through the corrugated bedding. S4. The double-sided racks and the inner walls of both sides of the guardrail are fixedly connected by connecting components; S5. A push rod is fixed on both sides of the rack, and a buffer component is provided inside the guardrail to provide cushioning for the push rod.
[0024] In summary, this application includes at least one of the following beneficial technical effects: 1. An arched frame is fixed to the upper base of the highway, and reinforcing bars are installed on the arched frame. Multiple pillars are fixed to the bottom of the arched frame. The arched frame and reinforcing bars can not only improve the support of the road surface, but the support pillars can also decompose part of the load-bearing capacity of the arched frame and transfer the force to the ground. This can increase the load-bearing capacity of the road surface and reduce fracture damage. 2. First, drain the rainwater from the drainage ditch into a storage tank for temporary storage. When the weather is sunny or dry, evaporate the rainwater in the storage tank to increase the humidity of the road surface, thereby improving the utilization rate of rainwater and reducing the probability of road surface cracking. 3. With the cooperation of connecting rods and springs, the recovery force of the wave pad layer in the guardrail can be increased. At the same time, the buffer inside the guardrail can slow down the deformation speed of the spring and assist the spring in returning to its original length, thereby improving the impact resistance and stability of the guardrail. Attached Figure Description
[0025] Figure 1 This is a structural schematic diagram of an embodiment of this application; Figure 2 This is a schematic diagram showing the cross-sectional structure of the water storage tank and the water pipe; Figure 3 This is a schematic diagram showing the structure of the lead screw assembly; Figure 4 yes Figure 2 A magnified view of part A in the middle; Figure 5 This is a schematic diagram showing the cross-sectional structure of the guardrail; Figure 6 This is a schematic diagram showing the structure of the connector.
[0026] Explanation of reference numerals in the attached drawings: 1. Base layer; 11. Lower base layer; 111. Drainage pipe; 12. Upper base layer; 121. Drainage ditch; 1211. Leakage hole; 13. Surface layer; 131. Seepage hole; 2. Arch frame; 21. Reinforcing bar; 22. Support column; 23. Secondary arch frame; 3. Water guide pipe; 31. Water storage tank; 311. Outer tank; 3111. Pipe hole; 312. Inner tank; 3121. Slide groove; 3122. Sealing ring; 3123. Water passage hole; 3124. 313 Water level sensor; 4. Cylinder; 5. Baffle; 6. Screw assembly; 7. Bidirectional screw; 8. Guide rod; 9. Rotary motor; 10. Guardrail; 11. Corrugated pad; 12. Connecting rod; 13. Spring; 14. Connecting assembly; 15. Double-sided rack; 16. First gear; 17. Second gear; 18. First rack; 19. Second rack; 20. Connecting piece; 10. Push rod; 11. Buffer; 22. Connecting rod. Detailed Implementation
[0027] The following is in conjunction with the appendix Figures 1-6This application will be described in further detail.
[0028] This application discloses a highway structure.
[0029] refer to Figure 1 A highway structure, from bottom to top, consists of a base course 1, a lower base course 11, an upper base course 12, and a surface course 13. According to conventional road conditions, the base course 1 is generally a rammed earth layer, the lower base course 11 is generally a crushed stone layer, the upper base course 12 is generally a concrete layer, and the surface course 13 is generally an asphalt pavement. The asphalt pavement is usually designed to be higher in the middle and lower on both sides to facilitate the drainage of rainwater on the road surface to both sides. A guardrail 5 is vertically fixed on the side of the highway, and a corrugated pad 51 is fixed on the side of the guardrail 5 closest to the road surface.
[0030] refer to Figure 1 and Figure 2 Because it is easier for workers to construct on a concrete layer, multiple arched frames 2 are vertically fixed in the concrete during the laying of the upper base layer 12. The multiple arched frames 2 are spaced apart along the length of the road. Reinforcing bars 21 are fixed on the arched frames 2. Each arched frame 2 is fixed with two secondary arched frames 23. The secondary arched frames 23 are also arched and are axially symmetrical along the center line of the arched frame 2. Multiple support columns 22 are fixed at the bottom of the arched frame 2. The multiple support columns 22 are spaced apart along the length of the arched frame 2. The arched frames 2 can improve the support force of the concrete layer, and the secondary arched frames 23 can decompose the pressure directly borne by the arched frames 2. In addition, some pressure will be transmitted to the ground through the support columns 22, which can effectively increase the bearing capacity of the road surface.
[0031] Multiple infiltration holes 131 are provided on both sides of the surface layer 13 along the length of the highway. A drainage ditch 121 is provided in the upper base layer 12 directly below the infiltration holes 131, extending along the length of the highway. Drainage pipes 111 are installed on both sides of the lower base layer 11. Conventional highway drainage measures utilize the characteristic of a higher center and lower sides of the road surface. After rainwater infiltration and evaporation, it is first drained into the drainage ditches 121 on both sides. Then, pits are excavated at specific locations along the highway, and the water in the drainage ditches 121 flows through... The rainwater is discharged into the pit foundation through the drainage ditch 121 and the drainage pipe 111. This method does not make high utilization of rainwater. At this time, a water guide pipe 3 and a water storage tank 31 are installed inside the upper base layer 12. Multiple drainage holes 1211 are opened at the bottom of the drainage ditch 121. The water guide pipe 3 guides the water in the drainage holes 1211 to the water storage tank 31 for temporary storage. The top of the water storage tank 31 is solid. In dry weather, the water in the water storage tank 31 is evaporated to increase the road surface moisture and prevent the road surface from cracking. This can increase the utilization of rainwater.
[0032] refer to Figure 2 , Figure 3 and Figure 4 A baffle 4 is installed at the leakage hole 1211 of the drainage ditch 121. The baffle 4 is U-shaped. A screw assembly 41 is installed at the drainage ditch 121. The screw assembly 41 includes a double-acting screw 411, a guide rod 412, and a rotating motor 413. Two baffles 4 are installed at each leakage hole 1211. The guide rod 412 and the double-acting screw 411 are respectively installed along the side wall parallel to the drainage ditch 121. The guide rod 412 is fixedly connected to the drainage ditch 121, and the double-acting screw 411 is fixedly connected to the drainage ditch 121. The groove 121 is rotatably connected. One end of the bidirectional screw 411 is fixedly connected to the rotating motor 413. One end of the baffle 4 passes through the guide rod 412 and is slidably connected to the guide rod 412. The other end passes through the bidirectional screw 411 and is rotatably connected to the bidirectional screw 411. The two baffles 4 are axially symmetrical about the center line of the bidirectional screw 411. When the rotating motor 413 rotates, the bidirectional screw 411 rotates, and the baffles 4 move towards or away from each other under the guidance of the guide rod 412.
[0033] The water storage tank 31 includes an outer tank 311 and an inner tank 312. The outer tank 311 is hollow, and the inner tank 312 is located inside the outer tank 311. A cylinder 313 is fixed inside the outer tank 311, and the movable end of the cylinder 313 is fixedly connected to the inner tank 312. The inner tank 312 reciprocates vertically under the driving action of the cylinder 313. A sliding groove 3121 is provided on the outer wall of the inner tank 312, and a sealing ring 3122 is fixed on the inner wall of the sliding groove 3121. A water passage hole 3123 is provided in the sliding groove 3121. A through-pipe hole 3111 is provided on the side wall of the outer tank 311, and a water guide pipe 3 passes through the through-pipe hole 3111 and is fixedly connected to the outer tank 311. A water level sensor 3124 is fixed on the inner wall of the inner tank 312. Rainwater in the drainage ditch 121... After the water flows back through the water pipe 3 to a certain extent, the water level sensor 3124 senses the change in water level and transmits the signal to the rotating motor 413. The rotating motor 413 starts and drives the bidirectional screw 411 to rotate. The bidirectional screw 411 drives the two side baffles 4 to move closer to each other at the same time, and then closes the drain outlet. This prevents more rainwater from entering the water storage tank 31. When the weather is sunny or dry, the rainwater in the water storage tank 31 will raise the inner tank 312, which will facilitate the evaporation of the water in the inner tank 312, increase the road surface moisture, and thus improve the utilization rate of rainwater on the road surface. When the inner tank 312 rises, the outlet of the water pipe 3 is always inside the sealing ring 3122, which can increase the sealing of the outlet.
[0034] refer to Figure 1 , Figure 5 and Figure 6A connecting rod 52 is provided on the guardrail 5. The connecting rod 52 passes through the corrugated pad layer 51 and the side wall of the guardrail 5 and enters the interior of the guardrail 5. A spring 521 is provided on the connecting rod 52. One end of the spring 521 is fixed to the corrugated pad layer 51 and the other end is fixed to the side wall of the guardrail 5. In this way, when the guardrail 5 is impacted, the connecting rod 52 is pushed forward. The deformation of the spring 521 can decompose part of the deformation of the corrugated pad layer 51, and the force of the spring 521 to restore its original length can assist the corrugated pad layer 51 to restore its original shape.
[0035] A connecting component 6 is provided on the connecting rod 52. The connecting component 6 includes a double-sided rack 61, a first gear 62, a second gear 63, a first rack 64, and a second rack 65. The double-sided rack 61 is fixedly connected to the connecting rod 52. The first gear 62 and the second gear 63 are respectively located on both sides of the double-sided rack 61 and mesh with the rack 61. The first rack 64 is located on the side of the first gear 62 away from the double-sided rack 61 and meshes with the first gear 62. The second rack 65 is located on the side of the second gear 63 away from the double-sided rack 61 and meshes with the second gear 63. The first rack 64 and the second rack 65 are centrally symmetrically arranged around the center point of the double-sided rack 61. The top and bottom surfaces of the guardrail 5 are sealed, providing a limit for the first rack 64 and the second rack 65. To prevent the first rack 64 and the second rack 65 from deviating from their positions, a connector 66 is fixed to the end of the first rack 64 and the second rack 65 near the side wall of the guardrail 5. The connector 66 is U-shaped and is fixed to the two side walls of the guardrail 5 respectively. When the push rod 7 is pushed forward, the racks 61 on both sides mesh with the first gear 62 and the second gear 63 on both sides. The first gear 62 and the second gear 63 mesh with the first rack 64 and the second rack 65 respectively. The first rack 64 and the second rack 65 drive the connector 66 to have a pulling tendency to move towards each other. At this time, part of the pulling force is canceled out, and the other part is transmitted to the ground through the connector 66 and dissipated. This can reduce the impact force of the connecting rod 52.
[0036] A push rod 7 is fixed on the double-sided rack 61. A buffer 8 is provided at the end of the push rod 7 away from the double-sided rack 61. The buffer 8 includes a buffer block 81 and a connecting rod 82. The connecting rod 82 is U-shaped and fixedly connected to the guardrail 5. There are two buffer blocks 81, which are fixedly connected to the connecting rod 82 respectively. The two buffer blocks 81 are symmetrically arranged along the center line of the connecting rod 82. The two buffer blocks 81 are two opposite blocks with right-angled triangle cross sections. The push rod 7 is T-shaped. When the push rod 7 abuts against the inclined surfaces of the two buffer blocks 81, it pushes the two buffer blocks 81 to move away from each other. At this time, the buffer blocks 81 will reduce the deformation force of the spring 521. The inclined surfaces of the buffer blocks 81 want to return to their original position, which will assist the spring 521 in wanting to return to its original length. That is, it reduces the deformation force of the spring 521, increases the service life of the spring 521, and improves the recovery efficiency of the wave pad layer 51.
[0037] The implementation principle of a highway structure and paving method according to an embodiment of this application is as follows: First, a base layer 1, a lower base layer 11, an upper base layer 12, and a surface layer 13 are laid from bottom to top according to the conventional highway method. Guardrails 5 are fixed on the side of the highway. When laying the upper base layer 12, an arch frame 2 is fixed. A reinforcing bar 21, a secondary arch frame 23, and a support column 22 are fixed on the arch frame 2. Drainage ditches 121 are opened on both sides of the arch frame 2. A water leakage hole 1211 is opened at the bottom of the drainage ditch 121. A water guide pipe 3 is connected to the water leakage hole 1211. The water guide pipe 3 is connected to a water storage tank 31. A corrugated pad 51 is fixed on the guardrail 5. A connecting rod 52 and a spring 521 are fixed on the corrugated pad 51. A connecting component 6 and a buffer 8 are set inside the guardrail 5 to provide assistance to the spring 521 and the corrugated pad 51 to restore their original length.
[0038] This application also discloses a method for paving a highway structure.
[0039] Includes the following steps: S1. First, the highway is laid in the order of base layer 1, lower base layer 11, upper base layer 12 and surface layer 13 from bottom to top. Multiple arched frames 2 are fixed at intervals along the length of the highway on the upper base layer 12. Reinforcing bars 21 are set on the arched frames 2, and multiple pillars 22 are fixed at the bottom of the arched frames 2. S2. Drainage ditches 121 are opened on both sides of the highway. A water pipe 3 is fixedly connected to the bottom of the drainage ditch 121. A water storage tank 31 is fixedly connected to the end of the water pipe 3 away from the drainage ditch 121. The water storage tank 31 and the support column 22 are interspersed at intervals. S3. A guardrail 5 is vertically fixed on the side of the highway. A corrugated pad 51 is fixed on the side of the guardrail 5 facing the road surface. A connecting rod 52 is installed through the corrugated pad 51. S4. Inside the guardrail 5, the double-sided racks 61 and the inner walls of both sides of the guardrail 5 are fixedly connected by the connecting component 6. S5, push rods 7 are fixed on the double-sided racks 61, and buffers 8 are provided inside the guardrail 5 to provide cushioning for the push rods 7.
[0040] The embodiments described in this specific implementation are preferred embodiments of this application and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A highway structure, comprising, from bottom to top, a base course (1), a lower base course (11), an upper base course (12), and a surface course (13), characterized in that: Multiple seepage holes (131) are provided on both sides of the surface layer (13) along the length of the road. A drainage ditch (121) is provided in the upper base layer (12) directly below the seepage holes (131). The drainage ditch (121) is set along the length of the road. Drainage pipes (111) are provided on both sides of the lower base layer (11). An arched frame (2) is fixed inside the upper base layer (12). The arched frame (2) is fixed in the middle of the two drainage ditches (121). A reinforcing bar (21) is horizontally fixed on the arched frame (2). A drainage ditch (121) is opened at the bottom. There are multiple drainage holes (1211) spaced apart along the length of the road. A water pipe (3) is fixedly connected to each drainage hole (1211). A water storage tank (31) is fixedly connected to the end of the water pipe (3) away from the drainage ditch (121). The top of the water storage tank (31) is missing. A baffle (4) is slidably connected to the bottom of the drainage ditch (121). The sliding direction of the baffle (4) is along the position close to or away from the drainage hole (1211). A screw assembly (41) for controlling the sliding of the baffle (4) is provided at the drainage ditch (121). The lead screw assembly (41) includes a bidirectional screw (411) and a guide rod (412). Two baffles (4) are provided. One end of the baffle (4) is threadedly connected to the bidirectional screw (411), and the other end passes through the guide rod (412) and is slidably connected to the guide rod (412). The two baffles (4) are arranged symmetrically along the center line of the bidirectional screw (411). A water level sensor (3124) is fixed inside the water storage tank (31). The water storage tank (31) includes an outer tank (311) and an inner tank (312). The outer tank (311) is hollow inside, and the inner tank... (312) is set inside the outer barrel (311) and is slidably connected to the outer barrel (311). The sliding direction of the inner barrel (312) is along the direction close to or away from the outer barrel (311). A sliding groove (3121) is provided on the outer wall of the inner barrel (3121). A sealing ring (3122) is fixed on the inner wall of the sliding groove (3121). A water passage hole (3123) is provided in the sliding groove (3121). A through-pipe hole (3111) is provided on the side wall of the outer barrel (311). The water guide pipe (3) passes through the through-pipe hole (3111) and is fixedly connected to the outer barrel (311).
2. A highway structure according to claim 1, characterized in that: The bottom of the arched frame (2) is vertically fixed with multiple support columns (22), which are spaced apart along the length and width of the road, respectively.
3. A highway structure according to claim 1, characterized in that: A guardrail (5) is vertically fixed on the side of the highway. A corrugated pad (51) is fixed on the side of the guardrail (5) facing the road surface. A connecting rod (52) is provided on the guardrail (5). The connecting rod (52) passes through the corrugated pad (51) and the side wall of the guardrail (5) and enters the interior of the guardrail (5). A spring (521) is provided on the connecting rod (52). One end of the spring (521) is fixed to the corrugated pad (51), and the other end is fixed to the side wall of the guardrail (5). A connecting component (6) for connecting with the side wall of the guardrail (5) is provided at one end of the connecting rod (52) that passes through the guardrail (5).
4. A highway structure according to claim 3, characterized in that: The connecting assembly (6) includes a double-sided rack (61), a first gear (62), a second gear (63), a first rack (64), and a second rack (65). The double-sided rack (61) is fixedly connected to the connecting rod (52). The first gear (62) and the second gear (63) are respectively disposed on both sides of the double-sided rack (61) and mesh with the double-sided rack (61). The first rack (64) is disposed on the side of the first gear (62) away from the double-sided rack (61). The first gear (62) meshes with the second gear (63), and the second rack (65) is located on the side of the second gear (63) away from the racks (61) on both sides and meshes with the second gear (63). The first rack (64) and the second rack (65) are arranged symmetrically around the center point of the racks (61) on both sides. A connector (66) is fixed at one end of the first rack (64) and the second rack (65) near the side wall of the guardrail (5), and the connector (66) is fixedly connected to the side wall of the guardrail (5).
5. A highway structure according to claim 4, characterized in that: A push rod (7) is fixed at the end of the double-sided rack (61) away from the connecting rod (52), and a buffer (8) is provided at the end of the push rod (7) away from the double-sided rack (61) to provide buffer for the push rod (7).
6. A highway structure according to claim 5, characterized in that: The buffer component (8) includes a buffer block (81) and a connecting rod (82). The connecting rod (82) is fixedly connected to the guardrail (5). There are two buffer blocks (81). The two buffer blocks (81) are fixedly connected to the connecting rod (82) respectively. The two buffer blocks (81) are arranged symmetrically along the center line of the connecting rod (82). The side of the two buffer blocks (81) that is close to each other is set as a bevel. When the push rod (7) abuts against the bevel of the two buffer blocks (81), the two buffer blocks (81) move to the side that is far away from each other.
7. A method for paving a highway structure, applicable to the highway structure described in any one of claims 1-6, characterized in that: Includes the following steps: S1. First, the highway is laid in the order of base layer (1), lower base layer (11), upper base layer (12) and surface layer (13) from bottom to top. Multiple arched frames (2) are fixed at intervals along the length of the highway on the upper base layer (12). Reinforcing bars (21) are set on the arched frames (2), and multiple pillars (22) are fixed at the bottom of the arched frames (2). S2. Drainage ditches (121) are opened on both sides of the highway. A water pipe (3) is fixedly connected to the bottom of the drainage ditch (121). A water storage tank (31) is fixedly connected to the end of the water pipe (3) away from the drainage ditch (121). The water storage tank (31) and the support column (22) are interspersed at intervals. S3. A guardrail (5) is vertically fixed on the side of the highway. A corrugated pad (51) is fixed on the side of the guardrail (5) facing the road surface. A connecting rod (52) is installed through the corrugated pad (51). S4. The double-sided racks (61) and the inner walls of both sides of the guardrail (5) are fixedly connected by the connecting component (6); S5. A push rod (7) is fixed on the double-sided rack (61), and a buffer (8) is provided inside the guardrail (5) to provide buffer for the push rod (7).
Citation Information
Patent Citations
Railway-crossing bridge guardrail
CN217870177U
Garden road structure
CN219410413U